North Region Construction - Project 01A6618

HM4-0P500-Hydesville Ped Safety
 
Contract
01A6618 Minor B
01-0P500
 
Bid Date
04/22/2026
 
County Route
HUM-036
 
Description
Hydesville Pedestrian Enhancement
 
Bidder Inquiry / Response
 
Inquiry:
1. Looking at the project plans, on sheet E-1, I noticed the single RRFB sign is hardwired to the RRFB system at the crosswalk. These systems can connect via Bluetooth, eliminating the need for this wire and pull boxes. Is this permissible?
2. We've previously installed RRFB systems mounted on wooden posts and the ground rod shown on sheet ED-1 wasn't needed, due to bluetooth pairing. If FBIC isn't necessary, may this ground rod and grounding be eliminated as well?
 
Response:
1. The RRFB and advance flashing beacon shown on E-1 need to be hard wired to ensure system reliability. RRFBs shown on E-2 and E-3 will be connected via Bluetooth. Bid per contract documents.
2. Bid per contract documents.