Construction Project Funding Identification Signs
The Construction Project Funding Signs can be used with a total contract cost of $1,000,000 or more and 60 working days or more, or 70 working days minimum when Saturdays or holidays are counted as working days.
Available Sizes:
- Freeway & Expressway: 132” x 78” (11 ft x 6.5 ft)
- Conventional Highways: 96” x 60” (8 ft x 5 ft)
- Local Roadways: 48” x 30” (4 ft x 2.5 ft)
CA Sign Specification Drawings and Artwork
File | Name | Date |
C48B (CA) (PDF) | Construction Project Funding Identification Sign (Building CA) | 4/1/25 |
C49A (CA) (PDF) | Construction Project Funding Identification Sign (Clean CA) | 8/23/23 |
C49D (CA) (PDF) | Construction Project Funding Identification Sign (Clean CA and Building CA) | 4/1/25 |
C50C (CA) (PDF) | Construction Project Funding Identification Sign (Federal-Aid Highway Funds) | 4/1/25 |
C50D (CA) (PDF) | Construction Project Funding Identification Sign (Federal-Aid Highway Funds) | 4/1/25 |
C51 (CA) (PDF) | Construction Project Funding Identification Sign (Local Funds) | 8/21/23 |
Building CA Logo (AI) | Building California (CMYK vector AI) | 4/1/25 |
Clean CA Logo (EPS) | Clean California (CMYK vector EPS) | N/A |
BWZA (PDF) | Be Work Zone Alert (PDF) | N/A |
BWZA (JPG) | Be Work Zone Alert (CMYK JPG) | N/A |
BWZA (AI) | Be Work Zone Alert (CMYK vector AI) | N/A |
For further assistance, please contact Mario Lozano-Cisneros.
Traffic Control Devices
Policy & Guidance
- CA MUTCD | Get Email Notifications
- CTCDC
- Division Policy:
Signs
- CA Numbered Exit Uniform System (Cal-NExUS)
- Contractor-Furnished Sign & Standard Plans
- Construction Project Funding Identification Signs
- Neighborhood Electric Vehicle (NEV) Signs
- Sign Charts
- Sign Specification Drawings | Spec Updates
- Specific Service (Business Logo) Signs
- Tourist Oriented Directional Signs
- Victims Memorial Signs
- Zero-Emission Vehicle Signage
Work Zones
Related Links
Contacts