Project Study Report - Project Development Support Guidance
What Projects Can Utilize the Streamlined Project Initiation Document (PID) Process?
All State Transportation Improvement Program (STIP) and locally-funded projects are required to use the Project Study Report-Project Development Support (PSR-PDS) format.
If appropriate, a local agency may submit a request to the District Director asking for approval to use the Project Study Report (PSR) in lieu of the PSR-PDS.
Given limited resources available to fund the development or review and approval of PIDs, the PSR should be reserved for projects where all support, right of way acquisition, and construction costs will be programmed or funded at once or within a STIP cycle.
Project Study Report - Project Development Support Guidance
Guidance Documents
- Project Study Report - Project Development Support (PSR-PDS) Guidance
- Project Study Report - Project Development Support (PSR-PDS) Template
- Project Study Report - Project Development Support (PSR-PDS) Estimate
Guidance Articles
- Article 2 - Design Scoping Index (PDF)
- Article 3 - Stormwater Documentation (PDF)
- Article 4 - Transportation Planning Scoping Information Sheet (PDF)
- Article 5 - Traffic Engineering Performance Assessment (PDF)
- Article 6 - Preliminary Environmental Analysis Report (PDF)
- Article 8 - PSR-PDS Survey Needs Questionnaire (PDF)
- Article 9 - Quality Management Plan (PDF)
- Article 10 - Risk Register (PDF)
- Article 11 - DES Scoping (PDF)