Sac 5 Corridor Enhancement Project Maps

Sac 5 Corridor Enhancement Project Season 1

Season 1 Work:

  1. Bridge work north of Laguna Boulevard, north of Cosumnes River Boulevard and north of Casilada Way.
  2. Sound wall work south of Pocket Road and Meadowview Road.
  3. Asphalt work near Florin Road and the U.S. 50  and I-5 interchange.
  4. Crack and seat and Overlay work south of Richards Boulevard.

Sac 5 Corridor Enhancement Project Season 1

Season 2 Work:

  1. Bridge work north of Laguna Boulevard, north of Cosumnes River Boulevard and north of Casilada Way.
  2. Retaining wall work south and north of Florin Road and north of Sutterville Road.
  3. Outside widening of lanes from Meadow and Pocket Roads through to the U.S. 50 and I-5 interchange.
  4. Concrete barrier work from north of Laguna Boulevard to Cosumnes River Boulevard.
  5. Crack and seat and Overlay work south of Richards Boulevard.

Sac 5 Corridor Enhancement Project Season 1

Season 3 Work:

  1. Bridge work at multiple locations north of Florin Road to Casilada Way.
  2. Median widening work at Laguna Boulevard to north of Laguna Boulevard.
  3. Additive bus and carpool lane work south of Elk Grove Boulevard to north of Laguna Boulevard.
  4. Concrete barrier work from Meadowview and Pockets roads to U.S. 50 and I-5 interchange.
  5. Median paving work from Meadowview and Pockets roads to U.S. 50 and I-5 interchange.
  6. Demolition work for old Casilada Way bike and pedestrian overcrossing.
  7. Asphalt work from Florin Road to U.S. 50 and I-5 interchange. Includes 55 hour weekend closures.