Contract 05A2318 (05-1J7504)

The responses to bidder's inquiries, unless incorporated into a formal addendum to the contract, are not a part of the contract and are provided for the bidder's convenience only. In some instances, the question and answer may represent a summary of the matters discussed rather than a word-for-word recitation. The availability or use of information provided in the responses to bidder's inquiries is not to be construed in any way as a waiver of the provisions of Section 2-1.03 of the Standard Specifications or any other provision of the contract, the plans, Standard Specifications or Special Provisions, nor to excuse the contractor from full compliance with those contract requirements. Bidders are cautioned that subsequent responses or contract addenda may affect or vary a response previously given.

Q1) Are Logs of Test Boring available?  There is another sign structure 700’ upstream.  Hopefully, you have something for my concerns of water table and general drivability of the 5’ X 22’ foundation.

A1) Attention is directed to Addendum No 1, Supplemental Information Package.

Q2) Is it possible to coordinate the CMS, to be direct shipped to the job, instead of unloading & reloading onto a cushioned truck?

A2) Please place your bid in accordance with the current contract documents.

Q3) Typically, Caltrans furnishes Controller Assemblies, which includes the cabinet, but without bolts.  For this project, it states Controller Unit.  Who supplies the cab?

A3) In accordance with the contract documents the contractor is required to supply the cabinet.