2026 Job Order Contracting Annual Report

This is the Job Order Contracting (JOC) Program’s annual progress report as required by Streets and Highways Code Section 217.1(f) (Senate Bill (SB) 146, Chapter 58, Statutes of 2023) by reflecting JOC activities through December 31, 2033.  This report is prepared in accordance with paragraph (f) of Streets and Highways Code Section 217.1.

JOC-MA/WO1

 

Contractor

 

Estimated Project Cost

 

Awarded Project Cost

 

Award Date

Procurement Time Saving

Written Protest

Small Business Usage

DVBE2 Usage

Labor Code Violations

MA-01JOC00001

HUM 101Pavement Preservation

VSS International, Inc.

$2,800,000

-

6/18/2024

No time saving3

None

-

-

-

WO-01-0M7004

-

-

$2,573,124

09/18/24

-

-

$385,968

$197,389

None

MA-02JOC49604

LAS, SHA, THE 36, 44, 99, 299 Pavement Preservation

Stimpel-Wiebelhaus Associates, Inc.

$608,555

-

06/07/24

No time saving3

None

-

-

-

WO-02-4J9604

-

-

$608,135

07/26/24

-

-

$565,485

$34,480

None

MA-06JOC20231

KER 99 Slab Replacement

Papich Construction Company, Inc.

$1,561,645

-

05/02/24

33 days

None

-

-

-

WO-06-1F8604

-

-

$1,374,475

09/11/24

-

-

$41,835

$46,228

None

MA-11JOC23242

SD 805 Bridge Preservation

Myers & Sons Construction, LLC

$4,714,000

-

05/20/24

56 days

None

-

-

-

WO-11-2N1704

-

-

$3,191,090

10/10/24

-

-

$555,214

$74,627

None

MA-04JOC25101

SM 92 and SON 128 Pavement Preservation

O.C. Jones & Sons, Inc.

$1,904,000

-

05/21/25

120 days

None

-

-

-

WO-04-0X650

-

-

$751,124

09/26/25

 

 

$26,887

$57,691

None

WO-04-0X720

-

-

$999,111

07/22/25

 

 

$146,831

$48,000

None

MA-07JOC40001

LA Advanced curve warning signs

Polo Engineering, Inc.

$1,500,000

-

05/22/25

4 days

None

-

-

-

WO-07-0W890

-

-

$1,450,413

07/23/25

-

-

-

-

-

Table 1: Job Order Contract Award Information

 

1 Job Order Contracting - Master Agreement/Work Order

2  DVBE – Disabled Veteran Business Enterprise

3 JOC provides the greatest benefit when multiple projects are bundled under a single Master Agreement. For this case, only one project (one EA) was delivered through JOC; therefore, the procurement timeline was comparable to the conventional procurement process and did not result in measurable time savings

 

Summary of Small Business Usage

SB utilization for several ongoing JOC projects is summarized in the table above. As more projects are completed, information will be included in future reports.

Recommendations

Job Order Contracting process is ideal for projects that involve non-complex, commonly encountered and repetitive tasks with a well-defined scope. This procurement method shows greater efficiencies are realized when multiple locations are bundled under one JOC Master Agreement. As more JOC projects with multiple locations are completed, additional data will be available to further assess the effectiveness of this delivery method.

Caltrans will continue to utilize Job Order Contracting for projects that are defined in the statute.