City of Arvin Median and Pedestrian Improvements |
Kern |
223 |
Enhance safety features for pedestrians with the improvement of current crosswalks and installation of new crosswalks; improvement aethetics of the existing medians and improve the visual character and identity of the city |
City of Avenal Enhancement |
Kings |
269, 33 |
Remove and replace vegetation; install radar feedback speed signs along SR 269 to enhance the safety of users along the corridor; install a gateway monument. |
Fresno Block Wall |
Fresno |
41 |
Install concrete masonry unit wall and drought tolerant plantings |
Kerman Roundabout Enhancement Project |
Fresno |
145 |
Removal and replacement of plantinginside and outside of the central island; install decomposed granite or rock blanket within the central island to reduce maintenance; revision of the existing irrigation system, repair of existing hardscaping, rock blanket paving along sidewalk edge; install gateway monument inside of the central island. |
Madera Block Wall Enhancement |
Madera |
99 |
Install oleander planting in front of the block wall to deter tagging; install a simple artistic design to further discourage tagging to the wall. |
McKinley Public Space Improvement |
Fresno |
41 |
Install a public gathering space; install street furnishings such as benches, fencing, planting, and irrigation; install sculptures created in partnership with local artists; convert the space into a community garden if approved; install planter boxes and a community building. |
Mendota and Firebaugh Beautification and Enhancement |
Fresno |
33/290 |
Install planting along the west side of SR 33 where irrigation is already in place; install a gateway monument; install sidewalk; install radar feedback speed limit signs; install rectangular rapid flashing beacons at marked crosswalks; install benches; add green paint to bike lanes. |
San Pablo Park Enhancement and Beautification |
Fresno |
180 |
Enhance and beautify existing structures in San Pablo Park located under SR 180 in Fresno; remove and replace vegetation; install additional trash containers; install new signage, improved fencing, and public art in partnership with local artists. |
Tulare Corridor Screening |
Tulare |
99 |
Enhance and beautify the SR 99 corridor in Tulare County for travelers along 99 and members of the communities; construct enhanced fencing and provide visual screening to decrease views of adjacent blighted areas; provide privacy screening for residents living adjacent to SR 99. |
City of Bakersfield – SR 204 Slope Paving, Sidewalk Gap Closures, and Artwork |
Kern |
58/204 |
Install murals underneath Caltrans bridge structures located along the corridor; removal and replacement of vegetation on slopes; improved fencing; sidewalk gap closures and remediation; green bike lane paintings; utility box art wrappings; red stamped concrete replacement in the medians rock cobble in gores; screen planting; free-standing sculptural pieces and rock work on slopes. |
Mural installation in the SR 41/California Ave/F St Airspace |
Fresno |
41 |
Enhance and beautify the airspace under SR 41 next to F Street in the city of Fresno; add a mural to the California Avenue abutment wall. |
Chowchilla Enhancement |
Madera |
233 |
Install new trees and vegetation; install tree wells and grates; install rectangular rapid flashing beacons at marked crosswalks; develop a new gateway monument for the city; median beautification along SR 233 corridor; quick build bulb outs; repair missing or damaged sidewalk sections |
Cutler-Orosi Corridor Enhancement |
Tulare |
63 |
Construct road diet including traffic calming elements such as bulb- outs which could be expanded to create small pockets of public space for artwork placement; install rectangular rapid flashing beacons at marked crosswalks; install accent and shade tree planting to reduce heat island effects; develop safe bike lanes to promote active transportation; incorporate streetscape furnishings including an aesthetic related family of streetscape elements such as benches, trash receptacles, bike racks, bus stop furnishings; accent paving in sidewalks at spot locations of interest; add free standing art and/or a gateway monument at community entryways and along the corridor. |
Garces Circle Improvements |
Kern |
204 |
Install improved fencing, curb ramps, new sidewalks, cobblestone paving, new seating, and murals; aesthetic fencing beneath bridges used as a safety enhancement to protect structure from potential fire; safety enhancements within the central space of the Garces Memorial circle with installation of rock blanket or similar in Caltrans right of way. |
MacFarland & Delano Enhancement |
Kern |
99 |
Create a new pedestrian trail system along the freeway for both the NB and SB frontage roads; install artwork and site appurtenances, benches, trash receptacles; reconstruct right of way fence; install slope paving beneath bridge |
Tulare Avenue and Divisadero Enhancement |
Fresno |
41 |
Install artwork in partnership with local artists; install rock blanket, and replace dead vegetation with drought tolerant plants. |
City of Bakersfield – SR 99/California Ave.
Pedestrian Improvements |
Kern |
99 |
Install rock blanket; install decorative fencing; paint existing retaining wall and columns on bridge structures |