Hanford — The California Transportation Commission (CTC) recently approved $3.4 billion for more than 120 transportation projects to improve highway safety, strengthen critical infrastructure and expand transportation options statewide. More than 75 percent of today’s investment ($2.7 billion) features annual funding to support approximately 600 local governments and regional transportation authorities to maintain bridges, reduce commute times, improve safety, cut greenhouse gas emissions and expand transportation services to communities throughout the state.
Of the combined total, nearly $136 million came from the federal Infrastructure Investment and Jobs Act of 2021 (IIJA) and another $300 million from California’s Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017.
“Under Governor Newsom’s leadership, we are delivering on a bold promise: a modern, sustainable transportation network built for the future,” said California Transportation Secretary Toks Omishakin. “The CTC and Caltrans have worked tirelessly to broaden transportation options for people across California. From zero-emission transit to safer neighborhood streets, these projects are actively transforming California’s landscape for the benefit of our communities.”
“The impactful projects funded advance our ongoing commitment to building and maintaining a highway system that serves all Californians, now and for decades to come,” said Caltrans Director Dina El-Tawansy. “These smart, proactive investments power our mission to improve lives and communities through transportation.”
“These investments reflect our commitment to a transportation system that serves California’s diverse communities, and will improve safety, strengthen critical infrastructure, and expand connections for Californians across the state,” said California Transportation Commission Chair Clarissa Falcon.
Featured projects:
- Improving Mobility Along Interstate 10: $170 million to construct two express lanes in each direction on Interstate 10 from Pomona to Ontario. The project will improve mobility, safety and corridor reliability for thousands of daily commuters.
- Connecting North Bay Communities by Rail: $162 million to add a nine-mile rail extension between Windsor and Healdsburg in Sonoma County, along with new bicycle and pedestrian lanes. The project closes a longstanding gap in rail service between the North Bay and San Francisco.
- Improving Bicycle and Pedestrian Safety: $6.2 million to install traffic restrictions, street crossing enhancements and bike lanes in Monterey and Salinas. Two combined projects are intended to make it safer and easier for residents and students to walk and bike in high traffic neighborhoods.
- Expanding Zero-Emission Truck Infrastructure: $3.7 million to add 28 charging stations for electric trucks operating along Interstate 710 in Los Angeles County. When completed, the project will boost California’s efforts to achieve carbon neutrality by 2045 by eliminating more than 407,000 metric tons of carbon emissions, while keeping goods moving to support the nation’s economy.
Alameda County
- None
Contra Costa County
- $1,077,000 allocation on SR-24 in Lafayette at Pleasant Hill Road Undercrossing onramp. This project is injection grouting to stabilize the subgrade roadway prism and fill voids caused by a failed culvert.
Marin County
- $3,315,000 allocation on US-101 in San Rafael at San Rafael Viaduct. This project will place a polyester concrete overlay in Lanes 3 and 4 to restore proper profile alignment and install steel shims beneath the suspended span to address the bridge deck settlement.
- $1,522,000 allocation on US-101 in and near Sausalito at Waldo Tunnel. This project will replace existing lighting with Light Emitting Diode (LED) lighting.
Napa County
- $3,610,000 allocation on SR-29 near Calistoga, at Garnett Creek Branch Bridge. This project will replace the bridge.
- $2,515,000 allocation on SR-29 near Calistoga, at No Name Creek Bridge. This project is for bridge preventative maintenance and scour mitigation.
San Francisco County
- $1,121,000 allocation on I-80 in San Francico at the 5th Street onramp. This project will repair bridge spalls and column damage, perform rebar and concrete repairs, replace electrical conduit, and clear drainage.
San Mateo County
- $2,054,000 allocation on I-280 near San Carlos, at 0.3 mile and 0.5 mile north of Edgewood Road. This project will repair the settled roadway shoulder and embankment and repair culverts at the two sinkholes.
Santa Clara County
- $4,728,000 allocation on US-101 in and near the cities of San Jose, Santa Clara, Sunnyvale, Mountain View, and Palo Alto, from 0.5 mile south of De La Cruz Boulevard to 0.4 mile north of Embarcadero Road. This project will
rehabilitate pavement and upgrade curb ramps to Americans with Disabilities Act (ADA) standards. - $1,627,000 allocation on I-880 in San Jose, at northbound Route 82 Connector. This project will replace two pumps to restore permanent drainage and prevent further roadway flooding and unplanned closures.
- $1,150,000 allocation on SR-82 in Santa Clara, from Pomeroy Avenue to Lincoln Street. This project will construct Class II and Class IV bike lanes, bike loop detectors, pedestrian hybrid beacon system, and crosswalks.
Solano County
- $3,182,000 allocation on SR-12 near Suisun City and Rio Vista from 0.5 mile east of Lambie Road to Currie Road. This project will rehabilitate pavement, upgrade guardrail and sign panels.
Sonoma County - $40,857,000 allocation on US-101 in and near Santa Rosa, at 224 Lincoln Street and 3251 Brickway Boulevard. This project will relocate Santa Rosa Maintenance Station by demolishing the old facility and constructing the new one.
- $1,700,000 allocation on SR-116 near Guerneville, from Brookside Lane to River Road. This project will upgrade curb ramps and sidewalk, and install Accessible Pedestrian Signals (APS) pushbuttons to make facilities compliant with the Americans with Disabilities Act (ADA) standards.
- $1,675,000 allocation on SR-37 near Novato, at Lakeville Highway/Reclamation Road. This project will construct earth retaining systems, sheet pile walls, cement grouting, and reconstruct pavement.
- $200,000 allocation on SR-1 just north of Timber Cove Road. This project will construct retaining wall using sheet piles, repair roadway with polyurethane injection, and grind and pave the roadway.
Multiple Counties
- $1,751,000 allocation SR-25 near Gilroy from the San Benito County line to Miller Railroad Crossing, also in San Benito County, from 0.5 mile east to 0.1 mile east of Santa Clara County line. This project will install temporary median barrier, crash cushions, warning signs, and dynamic feedback signs, and replace striping.
- $400,000 allocation on SR-24 in Orinda at the Caldecott Operation and Maintenance Center (OMC) for Tunnel No. 28. This project will also upgrade Supervisory Control and Data Acquisition (SCADA) and System Integration for Bores 1, 2, 3, and 4.
California has invested approximately $25 billion in infrastructure projects since IIJA’s passage. Those funds are leveraged along with SB 1, which invests an estimated $5 billion annually, split between state and local investments. Road projects progress through construction phases more quickly based on the availability of funds, including projects that are partially funded by SB 1.
For more information about transportation and other infrastructure projects funded with state and federal investments, visit build.ca.gov.
| CleanCA.com | #CleanCA | #BeWorkZoneAlert | Twitter | Facebook | YouTube |
# #