Caltrans Paving Section of State Route 12 in Santa Rosa

Published:

District: 4 - Oakland
Contact: Jeff Weiss
 jeffrey.weiss@dot.ca.gov                
Phone: (510) 715-8770

From Brush Creek Road to Farmers Lane
Paving occurs Monday, June 22 – Saturday, June 28

Santa Rosa - On Monday, June 22, 2020, Caltrans will begin paving a half-mile section of State Route 12 in Santa Rosa between Brush Creek Road and Farmers Lane. The highway has two lanes in each direction and right-hand shoulders. Caltrans installed a median barrier on this stretch of road in 2018.

Work crews will pave between 8:00 PM and 7:00 AM.  Caltrans will always leave one lane open in each direction while paving.

Caltrans will pave with rubberized asphalt, a long-lasting pavement containing scraps of discarded tires. Rubberized asphalt also benefits the environment by making use of worn tires that would otherwise languish in landfills.

On top of the rubberized asphalt, Caltrans will apply a layer of open-graded pavement, which provides enhanced traction in rainy weather. Open grade pavement is porous, allowing water to seep to the nonporous levels of asphalt where it runs off the road.

Please drive cautiously through the construction zone, leave a safe traveling distance between your vehicle and the vehicle ahead of you, and Slow for the Cone Zone.

Caltrans Paving Section of State Route 12 in Santa Rosa map

For 24/7 traffic updates, go to 511.org: https://twitter.com/511SFBay You can also get real-time information on all State Highways in California on our Caltrans Quick Map: http://quickmap.dot.ca.gov/  Please be #WorkZoneAlert

Or follow Caltrans on Twitter at https://twitter.com/CaltransD4