242 Rehabilitation Media Bar
Media Content for Northbound State Route 242 (SR-242)-Rehabilitation Project Concord
This project includes funding from Senate Bill (SB) 1, the Road Repair and Accountability Act of 2017. SB 1 provides $5 billion in transportation funding annually split between the state and local agencies. Road projects progress through construction phases more quickly based on the availability of SB 1 funds, including projects that are partially funded by SB 1. For more information about other transportation projects funded by SB 1, visit www.rebuildingca.ca.gov.
Video
7-18-2021
- 7-18-21 7PM Lane 3 Placing Concrete II Part 1
- 7-18-21 7PM Lane 3 Placing Concrete Part 2
- 7-18-21 7PM Lane 3 Placing Concrete Part 3
7-17-2021
-
Here’s live link to NB-680 at NB SR-242 interchange camera: I-680 : Pleasant Hill : TV817 -- I-680 : Sourth of SR-242 (ca.gov)
Images
7-18-2021
- 71821 at 530AM completion of CRCP paving in lane 3
- 71821 at 1830 Start of concrete paving in lane 3 with concrete paving machine
- 7-18-21 at 445PM Crews hand finishing the concrete paving near Clayton Rd UC
7-17-2021
- NB242 Lane 3 Crews paving lanes at joint between lane 2 and lane 3
- 71721 at 0900 NB242 Lane 3 Asphalt paving in progress
- 71721 at 0917 NB242 Lane 3 Asphalt paving installed and tie bars installed
- 71721 at 0934 NB242 Lane 3 Crews installing rebar mats south of Willow Pass
- 71721 at 1005 NB242 Lane 3 Crews insatlling rebar mats with crane
- NB242 Lane 3 Crews drilling holes for tie bars at joint between lane 2 and lane 3
- NB242 Lane 3 Crews removing concrete from lane 3 and loading semi end dumps for offsite recycling
- NB242 Lane 3 Dowel bars installed in approach slabs at end of CRCP runs
- NB242 Lane 3 old concrete removed and base material smoothed and compacted
- NB242 Lane 3 support slabs poured and bond breaker in place at termination of CRCP
Video
7-9-2021
- DJI_0320 7-9-21 NB SR242 7-9-21 Prior to Construction Looking south
- DJI_0322 7-9-21 NB SR242 prior to construction looking north
- DroneVideo1_07_09_21 Prior to construction NB SR242 looking north #1
- DroneVideo2_07_09-21 Prior to construction NB SR242 looking north #2
- DroneVideo3_07_09_21 Prior to construction NB SR242 look south #1
- DroneVideo4_07_09_21
7-10-2021
- Video of NB SR 242 Construction Work
- DJI_0001 7-10-21 Asphalt Paving Clayton to Willow Pass
- DJI_0009 7-10-21 concrete removed btwn Willow Pass and Concord Ave
- DJI_0011 7-10-21 concrete removal and excavators working in lane #2
- IMG_2230 7-10-21 NB242 Lane 2 installing reinforcing steel mat and chairs
- IMG_2241 7-10-21 NB242 Finishing roadway excavation and concrete removal in lane #2
- IMG_2230 7-10-21 NB242 Lane 2 installing reinforcing steel mat and chairs.MOV
- DJI_0076 reinforcing steel in place in lane #2 south of Willow Pass Rd.MOV
- DJI_0077 reinforcing steel in place in lane #2 north of Willow Pass.MOV
- DJI_0087 7-10-21 at 1520 crews adjusting rebar mats in lane #2 with traffic in lane #1.MOV
- DJI_0090_7-10-21 at 1600 Crews adjusting rebar mats at Concord Ave in Lane #2 traffic in lane #1.mp4
7-11-2021
- DJI_0177 7-11-21 at 0730 Concrete delivery and placement near Concord Ave onNB242.MOV
DJI_0104 7-11-21 at 0700 Completed concrete pour between Clayton Rd UC and Willow Pass Rd UC.MOV
DJI_0108 7-11-21 at 0700 Completed paving between Willow Pass UC and Concord Ave UC.MOV
DJI_0151 7-11-21 at 0715 Concrete curing crew approaching Concord Ave.MOV
DJI_0168 7-11-21 at 0720 Concrete placement crew approaching Concord Ave on NB 242.MOV
DJI_0171 7-11-21 at 0725 Concrete finishing crews approaching Concord Av on NB242.MOV
Images
- 7-10-21 NB SR242 Support Slab poured under end of CRCP
- DJI_0008 7-10-21 concrete removed asphalt starting north of Willow Pass Rd
- DJI_0004 7-10-21 start of paving looking N from Willow Pass Rd UC
- 7-10-21 Crane lifting rebar mats into lane #2.jpeg
- 7-10-21 Crews setting rebar mats in lane #2 with crane.jpeg
- 7-10-21 Rebar mats placed in lane #2.jpeg
- Prior to work
7-11-2021
- IMG_2285 NB242 7-10-12 at 1030PM concrete poured and spray curing compound applied.JPG
- IMG_2273 NB242 7-11-21 at 0800 Traffic Barrels with Wet Concrete Signs in place along lane split between lanes #1 and #2.JPG
- IMG_2280 NB242 7-11-21 at 0800 Fresh concrete in place N of Concord Ave lane #2 with white spray cure.JPG
- IMG_2281 NB242 7-10-21 at 1030PM wet concrete placed in lane #2 near Clayton Rd UC.JPG
- IMG_2282 NB242 7-11-21 at 0800 Concrete paving crew and paving machine running in lane #2.JPG
- IMG_2283 NB242 7-10-21 at 11PM concrete crew placing concrete at night.JPG
- IMG_2284 NB242 7-11-12 at 0800 wet concrete sign with staff in background.JPG