Tuolumne 49 Pavement Anchor Project

Project Description

This project proposes to restore the pavement from Jamestown to Sonora while adding and installing complete street assets within primary project location limits and addressing bridge work in East Sonora. The work consists of cold planning existing pavement and resurfacing with various materials while adding / installing sidewalks, Class I & II bike lanes, transit stops, and a retaining wall. The bridge work includes placing polyester concrete on bridge deck and approach slabs.

10-1P090 Tuolumne 49 Pavement Anchor Project Map

Project Benefits

Purpose

Restore the facility to a state of good repair by rehabilitating the roadway, reducing maintenance expenditures by the Department, and providing safe conditions for Field Maintenance by reducing excessive exposure to moving traffic.

Need

Not promptly implementing maintenance strategies reduces the design life and level of service resulting in increasing costs to maintain and challenges for field maintenance staff to repair SR 49 in a condition that is adequate for the traveling public.


Current Schedule

Spring 2023

Project Study Report (M010)

Summer 2026

Project Approval & Environmental Document (M200)

Winter 2028

Right of Way Certification (M410)

Winter 2029

Ready to List (M460)

Summer 2029

Approved Construction Contract (M500)

Winter 2031

Project Completion (M600)


Funding Source


2024 SHOPP Cycle. Program: 20.10.201.121 Pavement Preservation – DIB 81. 201.119 Bridge Preservation, and 201.361 ADA Pedestrian Infrastructure.


Project Status


PA&ED allocated in March 2024. PA&ED to start. TCTC interested and coordination with 10-1L200 (Jamestown Widening project)


Project Cost/Programmed (x$1,000):

Programed Project Cost Capital $ Support $
Project Initiation Document $0 $2
Project Approval & Environmental Document   3,499
Plans, Specifications, & Estimates   $2,938
Right of Way $2,596 $3,047
Construction $45,184 $5,932
Projected Cost as of April 25, 2024: Planned $ Expended $
Project Initiation Document $2 $240
Project Approval & Environmental Document $3,499 $0
Plans, Specifications, & Estimates $2,938 $0
Right of Way $3,047 $0
Construction $5,932 $0

Project Manager

Charlie Do

Charlie Do
Office Cell: (209) 986-0962
Email: Charlie.Do@dot.ca.gov

Public Information Office

District 10 logo

Phone: (209) 948-7977
Email: District10PublicAffairs@dot.ca.gov