Tuolumne & Calaveras Counties Drainage System Rehabilitation Project

Project Description

Existing cross drainage culverts under, State Routes (SR) 26, 108, and 120 primarily convey flow of surface water and stream flow across or from the highway right of way. These drainage systems also provide protection against flooding. The Maintenance Engineering Culvert Inspection Team reported that at least 40 culverts identified in this project have exceeded their design life and have deteriorated, corroded, and damaged inverts, as well as shape loss and joint separations. Therefore, if these culverts aren’t rehabilitated or replaced, undermining will occur and compromise the roadway.

Tuolumne Drainage System Rehabilitation Project Map

Calaveras Drainage System Rehabilitation Project Map

Project Benefits

Purpose and Need

The purpose of this project is to rehabilitate old failing culverts. If not rehabilitated, the roadway will eventually settle due to erosion of the soil below the pavement.


Current Schedule

Fall 2018

Project Study Report (M010)

Fall 2022

Project Approval & Environmental Document (M200)

Spring 2025

Right of Way Certification (M410)

Spring 2025

Ready to List (M460)

Winter 2025

Approved Construction Contract (M500)

Fall 2027

Project Completion (M600)


Funding Source


SHOPP Roadway. 20.XX.201.151


Project Status


The project is currently in the Construction phase.


Project Cost/Programmed (x$1,000):

Programed Project Cost Capital $ Support $
Project Approval & Environmental Document   $1,332
Plans, Specifications, & Estimates   $1,400
Right of Way $247 $298
Construction $3,100 $1,307
Projected Cost as of March 28, 2024: Planned $ Expended $
Project Approval & Environmental Document $1,332 $1,160
Plans, Specifications, & Estimates $1,400 $769
Right of Way $298 $117
Construction $1,307 $0