Office of Pavement Programming

Office of Pavement Programming

2389 Gateway Oaks Suite# 200

Sacramento, CA 95833

The primary functions of the Office of Pavement Programming are: 

  • Establish pavement funding, allocation and targets for the State Highway System Management Plan (SHSMP). The SHSMP is a new integrated management plan that fulfills the Streets and Highway Code section 164.6 requirements for the Ten-Year State Highway Operation and Protection Program (SHOPP) plan. The current SHSMP can be found by clicking the link below:
  • Collaborate with the districts to develop a Ten-Year Pavement (SHOPP) Plan
  • Collaborate with the districts to develop a Five-Year HM1 Plan
  • Prepare Annual Crumb Rubber Report. Public Resources Code section 42703 requires the Secretary of the Transportation Agency to prepare the crumb rubber report by January 1 (one year after the calendar year ends), on an annual basis. The crumb rubber report contains an analysis comparing the cost differential between asphalt containing crumb rubber and conventional asphalt. Section 42703 also requires the California Department of Transportation (Caltrans) to meet specified crumb rubber usage targets and to increase crumb rubber usage by specified dates unless the cost of asphalt containing crumb rubber exceeds the cost of conventional asphalt. This report addresses both requirements. The current Crumb Rubber Report and previous reports are found by clicking on the link below: