Caltrans District 11 Construction

Proposed Projects to be Advertised

* SB1

**Safety

Quarter 3

TOTAL $33,734,845

EA CAPITAL CO-RTE POST MILE PROJECT DESCRIPTION PLANNED ADV.
DATE
11-2N147 $823,547 IMP-111 50.7/52.5 REPAIR TWO CULVERTS 03/03/25 A
11-2N176* $2,727,911 IMP-8 R50.3/R96.7 MICRO-SURFACING, RHMA-G, SHOULDER BACKING, STRIPING, AND INSTALL SIGNS 03/03/25 A
11-2N225** $1,924,934 SD, IMP-78 VAR INSTALL RUMBLE STRIPS AND PLACE PAVEMENT DELINEATION 03/03/25 A
11-2N230* $3,433,049 IMP-86 4.5/R21.9 MICROSURFACING 03/03/25 A
11-2N232 $3,811,431 SD-8 R73/R77.7 0.1' BWC-G OVERLAY 03/03/25 A
11-2N168* $6,836,975 SD-5 R53.9/R63.7 POLYESTER CONCRETE, METHACRYLATE, JOINT SEALS AND APPROACH SLABS 03/17/25
11-2N207* $6,743,242 SD-54, 805 VAR BRIDGE PRESERVATION 03/17/25
11-2N224** $1,160,303 SD-79 L0.6/52.9 REMOVE AND INSTALL ROADSIDE SIGNS 03/17/25
11-2N226** $1,677,430 IMP-98 30.0/R57.0 PLACE RUMBLE STRIPS AND PAVEMENT DELINEATION 03/17/25
11-2N234* $4,596,023 SD-15 0.4/T2.8 COLD PLANE AC, RHMA-G OVERLAY, PAVEMENT MARKING AND SHOULDER BACKING 03/17/25

Quarter 4

TOTAL $205,870,024

EA CAPITAL CO-RTE POST MILE PROJECT DESCRIPTION PLANNED ADV.
DATE
11-2N178* $6,524,948 IMP-8 R0.0R/R10 MICROSURFACING 04/01/25
11-2N228 $2,000,000 IMP-78 0/13.2 GRINDING 04/01/25
11-2N233* $1,800,451 SD-15 R6.2/30.9 MICROSURFACING, COLD PLANE ANS SLAB REPLACEMENT 04/01/25
11-2N206 $4,438,000 SD-94 1.6/R13.3 BRIDGE PRESERVATION 04/03/25
11-17370 $31,490,625 SD-805 2.6/3.2 PALM AVENUE/805 INTERCHANGE 04/18/25
11-43023* $159,616,000 SD-805 0.1/14.6 I-805 PAVEMENT REHAB & AUX LANES ADDITION 06/09/25

Quarter 1

TOTAL $168,344,000

EA CAPITAL CO-RTE POST MILE PROJECT DESCRIPTION PLANNED ADV.
DATE
11-43081* $26,538,000 SD-79 11.2/44.7 PAVEMENT REHABILITATION 07/08/25
11-43031* $12,200,000 SD-67 4.1/15.9 REPAIR/REPLACE CULVERTS, SIGN PANEL REPLACEMENT, ADA UPGRADE, WORKER SAFETY AND LED LIGHTING 07/10/25
11-43034* $72,203,000 SD-94 1.4/15.4 DRAINAGE, PAVEMENT, SAFETY, MOBILITY, AND ROADSIDE IMPROVEMENTS 07/31/25
11-2N208 $6,129,000 SD-VAR R12.4/R15.2 BRIDGE PRESERVATION 08/01/25
11-2N209 $5,493,000 SD-VAR L1.2/R20 BRIDGE PRESERVATION 08/01/25
11-43026* $18,502,000 SD-VAR 0 REHABILITATE CULVERTS, UPGRADE CURB RAMPS TO ADA STANDARDS, REPLACE ROADSIDE SIGNS, INSTALL RUMBLE STRIPS, AND UPGRADE LIGHTING 08/04/25
11-43100 $8,033,000 SD-5 R49.3/R52.3 ADA CURB RAMP IMPROVEMENTS 08/08/25
11-43082 $5,337,000 SD-5 R66.2/R67.4 CVEF IMPROVEMENTS 08/12/25
11-43027* $13,909,000 SD-76 17.5/52.2 DRAINAGE, SAFETY AND MOBILITY IMPROVEMENTS 08/19/25

Quarter 2

TOTAL $37,804,000

EA CAPITAL CO-RTE POST MILE PROJECT DESCRIPTION PLANNED ADV.
DATE
11-43091* $37,804,000 SD-76 R0/R8.1 PAVEMENT 11/20/25

Quarter 3

TOTAL $141,431,050

EA CAPITAL CO-RTE POST MILE PROJECT DESCRIPTION PLANNED ADV.
DATE
11-14665 $71,000,000 SD-94 R10.3/R11.8 PHASE 1 OF CONNECTOR PROJECT - CONSTRUCT SB RTE. 125 TO EB RTE. 94 FWY. CONNECTOR RAMP 01/14/26
11-43096 $11,890,000 SD-8 R67.6 REHABILITATION THE MAINTENANCE FACILITY 01/20/26
11-2N235 $4,000,000 SD-76 R8.1/R17.2 0.1' RBWC-G Overlay 02/01/26
11-2N251 $2,500,000 SD-15 0/30 MICROSURFACING AT VARIOUS RAMPS 02/01/26
11-2N252 $3,500,000 IMP-86 0/4.5 MILL AND FILL WITH RHMA-G 02/01/26
11-2N254 $2,500,000 SD-15 5.6/45.6 PCC SLAB REPLACEMENT (ISR) 02/01/26
11-2N255 $2,000,000 SD-8 14.6/60 PCC SLAB REPLACEMENT (ISR) 02/01/26
11-2N258 $3,000,000 IMP-78 80/95.3 PAVEMENT PRESERVATION - MICROSURFACING 02/01/26
11-2N266 $1,500,000 SD-56 9.4/9.8 MILL AND FILL WITH RHMA-G 02/01/26
11-2N275 $1,500,000 IMP-115 30/34.5 PAVEMENT PRESERVATION - MICROSURFACING 02/01/26
11-2N276 $3,000,000 SD-8 68/73 PAVEMENT PRESERVATION - MICROSURFACING 02/01/26
11-2N243 $1,000,050 SD-15 19/20.4 BIKE AND PEDESTRIAN SAFETY 02/10/26
11-2N244 $599,000 SD-56 6.7/19.7 WRONG WAY DRIVER AND PEDESTRIAN SAFETY 02/10/26
11-2N236 $5,520,000 SD-5 12/19.5 BRIDGE PRESERVATION 03/01/26
11-2N237 $6,263,000 SD-5 R40.6/R72 BRIDGE PRESERVATION 03/01/26
11-2N238 $5,455,000 SD-125 5.6/19.9 BRIDGE PRESERVATION 03/01/26
11-43088* $16,204,000 SD-78 33.7/37.3 MINOR PAVEMENT AND CULVERT REHABILITATION WITH SIDEWALK AND ADA CURB RAMP IMPROVEMENTS 03/12/26

Quarter 4

TOTAL $19,561,000

EA CAPITAL CO-RTE POST MILE PROJECT DESCRIPTION PLANNED ADV.
DATE
11-43097 $5,860,000 SD-15 M18.2/R44.8 ADA & TMS 04/01/26
11-43185** $2,704,000 SD-15 R49.9/R50.5 PLACE HIGH TENSION CABALE BARRIER AND MIDWEST GUARDRAIL 04/24/26
11-43180 $10,997,000 SD-VAR 0 INSTALL BEST MANAGEMENT PRACTICES, TRASH CAPTURE DEVICES IN VAR LOCATIONS WITHIN SAN DIEGO COUNTY 06/03/26