Bridge Maintenance in Siskiyou County

Bridge Maintenance in SIS -- Before

The Project:

The Bridge Maintenance in Siskiyou County Project will provide bridge rehabilitation along Interstate 5 at the following locations:

  • Oak Street Undercrossing (Dunsmuir)
  • North Mount Shasta Separation
  • Abrams Lake Overcrossing (1)
  • Abrams Lake Overcrossing (2)
  • Deetz Road Undercrossing
  • South Weed Undercrossing
  • Route 5/97 Separation (1)
  • Route 5/97 Separation (2)
  • Route 5/265 Separation
  • Klamath River Bridge & Separation (near Collier Safety Roadside Rest Area)

Project Includes:

Various bridge maintenance operations at 10 locations in Siskiyou County along Interstate 5.

Current Project Schedule:

There are an estimated 95 working days for this project, approximately 65 of which will require traffic control. Construction is scheduled for 2024.

Project Funding Estimates:

Total project cost (including support) is $3 million.  This project is made possible by Senate Bill (SB) 1 funding.

Contacts:

Project Manager: Brandon Trent

Public Information Officer: Chris Woodward