Fort Bragg ADA

Caltrans proposes to reconstruct existing sidewalks within the City of Fort Bragg in compliance with Americans with Disabilities Act (ADA) standards. The project will also construct new sidewalks on the east side of State Route 1 (SR1) from the State Route 20 (SR20) intersection to Boatyard Drive. Additional new sidewalk construction will occur on the west side of Route 1 from Ocean View Drive to the south end of the Noyo River Bridge, from Noyo Point Road to Cypress Street, and from Spruce Street to Elm Street. Walkway construction will occur along the south side of Cypress Street extending west from Route 1 for approximately 125 feet. Some of the new sidewalks will include construction of retaining walls. Additional improvements include drainage, road striping and signal button upgrades. 

The purpose of the project is to comply with American with Disability Act (ADA) requirements and improve conditions for pedestrians along Route 1 from the Route 20 intersection to Elm Street.

Construction Update

All businesses remain open during construction. Expect minor traffic delays during construction. Temporary access impacts may occur within the designated work area. Measures will be implemented to minimize disruptions and maintain safe access for vehicles and pedestrians. Please follow signage and thank you for your patience during this project.

Map indicating road work along Route 1 in Fort Bragg in Mendocino County. Northbound road closures from junction of Route 20 to Madrone Street. Southbound lane closures from Noyo Point Road to Cypress Street.

Route 20 to Boatyard Drive (November 1-30)

Work includes ADA-compliant sidewalks, a retaining wall, and street lighting.

Traffic Impact:

  • Route 1 (59.8 to 60 Postmiles) – Jct. Route 20 to Boatyard Drive; intermittent and alternating northbound lane closures will be in effect from 7 a.m. to 3 p.m. Motorists should expect minor slowdowns.

 *Construction schedule is subject to change.

 Schedule

  • Begin Construction: Spring 2026
  • End Construction: Fall 2027

Budget

The project construction cost is approximately $9.5 million.

Contact Information

Project Manager 
Alex Arévalo 
(707) 572-7392

Public Information Officer (Media Inquires) 
Manny Machado
(707) 496-6879, TTY 711

Last reviewed: September 2026

 

Recently poured sidewalks on Route 1 in Fort Bragg.

Framing and rebar is in place for new sidewalks on Route 1 in Fort Bragg.

Excavation work is bolstered by wooden framing as route 1 traffic passes by in Fort Bragg.

Construction of sidewalks and retaining wall, October 2026

 

Route 1 sign.