North Region Construction - Project 02A1978 Construct Building
Contract
02A1978
Bid Date
3/17/21
County Route PM/KP
SHA-044-62.5/62.5
Description
Construct a building
Bidder Inquiry / Response
Inquiry:
- What is the sheeting base to seal to?
- May 6’ x 7’ doors be used in place of 6’ x 6’7” doors?
- What goes in the 5’ x 3’ wall openings? Are they to be left open?
- Is there a snow load for the 5’ x 3’ overhangs?
- Who is responsible for engineering the footings for the PEMB? The contractor?
- Is there any electrical or plumbing for this building project?
Response:
- What is the sheeting base to seal to?
Bid per the contract documents
- May 6’ x 7’ doors be used in place of 6’ x 6’7” doors?
Yes
- What goes in the 5’ x 3’ wall openings? Are they to be left open?
The 5’ x 3’ wall openings are to be left open.
- Is there a snow load for the 5’ x 3’ overhangs?
Yes, snow loads is to be accounted for in the design of the 5’ x 3’ overhangs.
- Who is responsible for engineering the footings for the PEMB? The contractor?
The contractor
- Is there any electrical or plumbing for this building project?
No