Sac 5 Corridor Enhancement Project Maps
Season 1 Work:
- Bridge work north of Laguna Boulevard, north of Cosumnes River Boulevard and north of Casilada Way.
- Sound wall work south of Pocket Road and Meadowview Road.
- Asphalt work near Florin Road and the U.S. 50 and I-5 interchange.
- Crack and seat and Overlay work south of Richards Boulevard.
Season 2 Work:
- Bridge work north of Laguna Boulevard, north of Cosumnes River Boulevard and north of Casilada Way.
- Retaining wall work south and north of Florin Road and north of Sutterville Road.
- Outside widening of lanes from Meadow and Pocket Roads through to the U.S. 50 and I-5 interchange.
- Concrete barrier work from north of Laguna Boulevard to Cosumnes River Boulevard.
- Crack and seat and Overlay work south of Richards Boulevard.
Season 3 Work:
- Bridge work at multiple locations north of Florin Road to Casilada Way.
- Median widening work at Laguna Boulevard to north of Laguna Boulevard.
- Additive bus and carpool lane work south of Elk Grove Boulevard to north of Laguna Boulevard.
- Concrete barrier work from Meadowview and Pockets roads to U.S. 50 and I-5 interchange.
- Median paving work from Meadowview and Pockets roads to U.S. 50 and I-5 interchange.
- Demolition work for old Casilada Way bike and pedestrian overcrossing.
- Asphalt work from Florin Road to U.S. 50 and I-5 interchange. Includes 55 hour weekend closures.