Bridge Contractor Outreach

The formation of the Bridge Contractors/Caltrans Liaison Committee serves the purpose of fostering productive discourse between the Division of Engineering Services and the Bridge Contracting community, specifically focusing on structural matters. Our objective is to promote the exchange of information and engage in collaborative efforts to address action items that have been mutually agreed upon by the committee.  

In addition to our semi-annual meetings, we are prepared to convene additional sessions as necessary to address specific action items.  If you require any of the topic files below, please reach out to us via email at osc.administration@dot.ca.gov.  We are here to facilitate communication and provide the necessary resources to support our shared goals.


September 2023 Meeting Information: 

April 2023 Meeting Information: 

September 2022 Meeting Information:

April 2022 Meeting Information:

September 2021 Meeting Information:

September 2018 Meeting Information:

  • September 21 Agenda (PDF)
  • Meeting Minutes:
    • September Meeting Minutes (PDF)
  • Handouts: (PDF)
    • Look Ahead List by District (PDF)
  • Presentations: (PDF)
    • Falsework Subcommittee Update (PDF)
    • Specification Update (PDF)
    • METS-Source Inspection and DIME Program (PDF)

March 2018 Meeting Information:

  • March 16 Agenda (PDF) 
  • Meeting Minutes:
  • Handouts: (PDF)
    • Accelerated Bridge Delivery Freight Corridor Improvement (PDF)
    • Look Ahead List by District (PDF)
    • Specification Updates (DOC)
  • Presentations: (PDF)
    • Bridges and Biology-Project Delivery Process (PDF)
    • CM-GC Marine Demo SFOBB (PDF)
    • CM-GC SR-99 (PDF)
    • FW Temporary Structures (PDF)
    • Structure Specifications & Research (PDF)

September 2017 Meeting Information:

  • September 22 Agenda (PDF)
  • Work Trend:
    • FY 2018 Upcoming Projects for Office F, D4-East (PDF)
    • FY 2018 Upcoming Projects for Office F, D4-North (PDF)
  • Meeting Minutes:
    • September 22 Meeting Minutes (PDF)
  • Handouts: (PDF)
    • A. Future Projects (PDF)
  • Presentations: (PDF)
    • Freight Corridor (PDF)
    • Pfiefer Canyon (PDF)
    • DRB Update (PDF)

March 2017 Meeting Information:

  • March 24 Agenda (PDF)
  • Meeting Minutes:
    • March 24 Meeting Minutes (PDF)
  • Handouts: (PDF)
    • A. Modified Contractor Risk Assessment (PDF)
  • Presentations: (PDF)
    • Friction Testing (PDF)
    • Deck Panel Replacement (PDF)
    • Concrete Deck Curing (PDF)
    • Differing Site Condition (PDF)

September 2016 Meeting Information:

  • September 16 Agenda (PDF)
  • Meeting Minutes: (PDF)
    • September 16 Meeting Minutes (PDF)
    • September 16 Sign-in Sheets (PDF)
  • Presentations: (PDF)
    • BIM for Construction (PDF)
    • Risk Management-How CT See Projects (PPTX)

March 2016 Meeting Information:

  • March 18 Agenda (PDF)
  • Prereads: (PDF)
    • 2015 SS Section 51-6 "Mass Concrete" (PDF)
    • Specification Revisions (DOC)
  • Meeting Minutes: (PDF)
    • March 18 Meeting Minutes (PDF)
    • March 18 Sign-in Sheets (PDF)
  • Presentations: (PDF)
    • B. Mass Concrete - Part 1 (PDF)
    • C. Mass Concrete -Part 2 (PDF)
    • D. 2015 Construction Standards (PDF)
    • E. Concrete Deck Specifications (PDF)
  • Handouts: (PDF)
    • A. Mass Concrete Specifications (PDF)
    • F. Concrete Deck Specifications (PDF)
    • G. Concrete Deck Specifications Summary (PDF)

September 2015 Meeting Information:

  • September 18 Agenda (PDF)
  • Prereads: (PDF)
    • Role of the Demolition Engineer (PDF)
    • Falsework Certification (PDF)
  • Meeting Minutes: (PDF)
    • September 18 Meeting Minutes (PDF)
    • September 18 Sign-in Sheets (PDF)
  • Presentations: (PDF)
    • Foundations Testing Branch: Gamma-Gamma Logging (PPTX)

March 2015 Meeting Information:

  • March 20 Agenda (DOC)
  • Prereads: (PDF)
    • Clear Cure Draft Specification (PDF)
  • Meeting Minutes (PDF)
  • Presentations: (PDF)
    • Fort Goff Project (PDF)
    • Rebar Guying (PDF)
September 2014 Meeting Information:
  • September 19 Agenda (PDF)
  • Prereads: (PDF)
    • Item 3a: Falsework Removal Specifications (PDF)
    • Item 3b: DIB Architectural Guidelines (PDF)
    • Item 3c: Architectural Treatment Draft Specifications (PDF)
  • Meeting Minutes (PDF)
  • Presentations: (PDF)
    • Falsework Update (PDF)
    • ABC Project (PDF)
March 2014 Meeting Information:
  • March 21 Agenda (PDF)
  • Prereads: (PDF)
    • Item 3a: PRESTRESSING.pdf (PDF)
    • Item 3b: FALSEWORK.doc (DOC)
    • Item 3c: QA/QC STRUCTURAL CONCRETE.docx (DOC)
    • Item 3d: SKID TESTING MACHINE.pdf (PDF)
    • Item 4: Clear Cure on Architectural finishes Butch Parker Rados Const.docx (DOC)
    • Item 5: Crackless decks.docx (DOC)
  • Meeting Minutes (PDF)
  • Presentations: (PDF)
    • Falsework (PDF)
    • Structural Concrete (PDF)
    • Crack-less Bridge Decks (PDF)
September 2013 Meeting Information:
  • Agenda (PDF)
  • Handouts: (PDF)
    • Friction Coefficient (PDF)
    • Pre-Authorized Wood & Sand Jack Memo C-18 (PDF)
    • Specification for Constructing Temp Pedestrian Facilities (PDF)
    • Summary of Revisions to Standards Section 50 (PDF)
    • Wall Aesthetics DIB (PDF)
    • Winches Section 48 (PDF)
  • Attendees (PDF)
  • Meeting Minutes (PDF)
  • Presentations: (PDF)
    • Prestressing (PDF)
    • Aesthetics (PDF)
March 2013 Meeting Information:
  • Agenda (PDF)
  • Attendees (PDF)
  • Meeting Minutes (PDF)
  • CIDH Piles Presentation (PDF)
  • Column Size Presentation (PDF)
  • Falsework Presentation (PDF)
  • Prestressing Presentation (PDF)
  • Aesthetics Presentation (PDF)
September 2012 Meeting Information:
  • Participants (PDF)
  • Meeting Minutes (PDF)
  • Summary of Comments (PDF)
  • Charter (PDF)
  • QA/QC Concrete Presentation (PDF)