San Francisco/Oakland Bay Bridge Cable Inspection

Header banner for San Francisco Oakland Bay Bridge Cable Inspection Project

Current Advisories


September 23, 2024

Nighttime Lane Closures on WB I-80 San Francisco/Oakland Bay Bridge due to routine cable inspection and maintenance Beginning September 26 from 8:00 PM to 4:00 AM

(The Bay Bridge is safe for motorists to travel. Motorists are encouraged to use Caltrans Quickmap)

San Francisco  — Caltrans is conducting routine cable inspection and maintenance on the westbound Interstate 80 (I-80) San Francisco/Oakland Bay Bridge starting September 26, which will require the closures of the far-right lanes from the Yerba Buena Island Tunnel to the end of the bridge. This project ensures that the bridge remains safe and operational.

Inspections of the cable will be in progress Monday through Friday nights from 8:00 PM to 4:00 AM, until May 2025. A construction work zone speed limit reduction will be in effect during these hours, reducing speed limit to 40MPH. Caltrans will keep the public apprised of all future scheduled closures. Read more about current and future San Francisco County freeway repairs and repair work schedules at San Francisco Freeway & Road Rehabilitation | Caltrans.

Traffic Delays:

Motorists traveling from the East Bay into San Francisco across the San Francisco Bay Bridge (westbound 1-80) may experience minor delays.

Caltrans thanks pedestrians, cyclists, and motorists for your patience as we work to repair freeway barriers. Every effort will be made to minimize inconvenience to the traveling public.  When possible, please consider using public transit where your MUNI, BART, CalTrain, and AC Transit systems are all reliable and comfortable alternatives to driving.

Traffic Control Measures:

Changeable messages and directional signs will be in place to assist motorists traveling in the area. During the closures, the California Highway Patrol (CHP) will be onsite, and the reduced speed limit will be enforced.  Please drive with caution. Slow for the Cone Zone and Be Work Zone Alert. Caltrans thanks motorists for their patience while we work to maintain our state’s highways, bridges, and tunnels.


Project Overview

Caltrans is conducting routine cable inspection and maintenance on the westbound Interstate 80 (I-80) San Francisco/Oakland Bay Bridge starting September 26, which will require the closures of the far-right lanes from the Yerba Buena Island Tunnel to the end of the bridge. The bridge is safe and secure.  This project ensures that the bridge remains safe and operational. Inspections of the cable will be in progress Monday through Friday nights from 8:00 PM to 4:00 AM, until May 2025.  A construction work zone speed limit reduction will be in effect during these hours, reducing speed limit to 40MPH.  Caltrans will complete routine cable inspections and maintenance initially on the westbound 1-80 section of the freeway. Caltrans will keep the public apprised of future scheduled closures.
Photograph of the western span of the San Francisco Oakland Bay Bridge looking towards San Francisco.

Schedule

September 26, 2024 – May 2025
Crews will access the bridge cables every Monday through Friday, from  8 pm to 4 am.
Current project will occur from the Yerba Buena Island Tunnel to the end of the Bay Bridge in San Francisco

Caltrans District 4 Bay Bridge Cable Inspection

Contact

For real-time traffic, click on Caltrans QuickMap: https://quickmap.dot.ca.gov/
For 24/7 traffic updates, follow 511.org: https://x.com/511SFBay

For more information contact:

Lori Shepherd
Public Information Officer
San Francisco County CALTRANS - District 4