Closures at the Interstate 880 SR 238 Interchange

Published:

Date:  March 13, 2020
District: 4 - Oakland
Contact: RocQuel Johnson
Phone:  (510) 501-0446

Friday, March 13 until Monday, March 16, 2020

San Leandro – Caltrans will perform repairs at the Northbound (NB) State Route 238 (SR-238)/ Southbound (SB) Interstate 880 (I-880) connector in the City of San Leandro, Alameda County.  The work is scheduled as follows:

  • Friday, March 13 until Monday, March 16, from 10:00 PM until 4:00 AM (Full Connector Closure for SB I-880/NB SR-238).
  • Friday, March 13 until Monday, March 16, from 7:00 PM until 4:00 AM (Long-Term Lane Closure for SB I-880/NB SR-238).

Detour Information 03/13 until 03/16 (nightly):

  • Friday night until Monday morning:   1. Exit NB SR-238 at Hesperian Boulevard off-ramp; turn right onto Spring Lake Drive. Take another right on SB Hesperian Boulevard; continue on Hesperian Boulevard past Lewelling Boulevard; turn left at Grant Avenue for the SB I-880 on-ramp.   

Traffic Controls Measures:
Changeable message signs and directional signs will be in place to assist motorists traveling in the area.  Please follow posted detour information.  Motorists are advised to expect delays and allow extra time for their commute.  Please drive with caution through the construction zone.  Slow for the Cone Zone.   
 
For 24/7 traffic updates, follow 511.org: https://twitter.com/511SFBAY.  
For real-time traffic, click-on Caltrans QuickMap: http://quickmap.dot.ca.gov/.