State Route 59 Capital Preventive Maintenance Project
Project Description
The proposed project is a Capital Preventive Maintenance (CAPM) to preserve and extend the pavement service life within the project limits. The project is located on SR 59, in Merced County, in the City of Merced from 0.20 mile south of SR 59 and W Childs Ave intersection (PM 14.1) to the intersection of SR 59 and SR 99 (PM 14.763) continuing from the intersection of SR 59 and SR 99 on V St (PM 14.78) to 0.10 mile north of S Fork Black Rascal Creek near Santa Fe Dr intersection (PM 16.3).
The scope of the work includes cold planning existing pavement, dig-outs to repair localized areas of severe failure, sealing cracks, repair, replace and upgrade AC dikes and curbs, adding shoulder backing, upgrading ADA ramps, replacement of existing drainage grates with bicycle proof grates where needed, and signal work at 3 intersections: (15th St (ED023), 16th St (ED003) and Santa Fe Dr/Olive Ave (ED004) intersections with SR 59.
Project Benefits
Purpose and Need
The purpose of this project is to restore the existing facility to a state of good serviceability, improve ride quality, and extend the service life of the existing pavement structure.
The need for this project is to repair distressed pavement for pavement preservation.
Current Schedule
Project Study Report (M010)
06/28/21 (A)
Project Approval & Environmental Document (M200)
10/30/24 (T)
Right of Way Certification (M410)
12/17/25 (T)
Ready to List (M460)
12/24/25 (T)
Approved Construction Contract (M500)
07/31/26 (T)
Project Completion (M600)
05/28/27 (T)
Funding Source
State Highway Operation and Protection Program (SHOPP) – Pavement Rehabilitation (201.121)
Project Status
Project Study Report was approved 6/28/2021 and PA&ED targeted for October 2024.
Project Cost/Programmed (x$1,000):
Programed Project Cost | Capital $ | Support $ |
---|---|---|
Project Approval & Environmental Document | $1,678 | |
Plans, Specifications, & Estimates | $2,621 | |
Right of Way | $1,736 | $1,288 |
Construction | $11,602 | $2,191 |
Projected Cost as of September 10, 2024: | Planned $ | Expended $ |
---|---|---|
Project Approval & Environmental Document | $1,678 | $1,460 |
Plans, Specifications, & Estimates | $2,621 | $0 |
Right of Way | $1,288 | $0 |
Construction | $2,191 | $0 |
Project Manager
Charlie Do
Phone: (209) 986-0692
Email: Charlie.Do@dot.ca.gov
Public Information Office
Phone: (209) 948-7977
Email: District10PublicAffairs@dot.ca.gov
Address: P.O. Box 2048, Stockton, CA 95201-2048
Title VI Information
The California Department of Transportation (Caltrans) assures that no person shall, on the basis of race, color, or national origin, be excluded from participation in, be denied the benefits of, or be otherwise subjected to discrimination under any program or activity receiving Federal financial assistance, as required by Title VI of the Civil Rights Act of 1964 , as amended, the Civil Rights Restoration Act of 1987 , and Federal Executive Order 12898 (Federal Actions to Address Environmental Justice in Minority Populations and Low-Income Populations).
Caltrans will make every effort to ensure nondiscrimination in all of its programs and activities, whether they are federally funded or not, and that services and benefits are fairly distributed to all people, regardless of race, color, or national origin. In addition, Caltrans will facilitate meaningful participation in the transportation planning process in a nondiscriminatory manner.
Title VI Brochure (English, PDF)
Title VI Brochure (Spanish, PDF)
Title VI of the Civil Rights Act of 1964 (Caltrans Information)