Archive of Office Bulletins
All Office Bulletins expire upon issuance of a Local Programs Procedure (LPP). Please visit our LPP page for a summary of the revisions made for the chapters.
DLA-OB Title | Attachments | Contact | Date Issued | Impacts |
---|---|---|---|---|
DLA-OB 20-05 Local Agency Oversight of Property Management and Excess Land Disposal | 1) LAPM Chapter 13 2) Exhibit 13-F: Local Public Agency Real Property Services Checklist (F-PDF) |
Eva-Marie Figlietti | 10/15/20 | LAPM Ch 13 |
DLA-OB 20-04 DBE Procedure Updates | 1) LAPM Chapter 9 2) Exhibit 9-A: DBE Implementation Agreement for Local Agencies (F-PDF) 3) Exhibit 9-B: DBE Implementation Agreement for Local Agencies (F-PDF) 4) Exhibit 10-R: AE Sample Contract Language (F-PDF) 5) Exhibit 12-G: Required Federal-aid Contract Language (F-PDF) |
Wenyi Long | 09/04/20 | LAPM Ch 9 Exhibits 9-A, 9-B, 10-R, 12-G |
DLA-OB 20-02 DBE Running Tally | Attachment 1 Exhibit 9-F(excel) Attachment 2 Sample Output Summary Reports(PDF) |
Hau Doan | rev. 02/13/20 | LAPM ch 09 |
DLA-OB 20-01 - Rescission of Patented or Proprietary Product Regulations | NA | Kitae Nam | 02/06/20 | LAPM ch 12 |
DLA-OB 19-05 - Local Agency Invoicing |
Dee Lam | rev. 11/26/19 | LAPM ch 05 | |
DLA-OB 19-02 - Interim ATP Count Guidance |
Interim-ATP Count Methodology Guidance | Teresa McWilliam | rev. 09/16/19 | LAPG Ch 22 |
DLA-OB 19-01 - Local Assistance Highway Bridge Program Project Delivery Policy |
NA | Eileen Crawford | 04/25/19 | LAPG Ch 06 |
DLA-OB 19-03 - DBE Goal Calculation and GFE Review(PDF) | Attachment 1 - Exhibit 9-D: Contract Goal Methodology Attachment 2 - Exhibit 9-E: Sample Local Agency Good Faith Effort Review Attachment 3 - Exhibit 15-H: Proposer/Contractor Good Faith Efforts |
Wenyi Long | 11/22/19 | LAPM ch 9 |
DLA-OB 18-03 - Authorization/Adjustment Requests (PDF) | LAPM-3A Project Authorization /Adjustment Request (PDF) | David Giongco | 11/29/18 | LAPM - Ch 03 |
DLA-OB 18-02 - Highway Bridge Program Project Project Programming Policy(PDF) |
March 2018 HBP Project Prioritization - ON SYSTEM(PDF) March 2018 HBP Project Prioritization - OFF SYSTEM(PDF) |
Linda Newton | 06/18/18 | LAPG - Ch 06 |
DLA-OB 18-01 - Period of Performance(PDF) |
LAPM Exhibit 3-A, Request for Authorization to Proceed with Preliminary Engineering LAPM Exhibit 3-B, Request for Authorization to Proceed with Right of Way LAPM Exhibit 3-C, Request for Authorization to Proceed with Utility Relocation LAPM Exhibit 3-D, Request for Authorization to Proceed with Construction Exhibit 3-O, Sample Local Federal-Aid Finance Letter LAPM Exhibit 3-Q, Request for Authorization to Proceed with Non-Infrastructure Project LAPM Exhibit 5-J, Local Agency Invoice Review Checklist |
Winton Emmett |
03/12/18
|
LAPM - Ch 03 and 05 |
DLA-OB 17-02 - Architectural and Engineering Consultant Contract Review(PDF) |
Attachment 1 Exhibit 10-C A&E Consultant Contract Reviewers Checklist Attachment 2 Exhibit 3-A Request for Authorization to Proceed with Preliminary Engineering Attachment 3 Exhibit 3-B Request for Authorization To Proceed with Right of Way Attachment 4 Exhibit 3-C Request for Authorization to Proceed with Utility Relocation Attachment 5 Exhibit 3-D Request for Authorization to Proceed with Construction Attachment 6 Exhibit 3-Q Request for Authorization to Proceed with Non-Infrastructure Project |
Felicia Haslem | 08/18/17 | LAPM - Ch 3 & 10 |
DLA-OB 17-01 - Federal Highway Administration (FHWA) Approval of Architectural and Engineering (A&E) Consultants in a Management Support Role(PDF) |
Attachment 1 - May 15, 2017 FHWA California Division letter: "FHWA Approval of Architectural and Engineering (A/E) Consultants in a Management Support Role"
Attachment 2 - 2017 Consultant in a Management Support Role Procurement Process Attachment 3 - LAPM Exhibit 10-U Consultant in Management Support Role Conflict of Interest and Confidentiality Statement (Revised) |
Sukhdeep Nagra | 07/20/17 | LAPM - Ch 10 |
DLA-OB 16-03 - Capital Subvention Reimbursement Allocation and De-Allocation(PDF) | Attachment 1- Exhibit 3-H Request for Capital Subvention Reimbursement Allocation/De-Allocation Attachment 2 - Capital Subvention Reimbursement Allocation and De-Allocation Process Flowchart |
Peggy Siu | 03/04/16 | Superseded by LPP 16-03 |
DLA-OB 16-02 - Period of Performance(PDF) |
Attachment 1 - Exhibit 3-A "Request for Authorization to Proceed with Preliminary Engineering" Attachment 2 - Exhibit 3-B "Request for Authorization to Proceed with Right of Way" Attachment 3 - Exhibit 3-C "Request for Authorization to Proceed with Utility Relocation" Attachment 4 - Exhibit 3-D "Request for Authorization to Proceed with Construction" Attachment 5 - Exhibit 3-O "Local Federal-Aid Project Finance Letter" Attachment 6 - Exhibit 3-Q "Request for Authorization to Proceed with Non-Infrastructure Project" Attachment 7 - Exhibit 5-J "Local Agency Invoice Review Checklist" |
David Giongco | 02/17/16 | Superseded by LPP 16-03 |
DLA-OB 16-01 - Implementation of Cargo Preference Act Requirements |
Attachment 1-FHWA California Division Letter: "Implementation of the Cargo Preference" Attachment 2 -FHWA policy memorandum: "Implementation of Cargo Preference Act Requirements in the Federal-aid Highway Program" |
David Giongco | 01/21/16 | Superseded by LPP 16-03 |
DLA-OB 15-05 - Bridge Preventative Maintenance Program Guidelines | Attachment 1-Bridge Preventive Maintenance Program Guidelines, December 2015 Attachment 2 -BPMP Plan Template |
Linda Newton | 12/23/15 | LAPG - Ch 06 |
DLA-OB 15-04 - Local Assistance Highway Bridge Program Bridge Investment | Attachment 1-Bridge Investment Credit Concept Attachment 2 -Bridge Investment Credit Questions and Answers Attachment 3 -Bridge Investment Credit (BIC) Draft Office Bulletin Comments and questions from Districts and Local Agencies |
Reza Fereshtehnejad | 11/02/15 | LAPG - Ch 06 |
DLA-OB 15-03 - Right of Way Certification( PDF) | Attachment A-Exhibit 13-B "Right of Way Certification" Attachment B -Memo "Right of Entry - Payment Before Possession" |
Linda W Tong | 08/14/15 | Superseded By LPP 16-04 |
DLA-OB 15-02 - Local Agency Employee in Responsible Charge( PDF) | None | Mike Giuliano | 06/30/15 | Superseded By LPP 16-04 |
DLA-OB 15-01 - Appropriation Year and Budget Authority( PDF) | Attachment A - Amendments to Section 3.5 | Daniel Burke | 03/12/15 | Superseded By LPP 16-04 |
DLA-OB 14-08 - Notice to Proceed Submittal | None | Mike Giuliano | 11/12/14 | Superseded By LPP 16-04 |
DLA-OB 14-07 - Environmental Procedures(PDF) | Attachment A - EX. 6E Categorical Exclusion Checklist | Lupe Jimenez | 11/05/14 | Superseded By LPP 16-04 |
DLA-OB 14-06 - Review of the DBE Contract Goals and Good Faith Efforts - Pilot Study (PDF) | Attachment A - EX. 3A Request for Authorization to Proceed with Preliminary Engineering(Word) Attachment B - EX. 3B Request for Authorization to Proceed with Right of Way(Word) Attachment C - EX. 3C Request for Authorization to Proceed with Utility Relocation(Word) Attachment D - EX. 3D Request for Authorization to Proceed with Construction(Word) |
Henry Wells
|
09/28/14 | LAPM - Ch 9 |
DLA-OB 14-05 - Risk-Based Invoicing |
Attachment A- Local Agency Invoice Review Checklist
Attachment B1-B4 Billing Summary Attachment C Billing Summary Instructions |
Peter Anderson | 07/04/14 | LAPM - Ch 5 |
DLA-OB 14-04 - Utility Clause Update-Buy America | Attachment 1- Ex. 14-G: Utility Agreement
Clauses Attachment 2- Ex. 14-I: Local Agency/Utility Owner Special Agreement |
Linda W Tong | 04/28/14 | Superseded By LPP 16-05 |
DLA-OB 14-03 - Use of Toll Credits in Lieu of Non-Federal Share Match for Local Assistance Federal-Aid Highway Projects | Attachment 1- Caltrans Toll Credit Use Policy Attachment 2- Toll Credit Use Example |
Robert Nguyen | 03/27/14 | Superseded By LPP 16-05 |
DLA-OB 14-02 - ADA Requirements for Curb Ramps(PDF) | Rajalingam Valluvan | 03/18/14 | Superseded By LPP 16-04 | |
DLA-OB 14-01 - LAPM Chapter 6 - Environmental Procedures(PDF) |
Attachment 1- Exhibit 6E Categorical Exclusion Checklist Attachment 2- Exhibit 6F Categorical Exemption/Categorical Exclusion Determination Form |
Laura Walsh | 02/12/14 | Superseded By LPP 16-04 |
DLA-OB 13-09 - LAPG Chapter 23-Local Agency STIP Projects (PDF) | Attachment - LAPG Chapter 23 - Local Agency STIP Projects | Jaime Espinoza | 10/31/13 | LAPG - Ch 23 |
DLA-OB 13-08-Final Invoicing When Funds Lapse |
Attachment 1 - Cooperative Work Agreement (CWA) Timeline Attachment 2 - Finance Letter Example |
Daniel Burke | 08/26/13 | Superseded by LPP 16-03 |
DLA-OB 13-06 -Revised LAPM Chapter 12 | Chapter 12 Plans, Specifications & Estimate | Henry Wells | 08/12/13 | LAPM - Ch 10, 12, 15, 16 |
DLA-OB 13-05 -Transparency Act-DUNS Number | Exhibit 3E - Request for Authorization to Proceed Data Sheet(s) | Frank Cao | 07/16/13 | Superseded by LPP 16-03 |
DLA-OB 13-04 - Highway Safety Improvement Program(PDF) | Highway Safety Improvement Program Guidelines(PDF) | Ted Davini | 04/29/13 | LAPG - Ch 9 & 10 |
DLA-OB 13-03 - Construction Oversight Program | Construction Review Checklist | Tim Buchanan | 04/24/13 | Superseded by LPP 16-03 |
Local Assistance Procedures Manual Chapter 6 - Environmental Procedures |
Germaine Belanger |
03/14/13 | Superseded by LPP 16-05 | |
Attachment 1 - Sample Projects Pro Rata and Lump Sum Funding Scenarios Attachment 2 - LAPM Exhibit 3-O (Finance Letter) Attachment 3 - FHWA Letter Dated October 26, 2012 (Fed Reimbursement Rate) Attachment 4 - FHWA Memorandum dated January 3, 2012 (Modifications when using Lump Sum) |
Adam Ambrosini | 01/31/13 | Superseded by LPP 16-03 | |
DLA-OB 12-05 -Revised Form FHWA-1273 for Federal-aid Construction Contracts |
Attachment 1 - LAPM Exhibit 12-E, Attachment B Attachment 2 - Summary of Form FHWA-1273 Revisions (March 10, 1994 versus May 1, 2012) |
Eugene Shy |
07/31/12 |
Superseded by DLA-OB 13-06 |
DLA-OB 12-04 -Race Conscious Measures to include all DBEs | Director's
Letter to Local Agency Local Agency Commitment Letter (WORD, PDF) Individual Forms in LAPM |
Jessica Del Nero | 06/29/12 | Superseded by LPP 14-01 |
DLA-OB 12-03R LAPM Chapter 10 Consultant Selection | Chapter 10 Consultant Selection | David Saia | 11/30/12 (Revised) | Superseded by LPP 13-01 |
DLA-OB 12-02 Highway Safety Improvement Program (HSIP) and High Risk Rural Roads Program (HR3) |
HSIP and HR3 Program Guidelines HSIP/HR3 Application Form Instructions for HSIP/HR3 Application Form Local Roadway Safety Manual for California Local Road Owners |
Ted Davini | 04/20/12 |
Superseded by OB-13-04 |
DLA-OB 12-01 Pavement Preventive Maintenance | Pavement Management System Certification | Peter Anderson | 02/01/12 | Superseded By LPP 16-04 |
DLA-OB 11-14 State-Legislated Safe Routes to School (SR2S) Program (PDF) |
State-Legislated Safe Routes to School (SR2S) Program Guidelines Cycle 10 (PDF) Application for State-Legislated Safe Routes to School (SR2S) Program Cycle 10 - Application Summary (PDF) |
Dawn Foster | 12/19/11 | LAPG - Ch 24 |
DLA-OB 11-12 $150,000 Simplified Acquisition Threshold | None | Eugene Shy | 12/02/11 | Superseded by LPP 13-01 |
DLA-OB 11-11 Local Assistance Dispute Resolution Process | Dispute Resolution Process | Eugene Shy | 11/16/11 | Superseded by LPP 12-02 |
DLA-OB 11-10 Preliminary Environmental Screening Form for Non-Infrastructure Projects [PES(NI)] |
PES(NI)
Form Instructions for Completing the PES(NI) Form Undertakings Exempt From Further Review Memo Dated June 13, 2011 Non-Infrastructure Project Natural Environmental Study - No Effect Memo Dated November 8, 2011 |
Germaine Belanger | 11/08/11 (Revised) | Superseded by OB-13-02 |
DLA-OB 11-09 Right of Way Certification - Short Form (Exhibit 13-A) |
Exhibit 13-A Short Form - Right of Way Certification for Local Assistance Project |
Ray Zhang | 6/24/11 | Superseded by LPP 13-02 |
DLA-OB 11-08 Authorization of Non-Infrastructure Federal-aid Projects |
Exhibit 3-Q Request for Authorization to Proceed with
Non-Infrastructure Project Non-Infrastructure Project Work Plan (Sample) |
Ray Zhang | 6/24/11 | Superseded by LPP 12-01 |
DLA-OB 11-07-Capital Subvention Reimbursement Allocation | Exhibit 3-H Request for Capital Subvention Reimbursement Allocation | Adam Ambrosini | 05/09/11 | Superseded OB 16-03 |
DLA-OB 11-06-Federal Safe Routes To School (SRTS) Program (PDF) |
Chapter 24 - Federal Safe Routes to School Program Guidelines (PDF) |
Dawn Foster | 4/15/2011 | LAPG - Ch 24 |
DLA-OB 11-05-Preliminary Engineering Phase Over 10 Years | None | Chris Jensen | 03/24/11 | Superseded By LPP 16-04 |
DLA-OB 11-04-Evaluating and Submitting Good Faith Efforts | Evaluation of Good Faith Effort | Henry Wells | 03/15/11 | Superseded by LPP 14-01 |
DLA-OB 11-03-Federal-Aid Funds Inactive Obligation Management(PDF) | None |
Chris Jensen |
3/09/11 | Rescinded 4-9-13 |
DLA-OB 11-02-Local Assistance Highway Bridge Program High Cost Projects Programming Policy and Procedures (PDF) |
Exhibit A: Sample Funding Commitment Letter (PDF) Exhibit B: Sample Funding Sheet for use in Exhibit A (PDF) |
Eric Bost | 02/24/11 | LAPG - Ch 6 |
DLA-OB 11-01-Local Assistance Highway Bridge Program Project Prioritization Policy (PDF) | None | Eric Bost | 02/24/11 | LAPG - Ch 6 |
DLA-OB 10-16 – Chapter 19 Project Oversight and Process Reviews |
Chapter 19 - Project Oversight and Process Reviews
|
Eugene Shy | 12/21/10 | Superseded by LPP 11-01 |
DLA-OB 10-15 – Deletion of Exhibit 13-A "No Right of Way Certification" |
None
|
Eugene Shy | 11/18/10 | Superseded by LPP 11-05 |
DLA-OB 10-14 – $1 Million Pre-award Audit Threshold |
None
|
David Saia | 11/15/10 | Superseded by LPP 11-05 |
DLA-OB 10-13 – Interim Guidance on the Use of Project Labor Agreements |
Executive Order 13502 of February 6, 2009
|
Eugene Shy | 10/25/10 | Superseded by LPP 11-05 |
DLA-OB 10-12 - Conflict of Interest Certification |
Conflict of Interest Statement Certification
|
April Nitsos | 09/23/10 | Superseded by LPP 11-05 |
DLA-OB 10-11 - Highway Safety Improvement Program (HSIP) |
HSIP Guidelines
|
Ted Davini | 09/01/10 | Superseded by OB 12-02 |
DLA-OB 10-10 - High-Risk (Formerly “Major”) ITS Project Procedure Change |
Revised Ch.13 of LAPG Revised Exhibit 3-A of LAPM |
Frank Cao |
08/03/10
|
Superseded by LPP 12-01 |
DLA-OB 10-09 - Use of Toll Credits |
Updated Exhibits in Ch.3 of
LAPM Caltrans Toll Credit Policy |
Rihui Zhang |
07/22/10
|
Superseded by LPP 12-01 |
High Priority Projects Program Guidelines |
April Nitsos |
05/28/10 |
Superseded by LPP 11-05 |
|
Interim Exhibit 9-B: Local Agency DBE Annual Submittal Form |
Henry Wells |
05/28/10 |
Superseded by LPP 14-01 |
|
DLA-OB 10-06 - Documenting and Transmitting Environmental Decisions(PDF) |
Revised Ch.6 of LAPM |
Margaret.Buss |
05/20/10 |
Superseded by LPP 11-05 |
DLA-OB 10-05 - State Legislated Safe Routes to School (SR2S) Program(PDF) |
Cycle_9_Guidelines Cycle_9_Application |
Dawn Foster |
04/14/10 |
Superseded by DLA-OB 11-14 |
DLA-OB 10-04 - Highway for Life Program | HfL Application Template and Instructions | April Nitsos | 04/07/10 | Superseded by LPP 11-05 |
DLA-OB 10-03 Prevention of Consultant Selection Conflicts of Interest |
Revisions to Chapter 10.8 of the LAPM Exhibit 10-T "Panel Member Conflict of Interest and Confidentiality Statement" Exhibit 10-U "Consultant in Management Position Conflict of Interest and Confidentiality Statement" |
Eugene Shy
|
03/22/10
|
Superseded by LPP 11-05 |
DLA-OB 10-02 Local Assistance Highway Bridge Program Prioritization Policy | None |
Eric Bost
|
01/21/10
|
Superseded by DLA-OB 11-01 |
DLA-OB 10-01 Highway Bridge Programming FTIP Procedures (PDF) | None | Eric Bost | 01/21/10 | LAPG – Ch 6, 7, 12 |
DLA-OB 09-06 - Use of ARRA Funding For Force Account Work(PDF) | 23CFR635.205(b) | Eugene Shy | 08/31/09 | Expired 09/30/10 |
DLA-OB 09-05 - Progress Invoice review |
Invoice Review Checklist Bid Summary/Cost to Date Form |
Bill Sandoval | 11/19/10 (Revised) | superseded by DLA-OB 14-05 |
DLA-OB 09-04 - Highway Safety Improvement Program |
HSIP Guidelines HSIP Application |
Randy Ronning | 07/21/09 | Superseded by DLA-OB 10-11 |
DLA-OB 09-03 - Using the Internet for Federal Wage Rates(PDF) |
Revisions to Chapter 12 of the LAPM | Eugene Shy | 07/14/09 | Superseded by LPP 11-05 |
DLA-OB 09-02-Independent Assurance Services for Local Agencies | None | Eugene Shy | 03/05/09 | Superseded by LPP 12-01 |
DLA-OB 09-01-State-legislated Safe Routes to School (SR2S) Program(PDF) | State-legislated Safe Routes to School (SR2S) Program Guidelines State-legislated Safe Routes to School (SR2S) Program Application (8th Cycle) |
Joyce Parks | 01/15/09 | Superseded by DLA-OB 10-05 |
DLA-OB 08-01-Office Bulletins(PDF) |
Approving Office Chiefs and Committee
Chairs(Revised
10/05/12) District Comments |
David Saia | 09/25/08 | Expired |