Sonoma County Highway 1 Updates for Emergency
Repair Projects October 4, 2019
Caltrans has initiated emergency repair projects along Sonoma Highway 1 to address roadway deterioration caused by storm damage and continued coastal erosion.
Upcoming Work
1.SON – Bodega Bay (PM 11.2) Installation of both headwalls is complete. Flaggers will be on-site during day time work to assist trucks and equipment entering/exiting work site. Work scheduled, Sun thru Sat. Night between 6:30PM-7:00AM.
2.SON – Gleason Beach (PM 15.4): The roadway is open to regular two-way traffic when no construction work is performed. Pile installation continues, with one-way traffic control and flaggers for wall construction activities. The work schedule is Mon thru Sat, 7AM to 7 PM. As of October 2nd, 39 of 71 piles have been installed.
3.SON – Jenner (PM 22.64): Work is anticipated to repair slide and improve drainage.
4.SON – Jenner (PM 24.2): One- way traffic control in place. Soldier pile wall installation, next 6 weeks.
5.SON – Salt Pt. State Park (PM 38.64): Work is anticipated to repair slide.
What To Expect
A traveler can expect 5 minute delays at Locations 2 through 5.
Please drive cautiously through the construction zone, leave a safe distance between your vehicle and the vehicle ahead of you, and Slow for the Cone Zone.
Other Resources
Please visit 511.org or the Caltrans QuickMap for real-time info on travel conditions.
Bodega Bay businesses along Highway 1 are open for business.
Caltrans thanks you for your patience as we work to maintain California’s highways.
Caltrans Public Information Officers
Alejandro Lopez: (510)-286-5445
RocQuel Johnson: (510) 286-4948