District 8 Current Projects
- Emergency Projects SR-74 and SR-243
- XpressWest
- I-10 Blythe Pavement Rehabilitation
- I-10 Tune Up Pavement Rehabilitation
- I-15 Pavement Rehab near Hesperia
- I-15 Interchange Reconstruction
- I-15 Repair Earthen Dike
- I-40 Regrade Existing Median
- SR-127 Shoulder Widening and Rumble Strips
- SR-18 Raised Curb Median at Victorville
- SR-18 Raised Curb Median at SR-395
- SR-18 Shoulder Widening and Rumble Strips
- SR-2 Sheep Creek Bridge Shoulder Widening
- SR-38 Reline or Replace Culverts
- SR-58 Kramer Junction Expressway
- SR-60 Pavement Rehab
- SR-60 SWARM
- SR-60 Truck Climbing Lane
- SR-62 Embankment Restoration
- SR-62 Widen Shoulders and Install Rumble Strips
- SR-74 Raise Curb Median Safety
- SR-74 Widen Lanes Add Shoulders and Rumble Strips
- SR-79 Median Barrier and Rumble Strips near San Jacinto
- US-95 Rock Slope Protection and Culvert Replacement
- US-95 Widen Shoulders and Install Rumble Strips (Postmile 40.0-40.4)
- US-95 Widen Shoulders and Install Rumble Strips (Postmile 65.4-66.0)