Project Description:

This project proposes to modify signals at five locations and install Pedestrian Hybrid Beacon systems (PHBs) at three intersections, 10 Rectangular Rapid Flashing Beacon systems (RRFBs), and 2 Advanced Warning Beacon systems (AWBs) before STOP signs at off-ramp termini.
High-visibility crosswalk markings, advanced yield lines with associated signs are also installed.

On SR-37, the Wilson Ave Off-ramp from EB SR-37 will be upgraded with 2 curb ramps, a refurbished passageway, refreshed crosswalks, and an RRFB system.

Purpose and Need:

The purpose of this project is to enhance traffic safety at uncontrolled intersections and ramp termini by installing RRFBs, PHBs, and AWBs.

Status:

Complete Environmental Phase – Summer 2022
Complete Design – Spring 2024
Begin Construction – Winter 2025
End Construction – Winter 2027