Schedule: Monday, April 21 through Friday, April 25; 7 a.m. to 6 p.m.
Marin County — Caltrans is scheduled to continue work on the State Route 1 (Shoreline Highway) Capital Preventative Maintenance Project in April. The project started in the spring of 2024 and went into winter suspension in November.
One-way traffic control will be utilized for paving in and around the town of Tomales on Monday, April 21 and Tuesday, April 22 between 7 a.m. and 6 p.m. each day.
One-way traffic control will be utilized in and around the town of Olema from Wednesday, April 23 through Friday, April 25 between 7 a.m. and 6 p.m. each day.
Temperatures and other weather factors could affect times.
No-parking signs will be set up in both towns to explain when paving will occur.
The overall project will repair segments of SR-1 and will include cycling and pedestrian upgrades. The project is slated to make improvements during a nearly 14-mile stretch from Olema through Point Reyes Station and from Tomales to the county line.
The upgrades include pavement resurfacing and repairs; restriping; culvert replacements to improve drainage; shoulder widening to help cyclists; guardrail, crosswalk, and signage upgrades; new signage; and sidewalk and path upgrades to meet disability access standards and improve access to West Marin-Inverness School in Point Reyes Station.
For 24/7 traffic updates, please visit 511.org: https://x.com/511SFBay
For real-time information, visit Caltrans QuickMap: https://quickmap.dot.ca.gov
Follow us on X: https://x.com/CaltransD4
Or call 1-800-472-7623, 1-800-427-ROAD for state highway conditions statewide.
| CleanCA.com | CleanWaterCA | #BeWorkZoneAlert | X | Facebook | YouTube |
###