Bridge Construction Records and Procedures Manual Volume 2

BCRP Manual Volume 2 (PDF) (4/29/2022) Open with Google Chrome

Table of Contents (PDF) (6/30/2022)

Section No. Issue Date Title
1-0.00  4/22/2019 General (PDF)
 1-1.09  4/22/2019 General - Freeze Thaw Areas (PDF)
     
 Section No. Issue Date Title
4-0.0 8/31/2015 Scope of Work (PDF)
     
Section No. Issue Date Title
5-0.00 4/22/2019 Control of Work (PDF)
 5-1.01   Control of Work - General
 5-1.02   Control of Work - Contract Components
 5-1.03   Control of Work - Engineer's Authority
 5-1.09   Control of Work - Partnering
 5-1.17   Control of Work - Character of Workers
 5-1.20C   Control of Work - Railroad Relations
 5-1.23   Control of Work - Submittals
 5-1.26   Control of Work - Construction Surveys
 5-1.30   Control of Work - Noncompliant and Unauthorized Work
 5-1.36 4/22/2019 Control of Work - Property and Facility Preservation (PDF)
 5-1.36 Att. 01 4/22/2019 Preservation of Property (PDF)
 5-1.37B   Control of Work - Maintenance and Protection - Load Limits
 5-1.38   Control of Work - Maintenance and Protection Relief
 5-1.43A-D   Control of Work - Potential Claims
 5-1.43E   Control of Work - Alternative Dispute Resolution
 5-1.46   Control of Work - Final Inspection and Contract Acceptance
     
Section No. Date Title
6-0.0   Control of Materials 
 6-2    Control of Materials - Quality Assurance (PDF)
     
Section No. Date Title
7-0.00 2/28/2022  Legal Relationships and Responsibility to the Public 
 7-1.02K(6)(B)   Legal Relationships and Responsibility to the Public - Excavation Safety (PDF)
 7-1.02K(6)(e)  2/28/2022 Legal Relationships and Responsibility to the Public - Occupational Safety and Health Standards - Scaffolding (PDF)
     
Section No. Date Title
9-0.00   Payment 
9-1.16   Payment - Progress Payment (PDF)
     
Section No. Date Title
11-0.00   Welding
 11-1   Welding - General (PDF) 
 11-2   Welding - Quality Control (PDF)
     
Section No. Date Title
12-0.0 8/30/2019 Temporary Traffic Control (PDF)
 12-4 8/30/2019 Maintaining Traffic (PDF)
     
Section No. Date Title
16-0.00 8/30/2019 Temporary Facilities (PDF)
 16-2.02 8/30/2019 Temporary Pedestrian Facilities (PDF)
     
Section No. Date Title
19-0.00 6/30/2022 Earthwork (PDF)
 19-1.03B  12/5/2017 Earthwork - General - Construction - Unsuitable Material (PDF)
 19-1.03D 12/5/2017 Earthwork - General - Construction - Buried Man-Made Objects (PDF)
 19-3.01A 6/30/2022 Earthwork - Structure Excavation and Backfill - Summary (PDF)
 19-3.01A Att. 1 6/30/2022 Sample Letters to the Contractor Regarding Spread Footings and Seal Courses 
 19-3.01C 12/5/2017 Earthwork - Structure Excavation and Backfill - Submittals (PDF)
 19-3.01C Att. 1 12/5/2017 Sample Authorization Letter (PDF)
 19-3.01C Att. 2 12/5/2017 Temporary Ground Anchor Encroachments Memo (PDF)
 19-3.01D(2) 12/31/2020  Earthwork - Structure Excavation and Backfill - Quality Assurance - Stability Test for Ground Anchor and Soil Nail Walls (PDF)
 19-3.01D(2) Att. 1 12/31/2020  Excavated Exposed Face Instability (PDF) 
 19-3.02   Earthwork - Structure Excavation and Backfill - Materials
 19-3.03B   Earthwork - Structure Excavation and Backfill - Structure Excavation
 19-3.03B(1-4) 12/31/2020  Earthwork - Structure Excavation and Backfill -Construction - Structure Excavation (PDF)
 19-3.03B(5) 6/30/2022 Earthwork - Structure Excavation and Backfill - Construction - Structure Excavation - Water Control and Foundation Treatment (PDF)
 19-3.03E 11/12/2021  Earthwork - Structure Excavation and Backfill - Construction - Structure Backfill (PDF)
 19-3.03K 4/29/2022 Earthwork - Structure Excavation and Backfill - Construction - Ground Anchor and Soil Nail Walls (PDF)
 19-3.04   Replaced by BCM 19-3.01A (PDF)
 19-4  1/21/2022 Earthwork - Rock Excavation (PDF)
 19-6.03D  8/31/2020 Earthwork - Embankment Construction - Settlement Periods and Surcharges (PDF)
     
Section No. Date Title
20-0.00  4/30/2021 Landscape (PDF)
 20-2.13 4/30/2021   Landscape - Supply Line on Structures (PDF)
 20-2.13 Att. 1    Potential Issues to Look for When Reviewing As-Built Drawings and Field Conditions (PDF)
     
Section No. Date Title
46-0.0 11/16/2018 Ground Anchors and Soil Nails (PDF)
 46-1 11/16/2018 Ground Anchors and Soil Nails - General (PDF)
 46-2 11/16/2018 Ground Anchors (PDF)
 46-3 11/16/2018 Soil Nails (PDF)
     
Section No. Date Title
47-0.0 12/20/2018 Earth Retaining Systems (PDF)
 47-2 12/20/2018 Earth Retaining Systems - Mechanically Stabilized Embankment (PDF)
 47-2 Att 1 12/20/2018 Mechanically Stabilized Embankment - Construction Checklist (PDF)
 47-6 12/20/2018 Earth Retaining Systems - Alternative Earth Retaining Systems (PDF)
     
Section No. Date Title
48-0.00 4/29/2022 Temporary Structures (PDF)
 48-1A   Temporary Structures - General - Contractor Designed Temporary Bridges
 48-1B   Temporary Structures - General - Work Platforms and Trestles
 48-2 6/4/2021  Temporary Structures - Falsework (PDF)
 48-2.03   Temporary Structures - Falsework - Construction (PDF)
 48-3 6/4/2021  Temporary Structures - Temporary Supports (PDF)
 48-4 6/4/2021  Temporary Structures -  Temporary Decking (PDF)
 48-4 Att. 01 6/5/2021  Sample Temporary Decking Plan (PDF)
 48-5 4/29/2022  Temporary Structures - Jacking Superstructure
 48-5 Att. 01 4/29/2022  Jacking System for Jacking a Bridge Superstructure (PDF)
 48-5.01C   Temporary Structures - Jacking Superstructure - Submittals (PDF)
 48-5.01D   Temporary Structures - Jacking Superstructure -Quality Assurance (PDF)
 48-5.03   Temporary Structures - Jacking Superstructure - Construction (PDF) - Removed 4/29/22, replaced by BCM 48-5 (PDF)
     
Section No. Date Title
49-0.00 4/29/2022 Piling (PDF)
 49-1 1/21/2022  Piling - General (PDF) 
 49-1.01C   Piling - General - Submittals replaced by BCM 49-1 (PDF)
 49-1.01D(3)   Piling - General - Quality Assurance - Load Test Piles replaced by BCM 49-1 (PDF)
 49-1.01D(4)   Piling - General - Quality Assurance - Dynamic Monitoring replaced by BCM 49-1 (PDF)
 49-2 3/30/2022  Driven Piling (PDF) 
 49-2 Att. 01 3/30/2022  Driven Piling - Steel H-Pile Lugs (PDF) 
 49-2 Att. 02 3/30/2022  Driven Piling - Acceptance Criteria (PDF) 
 49-2 Att. 03 3/30/2022  Driven Piling - Measurement and Payment (PDF) 
 49-2.01A(3)   Driven Piling - Submittals - Removed 3/30/21, replaced with BCM 49-2 (PDF)
 49-2.01A(4)(c)   Driven Piling - Quality Assurance - Department Acceptance
 49-2.01C   Driven Piling - Construction
 49-2.01D   Driven Piling - Payment
 49-2.02   Driven Piling - Steel Pipe Piling - Removed 3/30/21, replaced with BCM 49-2 (PDF)
 49-2.03   Driven Piling - Structural Shape Steel Piles - Removed 3/30/21, replaced with BCM 49-2 (PDF)
 49-2.04   Driven Piling - Precast Prestressed Concrete Piling
 49-2.05   Driven Piling - Steel Sheet Piling
 49-3   Piling-Cast-In-Place Concrete Piling  (PDF)
 49-3.01   Cast-In-Place Concrete Piling - General
 49-3.02A(3) 8/30/2019 Cast-In-Drilled-Hole Concrete Piling - Submittals (PDF)
 49-3.02A(4)(b)   Cast-In-Drilled-Hole Concrete Piling - Quality Assurance - Preconstruction Meeting
 49-3.02A(4)(c)   Cast-In-Drilled-Hole Concrete Piling - Quality Control
 49-3.02A(4)(d)   Cast-In-Drilled-Hole Concrete Piling - Department Acceptance
 49-3.02B 8/30/2019 Cast-In-Drilled-Hole Concrete Piling - Materials (PDF)
 49-3.02B Att1 8/30/2019 Cast-In-Drilled-Hole Concrete Piling - Materials - Attachment 1 (PDF)
 49-3.02B(6)   Cast-In-Drilled-Hole Concrete Piling - Materials - Slurry
 49-3.02C   Cast-In-Drilled-Hole Concrete Piling - Construction (PDF)
 49-3.03C   Driven Steel Shells Filled With Concrete and Reinforcement - Construction
 49-4.03   Steel Soldier Piling - Construction
 49-5 4/29/22  Micropiling (PDF) 
 49-5.01C   Micropiling - Submittals
 49-5.01D(3)   Micropiling - Quality Assurance - Preconstruction Meeting
 49-5.01D(4)(c)   Micropiling -Quality Control - Load Testing (PDF) - Removed 4/29/22, replaced with BCM 49-5 (PDF)
 49-5.01D(5)   Micropiling - Department Acceptance
 49-5.02   Micropiling - Materials
 49-5.03   Micropiling - Construction
 49-6.01C   Alternative Piling - Submittals
 49-6.01D(3)   Alternative Piling - Quality Assurance - Preconstruction Meeting
 49-6.01D(4)   Alternative Piling - Quality Control - Load Testing
 49-6.01D(5)   Alternative Piling - Department Acceptance
 49-6.02   Alternative Piling - Materials
 49-6.03   Alternative Piling - Construction
     
Section No. Date Title
50-0.0 11/16/2018 Prestressing Concrete (PDF)
 50-1   Prestressing Concrete - General (PDF) 
 50-1.01   Prestressing Concrete - General -Submittals and Quality Assurance (PDF) 
 50-1.01C 11.16.2018 Prestressing Concrete - General - Submittals (PDF)
 50-1.01D(1-2) 11/16/2018 Prestressing Concrete - General - Quality Assurance (PDF)
 50-1.01D(1-2) Attachment 1 11/16/2018 Air Pressure Field Monitoring Chart (PDF)
 50-1.01D(3) 11/16/2018 Prestressing Concrete - General - Department Acceptance (PDF)
 50-1.02 11/16/2018 Prestressing Concrete - General - Materials (PDF)
 50-1.03A 11/16/2019 Prestressing Concrete - Construction - General (PDF)
 50-1.03A Attachment 1 11/16/2018 Electrical Welding of Prestress Strand (PDF)
 50-1.03B 11/16/2018 Prestressing Concrete - General - Construction - Prestressing (PDF)
 50-1.03B Attachment 1 11/16/2018 Patching Concrete Under Prestress Bearing Plates (PDF)
     
Section No. Date Title
51-0.00 5/31/2022 Concrete Structures TOC (PDF)
 51 3/30/2015 Concrete Structures  (PDF)
 51-1.01   Concrete Structures - General (PDF)
 51-1.03C 1/18/2019 Concrete Structures - General - Construction - Preparation (PDF)
 51-1.03C Att. 01 1/18/2019 Form Panels (PDF)
 51-1.03(C-D)   Concrete Structures - General - Construction - Preparation and Placing Concrete (PDF)
 51-1.03E 5/31/2022  Concrete Structures - General - Miscellaneous Construction (PDF)
 51-1.03E Att. 01 5/31/2022  Miscellaneous Construction for Concrete Structures (PDF) 
 51-1.03F(1-4) 1/18/2019 Concrete Structures - General - Finishing Concrete (PDF)
 51-1.03F(5-6)   Concrete Structures - General - Finishing Roadway and Pedestrian Overcrossing Surfaces (PDF)
 51-1.03G  10/15/2021 Concrete Structures - General - Concrete Surface Textures (PDF)
 51-1.03H   Concrete Structures - General - Curing - Concrete Structures (PDF)
51-2 2/28/2022  Concrete Structures - Joints (PDF)
51-4 2/28/2022  Concrete Structures - Precast Concrete Members (PDF) 
51-5 2/28/2022  Concrete Structures - Approach Slabs (PDF) 
51-6  1/21/2022 Concrete Structures - Mass Concrete (PDF)
51-6 Att.01  1/21/2022  When The Mass Concrete Specification Applies (PDF)
     
Section No. Date Title
52-0.00 3/30/2022 Reinforcement (PDF)
 52-1 3/30/2022 Reinforcement - General (PDF)
 52-1 Att.01 3/30/2022  Reinforcing Steel Hook Detail for BCM 52-1 (PDF) 
 52-1 Att.02 3/30/2022  Identification of Reinforcing Steel Bars for BCM 52-1 (PDF) 
 52-1 Att.03 3/30/2022  Reinforcing Steel Bar Chart for BCM 52-1 (PDF)
 52-1 Att.04 3/30/2022  Welded Wire Reinforcement for BCM 52-1 (PDF)
 52-1 Att.05 3/30/2022 Spacing Requirements for Bundled Bars for BCM 52-1 (PDF) 
 52-2   Reinforcement - Epoxy-Coated Reinforcement and Epoxy-Coated Prefabricated Reinforcement (PDF)
 52-6 1/21/2022  Reinforcement - Splicing (PDF)
 52-6 Att.01 1/21/2022  Reinforcement Splices (PDF)
     
Section No. Date Title
53-0.00 4/22/2019 Shotcrete (PDF)
 53-1 4/22/2019 Shotcrete - General (PDF)
 53-2 4/22/2019 Structural Shotcrete (PDF)
 53-3
Sculpted Shotcrete (PDF)
     
Section No. Date Title
55   Steel Structures (future section to replace 170) (PDF)
 55-1.01C   Steel Structures - Submittals (PDF)
 55-1.02A-D   Steel Structures - Materials (PDF) 
 55-1.03   Steel Structures - Construction (PDF)
     
Section No. Date Title
56-0.0 4/30/2021 Overhead Sign Structures, Standards, and Poles (PDF)
   

Note: There is additional information regarding Overhead Sign Structures located in Section 168.

Eventually section 56 will replace the entire section 168.

 56-2.01C 12/20/2018 Overhead Sign Structures - Submittals (PDF)
 56-2.01C Attachment 1 12/20/2018 Additional Information for Shop Drawing Reviews (PDF)
 56-2.03 4/30/2021 Overhead Sign Structures - Construction (PDF)
 56-2.03 Attachment 1 4/30/2021 Sign Structure Installation Guide (PDF)
 56-2.03 Attachment 2 4/30/2021 Sign Structure Fastener Installation Guide (PDF)
     
Section No. Date Title
57-0.00 5/31/2022  Wood and Plastic Lumber Structures (PDF)
 57-2     Wood and Plastic Lumber Structures - Wood Structures
 57-3 5/31/2022    Wood and Plastic Lumber Structures - Plastic Lumber Structures (PDF)
     
Section No. Date Title
59-0   Structural Steel Coatings
 59-1    Structural Steel Coatings - General (PDF)
 59-2    Structural Steel Coatings - Painting Structural Steel (PDF)
 59-3    Structural Steel Coatings - Painting Galvanized Surfaces (PDF)
 59-4    Structural Steel Coatings - Painting Sign Structures (PDF)
 59-5   Structural Steel Coatings - Thermal Spray Coat Structure Steel (PDF) 
     
Section No. Date Title
60-0.00 6/30/2022 Existing Structures (PDF)
 60-2.02A(3-4) 12/31/2021  Existing Structures - Structure Removal - Submittals and Quality Assurance
 60-2.02A(3&4) Att. 1 12/31/2021  Bridge Removal Work Plan Review 
60-2.02A(3&4) Att. 2   12/31/2021 Bridge Removal Over and/or Adjacent to Railroad Tracks
 60-2.02C 8/31/2020 Existing Structures - Structure Removal - Construction (PDF)
 60-3.02 7/15/2021  Existing Structures - Structure Rehabilitation - Bridge Deck Repair & Preparation (PDF)
 60-3.03B 7/15/2021  Existing Structures - Structure Rehabilitation - Methacrylate Resin Bridge Deck Treatment (PDF)
 60-3.03B Att.1 7/15/2021  Methacrylate Deck Treatment Inspection Guidelines (PDF)
 60-3.04B-C 4/29/2022  Existing Structures - Structure Rehabilitation - Deck Overlays - Polyester Concrete Overlays & Expansion Dams (PDF)
 60-3.04B-C Att. 1 4/29/2022 Polyester Concrete Overlay and Expansion Dams (PDF) 
 60-3.04D   Existing Structures - Structure Rehabilitation - Deck Overlays - Concrete Overlays
 60-3.05B 7/15/2021  Existing Structures - Structure Rehabilitation - Repair Spalled Surface Area (PDF)

 60-3.05C

6/30/2022  Existing Structures - Structure Rehabilitation - Repairing Structures - Epoxy Crack Injection (PDF)
 60-3.05C Att. 01 6/30/2022  Epoxy Crack Injection Inspection Guidance (PDF) 
 60-3.05D   Existing Structures - Structure Rehabilitation - Heat Straighten Steel Girders
 60-4.04    Existing Structures - Modifying Structures - Coring Concrete
 60-4.06 5/31/2022   Existing Structures - Modifying Structures - Steel Column Casings (PDF)
 60-4.06 Att. 01  5/31/2022  Steel Column Casing Guidance (PDF)
 60-4.09    Existing Structures - Modifying Structures - Bridge Joint Restrainers
     
Section No. Date Title
70-0.0   Miscellaneous Drainage Facilities
 70-7   Miscellaneous Drainage Facilities - Casings for Bridges (PDF)
     
Section No. Date Title
72-0.00 10/15/2021 Slope Protection (PDF)
 72-11 10/15/2021  Slope Protection - Slope Paving (PDF)
     
Section No. Date Title
75   Miscellaneous Metal (PDF)
     
Section No. Date Time
76   Wells (PDF)
     
Section No. Date Title
78   Incidental Construction
 78-4   Miscellaneous Coatings (PDF)
     
Section No. Date  Title
83-0.00 9/30/2021 Railings and Barriers (PDF)
 83 (2.05-2.08)   Railings and Barriers - California Bridge Rails, Chain Link Railing, Cable Railings and Tubular Hand Railings
 83-3 9/30/2021  Railings and Barriers - Concrete Barriers (PDF)
 83-11.03   Railings and Barriers - Existing Metal Bridge Railings
     
Section No. Date Title
90-0.0 12/31/2020 Concrete (PDF)
 90-1   Concrete-General (PDF)
 90-1.0   Deleted 1/31/20
 90-2.0 9/30/2014 Control of Cement Content in Concrete (PDF)
 90-3.0 9/30/2014 Removing the Requirements of CA Test 515 from Structural Concrete (PDF)
 90-4.0 9/30/2014 Concrete Mix Design Database (PDF)
 90-5  12/31/2020 Self-Consolidating Concrete (PDF) 
 90-5.0 12/05/2017 Concrete Placement During Hot Weather (PDF)
 90-6.0 9/30/2014 Minimizing Early Age Concrete Bridge Deck Cracks (PDF)
 90-7   Replaced by B.C.M. 51 (PDF)
 90-8   Replaced by B.C.M. 51 (PDF)
     
Section No.  Date Title
91-0.00  4/30/2021 Paint (PDF)
 91-1 4/30/2021  Paint-General (PDF)
     
Section No. Date Title
95-0.00    Epoxy 
 95-1   Epoxy-General (PDF) 
     
     
Section No.  Date Title
99   Building Construction 
99-01000-1.10   Building Construction - As-Built Drawings (PDF)
99-1   Building Construction - General Requirements (PDF) 
     
Section No.  Date Title
110-0.0
Computer Information (deleted 1/31/2020)
     
Section No. Date Title
112-0.0 7/15/2021 Decks (PDF)
 112-1.0  9/2/1974 Longitudinal Deck Construction Joints (PDF)
 112-2.0 11/1/1982 Testing Bridge Deck Surfaces for Compliance with the Straightedge or Profilograph Requirements (PDF)
 112-2.1 9/15/1999 Profile Counts of Deck Profilographs (PDF)
 112-3.0 9/2/1974 Supports for Finishing Machines (PDF)
 112-4.0 11/30/2020 Friction Testing of Bridge Decks (PDF)
 112-5.0   Replaced with BCM 60-3.03B (PDF)
 112-6.0 5/27/2011 Quieter Bridge Deck Construction (PDF)
     
Section No. Date Title
115-0.0 3/1/1998 Electrical and Mechanical Equipment (PDF)
 115-1.0 3/1/1998 Inspection of Electrical, Mechanical, Water and Wastewater Work (PDF)
     
Section No. Date Title
120-0.0

3/30/2022

Falsework (PDF)
 120-1.0   Deleted 4/30/2021
 120-2.0 8/30/2013 Impaired Clearances at Falsework Traffic Openings (PDF)
 120-2.1 5/20/2010 Impaired Clearance at Traffic Openings (PDF)
 120-3.0 4/30/1995 Falsework Shear Values for Bolts/Anchors in Concrete (PDF)
 120-4.0   Reviewing and Submitting Temporary Support (Guying Plans) and Working Drawings - Removed 3/30/22, replaced by BCM 52-1 (PDF)
 120-5.0
Replaced with BCM 48-2 (PDF), BCM D-2.07 (PDF), and Falsework Manual, Chapter 2 (PDF)
 120-6.0
Deleted 6/4/2021
     
Section No. Date Title
122-0.00 12/5/2017 Shoring (PDF)
 122-1.0 6/1/1997 Submitting Shoring Plans
 BCB 122-2.0 10/15/2002 Support from Roadway Engineering (PDF)
 122-3.0 12/5/2017 Torvane Usage for Sloped Excavations (PDF)
     
Section No. Date Title
124-0.0 12/31/2021 Demolition (PDF)
 BCB 124-2.0   Replaced by BCM 60-2.02A (3&4) (PDF)
 BCM 124-3.0   Replaced by BCM 60-2.02A (3&4) (PDF)
     
Section No. Date Title
125-0.0   Replaced by Section 51
     
Section No. Date Title
130-0.0 3/30/2022 Foundations (PDF)
 130-1.0   Foundation Testing and Instrumentation Branch (FTI) replaced by BCM 49-1 (PDF)
 130-2.0   Removed 9/4/18
 130-3.0   Removed 6/30/14 (1)
 130-4.0   Pile Driving Acceptance Criteria - Removed 3/30/22, replaced by BCM 49-2 Att02 (PDF)
 130-5.0   Steel H-Pile Lugs- Removed 3/30/22, replaced by BCM 49-2 Att01 (PDF)
 130-6.0   Payment for Piling - Removed 3/30/22, replaced by BCM 49-2 Att03 (PDF)
 130-7.0 8/30/2019 CIDH Concrete Piling (PDF)
 130-8.0 12/9/2011 CIDH Pile Mitigation Committee (PDF)
 130-9.0 6/30/2011 CIDH Pile Installation Plan and Concrete Test Batch (PDF)
 130-10.0 8/30/2019 Testing of CIDH Piling (PDF)
 130-11.0 6/30/2014 Simple Repair of CIDH Piling (PDF)
 130-12.0 8/30/2019 Mitigation of CIDH Piling (PDF)
 130-13.0 6/30/2014 CIDH Pile Information Submittal (PDF)
 130-14.0   Removed 8/30/2019 (1)
 130-15.0   Removed 8/30/2019 (2)
 130-16.0   Replaced with B.C.M. 19-6.03D (PDF)
 130-17.0   Blank
 130-18.0   Removed 6/30/2014 (2)
 130-19.0 6/30/2014 Reference to the Foundation Manual-Appendix K for Construction Checklists for Foundation Work (PDF)
 130-20.0 2/9/2011 CIDH Pile Preconstruction Meeting (PDF)
 130-20.0 Attachment 1 12/9/2011 CIDH Pile Preconstruction Meeting Agenda/Minutes (PDF)
 130-20.0 Attachment 1.1 12/9/2011 Attendance Sheet CIDH Pile Preconstruction Meeting (PDF)
 130-20 Attachment 1.2 12/9/2011 CIDH Wet vs. Dry (Inspection Tube Requirements) (PDF)
 130-20 Attachment 1.3 12/9/2011 CIDH Drilling and Concrete Placement (PDF)
 130-20 Attachment 1.4 12/9/2011 Synthetic Slurry Test Record (PDF)
 130-20 Attachment 1.5 12/9/2011 Concrete Yield Plot (PDF)
 130-20 Attachment 1.6 12/9/2011 GGL Inspection Tube Verification (PDF)
 130-20 Attachment 1.7 6/30/2014 CIDH Pile Acceptance Test Request Form (PDF)
 130-20 Attachment 1.8 12/21/2012 Pile Design Data Form (PDF)
 130-20 Attachment 1.9 12/9/2011 Pile Mitigation Procedure (PDF)
 130-20 Attachment 1.10 12/9/2011 Mitigation Timeline - General Draft (PDF)
 130-21.0 6/30/2014 CIDH Pile Non-Standard Mitigation Meeting (PDF)
 130-22.0   Replaced by BCM 19-3.01A (PDF) and BCM 19-3.03B(5) (PDF)
     
132-0.0 7/29/2010 Miscellaneous Buildings (PDF)
 132-1.0 4/27/1987 Working Drawings and Material Submittals for Buildings (PDF)
 132-2.0 12/10/1987 Joint Review of Building Projects (PDF)
 BCB 132-2.1 5/1/1998 Inspection of Building-Related Transportation Facilities (PDF)
 132-2.2 7/29/2010 Clean Renewable Energy Bond (CREB) Project Inspection (PDF)
 132-3.0 8/5/1985 Parts Lists, Service Instructions, Manufacturer's warranties and Operation and Maintenance Instructions (PDF)
 132-4.0 5/10/1982 Changes Involving Building Projects (PDF)
     
135-0.0 4/11/2003 Miscellaneous Construction Materials (PDF)
 135-1.0 1/20/1983 Epoxy Adhesives (PDF)
 135-2.0 4/16/1990 Bridge Deck Expansion Joints and Joint Seals (PDF)
 BCB 135-2.1 1/20/2000 Release and Reporting of Values for Type B Joint Seal (PDF)
 135-3.0 4/16/1990 Compressive Deflections of Fiberglass or Steel Reinforced Elastomeric Bearing Pads (PDF)
 135-4.0   Blank 
 135-5.0 4/11/2003 Mechanical Anchorage Devices (PDF)
     
140-0.0 forthcoming Miscellaneous Concrete Structures
     
145-0.0 5/31/2022 Miscellaneous Information (PDF)
 145-1.0   Blank
145-2.0   Blank
 145-3.0 5/4/1981 Support Systems for Portions of Permanent Bridges which are Temporarily Unstable (PDF)
 145-4.0 12/1/1996 Contractor Designed Temporary Bridges or Other Temporary Facilities (PDF)
 145-5.0   Bonding Dowels in Drilled Holes. Removed 5/31/2022, replaced with BCM 51-1.03E (PDF)
 145-6.0   Blank
 145-7.0   Removed 11/16/18, replaced with BCM 47-2 (PDF)
 145-8.0   Removed 12/20/18, replaced with BCM 47-2 (PDF) and 47-2 Attachment 1 (PDF)
 145-9.0   Removed 12/20/18, replaced with BCM 47-6 (PDF)
 145-10.0   Tieback Wall Construction Checklist has been moved to the Foundation Manual Appendix H (PDF)
 145-11.0   Soil Nail Wall Construction Checklist has been moved to the Foundation Manual Appendix H (PDF)
     
150-0.0 5/30/2018 Overloads (PDF)
 150-1.0 5/30/2018 Weight Overload Guidelines for Bridges on Construction Projects (PDF)
 150-1.0 Attachment 1 5/30/2018 Example of a Change Order Recommendation to Authorize a Bridge Redesign (PDF)
 150-1.0 Attachment 2 5/30/2018 Bridge Overload Form (Stationary) (PDF)
 150-1.0 Attachment 3 5/30/2018 Bridge Overload Form (Moving) (PDF)
 150-1.0 Attachment 4 5/30/2018 Sample Letter to Contractor (PDF)
     
155-0.0 4/30/2021 Paint (Section 155) (PDF)
 155-1.0 4/2/1990 Cleaning and Painting of Structural Steel (PDF)
 155-2.0 11/26/1984 Bridge Painting - Estimating Work Done (PDF)
 155-3.0   Removed 4/30/2021, replaced with BCM 91-1 (PDF)
 BCB 155-4 2/20/1997 Application of Zinc-Rich Primer on Column Casings (PDF)
     
160-0.0 11/16/2018 Prestressed Concrete (PDF)
 160-1.0 1/15/2005 Broken or Slipped Prestress Strands (PDF)
 160-2.0   Removed 11/16/18, replaced with BCM 50-1.03B, Attachment 1 (PDF)
 160-3.0   Removed 11/16/18
 160-4.0   Removed 11/16/18
 160-5.0   Removed 11/16/18, replaced with BCM 50-1.03A Attachment 1 (PDF)
 160-6.0   Removed 11/16/18, replaced with BCM 50-1.01C (PDF)
     
161-0.0 4/27/1987 Pumping Plants (PDF)
 161-1.0 4/27/1987 Pumping Plant Electrical and Mechanical Equipment, Materials Lists and Working Drawings (PDF)
 161-2.0 12/4/1981 Electrical Service for Pumping Plants (PDF)
     
162-0.0 9/30/2021  Railings (PDF)
 162-1.0   Blank
 162-2.0   Removed 9/30/21, replaced with BCM 83-3 (PDF)
 BCB 162-3   Removed 9/30/21, replaced with BCM 83-3 (PDF)
     
165-0.0 3/30/2022 Reinforcing Steel (PDF)
 165-1.0  

Reinforcing Steel Hook Details - Removed 3/30/22, replaced with BCM 52-1 Att01 (PDF)

 165-2.0  

Identification of Reinforcing Steel Bar - Removed 3/30/33, replaced with BCM 52-1 Att02 (PDF)

 165-3.0  

Reinforcing Steel Bar Chart - Removed 3/30/22, replaced with BCM 52-1 Att03 (PDF)

 165-4.0  

Welded Wire Fabric - Removed 3/30/22, replaced with BCM 52-1 Att04 (PDF)

 165-5.0   Blank
 165-6.0   Blank
 165-7.0   Replaced with BCM 52-6 (PDF)
 165-10   Blank
 165-11   Removed 8/30/19, replaced with BCM 49-3.02B Attachment 1 (PDF)
     
168-0.0 12/20/2018 Signs (PDF)
 168-1.0   Removed 12/20/18, replaced with BCM 56-2.03
 168-2.0 11/15/1977

Expansion Anchors for Bridge Mounted Signs (PDF)

(Partially incorporated into BCM 56-2.03 (PDF) and Attachment 2 (PDF))

 168-3.0   Removed 12/20/18, replaced with BCM 56-2.01C (PDF)
 168-4.0 7/19/2012

Resin Capsule Anchorage for Bridge Mounted Sign Structures (PDF)

(Partially incorporated into BCM 56-2.03 Attachment 1 (PDF) and Attachment 2 (PDF))

     
170-0.0 7/1/2001 Structural Steel (PDF)
 170-1.0 7/1/2001 Discussion of Basic Construction Terms and Topics for High-Strength Bolted Connections (PDF)
 170-2.0 7/1/2001 Inspection Procedure for Checking Tension in High-Strength Bolts (PDF)
 170-3.0 7/1/2001 Approved Methods of Tensioning High-Strength Bolted Connections (PDF)
 170-4.0 7/1/2001 Structural Steel Working Drawings (PDF)
     
175-0.0 10/19/1998 Surveying (to be replaced)
 175-1.0 10/19/1998 Removed 9/17/2020
     
180-0.0 5/31/2022 Welding (PDF)
 BCB 180-1.0 12/2/1996 Field welding of Structural Steel (PDF)
 BCB 180-1.0 Attachment 1 12/2/1996 Bridge Welding Code AWS D1.5 - SC Contract Administration Guide (PDF)
 BCB 180-1.0 Attachment 2 12/2/1996 Structural Welding Code AWS D1.1 - SC Contract Administration Guide (PDF)
 BCB 180-1.0 Attachment 3 12/2/1996 Code of Safe Practices Welding Inspection (PDF)
 BCB 180-1.0 Attachment 4 12/2/1996 Checklist for Compliance with Welding Code AWS D1.5 (PDF)
 BCB 180-1.0 Attachment 5  12/2/1993 METS Quality Assurance Manual for Field Welding/Non Destructive Testing (PDF)
 BCB 180-2.1 6/1/2000 Checklist for Welding Quality Control (PDF)
 BCB 180-2.1 Attachment 1 6/1/2000 Welding Quality Control Checklist Definitions (PDF)
BCB 180-2.1 Attachment 2  6/1/2000 Welding Quality Control Checklist - Prior to Beginning Any Welding Work (PDF)
 BCB 180-2.1 Attachment 3 6/1/2000 Welding Quality Control Checklist - During Weld Production (PDF)
 BCB 180-2.1 Attachment 4 6/1/2000 Reinforcing Steel Checklist - Prior to Beginning Any Welding Work (PDF)
 BCB 180-3 12/16/1996 Reinforcing Steel Welding and Testing (PDF)
 BCB 180-3 Attachment 1 12/16/1996 Sample Welding Letter to Contractor (PDF)
 BCB 180-4 10/15/2002 Welding Support from METS (PDF)
 BCB 180-5 12/1/1996 Welding Support from METS for Projects Requiring Radiographs (PDF)
 BCB 180-6  

Revise Column Casing Weld Backing Plate Thickness

Removed 5/31/22, replaced with BCM 60-4.06 (PDF)

 BCB 180-6 Attachment 1  

Memorandum for Column Casing Inspection/Weld Backing

Removed 5/31/22, replaced with BCM 60-4.06 (PDF)

 BCB 180-7  

Inspection of Weld Backing Plate for Column Casing

Removed 5/31/22, replaced with BCM 60-4.06 (PDF)

 180-8.0  

Welding of Column Casings

Removed 5/31/22, replaced with BCM 60-4.06 (PDF)

 BCB 180-9 10/15/2002 Review of Contractor's Quality Control Plan (QCP) for Field Welding (PDF)
 BCB 180-9 Attachment 1 10/15/2002 METS QCP-1 and QCP-5 Examples (PDF)