The responses to bidder's inquiries, unless incorporated into a formal addendum to the contract, are not a part of the contract and are provided for the bidder's convenience only. In some instances, the question and answer may represent a summary of the matters discussed rather than a word-for-word recitation. The availability or use of information provided in the responses to bidder's inquiries is not to be construed in any way as a waiver of the provisions of Section 2-1.07 of the Standard Specifications or any other provision of the contract, the plans, Standard Specifications or Special Provisions, nor to excuse the contractor from full compliance with those contract requirements. Bidders are cautioned that subsequent responses or contract addenda may affect or vary a response previously given.
Q1) Is rapid-set concrete allowed to be used around the new pipe or does it have to be slurry?
A1) The contract documents specify slurry cement for structure backfill. Please bid per advertised contract documents.
Q2) Are traffic/trench plates allowed to be used on trench crossings? If so, are there any special details (recess, pinning, tack welding, etc)
A2) There are no trench plate details provided in the contract documents. Please bid per advertised contract documents.
Q3) Bid Item 12 “Invasive Species Control” – Is this item for SP Section 14-6.03D(1)? The 2025 Standard Specs 14-6.05 is reserved for invasive species control, but there is no section 14-6.05 in the SP.
A3) Please reference the work for “Invasive Species Control” to Note 3 on Project Plan Sheet L-1, “Vegetation removed due to excavation activities shall be placed on the finished grading plane.”
Q4) Is temporary barrier or K-rail required if the excavation is within the lane closure and the work is backfilled at the end of the shift?
A4) Temporary barrier or K-rail is not a bid item. Please refer to Standard Specifications Section 7-1.04 PUBLIC SAFETY for excavation backfill, and Special Provisions Section 12 for Lane Requirements Chart K1.