The responses to bidder's inquiries, unless incorporated into a formal addendum to the contract, are not a part of the contract and are provided for the bidder's convenience only. In some instances, the question and answer may represent a summary of the matters discussed rather than a word-for-word recitation. The availability or use of information provided in the responses to bidder's inquiries is not to be construed in any way as a waiver of the provisions of Section 2-1.03 of the Standard Specifications or any other provision of the contract, the plans, Standard Specifications or Special Provisions, nor to excuse the contractor from full compliance with those contract requirements. Bidders are cautioned that subsequent responses or contract addenda may affect or vary a response previously given.

Q1) Item #11 Trench Excavation The roadway quantity chart on Q-1 shows this work at the new Drainage Inlet stationing. What work is covered by this item? Is it the excavation for the new DI? Or is the excavation for the new RC Pipe?

A1) Item #11, Trench Excavation is to cover for an eighteen inch diameter reinforced concrete pipe to connect two existing and proposed drainage inlets as shown on L-1 (Layout & Detail) sheet. The work for this item is to excavate a fifteen feet long trench for a 18” reinforced concrete pipe.

Q2) Item #12 Structure Excavation The roadway quantity chart on Q-1 shows this work from sta. 02+31.77 to 02+61.59, which corresponds to the sawcut operations on L-1 and is called Roadway Excavation. Does this Roadway Excavation correspond to Item #12 Structure Excavation?

A2) Item #12, Structure Excavation is to cover for excavation of a proposed drainage inlet as shown on L-1 (Layout & Detail Sheet) sheet. Therefore, No, item # 12 ( Structural Excavation) does not correspond to the roadway excavation as shown on L-1 sheet. The roadway excavation only covers the small section of asphalt shoulder removal for concrete barrier installation.