Daytime One-way Traffic Control for State Route 1 (SR-1) Capital Preventive Maintenance Project in Marin County

Published:

Schedule: Monday, Oct. 21 through Friday, Oct. 25

Map location of State Route 1 Capital Maintenance Project in Marin County

Marin County — Caltrans is scheduled to continue work on the State Route 1 (Shoreline Highway) Capital Preventative Maintenance Project in October.

One-way traffic control or a traffic shift will be utilized for erosion control in between Point Reyes Station and Olema from Monday, Oct. 21 to Friday, Oct. 25 from 7 a.m. to 4 p.m. each day.

Changeable Message signs will be put up in the areas to remind residents about the construction.

This overall project will repair segments of SR-1 and will include cycling and pedestrian upgrades. The project is slated to make improvements during a nearly 14-mile stretch from Olema through Point Reyes Station and from Tomales to the county line.

The upgrades include pavement resurfacing and repairs; restriping; culvert replacements to improve drainage; shoulder widening to help cyclists; guardrail, crosswalk, and signage upgrades; new signage; and sidewalk and path upgrades to meet disability access standards and improve access to West Marin-Inverness School in Point Reyes Station.

Completed sidewalk and path upgrade to meet disability access standards as part of the State Route 1 (Shoreline Highway) Capital Preventative Maintenance Project.

The completion timeline for the project is Summer 2025.

All work is dependent on weather.

Please drive with caution. Slow for the Cone Zone and Be Work Zone Alert. Caltrans thanks motorists for their patience while we work to maintain our state's highways, bridges, and tunnels.

For 24/7 traffic updates, please visit 511.org: https://x.com/511SFBay
For real-time information, visit Caltrans QuickMap: https://quickmap.dot.ca.gov
Or follow us on X: https://x.com/CaltransD4

| CleanCA.com | CleanWaterCA #BeWorkZoneAlert | X | Facebook | YouTube |

###