I-805 South Bridge Safety and Sound Walls Project

Project Overview

The I-805 South Bridge Safety and Sound Walls project, part of a $33 million initiative to enhance the transportation infrastructure along this segment of the I-805 corridor, includes the addition of auxiliary lanes, bridge safety improvements, and sound walls. Additionally, crews will add auxiliary lanes on northbound I-805 from Naples Street undercrossing to Telegraph Canyon Road undercrossing and an auxiliary lane on southbound I 805 at Naples Street undercrossing. These lanes will allow drivers to speed up and slow down more safely when merging on or off the freeway.

With the addition of these auxiliary lanes, crews must also make bridge safety improvements at both the Telegraph Canyon Road and East Naples Street locations. These improvements will upgrade safety barriers to current code requirements and ensure that the bridges can support the additional weight of vehicles traveling along the interstate. Retaining walls will also be constructed near the Telegraph Canyon Road undercrossing and the Naples Street undercrossing bridges.

Project Map. For more information, call (619) 688-6670 or email CT.Public.Information.D11@dot.ca.gov

Goals

  • Preserve and enhance I-805 Corridor by revitalizing and constructing essential infrastructure.
  • Improve infrastructure performance and longevity by modernizing assets.
  • Enhance safety by supporting regional mobility, and sustainability through comprehensive corridor improvements. to increase accessibility for all travelers.

What to Expect

Daytime work will be conducted from 6:30 am to 3:30 pm. Intermittent ramp and lane closures will happen in the evening from 9:00 pm to 5:00 am. A few full roadway closures are to be expected in the evenings.

Project Features

The I-805 South Bridge Safety and Sound Walls Project work will include:

  • Bridge safety improvements at both the Telegraph Canyon Road and East Naples Street locations
  • Auxiliary lanes on northbound I-805 from Naples Street undercrossing to Telegraph Canyon Road undercrossing and on southbound I-805 at Naples Street undercrossing
  • Retaining walls near the Telegraph Canyon Road undercrossing and the Naples Street undercrossing bridges

Project Benefits

  • Allow for drivers to speed up and slow down more safely when merging on or off the freeway more safely
  • Upgrade safety barriers to current code requirements and ensure that the bridges can support the additional weight of vehicles traveling along the interstate
  • Stabilize the slopes, control erosion, and create additional usable land
  • Blocking, absorbing, and/or redirecting noise away from residences next to the freeway

Project Status

Construction began July 2024 with an estimated completion by Summer 2026.

Project Cost

The project is estimated to cost approximately $222.5 million and is solely funded by the State Highway Operation Protection Program with $197.4 million in Federal funds and $25.1 million in State Funds.

Contact

For More Information Visit:

https://dot.ca.gov/caltrans-near-me/district-11/current-projects/sr78-projects/sr78-assetmanagement

Email:

ct.public.information.D11@dot.ca.gov

Call:

(619) 688-6670