Project: I-80 Westbound Carquinez (Al Zampa) Bridge Deck Rehabilitation
Location: In Contra Costa and Solano Counties on Interstate 80 Post Miles Start CC-80-PM R13.8 to R14.1 &
SOL-80-PM R0.0 to R0.4
Work Summary: This project is under the toll bridge program and is an In-House Design. The project will replace the top course of the existing AC wearing surface on the orthotropic steel deck to improve rideability and preserve the bridge structure. This project will provide a smoother and safer driving surface while extending the service life of this critical I-80 connection.
53 Hour ClosureStart: August 21, 2026 at 10:00 PM
End: August 24, 2026 at 3:00 AM
Upcoming Projects
Project: Open Road Tolling (ORT)
Location: I-80 at the Carquinez Bridge Toll Plaza (Solano County)
Scope of Work:
- Remove existing toll booths
- Install temporary tolling system
- Prepare for gantry installation
Purpose: This project will transition the Carquinez Bridge to a modern, cashless tolling system, improving traffic flow and reducing congestion.