North Region Construction - Project 02A1978 Construct Building

Contract

02A1978

Bid Date

 3/17/21

County Route PM/KP

SHA-044-62.5/62.5

Description

Construct a building

Bidder Inquiry / Response

Inquiry:

  1. What is the sheeting base to seal to?
  2. May 6’ x 7’ doors be used in place of 6’ x 6’7” doors?
  3. What goes in the 5’ x 3’ wall openings? Are they to be left open?
  4. Is there  a snow load for the 5’ x 3’ overhangs?
  5. Who is responsible for engineering the footings for the PEMB? The contractor?
  6. Is there any electrical or plumbing for this building project?

Response:

  1. What is the sheeting base to seal to?

    Bid per the contract documents

  2. May 6’ x 7’ doors be used in place of 6’ x 6’7” doors?

    Yes

  3. What goes in the 5’ x 3’ wall openings? Are they to be left open?

    The 5’ x 3’ wall openings are to be left open.

  4. Is there  a snow load for the 5’ x 3’ overhangs?

    Yes, snow loads is to be accounted for in the design of the 5’ x 3’ overhangs.

  5. Who is responsible for engineering the footings for the PEMB? The contractor?

    The contractor

  6. Is there any electrical or plumbing for this building project?
    No