District: 4 - Oakland
Contact: Chiconda Davis
Phone: (510) 286-1227
To Resurface and Repave the On-Ramp Starts
Friday, November 22 until Sunday, November 24, 2019
Fremont – Caltrans will conduct paving operations in the City of Fremont, Alameda County starting Friday, November 22 through Sunday, November 24, 2019, from 4:00 AM until 3:00 PM on Interstate 880 (I-880). There will be a partial closure of the Auto Mall Parkway onramp on Northbound (NB) I-880. This day closure is required for paving with rubberized hot mix asphalt due to the temperature restrictions.
Onramp Closure Information 11/22 – 24/2019, from 4:00 AM until 3:00 PM:
(Friday – Sunday): NB I-880 at Auto Mall Parkway
Traffic Controls Measures: Changeable message signs and directional signs will be in place to assist motorists traveling in the area. Please follow posted detour information. Motorists are advised to expect delays and allow extra time for their commute. Please drive with caution through the construction zone. Slow for the Cone Zone.
For 24/7 traffic updates, follow 511.org
For real-time traffic, click-on Caltrans QuickMap