The project is located within the City of South Lake Tahoe (CSLT) on U.S. Highway 50 from the "Y" intersection with State Highway 89 to the Trout Creek Bridge.

Project Benefits

The project will collect and treat stormwater runoff as part of the Lake Tahoe Environmental Improvement Program (EIP). It will also widen the roadway to provide 6-foot shoulders for bike lanes, replace traffic signals, replace curb, gutter and sidewalks, and improve pavement cross slope. Caltrans is working with CSLT to incorporate improvements at Sierra Boulevard (signal and left turn lane).

Funding Breakdown

Local - $252,000
State - $0
Federal - $56,700,000
Estimated Total Project Cost - $56,952,000

Project Schedule

Environmental Document Completed - June 2009
Right of Way Acquisition Completed - Spring 2016
Design - Spring 2016
Advertise - Summer 2016
Begin Construction - Spring 2017 (utility relocation expected to start in May 2015)
Expected Completion - Winter 2019

Partnership

Caltrans, Regional Water Quality Control Board, TRPA and CSLT

Project Contact

Clark Peri, Project Manager
Phone: (916) 825-8168
Email: clark.peri@dot.ca.gov

Steve Nelson, Tahoe Basin Outreach Coordinator
Phone: (530) 741-4566
Email: steve.nelson@dot.ca.gov

Map

Trout Creek Bridge Map (PDF) 

Documents

No additional documents available.

News / Events

Press Releases

  • Caltrans Hosting Open House for U.S. Highway 50 Tahoe Basin Projects
  • New Signals to be Activated on Highway 50 Project in South Lake Tahoe
  • Construction Work Extended on U.S. Highway 50 in South Lake Tahoe
  • Delays on Highway 50 in South Lake Tahoe Increased During Paving Work
  • Work Set to Resume on U.S. Highway 50 Project in South Lake Tahoe
  • Work Wraps Up for Season on Project in South Lake Tahoe
  • Lane Restrictions Extended for Highway 50 Paving Work in South Lake Tahoe
  • Increased Lane Restrictions for South Lake Tahoe U.S. Highway 50 Project
  • Caltrans' Lake Tahoe Highway Construction Projects Shut Down for Holiday
  • Motorists Alerted to Increased Bike Traffic on Sunday During Annual Tahoe Ride
  • Traffic Restrictions Changing for Caltrans' Lake Tahoe Projects
  • Work to Begin Next Week on Highway 50 Project in South Lake Tahoe
  • Caltrans Hosting Meeting on Upcoming South Lake Tahoe Project

Additional Press Materials

Video / Photos

No additional photos or videos available.