Select State Highway System Project Outcomes

The California Department of Transportation has prepared the "Select State Highway System Project Outcomes" in accordance with changes to the California Streets and Highway Codes enacted into law in 2023.  This inaugural report summarizes select project level outcomes involving the State Highway System (SHS) from all funding sources for the fiscal years 2018/19 through 2022/23.  The report also includes a listing of all planned or pending projects that are planned, in design or under construction.

The full report is available as an Adobe Acrobat PDF.  Excel data files of various project lists are linked below.  Comments and/or feedback on the report or data files should be directed to CT-TAM@dot.ca.gov.

Below information coming soon.

2025 Report

  • Select State Highway System Project Outcomes
  • Dashboard coming soon

Data Files

  • Project listing with lane additions
  • Projects relinquishing State Highway System miles
  • Projects converting general purpose lane miles
  • Projects relocating homes or businesses
  • Projects constructing new bikeways
  • Projects constructing or reconstructing sidewalks
  • Planned and pending projects

Accessibility Assistance:  Caltrans makes every attempt to ensure our documents are accessible. Due to variances between assistive technologies, there may be portions of documents which are not accessible.  Where documents cannot be made accessible, we are committed to providing alternative access to the content.  Should you need additional assistance, please contact us at (916) 654-2852 or visit https://dot.ca.gov/request-ada-compliant-documents.