| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
8 -
0K3101
|
SBd -
95 -
51.2
|
NR NEEDLES FR 41.5 MI N/O ROUTE 62 & 5.5 MI S/O ROUTE 40 |
VERTICAL CURVE CORRECTION PROVIDE 2 12-FT LANES W/2 8FT OUTSIDE SHOULDERS |
Realign Curve |
1 – 10 |
90 |
June 2013 |
View Details
|
May 09, 2013 |
|
4 -
2A6204
|
SOL -
12 -
22.7/R23.7
|
IN SOLANO COUNTY ON ROUTE 12 NEAR RIO VISTA, AT CURIE, MCCLOSKEY AND AZEVEDO ROADS,FROM AZEVEDO RD TO LIBERTY ISLAND RD |
INSTALL LEFT-TURN POCKET |
Channelize, Modify Roadway, Widening |
10 – 20 |
120 |
August 2013 |
View Details
|
May 08, 2013 |
|
4 -
3A8704
|
CC -
680 -
24.3
|
IN CONTRA COSTA COUNTY ON ROUTE 680 NEAR MARINA VISTA |
BRIDGE REHABILITATION |
Rehabilitate Bridge Deck, Freeway and Structures |
10 – 20 |
260 |
September 2013 |
View Details
|
May 08, 2013 |
|
4 -
4A6304
|
SF -
35 -
VAR
|
IN SAN FRANCISCO COUNTY ON ROUTE 35 AND IN SANTA CLARA COUNTY ON ROUTES 9, 82, 152, AND 880 AT VARIOUS LOCATIONS |
CONSTRUCT ADA-COMPLIANT CURB RAMPS |
Wheelchair Ramps |
1 – 10 |
90 |
September 2013 |
View Details
|
May 08, 2013 |
|
4 -
4S7704
|
MRN -
1 -
0.9/1.0
|
IN MARIN COUNTY NEAR MARIN CITY ON ROUTE 1 FROM ROSS DRIVE TO TENNESSEE AVENUE |
CULVERT REPAIR AND REPLACEMENT |
Repair Culverts |
0 – 1 |
40 |
September 2013 |
View Details
|
May 08, 2013 |
|
4 -
4S0704
|
SCL -
101 -
5.1
|
IN SANTA CLARA COUNTY ON ROUTE 101 AT THE GILMAN ROAD OVERCROSSING |
INSTALL ROCK SLOPE PROTECTION |
Rock Slope Protection |
1 – 10 |
30 |
June 2013 |
View Details
|
May 08, 2013 |
|
4 -
4A2604
|
ALA -
580 -
1.5/2.2
|
IN ALAMEDA COUNTY ON ROUTES 84, 580, AND 680 AND IN CONTRA COSTA COUNTY ON ROUTES 4 AND 80 AT VARIOUS LOCATIONS |
INSTALL METAL BEAM GUARDRAIL |
Guard Railing |
1 – 10 |
190 |
June 2013 |
View Details
|
May 08, 2013 |
|
4 -
1A2904
|
SON -
12 -
9.6
|
IN SONOMA COUNTY ON ROUTE 12 NEAR SEBASTOPOL AT LAGUNA DE SANTA ROSA BRIDGE #20-0035 |
BRIDGE REPLACEMENT |
Replace Bridge, Erosion Control |
1 – 10 |
270 |
June 2013 |
View Details
|
May 08, 2013 |
|
4 -
4S0804
|
SCL -
101 -
36.92
|
IN SANTA CLARA COUNTY ON ROUTE 101 AT TAYLOR STREET |
RECONSTRUCT SLOPE WITH GEOGRID |
Repair Slope |
0 – 1 |
45 |
June 2013 |
View Details
|
May 08, 2013 |
|
4 -
4S1604
|
SON -
1 -
21.7
|
IN SONOMA COUNTY ON ROUTE 1 NEAR JENNER |
INSTALL SUB-DRAINAGE SYSTEM, RECONSTRUCT EMBANKMENT |
Repair Slope, Reconstruct Drainage, Retaining Wall |
1 – 10 |
155 |
June 2013 |
View Details
|
May 08, 2013 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
4 -
4S4504
|
MRN -
1 -
31.2
|
IN MARIN COUNTY ON ROUTE 1 AT 1.0 MILE NORTH OF CYPRESS ROAD |
RECONSTRUCT EMBANKMENT WITH RETAINING WALL |
Retaining Wall, Repair Slope |
1 – 10 |
60 |
September 2013 |
View Details
|
May 08, 2013 |
|
4 -
4S0504
|
SCL -
9 -
4.2
|
IN SANTA CLARA COUNTY ON ROUTE 9 NORTH OF SARATOGA GAP |
CONSTRUCT TIE-BACK WALL |
Retaining Wall, Repair Slope |
0 – 1 |
120 |
June 2013 |
View Details
|
May 08, 2013 |
|
4 -
4A5104
|
SF -
280 -
4.4
|
IN SAN FRANCISCO COUNTY ON ROUTE 280 AT THE SOUTHERN FREEWAY VIADUCT BRIDGE #34-0046
|
REPLACE BRIDGE HINGES |
Bridge, Freeway and Structures |
1 – 10 |
185 |
November 2013 |
View Details
|
May 08, 2013 |
|
4 -
2A4304
|
SCL -
9 -
2.5/7.0
|
IN SANTA CLARA COUNTY ON ROUTE 9 FROM 2.5 MILES EAST OF ROUTE 35 TO THE 6TH STREET INTERSECTION |
IMPROVE SIGHT DISTANCE |
Earthwork, Pavements Markings, Realign Curve |
1 – 10 |
280 |
July 2013 |
View Details
|
May 08, 2013 |
|
4 -
2A2504
|
SCL -
152 -
0.0/5.2
|
IN SANTA CLARA COUNTY ON ROUTE 152 FROM THE SANTA CRUZ COUNTY LINE TO 0.17 MILES EAST OF THE WATSONVILLE ROAD INTERSECTION |
IMPROVE SIGHT DISTANCE |
Earthwork, Grading and Paving, Retaining Wall |
20 – 40 |
630 |
July 2013 |
View Details
|
May 08, 2013 |
|
4 -
2A1104
|
NAP -
121 -
20.2/20.4
|
IN NAPA COUNTY ON ROUTE 128 NEAR NAPA AT CAPELL CREEK BRIDGE #21-0009 |
REPLACE BRIDGE (SCOUR) |
Replace Bridge |
1 – 10 |
180 |
May 2013 |
View Details
|
May 08, 2013 |
|
4 -
245444
|
SON -
101 -
20.7
|
IN SONOMA COUNTY ON RTE 101 IN SANTA ROSA AT COLLEGE AVENUE UNDERCROSSING |
COLLEGE AVENUE IMPROVEMENTS |
Widening, Modify Roadway |
1 – 10 |
200 |
August 2013 |
View Details
|
May 08, 2013 |
|
4 -
2356A4
|
SM -
101 -
0.0/3.6
|
IN SAN MATEO AND SANTA CLARA COUNTIES ON ROUTE 101 FROM EMBARCADERO ROAD TO MARSH ROAD |
REPLACEMENT LANDSCAPING |
Highway Planting |
1 – 10 |
70 |
July 2013 |
View Details
|
May 08, 2013 |
|
4 -
235624
|
SM -
101 -
0.0
|
IN SAN MATEO COUNTY ON ROUTE 101 AT THE SAN MATEO/SANTA CLARA COUNTY LINE |
REPLACE BRIDGE STRUCTURE AT SAN FRANCISQUITO CREEK |
Asphalt Concrete Surfacing, Bridge, Freeway and Structures |
1 – 10 |
440 |
September 2013 |
View Details
|
May 08, 2013 |
|
4 -
1G4204
|
SON -
116 -
13.6/13.9
|
IN SONOMA COUNTY AT GUERNEVILLE FROM 1.1 MILES EAST OF MAYS CANYON ROAD TO 0.1 MILE WEST OF OLD FELLOWS PARK ROAD |
CONSTRUCT RETAINING WALL, PLACE ROCK PROTECTION, MODIFY DRAINAGE |
Drainage, Retaining Wall, Rock Slope Protection |
0 – 1 |
90 |
August 2013 |
View Details
|
May 08, 2013 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
4 -
1A6714
|
ALA -
580 -
46.1
|
IN ALAMEDA COUNTY ON ROUTE 580 IN OAKLAND AT DISTRIBUTION STRUCTURE BR #33-0061 |
REHABILITATE BRIDGE DECK |
Rehabilitate Bridge Deck, Freeway and Structures |
40 – 60 |
550 |
September 2013 |
View Details
|
May 08, 2013 |
|
4 -
172444
|
ALA -
84 -
16.5
|
IN ALAMEDA COUNTY ON ROUTE 84 IN SUNOL AT TYLER RANCH NORTH OF 2ND STREET AND RAILROAD AVENUE |
ENVIRONMENTAL MITIGATION |
Highway Planting |
1 – 10 |
80 |
August 2013 |
View Details
|
May 08, 2013 |
|
4 -
4S6204
|
SON -
1 -
34.5
|
IN SONOMA COUNTY ON ROUTE 1 APPROXIMATELY 1.5 MILES NORTH OF FORT ROSS ROAD |
CONSTRUCT SOLDIER PILE TIE-BACK WALL |
Retaining Wall |
1 – 10 |
200 |
December 2013 |
View Details
|
May 08, 2013 |
|
4 -
153304
|
SCL -
101 -
0.0/26.7
|
IN SANTA CLARA COUNTY ON ROUTE 101 AT VARIOUS LOCATIONS FROM SAN BENITO COUNTY LINE TO ROUTE 85/101 INTERCHANGE |
TRAFFIC OPERATIONS SYSTEM AND RAMP WIDENING/METERING |
Interconnect Signals, Modify Ramp, Ramp Metering System |
10 – 20 |
500 |
July 2013 |
View Details
|
May 08, 2013 |
|
4 -
3S8304
|
SCL -
17 -
1.9/5.8
|
IN SANTA CLARA COUNTY ON ROUTE 17 FROM ROUTE 35 TO SOUTH SANTA CRUZ AVENUE |
CONSTRUCT HEADWALL AND SOIL WALL, DRAINAGE SYSTEM, REPAIR SLIPOUTS |
Drainage, Rock Slope Protection |
0 – 1 |
50 |
May 2013 |
View Details
|
May 08, 2013 |
|
11 -
401401
|
SD -
005 -
R12.6/R72.2
|
IN SAN DIEGO COUNTY AT VARIOUS LOCATIONS
|
REMOVE EXISTING MBGR AND REPLACE WITH CONCRETE BARRIER AND UPGRADE
|
Concrete Barrier, Remove Guard Railing |
1 – 10 |
125 |
June 2013 |
View Details
|
April 23, 2013 |
|
11 -
406601
|
SD -
76 -
R 004.2/R 007.6
|
IN SAN DIEGO COUNTY IN OCEANSIDE FROM RANCHO DEL ORO DRIVE TO 0.2 MILE WEST OF MELROSE DRIVE. |
MEDIAN BARRIER |
Concrete Barrier |
0 – 1 |
250 |
March 2014 |
View Details
|
April 18, 2013 |
|
11 -
409901
|
SD -
076 -
020.2/020.7
|
IN SAN DIEGO COUNTY NEAR OCEANSIDE FROM 0.8 MILE EAST OF
COUSER CANYON ROAD TO 2.3 MILES WEST OF PALA MISSION
ROAD. |
HIGHWAY RE-ALIGNMENT |
Realignment, Roadway |
0 – 1 |
250 |
January 0000 |
View Details
|
April 18, 2013 |
|
11 -
410300
|
SD -
8 -
037.9
|
ON ROUTE 8 IN SAN DIEGO COUNTY ABOUT 9 MILES EAST OF
ALPINE AT DESCANSO MAINTENANCE STATION |
PAVEMENT REHABILITATION |
Rehabilitate Pavement |
1 – 10 |
125 |
June 2014 |
View Details
|
April 18, 2013 |
|
11 -
408901
|
SD -
5 -
R.54.4/R72.2
|
IN SAN DIEGO COUNTY AT VARIOUS LOCATIONS |
CLEAN AND TREAT BRIDGE DECK WITH METHACRYLATE AND REPLACE JOINT SEALS |
Replace Joint Seals, Rehabilitate Bridge Deck |
1 – 10 |
180 |
May 2013 |
View Details
|
April 18, 2013 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
11 -
406501
|
SD -
15 -
R 036.8/R 040.8
|
IN SAN DIEGO COUNTY ABOUT 5 MILES NORTH OF ESCONDIDO FROM 0.2 MILE NORTH OF DEER SPRINGS ROAD OC TO GOPHER
CANYON ROAD UC. |
INSTALL NEW CABLE BARRIER |
|
1 – 10 |
325 |
January 2014 |
View Details
|
April 18, 2013 |
|
11 -
405501
|
SD -
8 -
006.9/008.2
|
IN SAN DIEGO COUNTY IN SAN DIEGO FROM 0.1 MILE WEST OF
WARING ROAD UNDERCROSSING TO 0.1 MILE WEST OF COLLEGE
AVENUE OVERCROSSING |
UPGRADE EXISTING MEDIAN MBGR TO CONCRETE BARRIER |
Concrete Barrier |
10 – 20 |
325 |
March 2015 |
View Details
|
April 18, 2013 |
|
11 -
404301
|
SD -
5 -
024.2/025.5
|
IN SAN DIEGO COUNTY IN SAN DIEGO FROM MISSION BAY OVERCROSSING TO 0.5 MILE SOUTH OF LA JOLLA PARKWAY VIADUCT |
OUTER SEPARATION BARRIER |
Concrete Barrier |
1 – 10 |
350 |
May 2013 |
View Details
|
April 18, 2013 |
|
11 -
402801
|
SD -
052 -
05.0 /06.2
|
IN SD CNTY IN SD FROM 0.5 M W OF CONVOY ST OC TO 0.4 M W OF RTE163
|
PAVEMENT REHABILITATION
|
Rehabilitate Pavement |
1 – 10 |
50-175 |
May 2013 |
View Details
|
April 18, 2013 |
|
11 -
2T2701
|
SD -
805 -
012.6/015.9
|
IN SAN DIEGO COUNTY IN SAN DIEGO FROM GREENWOOD
UNDERPASS TO UNIVERSITY AVE OVERCROSSING ***PM 12.6-15.9*** |
CONSTRUCT FREEWAY TO FREEWAY CONNECTOR |
Freeway and Structures, Interchange |
1 – 10 |
500 |
January 0000 |
View Details
|
April 17, 2013 |
|
11 -
2T2601
|
SD -
805 -
004.4/010.0
|
IN SAN DIEGO COUNTY IN CHULA VISTA AND NATIONAL CITY
FROM ORANGE AVE OVERCROSSING TO 18TH STREET OVERCROSSING PM ***4.4-10.0*** |
CONSTRUCT EXPRESS LANES |
Concrete Barrier, Freeway and Structures, Widening |
0 – 1 |
|
January 0000 |
View Details
|
April 17, 2013 |
|
11 -
2T2501
|
SD -
805 -
009.5/010.3
|
IN SAN DIEGO COUNTY IN NATIONAL CITY FROM GROVE STREET
OVERCROSSING TO PLAZA BLVE UNDERCROSSING PM
***9.5-10.3*** |
OUTSIDE WIDENING |
Widening |
1 – 10 |
250 |
January 0000 |
View Details
|
April 17, 2013 |
|
11 -
2T1901
|
SD -
15 -
005.6/R 006.0
|
IN SAN DIEGO COUNTY IN SAN DIEGO FROM ADAMS AVE
OVERCROSSING TO CAMINO DEL RIO SOUTH UNDERCROSSING |
CONSTRUCT COMMUTER BIKE FACILITY |
Asphalt Concrete Surfacing |
1 – 10 |
250 |
January 0000 |
View Details
|
April 17, 2013 |
|
11 -
2T1721
|
SD -
5 -
037.5/039.6
|
IN SAN DIEGO COUNTY IN SOLANA BEACH AND ENCINITAS FROM
0.1 MILE NORTH OF LOMAS SANTA FE DRIVE OVERCROSSING TO
0.2 MILE SOUTH OF BIRMINGHAM DRIVE OVERCROSSING |
REPLACE SAN ELIJO BRIDGE, BUILD RET WALLS N AND S BOUND
REALIGN RAMPS AND RECONFIG MANCH AVE |
Retaining Wall, Modify Ramp, Replace Bridge, Widening |
120 – 140 |
750 |
July 2015 |
View Details
|
April 17, 2013 |
|
11 -
2T1821
|
SD -
805 -
4.4/5.5
|
IN SAN DIEGO COUNTY FROM PALOMAR ST OC TO NAPLES STREET UC
|
DAR
|
Ramp |
40 – 60 |
250 |
July 2015 |
View Details
|
April 17, 2013 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
11 -
2T1711
|
SD -
5 -
037.5/051.4
|
IN SAN DIEGO CO. FROM 0.2KM NORTH END OF BR 57-479 TO
0.3KM NORTH OF THE I-5/SR-78 JUNCTION. CONSTRUCT AN HOV
LANE IN THE NB & SB _ DIRECTIONS PM 37.5/51.4 |
CONSTRUCT 1 HOV LANE IN SB & NB DIRECTIONS |
Widening, Freeway and Structures |
60 – 80 |
325-360 |
December 2015 |
View Details
|
April 17, 2013 |
|
11 -
2T1701
|
SD -
005 -
37.5 /51.4
|
IN SAN DIEGO COUNTY FROM MANCHESTER AVE TO SR 78
|
CONSTRUCT SOUNDWALLS IN THE NORTH AND SOUTH BOUND DIRECTIONS
|
Sound Wall |
40 – 60 |
500 |
February 2016 |
View Details
|
April 17, 2013 |
|
11 -
2M6701
|
SD -
76 -
R2.9/R8.5
|
IN SAN DIEGO COUNTY NEAR OCEANSIDE ON ROUTE 76 FROM MISSION AVENUE UC TO 0.7 MILE EAST OF MELROSE DRIVE |
CONSTRUCT A BWC - HMA CONCRETE OVERLAY |
Asphalt Concrete Surfacing, Rehabilitate Pavement |
1 – 10 |
180 |
March 2014 |
View Details
|
April 17, 2013 |
|
11 -
2M6601
|
IMP -
98 -
032.3/039.6
|
IN IMPERIAL COUNTY IN AND NEAR CALEXICO FROM ROUTE 111
TO ROUTE 7 |
APPLY ASPHALT RUBBER CHIP SEAL |
Asphalt Concrete Surfacing, Rehabilitate Pavement |
1 – 10 |
180 |
September 2014 |
View Details
|
April 17, 2013 |
|
11 -
2M6501
|
IMP -
86 -
043.1/067.8
|
IN IMPERIAL COUNTY NEAR SALTON CITY FROM 0.5 MILE SOUTH OF NORTH JUNCTI ON ROUTE 78 TO RIVERSIDE COUNTY LINE |
APPLY ASPHALT RUBBER CHIP SEAL |
Rehabilitate Pavement, Seal Coat |
1 – 10 |
250 |
May 2015 |
View Details
|
April 17, 2013 |
|
11 -
2M6401
|
SD -
67 -
R 005.8/R 018.5
|
IN SAN DIEGO COUNTY IN AND NEAR SANTEE AND POWAY FROM SAN DIEGO RIVER BRIDGE TO ARCHIE MOORE ROAD |
REPLACE ASPHALT CONCRETE SURFACING |
Asphalt Concrete Surfacing, Rehabilitate Pavement |
1 – 10 |
180 |
December 2016 |
View Details
|
April 17, 2013 |
|
11 -
2M6301
|
SD -
76 -
024.1/034.9
|
IN SAN DIEGO COUNTY FROM PALA MISSI ON ROAD TO 2,0 MILES
WEST OF RED GATE ROAD |
COLD IN-PLACE RECYCLING |
Rehabilitate Pavement |
1 – 10 |
180 |
October 2014 |
View Details
|
April 17, 2013 |
|
11 -
2M6101
|
IMP -
8 -
042.5/081.8
|
IN IMPERIAL COUNTY AT VARIOUS LOCATIONS |
CLEAN AND TREAT BRIDGE DECKS WITH METHACRYLATE AND REPAIR JOINT SEALS |
Seal Cracks, Rehabilitate Bridge Deck |
0 – 1 |
|
December 2013 |
View Details
|
April 17, 2013 |
|
11 -
2M5601
|
SD -
078 -
N17.2/19.2
|
IN SAN DIEGO COUNTY IN ESCONDIDO FROM LINCOLN PARKWAY TO OAK HILL DRIVE |
COLD PLANE AND PLACE A HOT MIX ASPHALT OVERLAY |
Asphalt Concrete Surfacing, Rehabilitate Pavement |
1 – 10 |
90 |
August 2014 |
View Details
|
April 17, 2013 |
|
11 -
2M5101
|
IMP -
086 -
11.3 /20.6
|
IN IMPERIAL COUNTY IN AND NEAR BRAWLEY FROM 15TH ST TO S JUNC RT78
|
ASPHALT RUBBER CHIP SEAL AND DIG OUTS
|
Seal Coat, Asphalt Concrete Surfacing, Rehabilitate Pavement |
1 – 10 |
125 |
August 2013 |
View Details
|
April 17, 2013 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
11 -
2M4901
|
SD -
079 -
35.1 /53.0
|
IN SD COUNTY AT WARNER SPRING, SUNSHINE SUMMIT AND OAK GROVE FROM
|
APPLY RAC OVERLAY
|
Rehabilitate Pavement, Asphalt Concrete Surfacing |
1 – 10 |
45-60 |
January 2014 |
View Details
|
April 17, 2013 |
|
11 -
2M4601
|
IMP -
086 -
21.9 /26.9
|
IN IMPERIAL COUNTY NEAR WESTMORLAND FROM 0.1 MILE N OF BRANDT RD TO 0.2
|
PCC SLAB REPLACEMENT AND REPAIR
|
Replace PCC Pavement, Rehabilitate Pavement |
1 – 10 |
125 |
April 2013 |
View Details
|
April 17, 2013 |
|
11 -
2M4401
|
IMP -
111 -
040.5/065.4
|
IN IMPERIAL COUNTY NEAR NILAND FROM MAIN STREET TO IMPERIAL COUNTY LINE |
PROFILE GRIND AR CHIP SEAL AND WARM MIX ASPHALT |
Slurry Seal Coat, Grading and Paving |
1 – 10 |
180 |
February 2014 |
View Details
|
April 17, 2013 |
|
11 -
2M4301
|
SD -
008 -
006.3/009.0
|
IN SAN DIEGO COUNTY IN SAN DIEGO AND LA MESA ON ROUTE 8
AT 0.3 MILE WEST OF LAKE MURRAY BOULEVARD |
SLAB REPLACEMENT, AC SHOULDER AND AUX LANE AC |
Replace PCC Pavement, Rehabilitate Pavement, Asphalt Concrete Surfacing |
1 – 10 |
250 |
January 2014 |
View Details
|
April 17, 2013 |
|
11 -
296901
|
SD -
54 -
T 011.0/T 014.2
|
IN SAN DIEGO COUNTY FROM ROUTE 94 TO GROVE ROAD |
PLACE MICROSURFACING |
Rehabilitate Pavement |
1 – 10 |
180 |
October 2015 |
View Details
|
April 17, 2013 |
|
11 -
294801
|
IMP -
186 -
00.0 /00.4
|
IN IMPERIAL COUNTY AT ANDRADE FROM MEXICO BORDER TO 0.4
MILE NORTH OF MEXICO BORDER. |
PEDESTRIAN/TRANSIT FACILITIES -(TE)
|
Wheelchair Ramps, Asphalt Concrete Surfacing, Park and Ride Facility |
1 – 10 |
150 |
July 2013 |
View Details
|
April 17, 2013 |
|
11 -
294201
|
IMP -
86 -
001.9/ 002.3
|
IN IMPERIAL COUNTY NEAR CALEXICO FROM 0.2 MILE EAST TO 0.2
MILE WEST OF DOGWOOD ROAD INTERSECTION |
ROADWAY WIDENING AND INSTALLATION OF TRAFFIC SIGNALS |
Widening, Signals |
1 – 10 |
125 |
January 0000 |
View Details
|
April 17, 2013 |
|
11 -
288701
|
IMP -
111 -
R04.6/R04.9
|
IN IMP CNTY NEAR CALEXICO ON SR-111 FROM 0.3 M SOUTH OF RTE 86
|
ROADWAY WIDENING FOR DEDICATED LEFT AND RIGHT TURN LANES
|
Widening |
1 – 10 |
90 |
January 0000 |
View Details
|
April 17, 2013 |
|
11 -
287701
|
SD -
-
|
IN SAN DIEGO COUNTY IN SAN DIEGO AT THE KEARNY MESA MATERIALS LAB |
UPGRADE MATERIALS LAB FACILITY |
Building |
1 – 10 |
250 |
June 2013 |
View Details
|
April 17, 2013 |
|
11 -
287201
|
SD -
78 -
12.1/13.0
|
IN SAN DIEGO COUNTY IN SAN MARCOS FROM SAN MARCOS BLVD CITY OF SAN MARCOS
UNDERCROSSING TO TWIN OAKS VALLEY ROAD UNDERCROSSING |
CONSTRUCT NEW STRUCTURE |
Freeway and Structures |
10 – 20 |
450 |
July 2015 |
View Details
|
April 17, 2013 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
11 -
275601
|
SD -
015 -
54.0
|
IN SAN DIEGO COUNTY IN RAINBOW ON ROUTE 15 AT THE RAINBOW TRUCK INSPE
|
UPGRADE ELECTRICAL AND MODIFY OFFICE
|
Modify Building, Modify Lighting, Scale Facility |
0 – 1 |
250 |
January 2014 |
View Details
|
April 17, 2013 |
|
11 -
275501
|
SD -
067 -
R00.0/R05.8
|
PAVEMENT REHABILITATION OF MAINLINE SHOULDERS, AND RAMPS.
|
IN SD CO IN EL CAJON AND NEAR SANTEE FM RTE 8 TO SD RIVER BR
|
Rehabilitate Pavement, Repair Ramp, Freeway |
20 – 40 |
250 |
March 2014 |
View Details
|
April 17, 2013 |
|
11 -
265011
|
SD -
163 -
00.5 /01.8
|
IN SD CTY IN SD FROM "A" STREET TO RICHMOND STREET OVERCROSSING.
|
SCENIC/HISTORIC HIGHWAY PRESERVATIO (PHASE 2A) TRANSPORTATION ENHANCEMT
|
|
1 – 10 |
250-750 |
July 2013 |
View Details
|
April 17, 2013 |
|
11 -
263901
|
SD -
805 -
010.0/010.6
|
IN SAN DIEGO COUNTY IN NATIONAL CITY FROM 0.5 KM SOUTH TO
0.5 KM NORTH OF PLAZA BOULEVARD UNDERCROSSING |
REVISE INTERCHANGE |
Modify Interchange |
1 – 10 |
125 |
April 2018 |
View Details
|
April 17, 2013 |
|
11 -
085781
|
SD -
163 -
000.6/001.4
|
IN SAN DIEGO COUNTY FROM 0.6 MILES SOUTH TO 1.4 MILES NORTH OF FRAIRS ROAD OC |
REVISE INTERCHANGE/WIDEN OC AND APPROACH |
Asphalt Concrete Surfacing, Modify Bridge, Freeway and Structures, Modify Overcrossing, Widening |
20 – 40 |
500 |
January 0000 |
View Details
|
April 17, 2013 |
|
11 -
080231
|
IMP -
98 -
032.1/032.4
|
IN IMP CNTY SR98 FROM 32.1 PM AT VV WILLIAMS AVE. TO 32.4 PM
TO OLLIE AVE. WIDEN HWY FROM 2-4 LANES. |
WIDEN HIGHWAY |
Widening |
1 – 10 |
250 |
April 2015 |
View Details
|
April 17, 2013 |
|
11 -
056331
|
SD -
11 -
0.00/2.80
|
IN SAN DIEGO COUNTY NEAR SAN DIEGO ON ROUTE 11 FROM 0.1 MILE EAST OF SANYO AVENUE UNDERCROSSING TO 1.9 MILES EAST OF SANYO AVENUE UNDERCROSSING |
CONSTRUCT NEW 4 LANE HIGHWAY AND COMMERCIAL VEHICLE ENFORCEMENT FACILITY |
Freeway |
200 – 250 |
550 |
January 2016 |
View Details
|
April 17, 2013 |
|
8 -
0G6201
|
SBd -
38 -
15.0/49.5
|
NEAR ANGELUS OAKS FR VALLEY OF THE FALLS DR TO NORTH JCT RTE 18 |
COLD PLANE AND OVERLAY |
Rehabilitate Pavement |
10 – 20 |
100 |
December 2013 |
View Details
|
April 04, 2013 |
|
8 -
449101
|
Riv -
111 -
1.1/1.9
|
S/O INDIO FR 0.16 MI South TO 0.20 MI N/O SALTON CR |
REPLACE BRIDGE |
Replace Bridge |
1 – 10 |
260 |
October 2013 |
View Details
|
March 19, 2013 |
|
8 -
0N5701
|
SBd -
40 -
140.7
|
IN THE CITY OF NEEDLES AT ROADRUNNER WASH BRIDGE |
BRIDGE SEISMIC RETROFIT |
Repair Bridge |
0 – 1 |
20 |
July 2013 |
View Details
|
March 18, 2013 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
8 -
0M4501
|
SBd -
38 -
5.2/5.5
|
IN MENTONE FR 0.2 MI E/O AMETHYST ST TO MOUNTAIN VIEW LANE |
ADD LEFT TURN POCKETS |
|
0 – 1 |
50 |
September 2013 |
View Details
|
March 18, 2013 |
|
8 -
0P3101
|
SBd -
395 -
16.2
|
IN ADELANTO AT BARLETT AVENUE |
INSTALL TRAFFIC SIGNALS |
Signals |
0 – 1 |
60 |
November 2013 |
View Details
|
March 18, 2013 |
|
8 -
0K2301
|
Riv -
10 -
57.6
|
IN/NEAR COACHELLA, FROM JCT 86S TO 0.5 MILE E/O COACHELLA CANAL BRIDGE |
PAVEMENT REHAB AND CONSTRUCT TWO RAMP TERMINI |
Rehabilitate Pavement |
1 – 10 |
100 |
October 2013 |
View Details
|
March 15, 2013 |
|
8 -
368501
|
SBd -
15 -
177.3/181.1
|
FROM 1.2 MILES NORTH OF NIPTON ROAD OVERCROSSING TO 0.5 MILE SOUTH OF YATES WELL ROAD OVERCROSSING |
CONSTRUCT COMMERCIAL VEHICLE ENFORCEMENT FACILITY (CVEF) |
Scale Facility |
20 – 40 |
340 |
June 2013 |
View Details
|
March 15, 2013 |
|
8 -
0G2901
|
SBD -
15 -
12.8
|
IN THE CITY OF FONTANA AT SIERRA AVENUE UNDERCROSSING TO 1.9 MILES SOUTH OF GLEN HELEN PARKWAY UNDERCROSING |
WIDEN AND SIGNALIZE EXIT RAMPS AT SIERRA AVENUE INTERCHANGE |
Signals |
1 – 10 |
90 |
June 2013 |
View Details
|
March 15, 2013 |
|
11 -
263301
|
IMP -
8 -
R 038.7 /R 039.3
|
IN IMPERIAL COUNTY IN EL CENTRO FROM 0.26MILE WEST TO
0.34MILE EAST OF DOGWOOD ROAD OVERCROSSING |
REVISE INTERCHANGE |
Modify Interchange |
20 – 40 |
325 |
September 2013 |
View Details
|
March 15, 2013 |
|
11 -
257151
|
SD -
076 -
12.1 /17.7
|
IN SD CNTY AT AND NEAR BONSALL FROM W/O SO MISSION RD TO E/O 76/15 SEP
|
CONSTRUCT 4 LANE HIGHWAY |
Highway Planting, Grading and Paving, Bridge |
100 – 120 |
1500 |
August 2013 |
View Details
|
March 15, 2013 |
|
11 -
241511
|
SD -
163 -
08.2 /09.4
|
IN SD CNTY, IN SD FRM 0.6 MI S TO 0.6MI N OF CLAIREMONT BLVD. OC
|
INTERCHANGE RECONFIGURATION FOR TRAFFIC HANDLING IMPROVEMENTS
|
Modify Interchange |
1 – 10 |
250 |
September 2013 |
View Details
|
March 15, 2013 |
|
11 -
238401
|
IMP -
7 -
000.0/001.2
|
IN IMPERIAL COUNTY ON STATE ROUTE 7 FROM THE
INTERNATIONAL BORDER TO STATE ROUTE 98 |
PAVEMENT REHABILITATION |
Rehabilitate Pavement |
10 – 20 |
125-250 |
June 2014 |
View Details
|
March 15, 2013 |
|
11 -
056341
|
SD -
11 -
2.40/2.40
|
IN SAN DIEGO COUNTY NEAR SAN DIEGO ON ROUTE 11 FROM 2.4 MILES EAST OF SANYO AVENUE UNDERCROSSING TO MEXICO
BORDER |
CONSTRUCT LAND PORT OF ENTRY |
Building |
0 – 1 |
110 |
August 2014 |
View Details
|
March 15, 2013 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
11 -
056321
|
SD -
11 -
0.00/1.30
|
IN SAN DIEGO COUNTY NEAR SAN DIEGO ON ROUTE 905 FROM 0.1 MILE WEST OF BRITANNIA BOULEVARD OVERCROSSING TO 1.6 MILES EAST OF LA MEDIA ROAD UNDERCROSSING |
CONSTRUCT FREEWAY TO FREEWAY CONNECTORS |
Freeway and Structures, Interchange, Overcrossing |
60 – 80 |
350 |
July 2013 |
View Details
|
March 15, 2013 |
|
11 -
0223U1
|
SD -
005 -
R 028.6/R 030.1
|
IN SAN DIEGO COUNTY IN SAN DIEGO FROM 0.4 MI SOUTH OF GENESEE AVE OVERCROSSING TO ROSELLE STREET UNDERCROSSING |
RECONST INTERCHANGE, SIGNAL INTERSECTION AND ADD AUX LANES |
Widening, Reconstruct Signals, Reconstruct Interchange |
60 – 80 |
638 |
May 2013 |
View Details
|
March 15, 2013 |
|
6 -
0H170_
|
FRE -
180 -
77.2
|
ON ROUTE 180 IN FRESNO COUNTY AT KINGS RIVER OVERFLOW BRIDGE (#42-0074) BETWEEN PM 77.1 AND PM 77.2. |
BRIDGE REPLACEMENT |
Replace Bridge |
1 – 10 |
290 |
July 2013 |
View Details
|
March 07, 2013 |
|
7 -
292304
|
LA -
5 -
25.6
|
IN LA NB LA-5 OFF-RAMP TO COLORADO FWY EXTENTION |
WIDENING OFF-RAMP AND BRIDGE |
Widening |
1 – 10 |
250 |
January 2017 |
View Details
|
February 22, 2013 |
|
7 -
286704
|
LA -
1 -
07.7 /09.2
|
PROJ DOMINGUEZ CHENNEL VAR TMDLS(LA 1 PM7.7-9.24,LA91 PM6-8.43,LA105, |
IMPLEMENT STORM WATER TREATMMENT |
Earthwork, Erosion Control, Highway Planting, Irrigation System |
60 – 80 |
750 |
March 2017 |
View Details
|
February 19, 2013 |
|
7 -
291404
|
LA -
1 -
56.0/58.0
|
IN MAL AT TRANCAS CREEK BRIDGE (53- 0027) |
BRIDGE REPLACEMENT |
Replace Bridge |
1 – 10 |
300 |
January 2018 |
View Details
|
February 08, 2013 |
|
7 -
296704
|
Ven -
118 -
21.8/32.6
|
IN VENTURA COUNTY, FROM ARROYO OH TO LA/VENTURA COUNTY LINE |
Pavement Repair & Curb Ramps |
Wheelchair Ramps, Seal Coat, Asphalt Concrete Surfacing, Groove Pavement, Guard Railing, Highway Planting, Rehabilitate Pavement, Replace PCC Pavement |
10 – 20 |
350 |
January 2018 |
View Details
|
January 31, 2013 |
|
7 -
1W2404
|
LA -
5 -
20.3
|
Bridge (Br. No.53-1424) Elysian Viaduct. |
Spot blast cleaning and paint entire structure. |
Clean and Paint Bridge |
10 – 20 |
400 |
September 2015 |
View Details
|
January 30, 2013 |
|
7 -
294604
|
LA -
101 -
0.0/1.4
|
IN LA CTY FR E/7TH ST TO N/FIGUEROA ST |
ROADSIDE SAFETY IMPROVEMENTS |
Erosion Control, Highway Planting, Modify Bridge Railing |
1 – 10 |
250 |
April 2015 |
View Details
|
January 30, 2013 |
|
7 -
2759U4
|
LA -
110 -
23.5/23.9
|
IN LA CNTY IN LA ON N/B RTE 110 AT THE RTE 101 IC |
SOURCE CONTROL |
Erosion Control, Highway Planting |
1 – 10 |
250 |
July 2013 |
View Details
|
January 30, 2013 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
7 -
3X7104
|
LA -
60 -
7.7
|
@ PARAMOUNT BL OC |
REALIGN RAMP & APPROACHES TO NEW BR |
Reconstruct Ramp |
1 – 10 |
250 |
May 2014 |
View Details
|
January 30, 2013 |
|
7 -
1193U4
|
LA -
010 -
37.5/42.4
|
IN LA COUNTY FROM CITRUS STREET IN WEST COVINA TO ROUTE 57 IN POMONA |
CONSTRUCT HOV LANE IN EACH DIRECTION |
Freeway and Structures, Widening |
120 – 140 |
940 |
October 2014 |
View Details
|
January 30, 2013 |
|
7 -
240704
|
LA -
VAR -
VAR
|
IN LOS ANGELES COUNTY ON VARIOUS ROUTES AT VARIOUS LOCATIONS
|
Install new Highway Advisory Radio (HAR) systems and upgrade the existing HARs and HAR flashing beacon signs. |
|
1 – 10 |
600 |
October 2016 |
View Details
|
January 30, 2013 |
|
7 -
257104
|
LA -
001 -
01.0/01.0
|
IN LA COUNTY AT VARIOUS LOCATIONS/RTS |
UPGRADE TCRMS-INST CHNGBL MESSG SIGN |
|
1 – 10 |
580 |
March 2015 |
View Details
|
January 30, 2013 |
|
6 -
36023_
|
TUL -
99 -
35.2/37.3
|
ON ROUTE 99 IN TULARE COUNTY NEAR VISALIA FROM 1.2 MILES SOUTH OF AVENUE 280 OC (BR NO. 46-195) TO 0.9 MILES SOUTH OF WEST VISALIA OH (BR NO. 46-226) |
4 LANE FREEWAY TO 6 LANE FREEWAY |
|
10 – 20 |
|
March 2013 |
View Details
|
January 24, 2013 |
|
6 -
0P160_
|
KIN -
198 -
R14.7/R17.9
|
ON ROUTE 198 IN HANFORD FROM 14TH AVENUE UNDERCROSSING TO 11TH AVENUE UNDERCROSSING |
OVERYLAY CAPM |
|
1 – 10 |
|
December 2013 |
View Details
|
January 24, 2013 |
|
6 -
0P140_
|
KER -
5 -
62.5/73.1
|
ON ROUTE 5 BETWEEN LERDO OVERCROSSING AND ROUTE 5/46 SEPARATION |
REPLACE PCC PANELS, GRIND CONCRETE PAVEMENT & CRACK SEAL AC SHOULDER |
|
1 – 10 |
|
February 2014 |
View Details
|
January 24, 2013 |
|
6 -
0N401_
|
KER -
58 -
67.8
|
NEAR EDISON AT NEUMARKLE ROAD UNDERCROSSING |
CONSTRUCT ROCK SLOPE PROTECTION |
|
0 – 1 |
|
May 2013 |
View Details
|
January 24, 2013 |
|
6 -
0N360_
|
KER -
5 -
10.4/R15.8
|
NEAR GRAPEVINE FROM 0.2 MILES NORTH OF GRAPEVINE UNDERCROSSING TO 0.3 MILES NORTH OF ROUTE 5/99 SEPARATION |
REPLACE AC PANELS WITH PCC |
|
1 – 10 |
|
October 2013 |
View Details
|
January 24, 2013 |
|
6 -
0N200_
|
MAD -
99 -
20.2/22.7
|
IN MADERA COUNTY NEAR FAIRMEAD AT VARIOUS LOCATIONS FROM 0.6 MILE SOUTH OF AVENUE 21 1/2 OVERCROSSING TO ROUTE 152 |
CONSTRUCT MEDIAN BARRIER |
|
1 – 10 |
|
October 2013 |
View Details
|
January 24, 2013 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
6 -
0M420_
|
FRE -
41/180 -
R24.5/R24.8,R57.9/R58.6
|
IN FRESNO COUNTY IN FRESNO ON RTE 41 FROM THE RTE 180/41 CONNECTOR TO OLIVE AVE UC AND ON RTE 180 FROM BLACKSTONE AVE UC TO RTE 180/41 CONNECTOR |
CONSTRUCT CONCRETE GUARD RAIL |
|
1 – 10 |
|
March 2013 |
View Details
|
January 24, 2013 |
|
6 -
0M020_
|
FRE -
168 -
R36.0
|
IN FRESNO COUNTY ABOUT 11 MILES EAST OF PRATHER AT MAYNARD MUNGER VISTA POINT |
ENHANCE VISTA POINT |
|
1 – 10 |
|
December 2013 |
View Details
|
January 24, 2013 |
|
6 -
0J920_
|
FRE -
145 -
32.8/33.4
|
ON ROUTE 145, FROM 0.3 MILES NORTH OF JENSEN AVENUE |
CONSTRUCT ROUNDABOUT |
|
1 – 10 |
|
November 2013 |
View Details
|
January 24, 2013 |
|
6 -
0G900_
|
MAD -
41 -
11.7/13.6
|
ON ROUTE 41 BETWEEN 0.3 MILES NORTH OF ROAD 208 AND 2.2 MILES NORTH OF ROAD 208 |
CONSTRUCT PASSING LANES |
|
10 – 20 |
|
October 2013 |
View Details
|
January 24, 2013 |
|
9 -
35310_
|
MNO -
395 -
6.9/10.3
|
ON ROUTE US 395 BETWEEN 2.4 MILES SOUTH OF LOWER ROCK CREEK ROAD AND 0.6 MILES NORTH OF LOWER ROCK CREEK ROAD |
CAPM |
|
1 – 10 |
|
February 2014 |
View Details
|
January 24, 2013 |
|
9 -
35410_
|
MNO -
395 -
63.9/65.1
|
IN MONO COUNTY NEAR LEE VINING FROM 0.4 MILES NORTH OF VIRGINIA LAKES ROAD TO 1.6 MILES NORTH OF VIRGINIA LAKES ROAD |
CAPM |
|
1 – 10 |
|
September 2013 |
View Details
|
January 24, 2013 |
|
9 -
35160_
|
INY -
395 -
45.5/50.3, 50.9/52.9
|
ON ROUTE 395 BETWEEN 0.7 MILES SOUTH OF COTTONWOOD ROAD AND 0.4 SOUTH OF LUBKIN CANYON RD |
COLD IN-PLACE RECYCLE CAPM |
|
1 – 10 |
|
July 2013 |
View Details
|
January 24, 2013 |
|
6 -
48750_
|
KIN -
198 -
R16.5/R17.2
|
ON ROUTE 198 FROM 0.4 MILES WEST OF 12TH AVENUE OVERCROSSING TO 0.3 MILES EAST OF 12TH AVENUE OVERCROSSING |
RECONSTRUCT INTERCHANGE |
|
10 – 20 |
|
June 2013 |
View Details
|
January 24, 2013 |
|
6 -
46220_
|
KIN -
198 -
R14.8/17.9
|
IN AND NEAR HANFORD AT THE 14TH AVE UC HANFORD/ARMONA RD UC AND THE 11TH AVE UC |
REHAB 3 BRIDGE DECKS |
Rehabilitate Bridge Deck, Rehabilitate Pavement, Replace Roadway, Modify Signs, Asphalt Concrete Surfacing, Replace Bridge Railing, Reconstruct Bridge, Modify Concrete Barrier, Modify Drainage, Modify Electrical Facilities, Reconstruct Freeway, Replace Guard Railing |
1 – 10 |
|
March 2013 |
View Details
|
January 24, 2013 |
|
6 -
43070_
|
TUL -
216 -
1.9/2.9
|
ON ROUTE 216 FROM LOVERS LANE PM 1.9 TO EAST OF MCAULIFF STREET AT PM 2.9 IN THE CITY OF VISALIA |
WIDEN & REALIGNMENT OF HOUSTON AVENUE (SR 216) |
|
1 – 10 |
|
February 2013 |
View Details
|
January 24, 2013 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
6 -
0H180_
|
KER -
14 -
39.9
|
ON ROUTE 14 IN KERN COUNTY AT PM 39.9, 24 MILES NORTH OF MOJAVE AT RED ROCK CANYON BRIDGE #50-0178 |
BRIDGE REPLACEMENT (SCOUR) |
Asphalt Concrete Surfacing, Replace Bridge, Earthwork, Grading and Paving, Reconstruct Guard Railing, Modify Roadway, Rock Slope Protection, Widening |
10 – 20 |
250 |
May 2013 |
View Details
|
January 24, 2013 |
|
7 -
220504
|
LA -
001 -
23.7/23.9
|
IN MANB/ESEG FROM 33RD STREET /ROSECRANS AVENUE |
ROADWAY WIDENING |
|
1 – 10 |
270 |
June 2014 |
View Details
|
January 23, 2013 |
|
7 -
249704
|
LA -
101 -
23.4/24.1
|
IN LA COUNTY IN LA BETWEEN WINNETKA AVENUE NB AND DE SOTO AVENUE NB |
ADDING AUXILIARY LANE |
Sound Wall, Retaining Wall, Reconstruct Interchange |
1 – 10 |
310 |
April 2015 |
View Details
|
January 23, 2013 |
|
7 -
249404
|
LA -
101 -
13.0/13.8
|
IN LA COUNTY IN LA BETWEEN LAUREL CANYON BOULEVARD AND COLD WATER AVENUE |
CONSTRUCT AUXILARY LANE |
Reconstruct Interchange, Retaining Wall, Sound Wall |
10 – 20 |
310 |
March 2015 |
View Details
|
January 23, 2013 |
|
7 -
277904
|
VEN -
23 -
22.8/23.5
|
In Ventura County Between Guiberson Road and Santa Clara River |
DRAINAGE SYSTEM RESTORATION |
Repair Culverts |
1 – 10 |
200 |
December 2014 |
View Details
|
January 23, 2013 |
|
7 -
244104
|
LA -
210 -
18.7/22.0
|
IN LA CANADA/FLINTRIDGE CITY, FROM OAK PLACE TO CTY'S S/E BOUNDARY |
CONSTRUCTION OF SOUNDWALL |
|
10 – 20 |
350 |
September 2016 |
View Details
|
January 23, 2013 |
|
7 -
289004
|
LA -
10 -
37.2/42.4
|
IN LA CNTY FR SOUTH MEADOW RD TO RTE 57 |
MAINLINE PAVEMENT REHABILITATION |
Rehabilitate Pavement, Replace PCC Pavement, Asphalt Concrete Surfacing |
20 – 40 |
600 |
November 2014 |
View Details
|
January 23, 2013 |
|
7 -
265604
|
LA -
138 -
69.3/74.9
|
IN LOS ANGELES COUNTY FR RTE 18 TO SBDO CNTY LINE |
WIDEN ROADWAY AND PAVE SHOULDERS |
Grading and Paving, Pavements Markings, Widening, Asphalt Concrete Surfacing |
10 – 20 |
500 |
May 2014 |
View Details
|
January 23, 2013 |
|
7 -
278604
|
LA -
210 -
20.8/21.5
|
IN LCF FROM FOOTHILL BLVD TO BIRKSHIRE PL UC |
SOUNDWALL CONSTRUCTION |
Sound Wall |
1 – 10 |
210 |
October 2014 |
View Details
|
January 23, 2013 |
|
7 -
256504
|
LA -
405 -
00.0/48.6
|
LA COUNTY IN LA ON RTE 405 VARIOUS LOCATIONS |
SAFETY LIGHTING CONVERSION |
|
1 – 10 |
420 |
October 2015 |
View Details
|
January 23, 2013 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
7 -
275504
|
LA -
710 -
5.0/7.0
|
In Los Angeles County from Ocean Boulevard to Pacific Coast Highway |
Roadway Rehabilitation |
Rehabilitate Pavement |
10 – 20 |
600 |
October 2015 |
View Details
|
January 23, 2013 |
|
7 -
278504
|
LA -
4054 -
8.7
|
IN LOS ANGELES COUNTY,IN CARSON - DELORES YARD OVER HEAD (53-1168) |
PAINT ENTIRE STEEL PORTION OF STRUCTURE AND POLYESTER CONCRETE DECK OVERLAY |
Rehabilitate Bridge Deck |
10 – 20 |
|
July 2017 |
View Details
|
January 23, 2013 |
|
7 -
224104
|
LA -
60 -
21.5R/23.0R
|
CITY OF INDUSTRY & DIAMOND BAR FROM FAIRWAY DR UC TO OLD BREA CYN RD UC |
CONSTRUCT INTERCHANGE |
Interchange |
10 – 20 |
250 |
January 2014 |
View Details
|
January 23, 2013 |
|
7 -
129994
|
LA -
30 -
00.0R/02.7
|
IN GEDR/LVN FROM JCT 210/66 AND LA-60; R25.4/30.5 AND LA-71; RI.3-R4.8 |
INSTALL COMM/TOS #4 FIELD HARDWARE |
Electrical Facilities |
1 – 10 |
480 |
September 2014 |
View Details
|
January 23, 2013 |
|
7 -
279104
|
LA -
57 -
4.3R/4.8R
|
LA COUNTY IN DIAMOND BAR & CITY OF INDUSTRY FR OC 53-1848R/UC53-1941 |
ADD WB AUXILIARY LANE/OC/RAMP/CONN |
Widening, Reconstruct Interchange |
180 – 200 |
700 |
March 2015 |
View Details
|
January 23, 2013 |
|
7 -
280304
|
LA -
5 -
16.2 /63.4
|
IN LOS ANGELES CNTY AT VAR LOC (LA-5, 10, 101, 110, 134, 170, 405) |
INSTALL ADA CURB RAMPS |
Wheelchair Ramps |
1 – 10 |
130 |
June 2014 |
View Details
|
January 23, 2013 |
|
7 -
291104
|
LA -
101 -
30.9/38.2
|
IN LA FR CALBASAS/AGURA HILLS |
INSTL & MODIFY ADA RAMPS,CONST SIDEWALKS, ADA IMPROVEMENTS |
Modify Signals, Wheelchair Ramps |
1 – 10 |
250 |
October 2015 |
View Details
|
January 23, 2013 |
|
7 -
259404
|
LA -
210 -
00.0/09.8
|
LA COUNTY, CITY OF LA/SAN FERNANDO & LA CANADA FLINTRIDGE AT VAR LOC |
STORM WATER MITIGATION (TRASH TMDL) |
|
1 – 10 |
520 |
September 2015 |
View Details
|
January 23, 2013 |
|
7 -
199614
|
LA -
405 -
39.4/40.5
|
IN LA FROM SB AT BURBANK BL/N&S BND RTE 101 CONN (LA-101;17.0/18.5) |
RECONST SB CONN, RAMP TO N&S BND 101 |
Reconstruct Interchange, Freeway and Structures |
140 – 160 |
1,000 |
August 2015 |
View Details
|
January 23, 2013 |
|
7 -
209704
|
LA -
5812 -
LE.ND/A.N
|
943 W. DORAN STREET - GLENDALE |
UPGRADE MAINTENANCE STATION |
|
0 – 1 |
290 |
August 2014 |
View Details
|
January 23, 2013 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
7 -
278304
|
LA -
405 -
3.5/5.5
|
IN LA COUNTY IN LONG BEACH AT TEMPLE AVE OC |
BRIDGE REHAB |
Replace Bridge |
1 – 10 |
500 |
May 2013 |
View Details
|
January 23, 2013 |
|
7 -
205604
|
LA -
001 -
44.0/44.2
|
IN MAL AT LAS FLORES CANYON BETWEEN PM 44.0 AND 44.2 |
DRAINAGE FACILITY IMPROVEMENTS |
|
1 – 10 |
280 |
November 2015 |
View Details
|
January 23, 2013 |
|
7 -
260404
|
LA -
039 -
31.0/33.0
|
IN LA COUNTY AT THE NF SAN GABRIEL BRIDGE |
BRIDGE SCOUR MITIGATION |
Replace Bridge Railing, Repair Bridge |
1 – 10 |
360 |
December 2015 |
View Details
|
January 23, 2013 |
|
7 -
288504
|
LA -
405 -
11.7
|
NB 405 at Carson Commercial Vehicle Enforcement Facility. |
Improve and Upgrade Commercial Vehicle Enforcement Facility. |
Repair Inspection Facility |
1 – 10 |
250 |
February 2014 |
View Details
|
January 23, 2013 |
|
7 -
259004
|
LA -
001 -
01.0/01.0
|
LA COUNTY IN LA RIVER METALS TMDL |
SAND FILTERS AND INFILTRATION DEVICES |
|
20 – 40 |
210 |
May 2014 |
View Details
|
January 23, 2013 |
|
7 -
259204
|
LA -
010 -
05.5R/14.8
|
LA COUNTY IN LA @ BALLONA CREEK METALS AND TOXICS TMDL |
SAND FILTERS AND INFILTRATION DEVICES |
|
1 – 10 |
200 |
June 2013 |
View Details
|
January 23, 2013 |
|
7 -
274904
|
LA -
110 -
23.5/23.9
|
IN LA CNTY IN LA ON S/B RTE 110 AT THE RTE 101 IC |
SOURCE CONTROL |
Erosion Control, Highway Planting |
1 – 10 |
250 |
August 2013 |
View Details
|
January 23, 2013 |
|
7 -
2768U4
|
LA -
210 -
0.8R/04.9R
|
IN LA CNTY IN LA ON S/B RTE 210 FR MACLAY AVE TO YARNELL ST |
EROSION CONTROL |
Erosion Control, Highway Planting |
1 – 10 |
250 |
June 2013 |
View Details
|
January 23, 2013 |
|
7 -
4H9004
|
LA -
060 -
20.6/
|
IN LA COUNTY IN ROWLAND HEIGHTS FROM W/B OFF-RAMP TO NOGALES STREET |
WIDEN OFF-RAMP |
Widening, Modify Interchange |
1 – 10 |
190 |
July 2013 |
View Details
|
January 23, 2013 |
|
7 -
232804
|
LA -
134 -
10.8/11.4
|
FROM RTE 134 TO SHERMAN WAY AND 0N RTE 405 FR N/S STAGG AV |
CONSTRUCTION OF SOUNDWALL |
|
40 – 60 |
340 |
May 2013 |
View Details
|
January 23, 2013 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
7 -
252004
|
LA -
405 -
34.3/48.6
|
IN LA COUNTY IN VARIOUS CITIES FROM GETTY CTR DRIVE TO NEAR ROUTE 5 |
SLAB REPLACEMENT, GRINDING OVERLAY |
Replace PCC Pavement, Rehabilitate Pavement, Replace Joint Seals |
40 – 60 |
400 |
February 2015 |
View Details
|
January 23, 2013 |
|
7 -
1170U4
|
LA -
010 -
33.4/37.5
|
IN LA COUNTY IN BALDWIN PARK & WEST COVINA FROM PUENTE AVENUE TO CITRUS STREET |
CONSTRUCT ONE HOV LANE IN EACH DIRECTION |
Widening, Freeway and Structures, Sound Wall |
100 – 120 |
940 |
May 2013 |
View Details
|
January 23, 2013 |
|
7 -
202124
|
LA -
710 -
21.9/23.1
|
IN CMMRC & BLL FRM SOUTH ATLNTC BLV TO TRIGGS ST REHAB RDWY |
LONG LIFE PAVEMENT & WIDEN BRIDGES |
Modify Bridge, Replace PCC Pavement, Widening |
80 – 100 |
650 |
June 2014 |
View Details
|
January 23, 2013 |
|
7 -
4Y7004
|
LA -
405 -
8.7
|
IN LA, LA-405 @ DOLORES YARD OH |
PAINT STEEL GIRDERS |
Clean and Paint Bridge |
1 – 10 |
100 |
July 2015 |
View Details
|
January 23, 2013 |
|
7 -
239704
|
LA -
001 -
51.0/52.0
|
IN LOS ANGELES FROM WEST OF LATIGO CANYON TO EAST OF MALIBU COVE COLONY DRIVE |
CONSTRUCT RETAINING WALL |
|
1 – 10 |
520 |
March 2015 |
View Details
|
January 23, 2013 |
|
7 -
255104
|
LA -
60 -
24.2R/24.7R
|
LA CNTY IN DIAMOND BAR AND INDUSTRY GRAND AV/SR 57/60 |
IC MODIFICATION and CONTRUCT ON-RAMPS |
|
10 – 20 |
280 |
March 2014 |
View Details
|
January 23, 2013 |
|
7 -
265904
|
LA -
101 -
01.0/11.0
|
LA COUNTY IN LA BETWEEN GRAND AVENUE AND VINELAND AVENUE |
UPGRADE BRIDGE RAILS |
Replace Bridge Railing |
1 – 10 |
340 |
April 2013 |
View Details
|
January 23, 2013 |
|
7 -
290904
|
LA -
210 -
7.1/7.8
|
IN LA CNTY IN LA BET TERRA BELLA AND MOBIL HOMES |
REPLACING MBGR TO CONCRETE BARRIER |
Concrete Barrier |
1 – 10 |
150 |
August 2013 |
View Details
|
January 23, 2013 |
|
7 -
278401
|
LA -
210 -
22.5/24.6
|
IN PASADENA FROM ARROYO BLVD TO ORANGE GROVE |
SOUNDWALL CONSTRUCTION |
Sound Wall |
1 – 10 |
210 |
April 2013 |
View Details
|
January 23, 2013 |
|
7 -
253104
|
LA -
213 -
00.6/04.1
|
ON LA COUNTY AT WESTERN AVENUE FROM 14TH STREET/PENINSULA VERDE DRIVE |
STORM DRAIN LINING |
Replace Drainage |
10 – 20 |
500 |
February 2014 |
View Details
|
January 23, 2013 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
7 -
204904
|
LA -
405 -
39.1/
|
ON S/B ROUTE 405 AT VENTURA BOULEVARD ON-RAMP |
ADDING A LANE TO THE ON-RAMP |
Widening |
1 – 10 |
290 |
February 2015 |
View Details
|
January 23, 2013 |
|
7 -
215924
|
LA -
005 -
00.0/01.5
|
IN LMRD FROM ARTESIA BOULEVARD/COYOTE CK OC |
WIDENING VALLEY VIEW AVENUE INTERCHANGE |
|
120 – 140 |
650 |
August 2014 |
View Details
|
January 23, 2013 |
|
7 -
281504
|
LA -
101 -
29.2 /38.1
|
IN LA & VEN CNTY, IN LA101 (PM29.26 /38.19) & VEN101 (PM0.00/1.21 |
GSRD'S OR OTHER TREATMENT BMPs |
Erosion Control, Highway Planting, Reconstruct Culverts |
20 – 40 |
750 |
March 2016 |
View Details
|
January 23, 2013 |
|
7 -
233004
|
LA -
405 -
06.4/43.1
|
VARIOUS CITY FROM LONG BEACH LOULEVARD TO S STAGG STREET, NB & SB |
CONSTRUCTION OF SOUND WALL |
|
20 – 40 |
230 |
January 2015 |
View Details
|
January 23, 2013 |
|
7 -
278804
|
LA -
5 -
54.4R/54.8R
|
IN LOS ANGELES COUNTY IN SCTA BETWEEN RYE CANYON ROAD AND RTE 5/126 IC |
UPGRADE WEIGH STATION |
Modify Scale Facility |
1 – 10 |
150 |
April 2013 |
View Details
|
January 23, 2013 |
|
7 -
3X0204
|
Ven -
150 -
27.4/29.4
|
Near Sulphur Springs, between Camp Bartlett and Rancho La Cuesta. |
Construct soldier pile walls |
Repair Slope, Retaining Wall |
1 – 10 |
250 |
June 2013 |
View Details
|
January 23, 2013 |
|
7 -
2777U4
|
LA -
5 -
25.2/27.0
|
IN LOS ANGELES ON ROUTE 5 FROM COLORADO EXTENSION TO HAZEL STREET PUC AND ON ROUTE 134 FROM VICTORY BOULEVARD/RIVERSIDE DRIVE TO SAN FERNANDO ROAD |
EROSION CONTROL |
Erosion Control, Highway Planting |
1 – 10 |
250 |
July 2013 |
View Details
|
January 23, 2013 |
|
7 -
226504
|
LA -
001 -
00.0/34.0
|
LA/VEN AT VARIOUS LOCATION ON ALL UC AND OC STRUCTURES |
INST. VERT CLEARANCE AND WARNING SIGNS |
|
1 – 10 |
410 |
December 2014 |
View Details
|
January 23, 2013 |
|
7 -
234504
|
LA -
110 -
00.0/21.2
|
FROM 9TH & GAFFEY STREET IN SAN PEDRO TO WAHSINGTON BOULEVARD IN DOWNTOWN LA |
REPL OH GUIDE-RETRO-REFL SIGN PANEL |
|
1 – 10 |
200 |
November 2014 |
View Details
|
January 23, 2013 |
|
7 -
1952U4
|
VEN -
101 -
00.1/03.0
|
IN VEN COUNTY NR THOUSAND OAKS FROM VEN COUNTY LINES TO 101/23 IC |
INTERCHANGE IMPROVEMENT |
Reconstruct Interchange |
10 – 20 |
570 |
July 2013 |
View Details
|
January 23, 2013 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
7 -
120944
|
LA -
710 -
15.7R/27.5
|
IN LYNWOOD TO ALHAMBRA FROM 105 TO VALLEY BOULEVARD |
INSTALL COMMUNICATION SYSTEMS |
Electrical Facilities |
1 – 10 |
400 |
October 2015 |
View Details
|
January 23, 2013 |
|
7 -
258804
|
LA -
-
00.0/00.0
|
LA COUNTY IN LA AT VARIOUS LOCATIONS |
SOIL STABILIZATION AND REVEGATION |
|
0 – 1 |
210 |
February 2013 |
View Details
|
January 23, 2013 |
|
7 -
252634
|
LA -
5 -
45.4R/59.7R
|
IN LA CNTY IN LA AND SCLA FR ROUTE 5/14 IC TO LAKE HUGHES RD UC |
ROADWAY REHABILITATION |
Replace PCC Pavement, Replace Joint Seals, Rehabilitate Pavement, Groove Pavement |
10 – 20 |
300 |
May 2013 |
View Details
|
January 23, 2013 |
|
7 -
3X0004
|
Ven -
33 -
15.7/15.8
|
In Meiners Oaks, near North Folk Matilija Creek. |
Construct soldier pile wall with tie-backs. |
Retaining Wall |
1 – 10 |
300 |
August 2013 |
View Details
|
January 23, 2013 |
|
7 -
278204
|
LA -
10 -
18.3/46.8
|
LA CNTY @ VAR LOC ON RTE 10, 14, 30 , 57, 71, 110, 118, 134, 210, & 710 |
INSTALL ADA CURB RAMPS |
Wheelchair Ramps |
1 – 10 |
260 |
August 2013 |
View Details
|
January 23, 2013 |
|
7 -
000003
|
-
VAR -
|
In Los Angeles and Ventura County on various routes. |
Minor A (between $250,001 and $1 million) and Minor B (up to $250,000) projects.
See link for a listing of upcoming projects:
http://www.dot.ca.gov/dist07/travel/projects/D7MinorProjects_Jan-2011.pdf
|
|
0 – 1 |
|
January 2013 |
View Details
|
January 23, 2013 |
|
8 -
491801
|
Riv -
62 -
62-0.0/R6.7
|
NEAR DESERT HOT SPRINGS FROM ROUTE 10/62 SEPARATION TO NORTH INDIAN CANYON DRIVE |
REHABILITATE ROADWAY PAVEMENT AND WIDEN MEDIAN SHOULDERS |
Rehabilitate Pavement |
10 – 20 |
180 |
May 2013 |
View Details
|
January 23, 2013 |
|
8 -
0M3101
|
Riv -
60 -
13.3/16.6
|
ALSO RIV-91-15.6/16.6 & SBD-210-24.1; IN CITIES OF MORENO VALLEY, RIVERSIDE AND SAN BERNARDINO |
UPGRADE PEDESTRIAN FACILITIES (CURB RAMPS) |
Wheelchair Ramps |
0 – 1 |
30 |
August 2013 |
View Details
|
January 22, 2013 |
|
8 -
0J0101
|
SBd -
18 -
53.3/53.6
|
IN BIG BEAR CITY AT BIG TREE DRIVE |
CONSTRUCT LEFT TURN IN BOTH DIRECTION, WIDEN SHOULDER WB |
Widening |
0 – 1 |
50 |
May 2013 |
View Details
|
January 22, 2013 |
|
8 -
0M6901
|
SBd -
95 -
57.0/57.3
|
IN NEEDLES FROM SAFARI DRIVE TO I-40/SR-95 |
CONSTRUCT SIDEWALKS AND CURB RAMPS |
Wheelchair Ramps |
0 – 1 |
45 |
May 2013 |
View Details
|
January 22, 2013 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
7 -
105964
|
VEN -
118 -
10.9/11.0
|
AT SOMIS FROM ROUTE 34 TO DONLON ROAD B7 |
MODIFY INTERSECTION |
Widening |
1 – 10 |
330 |
April 2025 |
View Details
|
January 14, 2013 |
|
7 -
000001
|
LA -
VAR -
VAR
|
In Los Angeles County on various routes. |
7 Pavement Rehabilitation Projects (Profile grinding, Replace Slabs, HMA, RHMA, sealing, etc.) |
Slurry Seal Coat, Asphalt Concrete Surfacing, Groove Pavement, Seal Cracks |
1 – 10 |
|
January 2013 |
View Details
|
January 14, 2013 |
|
7 -
000002
|
VEN -
VAR -
VAR
|
In Ventura County on various Routes |
3 Pavement Rehabilitation Projets (Profile Grinding, Cold In-place Recycling, and RHMA) |
Asphalt Concrete Surfacing, Slurry Seal Coat |
1 – 10 |
|
February 2013 |
View Details
|
January 14, 2013 |
|
7 -
293404
|
LA -
5 -
25.2 /25.9
|
IN GNDL ON COLORADO BL |
MEDIAN BARRIER/CURVE CORRECTION |
Concrete Barrier, Modify Drainage |
1 – 10 |
300 |
April 2015 |
View Details
|
January 02, 2013 |
|
10 -
0G800_
|
SJ -
12 -
0.1/R4.4
|
IN SAN JOAQUIN COUNTY NEAR TERMINOUS FROM MOKELUMNE RIVER BRIDGE TO POTATO SLOUGH BRIDGE |
ROADWAY REHABILITATION |
|
20 – 40 |
|
April 2013 |
View Details
|
December 12, 2012 |
|
10 -
0G350_
|
SJ -
12/120 -
R4.4, R0.8
|
IN SAN JOAQUIN CO NEAR TERMINOUS AT LITTLE POTATO SLOUGH BRIDGE AND NEAR MANTECA AT W120-N5 CONNECTOR OH |
REPLACE BEARING PADS, JOINT SEALS |
Replace Bridge Bearings, Replace Joint Seals, Repair Bridge |
1 – 10 |
330 |
August 2013 |
View Details
|
December 12, 2012 |
|
6 -
0E670_
|
TUL -
99 -
6.1/29.9
|
ON ROUTE 99 IN TULARE COUNTY AT VARIOUS LOCATIONS FROM AVENUE 48 OVERROSSING TO CROSS AVENUE OVERCROSSING |
99 CORRIDOR-BRIDGE ENHANCEMENT |
Clean and Paint Bridge, Erosion Control, Repair Slope |
0 – 1 |
40 |
June 2013 |
View Details
|
December 12, 2012 |
|
5 -
0R910_
|
SCR -
1 -
9.0/17.6
|
ON ROUTE 1 IN SANTA CRUZ COUNTY FROM SOUTH OF SOUTH APTOS UNDERPASS TO 0.10 MILES NORTH OF ROUTE 9 |
UPGRADE MBGR, CONSTRUCT CONCRETE BARRIER & RETAINING WALLS & GUARD RAIL |
Concrete Barrier, Reconstruct Culverts, Modify Guard Railing, Erosion Control, Earthwork |
1 – 10 |
157 |
April 2013 |
View Details
|
December 12, 2012 |
|
11 -
2T1401
|
SD -
805 -
6.4/25.5
|
IN SAN DIEGO COUNTY BETWEEN TELEGRAPH CANYON ROAD AND
THE MIRAMAR ROAD/LA JOLLA VILLAGE DRIVE OVERCROSSING |
Transit only Lanes |
Pavements Markings |
1 – 10 |
230 |
May 2012 |
View Details
|
December 03, 2012 |
|
11 -
2T1101
|
SD -
015 -
11.4 /M31.5
|
IN SAN DIEGO COUNTY IN THE RTE 15 VALUE PRICING BTWN SR 163 AND SR 78
|
PART OF THE 4 MANAGED LANES, OVER- SIGHT OF THE VALUE PRICING PROGRAM
|
Widening |
20 – 40 |
750 |
January 0000 |
View Details
|
December 03, 2012 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
7 -
291304
|
VEN -
33 -
7.6
|
IN VEN CNTY ON RTE 33 AT SAN ANTONIO CREEK |
SUB-SCOUR MIT AND RAILING UPGRADE |
Repair Bridge, Replace Bridge Railing |
1 – 10 |
600 |
August 2016 |
View Details
|
November 09, 2012 |
|
7 -
290704
|
LA -
47 -
0.9/2.0
|
IN CTY OF LA AT TERM ISLAND,VINCENT THOMAS BRIDGE 53 147 |
BRIDGE SEISMIC RESTORATION |
Bridge |
20 – 40 |
500 |
July 2015 |
View Details
|
October 22, 2012 |
|
10 -
0N830_
|
SJ -
L5721 -
|
IN SAN JOAQUIN COUNTY AT THE STOCKTON MAINTENANCE STATION |
INSTALL DESIGNED SOIL REMEDIATION |
|
0 – 1 |
Monitored as Needed |
March 2013 |
View Details
|
October 04, 2012 |
|
10 -
0A830_
|
SJ -
88 -
6.1/9.3
|
ON ROUTE 88 IN SAN JOAQUIN COUNTY AT THE CALAVERAS RIVER, MOSHER SLOUGH AND BEAR CREEK BRIDGES (KP 9.8/15.0) |
UPGRADE BRIDGE APPROACH GUARDRAIL AND EXTEND CULVERTS 4 LOCATIONS. |
Replace Culverts, Reconstruct Bridge |
1 – 10 |
70 |
September 2013 |
View Details
|
October 04, 2012 |
|
6 -
34252_
|
FRE -
180 -
R71.8/74.5
|
NEAR CENTERVILLE FROM QUALITY AVENUE TO SMITH AVENUE |
2C TO 4E ON EXISTING ALIGNMENT |
Bridge Railing, Asphalt Concrete Surfacing, Bridge, Concrete Barrier, Culverts, Drainage, Earthwork, Electrical Facilities, Erosion Control, Expressway, Fence, Grading and Paving, Guard Railing, Highway Planting, Remove Irrigation System, Lighting, Overhead, Pavements Markers, Pavements Markings, Realignment, Roadway, Rock Slope Protection, Seal Coat, Signs, Slurry Seal Coat, Widening, Wing Wall |
10 – 20 |
300 |
February 2013 |
View Details
|
October 04, 2012 |
|
6 -
0N390_
|
TUL -
245 -
20.8
|
ABOUT 10 MILES SOUTH OF BADGER AT COTTONWOOD CREEK |
CONSTRUCT ROCK SLOPE PROTECTION |
Rock Slope Protection, Highway Planting, Fence |
0 – 1 |
15 |
August 2013 |
View Details
|
October 04, 2012 |
|
10 -
0S950_
|
MER -
99 -
T13.0/R34.4
|
ON STATE ROUTE 4 IN SAN ON STATE ROUTE 99 IN THE CITY OF MERCED, ATWATER, LIVINGSTION AND DELHI AT VARIOUS LOCATIONS. |
CORRIDOR BRIDGE ENHANCEMENT |
|
0 – 1 |
|
May 2013 |
View Details
|
September 25, 2012 |
|
5 -
1C320_
|
SLO -
46 -
55.1/60.8
|
IN SAN LUIS OBISPO COUNTY NEAR CHOLAME FROM EAST JUCTION ROUTE 41/46 TO KERN COUNTY LINE |
INSTALL RUMBLE STRIPS |
Pavements Markers, Pavements Markings |
0 – 1 |
40 |
August 2013 |
View Details
|
September 25, 2012 |
|
5 -
0T970_
|
SB -
246 -
33.2/33.5
|
IN SANTA YNEZ FROM 0.1 MILE EAST OF EDISON STREET TO 0.1 MILE EAST OF MEADOWVALE LANE |
LEFT-TURN CHANNELIZATION |
Channelize, Pavements Markers, Pavements Markings, Widening |
0 – 1 |
80 |
August 2013 |
View Details
|
September 25, 2012 |
|
5 -
0Q631_
|
SLO -
101 -
36.0/37.5
|
IN SAN LUIS OBISPO COUNTY NEAR SANTA MARGARITA, FROM 0.8 MILE SOUTH TO 0.7 MILE NORTH OF TASSAJARA CREEK ROAD. LANDSCAPE MITIGATION. |
|
Highway Planting, Irrigation System |
0 – 1 |
790 |
March 2013 |
View Details
|
September 25, 2012 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
5 -
0G070_
|
SB -
101 -
22.3/23.0
|
IN SANTA BARBARA COUNTY ON ROUTE 101 BETWEEN FAIRVIEW AND LOS CARNEROS AVENUE |
UPGRADE EXISTING DRAINAGE CULVERTS |
|
10 – 20 |
|
September 2013 |
View Details
|
September 25, 2012 |
|
5 -
0C901_
|
SCR -
1 -
8.0/17.5
|
NEAR SANTA CRUZ, FROM 0.4 MILE SOUTH OF FREEDOM BLVD TO 0.4 MILE NORTH OF OCEAN STREET, INSTALL CCTV AND SIGNS |
INSTALL CCTV AND SIGNS |
|
1 – 10 |
|
August 2013 |
View Details
|
September 25, 2012 |
|
5 -
0C640_
|
SB -
246 -
R12.8/R17.6
|
ON ROUTE 246 IN SANTA BARBARA CO NEAR LOMPOC, FROM CEBADA CANYON RD TO 0.4 MILE EAST OF SANTA RITA ROAD |
PASSING LANES AND OPERATIONAL INPROVEMENTS |
|
20 – 40 |
|
September 2013 |
View Details
|
September 25, 2012 |
|
7 -
290104
|
LA -
91 -
4.0/11.0
|
ON LA-91 BTWEEN 0.2 M E OF LA-110 & 0.6 M W OF LA-105 |
Concrete Barrier & Reconstruct MBGR |
Concrete Barrier, Guard Railing |
1 – 10 |
250 |
November 2016 |
View Details
|
September 20, 2012 |
|
11 -
401100
|
SD -
15 -
005.6/006.1
|
IN SAN DIEGO COUNTY, IN SAN DIEGO, FROM THE ADAMS AVENUE OVER CROSSING TO 0.5 MILES NORTH OF THE ADAMS AVENUE OVERCROSSING |
PAVEMENT REHABILITATION |
Rehabilitate Pavement |
1 – 10 |
250 |
April 2012 |
View Details
|
September 18, 2012 |
|
11 -
2T1501
|
SD -
805 -
5.1-13.5
|
IN SD CO IN & NEAR CHULA VISTA FRM PALOMAR OC TO 94/805 SEPARATION
|
Install BRT Lanes on 905, 125, 805N, New Bridge, Ramp alignment, install signal |
Realignment, Bridge, Ramp, Signals |
80 – 100 |
420 |
November 2013 |
View Details
|
September 18, 2012 |
|
11 -
2T1301
|
SD -
015 -
R03.8/R06.0
|
IN SD CNTY IN SD FRM S15-S805 OC TO N15-E8 OC
|
BRT STATIONS ONTHE MANAGED LANES (OVERSIGHT PROJECT)
|
Widening |
40 – 60 |
750 |
July 2014 |
View Details
|
September 18, 2012 |
|
11 -
290400
|
SD -
094 -
14.9/30.0
|
IN SAN DIEGO COUNTY NEAR JAMUL FROM ROUTE 54 TO 0.2 MILE
EAST OF MARRON VALLEY ROAD____ |
PAVEMENT REHABILITATION |
Asphalt Concrete Surfacing, Rehabilitate Pavement |
10 – 20 |
150 |
April 2013 |
View Details
|
September 18, 2012 |
|
11 -
290300
|
SD -
5 -
R1.0
|
IN SAN DIEGO COUNTY AT VARIOUS LOCATIONS |
SEISMIC RETROFIT AND STRUCTURE REHABILITATION |
Repair Bridge |
1 – 10 |
260 |
August 2012 |
View Details
|
September 18, 2012 |
|
11 -
287100
|
SD -
094 -
01.4 /04.4
|
IN SD CNTY IN SD FROM RTE 94/5 SEP TO .2M WEST OF 47TH ST OC
|
CONSTRUCT 2 HOV LANES LANES
|
Widening, Freeway and Structures, Asphalt Concrete Surfacing |
250 – 300 |
250 |
February 2017 |
View Details
|
September 18, 2012 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
11 -
282301
|
SD -
005 -
R20.1/R23.9
|
IN SD CNTY IN SD ON RTE 5 FROM SD RIVER BR TO MBAY OC AND ON RTE8 VAR
|
STORM WATER DETENTION BASINS RETROFIT
|
Channelize, Modify Drainage, Rock Slope Protection |
1 – 10 |
60 |
June 2014 |
View Details
|
September 18, 2012 |
|
11 -
235800
|
SD -
005 -
R34.1/R54.6
|
ROUTE 5 - WIDEN FOR HOV, MIXED FLOW AND AUX LANES.
|
CONST HOV/GENERAL PURPOSE/AUX LANES
|
Widening |
900 – 1000 |
1000 |
January 0000 |
View Details
|
September 18, 2012 |
|
3 -
3E6204
|
BUT -
099 -
028.4/ 029.2
|
NEAR CHICO FROM ESTATES DRIVE TO 0.4 MILE NORTH OF BUTTE CREEK BRIDGE 12-126R |
REPLACE BRIDGE. (SCOUR) BRIDGE REPLACEMENT |
Replace Bridge |
10 – 20 |
365 |
November 2012 |
View Details
|
August 16, 2012 |
|
3 -
2F3504
|
NEV -
020 -
R012.2/R017.5
|
IN GRASS VALLEY/NEVADA CITY FROM ROUTE 20/49 SEPARATION BRIDGE 17-49 TO JUNCTION ROUTE 49 AT UREN STREET |
Asphalt Concrete Surfacing |
Asphalt Concrete Surfacing |
1 – 10 |
80 |
September 2012 |
View Details
|
August 16, 2012 |
|
3 -
1F9104
|
NEV -
049 -
004.5/ 005.8
|
9 MILES SOUTH OF GRASS VALLEY AT CARRIAGE ROAD, LADYBIRD DRIVE, AND HOLCOMB/CHERRY CREEK ROAD |
Asphalt Concrete Surfacing,Culverts,Earthwork,Erosion Control,Establish Existing Planting |
Establish Existing Planting, Erosion Control, Earthwork, Culverts, Asphalt Concrete Surfacing |
0 – 1 |
60 |
August 2013 |
View Details
|
August 16, 2012 |
|
3 -
1A8454
|
ED -
089 -
024.9/027.2
|
NEAR TAHOMA FROM MEEKS CREEK BRIDGE TO WILSOM AVENUE. STORM WATER MITIGATION |
Asphalt Concrete Surfacing,Reconstruct Culverts,Culverts,Reconstruct Drainage,Earthwork,Rehabilitate Pavement,Repair Roadway,Rock Slope Protection |
Reconstruct Drainage, Reconstruct Culverts, Asphalt Concrete Surfacing, Earthwork, Rehabilitate Pavement, Repair Roadway, Rock Slope Protection |
1 – 10 |
110 |
May 2014 |
View Details
|
August 16, 2012 |
|
3 -
0F2204
|
ED -
050 -
R031.3/
|
ABOUT 11.0 MILES EAST OF PLACERVILLE AT SLY PARK ROAD UNDERCROSSING 25-42 |
Bridge,Drainage,Guard Railing |
Guard Railing, Drainage, Bridge |
1 – 10 |
60 |
May 2014 |
View Details
|
August 16, 2012 |
|
2 -
4E8004
|
SIS -
161 -
009.0/ 011.3
|
IN SISKIYOU COUNTY ABOUT 12 MILES EAST OF DORRIS FROM 2.2 MILES WEST TO 0.2 MILES EAST OF FUGATE ROAD. |
Rehabilitate Pavement |
Rehabilitate Pavement |
0 – 1 |
30 |
August 2013 |
View Details
|
August 16, 2012 |
|
2 -
3E7904
|
TRI -
299 -
012.3/ 012.7
|
IN TRINITY COUNTY NEAR BURNT RANCH FROM 1.4 MILES TO 1.1 MILES WEST OF MILL CREEK ROAD. |
Realignment |
Realignment |
1 – 10 |
170 |
May 2014 |
View Details
|
August 16, 2012 |
|
2 -
3E7104
|
VAR -
036 -
030.4/ 030.7
|
IN TRINITY COUNTY ABOUT 12 MILES EAST OF FOREST GLEN FROM 1.7 MILES TO 2.1 MILES EAST OF ROUTE 3. |
Realign Curve |
Realign Curve |
0 – 1 |
60 |
March 2013 |
View Details
|
August 16, 2012 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
2 -
3E6904
|
MOD -
299 -
035.9/ 036.2
|
IN MODOC COUNTY NEAR ALTURAS FROM 1.2 MILES TO 0.9 MILES WEST OF CROWDER FLAT ROAD. |
Grading and Paving,Realignment |
Grading and Paving |
1 – 10 |
60 |
January 2013 |
View Details
|
August 16, 2012 |
|
2 -
3E4104
|
SHA -
299 -
000.3/002.6
|
IN SHASTA COUNTY ABOUT 20 MILES WST OF REDDING FROM 0.3 TO 2.6 MILES EAST OF TRINITY COUNTY LINE AND FROM 2.6 MILES TO 0.9 MILES WEST OF CRYSTAL CREEK ROAD. |
Earthwork,Realignment |
Realignment, Earthwork |
20 – 40 |
360 |
August 2014 |
View Details
|
August 16, 2012 |
|
2 -
2E7404
|
SHA -
299 -
083.0/ 084.0
|
NEAR BURNEY FROM 1.0 MILE WEST OF HAT CREEK BRIDGE TO HAT CREEK BRIDGE. |
CURVE IMPROVEMENT |
Realignment, Realign Curve, Grading and Paving, Earthwork |
1 – 10 |
120 |
April 2014 |
View Details
|
August 16, 2012 |
|
2 -
2E7304
|
TEH -
032 -
022.3/ 022.8
|
NEAR FROEST RANCH FROM EAST OF DEER CREEK BRIDGE #08-0072 TO DEER CREEK BRIDGE. CURVE IMPROVEMENT AND SHOULDER WIDENING. |
Earthwork,Grading and Paving,Realignment |
Earthwork, Grading and Paving, Realignment |
1 – 10 |
80 |
March 2013 |
View Details
|
August 16, 2012 |
|
2 -
0E8404
|
SIS -
003 -
047.7/ 048.5
|
IN SISKIYOU COUNTY IN YREKA FROM 4-H WAY TO LAWRENCE LANE. |
Widening |
Widening |
0 – 1 |
45 |
September 2012 |
View Details
|
August 16, 2012 |
|
2 -
0E4404
|
SIS -
097 -
002.5/ 002.9
|
IN SISKIYOU COUNTY NEAR WEED FROM 0.1 MILE SOUTH OF MAPLE AVENUE TO 0.1 MILE NORTH OF FIRST AVENUE. |
Widening |
Widening |
0 – 1 |
45 |
August 2012 |
View Details
|
August 16, 2012 |
|
2 -
0E3604
|
TEH -
005 -
010.5/
|
IN TEHAMA COUNTY NEAR CORNING AT CORNING SAFETY ROADSIDE REST AREA |
Replace Building,Erosion Control,Highway Planting,Replace Irrigation System,Replace Lighting,Retaining Wall,Wheelchair Ramps |
Replace Building, Erosion Control, Highway Planting, Replace Irrigation System, Replace Lighting, Retaining Wall, Wheelchair Ramps |
1 – 10 |
300 |
July 2013 |
View Details
|
August 16, 2012 |
|
1 -
484704
|
MEN -
001 -
040.1/ 040.9
|
IN MENDOCINO COUNTY ON STATE ROUTE 1 FROM 0.2 MI SOUTH TO 0.6 MI NORTH OF JUNCTION STATE ROUTE 128, AND ON STATE ROUTE 128 FROM 0.0 MI WEST TO 0.2 MI EAST OF JUNCTION STATE RTE 1 |
Asphalt Concrete Surfacing,Guard Railing,Widening |
Asphalt Concrete Surfacing, Guard Railing, Widening |
1 – 10 |
100 |
May 2013 |
View Details
|
August 16, 2012 |
|
1 -
463914
|
HUM -
299 -
000.0/ 042.9
|
|
|
|
1 – 10 |
150 |
October 2012 |
View Details
|
August 16, 2012 |
|
1 -
423704
|
HUM -
299 -
020.2/ 020.5
|
IN HUMBOLDT COUNTY ABOUT 14 MILES EAST OF BLUE LAKE FROM 0.2 TO 0.5 MI WEST OF CHEZEM ROAD #6L200 |
Asphalt Concrete Surfacing,Concrete Barrier,Culverts,Earthwork,Erosion Control,Establish Existing Planting,Flashing Beacons,Guard Railing,Highway Planting,Pavement Markings,Realignment,Repair Storm Damage |
Highway Planting, Guard Railing, Asphalt Concrete Surfacing, Concrete Barrier, Culverts, Flashing Beacons, Repair Storm Damage, Realignment, Pavements Markings, Earthwork, Erosion Control, Establish Existing Planting |
10 – 20 |
250 |
October 2012 |
View Details
|
August 16, 2012 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
1 -
378144
|
MEN -
128 -
010.6/ 023.3
|
IN MENDOCINO COUNTY NEAR PHILO FROM 1.0 MILE WEST OF NAVARRO RIDGE ROAD TO INDIAN CREEK BRIDGE #10-67 |
Replace Culverts |
|
1 – 10 |
60 |
February 2013 |
View Details
|
August 16, 2012 |
|
1 -
323304
|
HUM -
036 -
005.9/ 007.6
|
IN HUMBOLDT COUNTY AT CARLOTTA FROM WILSON LANE TO 0.5 MILE WEST OF CUMMINGS CREEK ROAD |
Channelize |
Channelize, Widening |
0 – 1 |
50 |
October 2012 |
View Details
|
August 16, 2012 |
|
1 -
296124
|
HUM -
299 -
R004.2/
|
IN HUMBOLDT COUNTY NEAR BLUE LAKE AT MILL CREEK BRIDGE #4-188
|
|
|
0 – 1 |
50 |
May 2012 |
View Details
|
August 16, 2012 |
|
1 -
0B5404
|
MEN -
162 -
013.9/ 022.7
|
IN MENDOCINO COUNTY NEAR DOS RIOS FROM 1.2 MILES WEST OF MID FK EEL RIVER #10-252 TO 2.8 MILES EAST OF SAND BANK CREEK |
Reconstruct Roadway |
Reconstruct Roadway |
1 – 10 |
67 |
February 2014 |
View Details
|
August 16, 2012 |
|
1 -
0B5104
|
MEN -
101 -
R087.4/R100.4
|
IN MENDOCINO COUNTY ABOUT 18 MILES NORTH OF LAYTONVILLE FROM 0.3 MI SOUTH OF THE ROUTE 101/271 JUNCTION TO RED MOUNTAIN CREEK BR#10-35 |
Earthwork,Retaining Wall,Reconstruct Roadway |
Earthwork, Reconstruct Roadway, Seal Cracks |
1 – 10 |
100. |
January 2014 |
View Details
|
August 16, 2012 |
|
1 -
0B5004
|
MEN -
101 -
003.7/ 005.3
|
IN MENDOCINO COUNTY NEAR HOPLAND FROM 0.6 MI NORTH OF COMMINSKY STA RD-103 TO 0.6 MI NORTH OF PIETA CR BRIDGE #10-83 |
Earthwork,Reconstruct Roadway |
Earthwork, Reconstruct Roadway |
1 – 10 |
200 |
December 2013 |
View Details
|
August 16, 2012 |
|
1 -
0B4204
|
HUM -
101 -
110.6/
|
IN HUMBOLDT COUNTY NEAR TRINIDAD AT 1.9 MILES SOUTH OF KANE ROAD AND AT 1.3 MILES NORTH OF KANE ROAD |
Repair Storm Damage |
Repair Storm Damage |
1 – 10 |
30 |
January 2014 |
View Details
|
August 16, 2012 |
|
1 -
0B4004
|
HUM -
101 -
R015.0/
|
IN HUMBOLDT COUNTY NEAR REDWAY AT 1.5 MILES SOUTH OF HURLBUTT UC# 4-213 AND AT 1.1 MILES SOUTH OF WILLIFORD RD UC# 4-117 |
Repair Storm Damage |
Repair Storm Damage |
1 – 10 |
30 |
December 2013 |
View Details
|
August 16, 2012 |
|
1 -
0B3704
|
HUM -
036 -
044.4/
|
IN HUMBOLDT COUNTY NEAR DINSMORE AT 1.2 MILES WEST OF THE HUMBOLDT- TRINITY COUNTY LINE |
Asphalt Concrete Surfacing,Earthwork,Erosion Control |
Erosion Control, Earthwork, Asphalt Concrete Surfacing |
1 – 10 |
50 |
December 2013 |
View Details
|
August 16, 2012 |
|
1 -
0B3404
|
HUM -
036 -
022.8/ 027.7
|
IN HUMBOLDT COUNTY NEAR SWAINS FLAT FROM 1.3 MILES WEST TO 3.9 MILES WEST OF VAN DUZEN RIVER BR#4-293 |
Asphalt Concrete Surfacing,Drainage,Earthwork,Erosion Control,Pavement Markers,Pavement Markings,Repair Storm Damage,Rock Slope Protection |
Drainage, Asphalt Concrete Surfacing, Earthwork, Repair Storm Damage, Pavements Markings, Pavements Markers, Erosion Control, Rock Slope Protection |
1 – 10 |
90-130 |
December 2013 |
View Details
|
August 16, 2012 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
1 -
0A2304
|
MEN -
020 -
R000.0/R000.1
|
IN MENDOCINO COUNTY NEAR FORT BRAGG FROM THE JUNCTION OF ROUTE 1 AND 20 TO 0.1 MI EAST OF THE JUNCTION OF ROUTE 1 AND 20 |
Drainage,Highway Planting,Retaining Wall,Wheelchair Ramps |
Wheelchair Ramps, Retaining Wall, Highway Planting, Drainage |
0 – 1 |
55 |
June 2012 |
View Details
|
August 16, 2012 |
|
1 -
493704
|
HUM -
096 -
011.0/013.2
|
IN HUMBOLDT COUNTY IN HOOPA FROM LOOP ROAD TO 0.1 MILES WEST OF HOSTLER CREEK BRIDGE #4-294 |
|
|
1 – 10 |
|
October 2014 |
View Details
|
August 16, 2012 |
|
1 -
0C4204
|
HUM -
101 -
059.0/068.2
|
|
|
|
1 – 10 |
|
March 2014 |
View Details
|
August 16, 2012 |
|
11 -
002700
|
SD -
005 -
R19.9/R21.2
|
ON I-5 FR 0.2 KM S OF 8/5 SEP.OH I8 TO 0.5KM N.OF TECOLOTE CREEK BRIDG
|
CONSTRUCT AUXILIARY LANES/ WIDEN CONNECTOR
|
Widening |
10 – 20 |
360 |
July 2013 |
View Details
|
August 13, 2012 |
|
3 -
3F0304
|
NEV -
080 -
R012.3/ 013.4
|
IN TRUCKEE FROM 0.9 MILE WEST OF DONNER PARK OVERCROSSING TO 0.1 MILE WEST OF CALIFORNIA AGRICULTURE INSPECTION STATION |
|
|
1 – 10 |
|
January 2013 |
View Details
|
August 06, 2012 |
|
3 -
3E1104
|
NEV -
080 -
028.0/
|
NEAR FLORISTON AT TRUCKEE RIVER BRIDGE #17-0063R/L |
|
|
1 – 10 |
|
April 2014 |
View Details
|
August 06, 2012 |
|
3 -
2F7004
|
YOL -
080 -
002.5/ 002.9
|
IN THE CITY OF DAVIS AT MACE BOULEVARD OVERCROSSING |
|
|
0 – 1 |
|
July 2012 |
View Details
|
August 06, 2012 |
|
3 -
2F4004
|
ED -
049 -
020.2/020.4
|
|
|
|
0 – 1 |
|
April 2014 |
View Details
|
August 06, 2012 |
|
3 -
2F3004
|
BUT -
070 -
009.2/ 017.0
|
IN AND NEAR OROVILLE FROM 0.1 MILE EAST OF PALERMO ROAD TO 0.4 MILE EAST OF GARDEN DRIVE OVERCROSSING |
|
|
1 – 10 |
|
September 2012 |
View Details
|
August 06, 2012 |
|
3 -
1F6904
|
NEV -
L5729 -
|
IN TRUCKEE AT THE TRUCKEE MAINTENANCE STATION |
|
|
0 – 1 |
|
December 2013 |
View Details
|
August 06, 2012 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
3 -
1F2804
|
GLE -
005 -
000.0/ 029.0
|
IN GLENN COUNTY ON ROUTE 5 FROM COLUSA COUNTY LINE TO TEHEMA COUNTY LINE |
|
|
0 – 1 |
|
December 2013 |
View Details
|
August 06, 2012 |
|
3 -
1E5104
|
BUT -
070 -
028.2/
|
ABOUT 12.3 MILES EAST OF OROVILLE AT WEST BRANCH FEATHER RIVER BRIDGE #12-0134 |
Reconstruct Bridge |
Reconstruct Bridge |
10 – 20 |
700-800 |
November 2012 |
View Details
|
August 06, 2012 |
|
3 -
1A8424
|
ED -
089 -
008.6/ 013.8
|
IN AND NEAR SOUTH LAKE TAHOE FROM ROUTE 50 TO CASCADE ROAD |
Asphalt Concrete Surfacing,Modify Culverts,Replace Drainage,Earthwork,Erosion Control,Reconstruct Guard Railing,Pavement Markers,Pavement Markings,Rehabilitate Pavement,Reconstruct Roadway,Replace Signs,Wheelchair Ramps,Widening |
Replace Drainage, Earthwork, Erosion Control, Reconstruct Guard Railing, Pavements Markers, Pavements Markings, Widening, Wheelchair Ramps, Replace Signs, Reconstruct Roadway, Rehabilitate Pavement, Asphalt Concrete Surfacing, Modify Culverts |
10 – 20 |
110 |
March 2014 |
View Details
|
August 06, 2012 |
|
3 -
1A7314
|
ED -
050 -
067.6/ 072.9
|
NEAR SOUTH LAKE TAHOE FROM MEYERS ROAD TO 0.1 MILE EAST OF INCLINE ROAD |
Storm water treatment BMPs, erosion control, C&G, construct drainage facilities, rehab existing drainage facilities |
Drainage, Erosion Control |
10 – 20 |
125 |
April 2013 |
View Details
|
August 06, 2012 |
|
3 -
0F3004
|
ED -
050 -
017.8/ 019.6
|
IN PLACERVILLE AT COLOMA STREET OVERCROSSING AND AT SMITH FLAT ROAD UNDERCROSSING |
|
|
1 – 10 |
|
May 2013 |
View Details
|
August 06, 2012 |
|
3 -
0F2304
|
SAC -
050 -
001.6/
|
IN THE CITY AND COUNTY OF SACRAMENTO AT CAMELLIA CITY VIADUCT 24-0248 R/L |
|
|
40 – 60 |
|
May 2013 |
View Details
|
August 06, 2012 |
|
2 -
4F1004
|
PLU -
070 -
023.7/023.9
|
|
|
|
1 – 10 |
|
April 2014 |
View Details
|
August 06, 2012 |
|
2 -
4E8204
|
LAS -
395 -
T005.4/R061.1
|
IN LASSEN COUNTY AT AND NEAR DOYLE FROM 0.7 MILE NORTH OF ROUTE 70 TO ROUTE 36 |
|
|
0 – 1 |
|
September 2012 |
View Details
|
August 06, 2012 |
|
2 -
4E5304
|
SHA -
005 -
000.6/ 030.2
|
|
|
|
1 – 10 |
|
June 2013 |
View Details
|
August 06, 2012 |
|
2 -
4E4804
|
SIS -
089 -
024.7/ 024.8
|
IN SISKIYOU COUNTY AT MCCLOUD AT BROADWAY AVENUE. |
|
|
0 – 1 |
|
August 2012 |
View Details
|
August 06, 2012 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
2 -
3E6504
|
SHA -
910 -
000.1/
|
IN SISKIYOU AND SHASTA COUNTIES AT VARIOUS LOCATIONS. REHABILITATE BRIDGE DECKS. |
BRIDGE MAINTENANCE |
Bridge |
1 – 10 |
|
January 2013 |
View Details
|
August 06, 2012 |
|
2 -
3E0804
|
SIS -
096 -
068.9/
|
IN SISKIYOU COUNTY AT HAMBURG AT 2.3 MILES WEST OF SCOTT RIVER BRIDGE |
Widening |
Widening |
0 – 1 |
20-30 |
March 2013 |
View Details
|
August 06, 2012 |
|
2 -
3C0724
|
LAS -
395 -
056.5/ 061.0
|
IN LASSEN COUNTY AT AND NEAR JOHN- STONVILLE FROM 0.1 MILE NORTH OF SUNNYSIDE ROAD TO 0.3 MILE SOUTH OF BANGHAM LANE. |
|
|
1 – 10 |
|
July 2013 |
View Details
|
August 06, 2012 |
|
2 -
360704
|
SHA -
299 -
030.3/ 040.7
|
IN SHASTA COUNTY AT AND NEAR BELLA VISTA FROM 0.3 MILE EAST OF INTERMOUNTAIN DRIVE TO 0.3 MILE WEST OF BACKBONE RIDGE ROAD |
Asphalt Concrete Surfacing,Replace Bridge,Modify Culverts |
Modify Culverts, Asphalt Concrete Surfacing, Replace Bridge |
20 – 40 |
240 |
August 2013 |
View Details
|
August 06, 2012 |
|
2 -
2E6204
|
TEH -
036 -
039.7/ 040.3
|
IN TEHAMA COUNTY NEAR RED BLUFF FROM BAKER ROAD TO 0.5 MILE EAST OF BAKER ROAD |
Culverts,Earthwork,Realignment,Rock Slope Protection |
Rock Slope Protection, Earthwork, Culverts, Realignment |
1 – 10 |
70 |
February 2013 |
View Details
|
August 06, 2012 |
|
2 -
2E3504
|
TRI -
299 -
000.4/ 000.8
|
IN TRINITY COUNTY NEAR SALYER FROM 0.6 MILE TO 0.2 MILE WEST OF CAMBEL RIDGE ROAD |
Culverts,Earthwork,Realign Curve,Retaining Wall |
Culverts, Earthwork, Realign Curve, Retaining Wall, Reconstruct Roadway |
1 – 10 |
90 |
March 2013 |
View Details
|
August 06, 2012 |
|
2 -
2E2914
|
SIS -
096 -
R000.4/ 077.5
|
IN SISKIYOU COUNTY AT VARIOUS LOCATIONS FROM SALMON RIVER BRIDGE 02-0177 TO KLAMATH RIVER BRIDGE 02-0117. |
|
|
1 – 10 |
|
October 2012 |
View Details
|
August 06, 2012 |
|
1 -
497104
|
MEN -
271 -
007.2/
|
IN MENDOCINO COUNTY NEAR LEGGETT AT THE LEGGETT MAINTENANCE STATION |
Maintenance Station |
Maintenance Station |
0 – 1 |
60-100 |
February 2014 |
View Details
|
August 06, 2012 |
|
1 -
488604
|
LAK -
020 -
008.1/ 008.6
|
IN LAKE COUNTY NEAR UPPER LAKE AT THE INTERSECTION OF ROUTES 20/29 |
Asphalt Concrete Surfacing,Channelize,Culverts,Drainage,Earthwork,Electrical Facilities,Erosion Control,Flashing Beacons,Grading and Paving,Highway Planting,Lighting,Pavement Markers,Pavement Markings,Realignment,Signals,Widening |
Asphalt Concrete Surfacing, Culverts, Channelize, Electrical Facilities, Erosion Control, Flashing Beacons, Grading and Paving, Highway Planting, Lighting, Drainage, Earthwork, Pavements Markers, Pavements Markings, Realignment, Signals, Widening |
1 – 10 |
110 |
May 2014 |
View Details
|
August 06, 2012 |
|
1 -
481104
|
DN -
197 -
004.5/
|
IN DEL NORTE COUNTY NEAR FORT DICK AT THE ENTRANCE TO RUBY VAN DEVENTER COUNTY PARK |
Widening |
Widening |
0 – 1 |
50 |
December 2013 |
View Details
|
August 06, 2012 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
1 -
476604
|
MEN -
128 -
034.5/ 035.5
|
IN MENDOCINO COUNTY ABOUT 4.9 MILES EAST OF BOONVILLE FROM SHEARING CREEK BRIDGE #10-59 TO 0.7 MI WEST OF MAPLE CREEK BRIDGE #10-55 |
Repair Storm Damage |
Repair Storm Damage |
1 – 10 |
180 |
August 2013 |
View Details
|
August 06, 2012 |
|
1 -
464804
|
HUM -
101 -
001.1/ 002.2
|
IN HUMBOLDT COUNTY NEAR GARBERVILLE FROM 0.5 MI SOUTH TO 0.5 MI NORTH OF RICHARDSON GROVE UC |
Asphalt Concrete Surfacing,Erosion Control,Grading and Paving,Realign Curve,Realignment,Retaining Wall |
Asphalt Concrete Surfacing, Erosion Control, Grading and Paving, Realign Curve, Realignment, Retaining Wall |
1 – 10 |
170 - 190 |
April 2011 |
View Details
|
August 06, 2012 |
|
1 -
454904
|
DN -
197 -
003.2/ 004.4
|
IN DEL NORTE COUNTY NEAR FORT DICK FROM 1.3 KM TO 0.5 KM SOUTH OF RUBY VANDEVENTER COUNTY PARK (KP 6.0/6.4) |
WIDENING |
Widening |
0 – 1 |
65 |
September 2014 |
View Details
|
August 06, 2012 |
|
1 -
437404
|
HUM -
299 -
030.7/
|
IN HUMBOLDT COUNTY ABOUT 8 MI WEST OF WILLOW CREEK AT 2.5 MI WEST OF E FORK WILLOW CREEK BRIDGE (KP 49.5) |
Repair Slope,Repair Roadway |
Repair Slope, Repair Roadway |
0 – 1 |
60-120 |
December 2012 |
View Details
|
August 06, 2012 |
|
1 -
412214
|
MEN -
101 -
R084.0/
|
IN MENDOCINO COUNTY ABOUT 11.4 KM SOUTH OF LEGGETT AT RATTLESNAKE CREEK BR #10-0029 |
Reconstruct Culverts,Erosion Control,Establish Existing Planting,Rock Slope Protection |
Erosion Control, Reconstruct Culverts, Establish Existing Planting |
0 – 1 |
79 - 90 |
November 2012 |
View Details
|
August 06, 2012 |
|
1 -
402804
|
MEN -
101 -
046.2/R084.6
|
IN MENDOCINO COUNTY FROM 0.5 KM NORTH OF BAECHTEL CREEK BRIDGE #10-13 TO 0.2 KM SOUTH OF CUMMINGS ROAD UNDERCROSSING #10-172 (KP 74.3/R136.1 |
Culverts |
Culverts |
1 – 10 |
80 |
September 2013 |
View Details
|
August 06, 2012 |
|
1 -
385724
|
MEN -
001 -
092.8/ 092.8
|
NEAR FT. BRAGG FROM 18.6MI NORTH TO 22.7 MILES NORTH OF TEN MILE RIVER BR. REQUIRED MITIGATION (FISH PASS- AGE/CULVERT REHAB) |
Replace Culverts,Repair Drainage |
Bridge, Replace Culverts, Repair Drainage |
1 – 10 |
120 - 240 |
July 2012 |
View Details
|
August 06, 2012 |
|
1 -
0B3304
|
DN -
199 -
026.3/
|
IN DEL NORTE COUNTY NEAR PATRICKS CREEK AT 0.9 MI NORTH OF SISKIYOU FORK RD |
|
|
0 – 1 |
|
March 2014 |
View Details
|
August 03, 2012 |
|
1 -
0B5704
|
MEN -
253 -
006.8/
|
IN MENDOCINO COUNTY NEAR BOONVILLE AT 3.4 MILES EAST OF SODA CREEK BR# 10-229 |
|
|
1 – 10 |
|
January 2014 |
View Details
|
August 02, 2012 |
|
1 -
0B5604
|
MEN -
253 -
001.5/ 001.8
|
IN MENDOCINO COUNTY NEAR BOONVILLE FROM 0.2 MI WEST TO 0.1 MI EAST OF SINGLY CATTLE PASS |
|
|
0 – 1 |
|
February 2014 |
View Details
|
August 02, 2012 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
1 -
0B5504
|
MEN -
162 -
016.1/
|
IN MENDOCINO COUNTY NEAR DOS RIOS AT 0.9 MI EAST OF LAYTONVILLE-DOS RIOS |
|
|
1 – 10 |
|
January 2014 |
View Details
|
August 02, 2012 |
|
1 -
0B1904
|
HUM -
101 -
054.3/ 056.8
|
IN HUMBOLDT COUNTY NEAR RIO DELL FROM THE EEL RIVER BRIDGE #4-16 TO 0.3 MILE SOUTH OF VAN DUZEN RIVER BRIDGE |
Erosion Control,Guard Railing |
Erosion Control, Guard Railing |
1 – 10 |
75 |
May 2013 |
View Details
|
August 02, 2012 |
|
1 -
0B1004
|
HUM -
101 -
086.3/ 087.8
|
IN HUMBOLDT COUNTY IN ARCATA FROM THE 11TH STREET OVERCROSSING #2-424 TO THE ARCATA OVERHEAD #4-79 |
Erosion Control,Guard Railing |
Erosion Control, Guard Railing |
0 – 1 |
50 |
July 2013 |
View Details
|
August 02, 2012 |
|
2 -
4E9505
|
SHA -
044 -
004.3/007.4
|
|
|
|
0 – 1 |
|
November 2012 |
View Details
|
August 02, 2012 |
|
2 -
4E5204
|
SHA -
044 -
021.1/ 021.4
|
IN SHASTA COUNTY ABOUT 10 MILES WEST OF SHINGLETOWN FROM 0.2 MILE TO 0.3 MILE WEST OF BLACK BUTTE ROAD. |
operational improvement
|
Widening |
0 – 1 |
30 |
March 2013 |
View Details
|
August 02, 2012 |
|
1 -
0A3204
|
HUM -
299 -
030.2/ 030.6
|
IN HUMBOLDT COUNTY ABOUT 9 MI WEST OF WILLOW CREEK FROM 0.3 MILE WEST TO 0.1 MILE EAST OF CEDAR CREEK ROAD |
Curve Improvement
|
|
1 – 10 |
50 |
July 2014 |
View Details
|
August 02, 2012 |
|
1 -
0A4904
|
HUM -
299 -
025.0/ 025.7
|
IN HUMBOLDT COUNTY ABOUT 13 MILES WEST OF WILLOW CREEK FROM 0.4 MILES EAST TO 1.1 MILES EAST OF CHEZEM ROAD |
Curve Improvement
|
|
1 – 10 |
120 |
July 2014 |
View Details
|
August 02, 2012 |
|
1 -
0A3604
|
HUM -
299 -
019.3/ 019.8
|
IN HUMBOLDT COUNTY ABOUT 14 MILES EAST OF BLUE LAKE FROM 0.3 MILE EAST TO 0.8 MILE EAST OF BAIR ROAD |
Curve Improvement
|
|
1 – 10 |
90 |
February 2014 |
View Details
|
August 02, 2012 |
|
2 -
4F2305
|
TEH -
005 -
R000.0/R022.2
|
|
|
|
0 – 1 |
|
February 2013 |
View Details
|
August 02, 2012 |
|
1 -
0C5204
|
VAR -
C0999 -
VAR/
|
|
|
|
0 – 1 |
|
July 2013 |
View Details
|
August 02, 2012 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
1 -
0B0904
|
DN -
101 -
008.2/008.7
|
IN DEL NORTE COUNTY NEAR KLAMATH FROM 0.1 MI SOUTH OF PANTHER CREEK BRIDGE #1-25 TO 0.1 MI NORTH OF HUNTER CREEK BRIDGE #1-03 |
|
|
1 – 10 |
|
July 2014 |
View Details
|
August 02, 2012 |
|
1 -
0B0804
|
DN -
101 -
R004.4/009.4
|
|
|
|
1 – 10 |
|
December 2013 |
View Details
|
August 02, 2012 |
|
3 -
3F4204
|
PLA -
089 -
T008.6/012.4
|
|
|
|
0 – 1 |
|
February 2013 |
View Details
|
August 02, 2012 |
|
3 -
3F4104
|
PLA -
049 -
000.9/
|
|
|
|
0 – 1 |
|
September 2013 |
View Details
|
August 02, 2012 |
|
3 -
3F0004
|
YUB -
020 -
013.3/020.3
|
ABOUT 12 MILES EAST OF MARYSVILLE FROM MARYSVILLE ROAD TO 0.3 MILE EAST OF LOWER SMARTVILLE ROAD |
|
|
1 – 10 |
|
September 2014 |
View Details
|
August 02, 2012 |
|
3 -
2F9704
|
COL -
020 -
028.2/030.5
|
IN AND NEAR COLUSA FROM 0.2 MILE EAST OF COLUSA BASIN BRIDGE 15-20 TO SIOC STREET |
|
|
1 – 10 |
|
September 2013 |
View Details
|
August 02, 2012 |
|
3 -
3E1204
|
BUT -
070 -
026.8/027.0
|
ABOUT 10.9 MILES NORTH OF OROVILLE AT PENTZ OVERHEAD #12-138 AND AT CHEROKEE OVERHEAD #12-137 |
|
|
1 – 10 |
|
August 2014 |
View Details
|
August 02, 2012 |
|
6 -
0N380_
|
KER -
178 -
13.8/15.8
|
ABOUT 7 MILES EAST OF BAKERSFIELD FROM SIDEHILL VIADUCT TO 2 MILES EAST OF SIDEHILL VIADUCT |
CONSTRUCT RETAINING STRUCTURES |
|
0 – 1 |
|
May 2013 |
View Details
|
July 12, 2012 |
|
6 -
0L390_
|
KER -
99 -
24.6
|
IN KERN COUNTY ON THE SOUTHBOUND ON-RAMP AT ROUTE 99 FROM WESTBOUND CALIFORNIA AVENUE IN THE CITY OF BAKERSFIELD |
RELOCATE RIGHT TURN LANE OF THE SB ONRAMP TO SR 99 |
|
1 – 10 |
|
April 2013 |
View Details
|
July 12, 2012 |
|
6 -
0J930_
|
KER -
119 -
0.0
|
ON ROUTES 33, 46, 63, 119,223 IN FRESNO, KERN AND TULARE COUNTIES AT VARIOUS LOCATIONS |
INSTALL GUARDRAIL AND EXTEND CULVERTS |
|
1 – 10 |
|
August 2013 |
View Details
|
July 12, 2012 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
6 -
0E660_
|
KER -
99 -
17.5/29.9
|
IN KER CO IN BAKERSFIELD AT VAR LOCATIONS FROM THE RTE 119/99 SEP TO THE RTE 65/99 SEP |
99 CORRIDOR-BRIDGE ENHANCEMENT |
|
1 – 10 |
|
June 2013 |
View Details
|
July 12, 2012 |
|
6 -
0L890_
|
KER -
99 -
26.8/R28.4
|
ON RTE 99 IN KERN CO NEAR BAKERSFIELD BETWEEN AIRPORT DRIVE OC AND BEARDSLEY CANAL BRIDGE |
WIDEN SHOULDER & GRIND IN RUMBLE STRIPS |
Widening |
0 – 1 |
30 |
July 2013 |
View Details
|
July 10, 2012 |
|
8 -
435411
|
SBd -
40 -
18.0
|
NEAR NEWBERRY SPRINGS 18 MI E/O JUNCTION RTE 15/40 CONNECTOR AT CREST WASH BRIDGE |
REGRADE & PLACE ROCK SLOPE PROTECTION (RSP) |
Rock Slope Protection |
0 – 1 |
60 |
June 2013 |
View Details
|
June 29, 2012 |
|
8 -
0N5101
|
Riv -
15 -
51.5
|
ALSO SBD I-15 0.0/2.41, NR ONTARIO, ON RIV 15 AT SB CONNECTOR TO EB & WB SR-60, & ON SBD-15 IN ONTARIO AT THE NB CONNECTOR TO EB I-10 |
REPLACE EXISTING MBGR WITH CONCRETE BARRIER (TYPE 60S) |
Concrete Barrier |
1 – 10 |
80 |
June 2013 |
View Details
|
June 29, 2012 |
|
1 -
378174
|
MEN -
128 -
000.2/ 011.1
|
NEAR NAVARRO FROM EAST TO ROUTE 1 TO WEST OF FLYNN CREEK BRIDGE REHAB CULVERTS |
REPLACE CULVERTS |
Replace Culverts |
1 – 10 |
150 |
March 2014 |
View Details
|
June 25, 2012 |
|
1 -
364324
|
MEN -
020 -
013.8/R032.0
|
IN MENDOCINO COUNTY NEAR WHISKEY SPRING AND WILLITS FROM SOUTH OF SOUTH FORK NOYO RIVER TO WEST OF CROPLEY LANE; ALSO ON ROUTE 1 AND ON ROUTE 101 |
Replace Culverts |
Replace Culverts |
1 – 10 |
100 |
December 2012 |
View Details
|
June 25, 2012 |
|
1 -
0B5204
|
MEN -
128 -
039.5/ 039.8
|
IN MENDOCINO COUNTY NEAR YORKVILLE FROM 0.7 TO 1.0 MILES EAST OF BEEBE CR BR#10-52 |
|
|
1 – 10 |
|
April 2014 |
View Details
|
June 25, 2012 |
|
1 -
0B4404
|
HUM -
169 -
026.4/ 029.9
|
IN HUMBOLDT COUNTY NEAR WEITCHPEC FROM 0.6 MI WEST OF MINERS CREEK BR #4-299 TO MARTINS FERRY BR#4-223 |
|
|
1 – 10 |
|
December 2013 |
View Details
|
June 25, 2012 |
|
1 -
0B4104
|
HUM -
101 -
R040.9/
|
IN HUMBOLDT COUNTY NEAR REDCREST AT 1.1 MILES NORTH OF REDCREST NB ONRAMP |
|
|
1 – 10 |
|
December 2013 |
View Details
|
June 25, 2012 |
|
1 -
0B3604
|
HUM -
036 -
035.5/ 040.5
|
IN HUMBOLDT COUNTY NEAR DINSMORE FROM 0.1 MI EAST OF SFK VAN DUZEN RIVER BR#4-119 TO 0.1 MI EAST OF VAN DUZEN RIVER BR#4-129 |
|
|
1 – 10 |
|
December 2013 |
View Details
|
June 25, 2012 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
1 -
0B3204
|
DN -
199 -
024.6/
|
IN DEL NORTE COUNTY NEAR PATRICKS CREEK AT 0.6 MI NORTH OF MID FK SMITH RIVER BR #1-15 |
|
|
1 – 10 |
|
January 2014 |
View Details
|
June 25, 2012 |
|
1 -
0B3104
|
DN -
199 -
008.7/
|
IN DEL NORTE COUNTY NEAR PATRICKS CREEK AT 2.3 MILES SOUTH OF HARDSCRABBLE CR BR #1-8 AND AT 0.3 MI SOUTH OF PATRICKS CR CAMPGROUND |
|
|
1 – 10 |
|
January 2014 |
View Details
|
June 25, 2012 |
|
1 -
0B2904
|
DN -
101 -
021.7/ 022.9
|
IN DEL NORTE COUNTY NEAR CRESCENT CITY FROM 1 MILE SOUTH TO 0.2 MI NORTH OF HAMILTON ROAD #8070 |
|
|
1 – 10 |
|
December 2013 |
View Details
|
June 25, 2012 |
|
1 -
0A4204
|
MEN -
C0999 -
VAR/
|
IN MENDOCINO COUNTY ON ROUTES 101 AND 253 AT VARIOUS LOCATIONS |
Repair Bridge,Rehabilitate Bridge Deck,Replace Joint Seals |
Replace Joint Seals, Rehabilitate Bridge Deck, Repair Bridge |
0 – 1 |
50 |
January 2013 |
View Details
|
June 25, 2012 |
|
3 -
4M6504
|
SAC -
051 -
005.7/006.7
|
|
|
|
0 – 1 |
|
April 2013 |
View Details
|
June 25, 2012 |
|
2 -
4E7004
|
SHA -
299 -
018.4/ 018.7
|
IN SHASTA COUNTY AT SHASTA FROM 0.1 MILE WEST OF FRENCH ALLEY TO RED BLUFF ROAD. |
|
|
0 – 1 |
|
February 2014 |
View Details
|
June 12, 2012 |
|
2 -
4E6304
|
SIS -
096 -
056.0/
|
IN SISKIYOU COUNTY NEAR SEIAD VALLEY AT 3.5 MILES EAST OF THOMPSON CREEK BRIDGE |
|
|
0 – 1 |
|
October 2013 |
View Details
|
June 12, 2012 |
|
2 -
4E6004
|
TRI -
003 -
030.8/ 031.2
|
IN TRINITY COUNTY AT WEAVERVILLE FROM TRINITY RIVER BRIDGE TO WASHINGTON STREET. |
|
|
0 – 1 |
|
February 2014 |
View Details
|
June 12, 2012 |
|
2 -
4C9604
|
TRI -
003 -
007.1/ 007.7
|
IN TRINITY COUNTY AT HAYFORK FROM MAIN STREET TO 0.1 MILE NORTH OF FOREST AVENUE. |
|
|
0 – 1 |
|
August 2012 |
View Details
|
June 12, 2012 |
|
2 -
3C0714
|
LAS -
395 -
061.6/ 076.6
|
IN AND NEAR JOHNSTONVILLE FROM 0.4 MILE SOUTH OF BANGHAM LANE TO 0.3 MILE SOUTH OF WENDEL RD. |
|
|
10 – 20 |
|
December 2013 |
View Details
|
June 12, 2012 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
2 -
374304
|
TRI -
299 -
023.3/
|
IN TRINITY COUNTY NEAR DEL LOMA AT BIG FRENCH CREEK BRIDGE (NO. 5.8) |
Modify Bridge,Replace Bridge Railing,Replace Guard Railing |
Replace Bridge Railing, Modify Bridge, Replace Guard Railing |
1 – 10 |
100 |
July 2012 |
View Details
|
June 12, 2012 |
|
2 -
2C0904
|
PLU -
070 -
050.3/ 053.0
|
IN PLUMAS COUNTY NEAR QUINCY FROM 0.3 MI WEST TO 0.5 MI EAST OF SPRING GARDEN BOH BR #09-0062 |
|
|
10 – 20 |
|
June 2014 |
View Details
|
June 12, 2012 |
|
1 -
3633U4
|
HUM -
101 -
079.9/ 087.8
|
|
|
|
10 – 20 |
|
July 2012 |
View Details
|
June 12, 2012 |
|
3 -
4M5404
|
ED -
050 -
018.1/ 019.1
|
IN PLACERVILLE ON ROUTE 50 FROM 0.1 MILE EAST OF BEDFORD AVENUE TO WILTSE ROAD UC AND ON ROUTE 193 NEAR PLACERVILLE FROM SOUTH FORK AMRICAN RV BRIDGE 25-33 TO ROUTE 49 |
|
|
0 – 1 |
|
January 2013 |
View Details
|
June 12, 2012 |
|
3 -
4M5004
|
NEV -
080 -
005.0/
|
IN NEVADA, PLACER, AND SIERRA COUNTIES AT VARIOUS LOCATIONS |
|
|
0 – 1 |
|
February 2013 |
View Details
|
June 12, 2012 |
|
3 -
4M4904
|
YOL -
113 -
000.0/ 022.1
|
IN SUTTER AND YOLO COUNTIES ON ROUTES 113/45/80 AT VARIOUS LOCATIONS |
|
|
0 – 1 |
|
March 2013 |
View Details
|
June 12, 2012 |
|
3 -
4M3704
|
SAC -
005 -
001.5/
|
IN EL DORADO, PLACER, SACRAMENTO, AND YOLO COUNTIES AT VARIOUS LOCATIONS |
|
|
0 – 1 |
|
December 2013 |
View Details
|
June 12, 2012 |
|
3 -
4M0704
|
NEV -
020 -
027.6/ 038.0
|
ABOUT 18 MILES EAST OF NEVADA CITY FROM MISSOURI BAR ROAD TO 0.4 MILE EAST OF EXCELSIOR POINT ROAD |
|
|
0 – 1 |
|
April 2013 |
View Details
|
June 12, 2012 |
|
3 -
4E5404
|
SIE -
049 -
048.3/ 049.2
|
ABOUT 10 MILES SOUTH OF LOYALTON FROM 0.5 MILE TO 1.3 MILES NORTH OF LEMON CANYON ROAD |
UPGRADE CULVERTS AND PAVE LOW SPOTS. Modify Culverts |
Asphalt Concrete Surfacing, Culverts |
1 – 10 |
50 |
January 2013 |
View Details
|
June 12, 2012 |
|
3 -
3E1004
|
PLA -
080 -
008.1/ 037.8
|
IN AND NEAR LOOMIS AT VARIOUS LOCATIONS FROM BRACE ROAD OVERCROSSING TO MAGRA ROAD OVERCROSSING |
|
|
20 – 40 |
|
June 2013 |
View Details
|
June 12, 2012 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
3 -
2F8104
|
PLA -
065 -
R007.7/M008.1
|
IN AND NEAR ROSEVILLE AT BLUE OAKS BOULEVARD OVERCROSSING ONRAMPS |
|
|
0 – 1 |
|
June 2012 |
View Details
|
June 12, 2012 |
|
3 -
2F3604
|
NEV -
020 -
R003.9/R012.2
|
IN AND NEAR GRASS VALLEY AND NEVADA CITY FROM 0.3 MILE EAST OF INDIAN SPRINGS ROAD TO JUNCTION ROUTE 49 IN GRASS VALLEY |
|
|
1 – 10 |
|
September 2012 |
View Details
|
June 12, 2012 |
|
3 -
2F1504
|
ED -
049 -
031.1/
|
ABOUT 8.8 MILES SOUTH OF AUBURN AT RATTLESNAKE BAR ROAD |
|
|
0 – 1 |
|
September 2013 |
View Details
|
June 12, 2012 |
|
3 -
2E9204
|
SAC -
104 -
000.0/ 000.1
|
IN SACRAMENTO COUNTY ON SR 104 AT THE INTERSECTION OF EAST STOCKTON AND WEST STOCKTON BLVD |
Modify Signals |
Modify Signals |
1 – 10 |
345 |
February 2013 |
View Details
|
June 12, 2012 |
|
3 -
1A8444
|
ED -
089 -
018.0/ 024.9
|
ABOUT 8.3 MILES NORTH OF SOUTH LAKE TAHOE FROM NORTH OF THE SIDEHILL VIADUCTS TO MEEKS CREEK |
Asphalt Concrete Surfacing,Replace Culverts,Reconstruct Drainage,Earthwork,Rock Slope Protection |
Rock Slope Protection, Asphalt Concrete Surfacing, Replace Culverts, Reconstruct Drainage, Earthwork |
10 – 20 |
350 |
February 2013 |
View Details
|
June 12, 2012 |
|
3 -
0F2605
|
BUT -
099 -
045.5/
|
ABOUT 10 MILES NORTH OF CHICO AT PINE CREEK BRIDGE 12-28 |
|
|
0 – 1 |
|
May 2013 |
View Details
|
June 12, 2012 |
|
3 -
4M2004
|
COL -
005 -
R022.3/
|
IN COLUSA, BUTTE, AND GLENN COUNTIES ON ROUTES 5, 20, 32,149, AND 162 AT VARIOUS LOCATIONS |
Rock Slope Protection |
Rock Slope Protection |
0 – 1 |
|
February 2014 |
View Details
|
June 12, 2012 |
|
3 -
4E5004
|
SIE -
089 -
004.5/ 005.5
|
ABOUT 12.0 MILES NORTH OF TRUCKEE FROM 2.3 MILES NORTH OF LITTLE TRUCKEE RIVER BRIDGE TO 0.2 MILE NORTH OF COTTONWOOD ROAD |
Fence,Rock Slope Protection |
Rock Slope Protection, Fence |
0 – 1 |
30 |
April 2013 |
View Details
|
June 12, 2012 |
|
3 -
3M7204
|
SAC -
160 -
005.9/L007.0
|
NEAR ISLETON AT THE ISLETON BRIDGE AND AT THE THREE MILE SLOUGH BRIDGE |
Clean and Paint Sign Structure |
Clean and Paint Sign Structure |
1 – 10 |
280 |
March 2013 |
View Details
|
June 12, 2012 |
|
3 -
1A7324
|
ED -
050 -
073.7/ 075.4
|
IN AND NEAR SOUTH LAKE TAHOE FROM SOUTH TAHOE AIRPORT ENTRANCE ROAD TO ROUTE 89 (KP 118.6/121.3) |
Asphalt Concrete Surfacing,Replace Culverts,Culverts,Repair Drainage,Earthwork,Erosion Control,Pavement Markers,Pavement Markings,Reconstruct Roadway,Reconstruct Signs |
Asphalt Concrete Surfacing, Reconstruct Signs, Reconstruct Roadway, Replace Culverts, Repair Drainage, Earthwork, Erosion Control, Pavements Markers, Pavements Markings |
1 – 10 |
96 |
October 2012 |
View Details
|
June 12, 2012 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
2 -
2E8204
|
SIE -
395 -
000.0/ 000.1
|
IN SIERRA COUNTY NEAR HALLELUJAH JUNCTION FROM NEVADA STATE LINE TO 0.1 MILE NORTH OF NEVADA STATE LINE |
Earthwork,Widening |
Earthwork, Widening |
0 – 1 |
20 |
March 2013 |
View Details
|
June 12, 2012 |
|
2 -
4F4005
|
TRI -
036 -
015.8/016.5
|
|
|
|
0 – 1 |
|
January 2014 |
View Details
|
June 12, 2012 |
|
2 -
4E5605
|
TRI -
003 -
000.5/
|
|
|
|
0 – 1 |
|
March 2013 |
View Details
|
June 12, 2012 |
|
1 -
0A4504
|
HUM -
C0999 -
VAR/
|
IN HUMBOLDT COUNTY ON VARIOUS ROUTES AND AT VARIOUS LOCATIONS |
Clean and Paint Bridge |
Clean and Paint Bridge |
1 – 10 |
150 |
December 2012 |
View Details
|
June 12, 2012 |
|
1 -
0A4404
|
MEN -
C0999 -
VAR/
|
IN MENDOCINO COUNTY ON VARIOUS ROUTES AND AT VARIOUS LOCATIONS |
Clean and Paint Bridge |
Clean and Paint Bridge |
1 – 10 |
200 |
December 2012 |
View Details
|
June 12, 2012 |
|
1 -
0A4304
|
LAK -
C0999 -
VAR/
|
IN LAKE COUNTY ON ROUTES 20 & 29 AT VARIOUS LOCATIONS |
Repair Bridge,Rehabilitate Bridge Deck,Replace Joint Seals |
Replace Joint Seals, Repair Bridge, Rehabilitate Bridge Deck |
0 – 1 |
80 |
January 2013 |
View Details
|
June 12, 2012 |
|
1 -
0A3804
|
HUM -
255 -
000.2/ 001.3
|
IN HUMBOLDT COUNTY NEAR EUREKA AT THREE LOCATIONS FROM EUREKA CHANNEL BRIDGE TO SAMOA CHANNEL BRIDGE |
Repair Bridge,Rehabilitate Bridge Deck,Replace Joint Seals |
Rehabilitate Bridge Deck, Replace Joint Seals, Bridge |
1 – 10 |
150 |
October 2012 |
View Details
|
June 12, 2012 |
|
1 -
0C4105
|
HUM -
211 -
073.2/R074.4
|
|
|
|
0 – 1 |
|
May 2013 |
View Details
|
June 12, 2012 |
|
1 -
0C1204
|
MEN -
001 -
|
|
|
|
0 – 1 |
|
June 2014 |
View Details
|
June 12, 2012 |
|
1 -
0B8304
|
MEN -
-
047.2/047.4
|
|
|
|
1 – 10 |
|
August 2014 |
View Details
|
June 12, 2012 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
8 -
0K2801
|
SBd -
40 -
73.0/89.0
|
NEAR LUDLOW FROM 1.5 MI W/O OLD DAD WASH TO 1.5 MI W/O FORTRESS WASH |
GRIND AND OVERLAY AC |
Rehabilitate Pavement |
20 – 40 |
120 |
July 2013 |
View Details
|
June 08, 2012 |
|
1 -
499104
|
DN -
101 -
000.9/ 020.3
|
IN DEL NORTE COUNTY FROM THE HUMBOLDT/DEL NORTE COUNTY LINE TO 3.0 MILES SOUTH OF MILL CREEK ROAD AT VARIOUS LOCATIONS |
|
|
0 – 1 |
|
July 2013 |
View Details
|
May 30, 2012 |
|
1 -
479404
|
DN -
199 -
020.5/ 025.7
|
IN DEL NORTE COUNTY NEAR PATRICK CREEK FROM 1.5 MI SOUTH OF PATRICK CREEK TO 5 MI NORTH OF PATRICK CREEK. |
|
|
10 – 20 |
|
August 2013 |
View Details
|
May 30, 2012 |
|
1 -
475024
|
HUM -
254 -
011.0/ 011.1
|
NEAR MIRANDA, 0.2 MILE NORTH OF BRIDGE CREEK. |
Asphalt Concrete Surfacing,Replace Culverts,Repair Storm Damage,Reconstruct Roadway |
Asphalt Concrete Surfacing, Reconstruct Roadway, Replace Culverts, Repair Storm Damage |
1 – 10 |
40 |
September 2012 |
View Details
|
May 30, 2012 |
|
1 -
465804
|
MEN -
001 -
014.7/ 021.8
|
IN MENDOCINO COUNTY IN AND NEAR POINT ARENA FROM 0.5 MI SOUTH OF POINT ARENA SCHOOL TO 0.4 MI NORTH OF KINNEY ROAD-RD 511 |
|
|
0 – 1 |
|
June 2012 |
View Details
|
May 30, 2012 |
|
1 -
459704
|
HUM -
101 -
098.1/ 100.7
|
IN HUMBOLDT COUNTY AT VARIOUS LOCATIONS FROM WESTHAVEN DRIVE UC TO TRINIDAD ROAD UNDERCROSSING |
|
|
1 – 10 |
|
May 2013 |
View Details
|
May 30, 2012 |
|
1 -
450904
|
HUM -
169 -
013.6/ 033.8
|
IN HUMBOLDT COUNTY AT VARIOUS LOCATIONS FROM 0.8 MILES WEST OF PECWAN CREEK BRIDGE TO THE JUNCTION OF ROUTE 96/169 |
Asphalt Concrete Surfacing,Modify Drainage,Earthwork,Erosion Control,Grading and Paving,Guard Railing,Pavement Markers,Pavement Markings,Realign Curve,Retaining Wall,Widening |
Asphalt Concrete Surfacing, Earthwork, Modify Drainage, Guard Railing, Erosion Control, Grading and Paving, Pavements Markers, Pavements Markings, Realign Curve, Retaining Wall, Widening |
1 – 10 |
350 |
August 2013 |
View Details
|
May 30, 2012 |
|
1 -
378164
|
MEN -
128 -
014.3/ 040.6
|
IN MENDOCINO COUNTY NEAR BOONVILLE FROM 3.6 MILES WEST OF MILL CREEK BR #10-73 TO 1.8 MILES EAST OF BEEBE CREEK BR #10-52 |
Replace Culverts |
Replace Culverts |
1 – 10 |
170 |
April 2013 |
View Details
|
May 30, 2012 |
|
1 -
378134
|
MEN -
128 -
030.1/ 048.4
|
IN MENDOCINO COUNTY NEAR BOONVILLE FROM 0.5 MILE EAST OF THE ROUTE 253 /128 JUNCTION TO MOUNTAIN HOUSE RD |
Replace Culverts |
Replace Culverts |
1 – 10 |
70 |
November 2012 |
View Details
|
May 30, 2012 |
|
1 -
378124
|
MEN -
128 -
048.6/ 050.3
|
IN MENDOCINO COUNTY NEAR YORKVILLE ON RTE 128 ROM 0.2 TO 1.9 MILES EAST OF MOUNTAIN HOUSE RD AND ON ROUTE 253 FROM 0.2 MI WEST TO 9.9 MI EAST OF SODA CREEK BR #10-229 |
Replace Culverts |
Replace Culverts |
1 – 10 |
70 |
April 2013 |
View Details
|
May 30, 2012 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
1 -
296114
|
HUM -
255 -
007.7/
|
IN HUMBOLDT COUNTY NEAR ARCATA AT MCDANIEL SLU BRIDGE #4-222 |
|
|
0 – 1 |
|
June 2014 |
View Details
|
May 30, 2012 |
|
1 -
0A5904
|
MEN -
001 -
042.5/ 044.4
|
IN MENDOCINO COUNTY NEAR ELK AT SALMON CREEK BRIDGE #10-134 AND AT ALBION RIVER BRIDGE #10-136 |
Repair Bridge,Clean and Paint Bridge |
Clean and Paint Bridge, Repair Bridge |
1 – 10 |
|
August 2012 |
View Details
|
May 30, 2012 |
|
1 -
0A1504
|
HUM -
211 -
R074.4/ 079.2
|
IN HUMBOLDT COUNTY NEAR FERNDALE FROM 0.2 MILE SOUTH OF SALT RIVER OVERFLOW BRIDGE TO ROUTE 101 |
|
|
0 – 1 |
|
January 2013 |
View Details
|
May 30, 2012 |
|
2 -
4F1805
|
TRI -
003 -
069.0/074.5
|
|
|
|
0 – 1 |
|
December 2012 |
View Details
|
May 30, 2012 |
|
2 -
4F1705
|
TRI -
003 -
000.5 006.0
|
|
|
|
0 – 1 |
|
December 2012 |
View Details
|
May 30, 2012 |
|
2 -
4F1605
|
SIS -
003 -
048.0/053.1
|
|
|
|
0 – 1 |
|
December 2012 |
View Details
|
May 30, 2012 |
|
2 -
4F1505
|
SIS -
097 -
000.5/ 011.5
|
|
|
|
0 – 1 |
|
January 2013 |
View Details
|
May 30, 2012 |
|
2 -
4F1405
|
MOD -
299 -
040.6/R046.7
|
|
|
|
0 – 1 |
|
January 2013 |
View Details
|
May 30, 2012 |
|
2 -
4F1305
|
LAS -
139 -
030.0/ 040.0
|
|
|
|
0 – 1 |
|
February 2013 |
View Details
|
May 30, 2012 |
|
2 -
4E9905
|
PLU -
070 -
|
|
|
|
0 – 1 |
|
February 2013 |
View Details
|
May 30, 2012 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
2 -
4E9805
|
PLU -
070 -
037.0/ 046.0
|
|
|
|
0 – 1 |
|
January 2013 |
View Details
|
May 30, 2012 |
|
2 -
4E9705
|
TEH -
036 -
055.0/ 066.0
|
|
|
|
0 – 1 |
|
December 2012 |
View Details
|
May 30, 2012 |
|
2 -
4E9604
|
TEH -
172 -
000.0/008.9
|
|
|
|
0 – 1 |
|
January 2013 |
View Details
|
May 30, 2012 |
|
2 -
4E5404
|
SIS -
003 -
009.7/
|
|
|
|
0 – 1 |
|
February 2013 |
View Details
|
May 30, 2012 |
|
2 -
3E6304
|
LAS -
910 -
000.0/000.1
|
|
|
|
1 – 10 |
|
January 2013 |
View Details
|
May 30, 2012 |
|
7 -
290004
|
LA -
405 -
13.2 /21.2
|
IN LA CNTY ON 1-405 BTWWN VRMNT AVE PM13.28 & NB OFF-RAMP TO NB CLLTR, |
INSTALL CONCRETE BARRIER & UPGRADE EXISTING MBGR |
Replace Guard Railing, Concrete Barrier |
1 – 10 |
350 |
September 2016 |
View Details
|
May 24, 2012 |
|
3 -
3F3204
|
SAC -
050 -
R005.0/016.7
|
IN SACRAMENTO AND EL DORADO COUNTIES AT VARIOUS LOCATIONS |
|
|
1 – 10 |
|
April 2013 |
View Details
|
May 16, 2012 |
|
3 -
3C9004
|
SAC -
012 -
000.3/006.1
|
NEAR RIO VISTA FROM SACRAMENTO RIVER BRIDGE 23-24 TO MOKELUMNE RIVER BRIDGE 29-43 |
|
|
1 – 10 |
|
August 2012 |
View Details
|
May 16, 2012 |
|
3 -
1F4204
|
BUT -
099 -
040.6/ 040.8
|
ABOUT 5.6 MILES NORTH OF CHICO AT THE ROCK CREEK BRIDGE 12-27 |
|
|
1 – 10 |
|
July 2014 |
View Details
|
May 16, 2012 |
|
3 -
1F2504
|
SAC -
050 -
007.0/007.5
|
IN SACRAMENTO COUNTY AT VARIOUS LOCATIONS |
|
|
0 – 1 |
|
March 2012 |
View Details
|
May 16, 2012 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
3 -
1A8434
|
ED -
089 -
013.8/018.0
|
NEAR SOUTH LAKE TAHOE FROM CASCADE ROAD TO NORTH OF EAGLE FALLS SIDEHILL VIADUCT |
|
|
10 – 20 |
|
July 2014 |
View Details
|
May 16, 2012 |
|
3 -
0F6904
|
BUT -
070 -
024.3/
|
ABOUT 9.5 MILES EAST OF OROVILLE AT FLAG CANYON CREEK BRIDGE 12-140 |
|
|
1 – 10 |
|
July 2014 |
View Details
|
May 16, 2012 |
|
3 -
0F2704
|
YUB -
065 -
002.2/
|
NEAR WHEATLAND AT DRY CREEK BRIDGE 16-2 |
|
|
1 – 10 |
|
June 2014 |
View Details
|
May 16, 2012 |
|
1 -
463924
|
HUM -
C09 -
|
|
|
|
1 – 10 |
|
July 2014 |
View Details
|
May 15, 2012 |
|
1 -
491214
|
LAK -
029 -
011.9/ 019.1
|
IN LAKE COUNTY ON ROUTE 29 FROM COYOTE CREEK BRIDGE TO JUNCTION ROUTE 53 |
|
|
1 – 10 |
|
June 2013 |
View Details
|
April 25, 2012 |
|
1 -
0C1304
|
MEN -
271 -
016.1/ 022.8
|
IN MENDOCINO AND HUMBOLDT COUNTIES NEAR PIERCY FROM BEAR PEN ROAD TO JUNCTION ROUTE 101 |
|
|
0 – 1 |
|
April 2013 |
View Details
|
April 25, 2012 |
|
1 -
0C1004
|
HUM -
036 -
040.3/ 045.7
|
IN HUMBOLDT COUNTY NEAR DINSMORE FROM VAN DUZEN RIVER BRIDGE NO 04- 0129 TO TRINITY COUNTY LINE |
|
|
0 – 1 |
|
January 2013 |
View Details
|
April 25, 2012 |
|
1 -
0B8604
|
HUM -
211 -
073.2/ 074.0
|
IN HUMBOLDT COUNTY IN FERNDALE FROM OCEAN AVENUE TO TENNYSON AVENUE |
|
|
0 – 1 |
|
December 2012 |
View Details
|
April 25, 2012 |
|
1 -
0B8404
|
DN -
199 -
T000.0/ 004.2
|
IN DEL NORTE COUNTY ON ROUTE 199 FROM 101 TO SMITH RIVER BRIDGE |
|
|
1 – 10 |
|
December 2012 |
View Details
|
April 25, 2012 |
|
1 -
0B1304
|
DN -
101 -
013.3/ 013.4
|
IN DEL NORTE COUNTY NEAR KLAMATH FROM 0.6 MILE NORTH OF WILSON CREEK BRIDGE TO 0.7 MILE NORTH OF WILSON CREEK BRIDGE |
|
|
0 – 1 |
|
December 2012 |
View Details
|
April 25, 2012 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
2 -
2C2254
|
TEH -
036 -
091.4/
|
IN TEHAMA COUNTY ABOUT 8 MILES EAST OF MINERAL AT MILL CREEK BRIDGE |
|
|
1 – 10 |
|
May 2013 |
View Details
|
March 26, 2012 |
|
1 -
474904
|
MEN -
001 -
070.5/
|
IN MENDOCINO COUNTY NEAR WESTPORT FROM 0.8 MI NORTH OF TEN MILE RIVER BRIDGE TO 4.2 MI SOUTH OF BLUE SLIDE GULCH BRIDGE |
Repair Slope,Repair Storm Damage |
Repair Slope, Repair Storm Damage |
1 – 10 |
45 |
December 2012 |
View Details
|
March 26, 2012 |
|
1 -
450004
|
DN -
199 -
022.7/ 023.0
|
IN DEL NORTE COUNTY NEAR PATRICKS CREEK FROM 0.9 KM TO 1.4 KM NORTH OF PATRICKS CREEK ROAD (KP 36.5/37.0) |
Widening |
Widening |
1 – 10 |
120 |
April 2013 |
View Details
|
March 26, 2012 |
|
1 -
0B8104
|
MEN -
101 -
R084.7/T091.3
|
IN MENDOCINO COUNTY NEAR LEGGETT FROM CUMMINGS ROAD UNDERCROSSING TO 0.6 MILE SOUTH OF JITNEY GULCH BRIDGE |
|
|
1 – 10 |
|
February 2013 |
View Details
|
March 26, 2012 |
|
1 -
0B8004
|
MEN -
001 -
040.3/ 043.7
|
IN MENDOCINO COUNTY NEAR ALBION FROM NAVARRO RIVER BRIDGE TO ALBION RIVER BRIDGE |
|
|
1 – 10 |
|
February 2013 |
View Details
|
March 26, 2012 |
|
1 -
0B7704
|
HUM -
096 -
023.1/ 029.9
|
IN HUMBOLDT COUNTY NEAR WEITCHPEC FROM KLAMATH RIVER BRIDGE #4-144 TO SLATE CREEK BRIDGE |
|
|
0 – 1 |
|
April 2013 |
View Details
|
March 26, 2012 |
|
1 -
0B3904
|
HUM -
096 -
008.5/ 008.7
|
IN HUMBOLDT COUNTY NEAR WILLOW CREEK FROM 0.2 TO 0.4 MI EAST OF END SIDEHILL VIADUCT2 #4-289 |
|
|
1 – 10 |
|
February 2014 |
View Details
|
March 26, 2012 |
|
1 -
0B2704
|
DN -
101 -
015.1/ 015.3
|
IN DEL NORTE COUNTY ABOUT 10 MILES SOUTH OF CRESCENT CITY FROM 1.3 TO 1.5 MILES NORTH OF RUDISILL ROAD |
|
|
1 – 10 |
|
November 2013 |
View Details
|
March 26, 2012 |
|
2 -
4E9404
|
TEH -
099 -
017.6/ 018.0
|
IN TEHAMA COUNTY NEAR DAIRYVILLE FROM 65TH AVENUE TO ANTELOPE CREEK BRIDGE. |
|
|
0 – 1 |
|
February 2013 |
View Details
|
March 26, 2012 |
|
2 -
4E2704
|
SHA -
299 -
083.0/ 083.8
|
IN SHASTA COUNTY NEAR FALL RIVER MILLS AT 0.2 MILE WEST OF HAT CREEK BRIDGE. |
|
|
0 – 1 |
|
April 2014 |
View Details
|
March 26, 2012 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
3 -
4M6104
|
NEV -
080 -
028.0/
|
NEAR FLORISTAN AT TRUCKEE RIVER BRIDGE 17-0063 R/L |
|
|
1 – 10 |
|
October 2013 |
View Details
|
March 26, 2012 |
|
3 -
4M1804
|
GLE -
162 -
037.6/ 051.0
|
ABOUT 8 MILES WEST OF ELK CREEK AT VARIOUS LOCATIONS FROM COUNTY ROAD 307 TO COUNTY ROAD 303 |
|
|
0 – 1 |
|
February 2014 |
View Details
|
March 26, 2012 |
|
3 -
1F2604
|
SIE -
089 -
000.0/ 002.3
|
IN SIERRA COUNTY ON ROUTE 89 FROM NEVADA COUNTY LINE TO LITTLE TRUCKEE RIVER BRIDGE 13-09 |
|
|
1 – 10 |
|
April 2014 |
View Details
|
March 26, 2012 |
|
7 -
276004
|
VEN -
101 -
14.0/21.0
|
15 LOC AT VEN CNTY RTE 101 TMDL IMP (PROV STRCT BMP'S RTE 101 IN TRSH) |
PSSR FOR BMP'S IN VEN TRASH TMDL |
Modify Drainage, Erosion Control |
1 – 10 |
200 |
December 2014 |
View Details
|
February 17, 2012 |
|
7 -
275004
|
VEN -
33 -
0.0/05.6
|
IN VENTURA CNTY IN VEN FR JCT RTE 101 TO NB OFF TO VISTA R |
INSTALL BEST MANAGEMENT PARACTICE (BMP) DEVICES FOR STORM WATER MITIGATION |
Modify Drainage |
20 – 40 |
200 |
December 2014 |
View Details
|
February 17, 2012 |
|
7 -
258404
|
LA -
5 -
16.5
|
IN LA NAD BURBANK FROM RTE 60 TO RTE 170 |
STORM WATER MITIGATION (TRASH TMDL) |
Reconstruct Drainage |
1 – 10 |
180 |
January 2015 |
View Details
|
February 17, 2012 |
|
7 -
293004
|
LA -
210 -
14.2R/24.8R
|
LA CNTY IN VARIOUS CITIES FROM LA TUNA CYN UC TO RTE 710/210 SEP |
REHAB RAMPS AND CONNECTOR PAVEMENTS |
Replace PCC Pavement, Groove Pavement, Asphalt Concrete Surfacing |
1 – 10 |
500 |
August 2015 |
View Details
|
February 17, 2012 |
|
7 -
256704
|
LA -
005 -
44.4/46.5
|
IN LA COUNTY IN LA ON RTE 5, 10, 14, AND 60 (VARIOUS LOCATIONS) |
SAFETY LIGHTING CONVERSION |
|
1 – 10 |
230 |
January 2016 |
View Details
|
February 07, 2012 |
|
7 -
276104
|
LA -
110 -
3.8 /6.5
|
IN LA COUNTY ON LA 110, FROM PACIFIC COAST HIGHWAY TO 223RD STRET OC |
GROSS SOLID REMOVAL DEVICES AND OTHER PERMANENT TREATMENT BMP'S |
Reconstruct Drainage, Retaining Wall |
1 – 10 |
350 |
February 2015 |
View Details
|
February 07, 2012 |
|
7 -
264904
|
LA -
001 -
23.7/23.8
|
LA COUNTY, MANHATTAN UC BRIDGE 53-00 62 I MANHATTAN BEACH CITY |
BRIDGE SEISMIC RESTORATION |
|
1 – 10 |
280 |
July 2014 |
View Details
|
February 07, 2012 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
7 -
282704
|
LA -
101 -
00.0/39.5
|
IN LA FR JCT ST 5 TO CNTY LN |
INSTALL MBGR - GAP CLOSURES |
Guard Railing |
1 – 10 |
250 |
March 2015 |
View Details
|
February 07, 2012 |
|
7 -
281104
|
LA -
110 -
24.7/24.9
|
LA COUNTY IN LA BETWEEN STADIUM WAY UC & FIGUEROA ST TUNNEL (SOUTHBOUND) |
Retrofit Stadium Way Sidehill Viaduct |
Repair Bridge |
0 – 1 |
125 |
February 2015 |
View Details
|
February 07, 2012 |
|
7 -
225904
|
LA -
101 -
24.7/25.8
|
IN LOS ANGELES AT NORTHBOUND EXIT TO CANOGA AVENUE & SOUTHBOUND EXIT VENTURA/TOPANGA CANYON BOULEVARD |
Widen exit ramps |
Modify Ramp |
1 – 10 |
290 |
March 2014 |
View Details
|
February 07, 2012 |
|
7 -
265204
|
LA -
405 -
34.3/34.6
|
LA COUNTY ON S/B AT SEPULVEDA BOULEVARD ON-RAMP |
CONSTRUCT ACCELERATION LANE |
|
0 – 1 |
320 |
November 2014 |
View Details
|
February 07, 2012 |
|
7 -
273704
|
LA -
001 -
08.2/08.6
|
IN LA COUNTY @ LB BETWEEN TRE 47-DOMIN CHANNEL |
BRIDGE REPLACEMENT/RAMP MODIFICATION |
Replace Bridge |
20 – 40 |
200 |
April 2014 |
View Details
|
February 07, 2012 |
|
7 -
273004
|
LA -
710 -
06.0/06.4
|
IN LA COUNTY IN LBCH FROM BRWY TO SHMKR BR |
REPLACE BRIDGE |
|
100 – 120 |
670 |
October 2014 |
View Details
|
February 03, 2012 |
|
7 -
213404
|
LA -
010 -
18.4/21.0
|
IN LA COUNTY IN LA FROM STATE STREET OC TO CAMPUS ROAD OC |
HIGHWAY PLANING RESTORATION |
|
0 – 1 |
980 |
January 2015 |
View Details
|
February 03, 2012 |
|
7 -
254004
|
VEN -
126 -
22.0/34.6
|
IN VEN COUNTY IN FILMORE AND VEN FROM ENTRANCE TO TEXACO LT TO VEN/LA |
COLD PLANE AND OVERLAY |
Asphalt Concrete Surfacing |
100 – 120 |
170 |
September 2013 |
View Details
|
February 03, 2012 |
|
7 -
273104
|
LA -
110 -
09.0/14.0
|
LA COUNTY BRIDGES ALONG LA-105 PM 7/8 AT LA-105/110 IC & LA-110 PM |
STRUCTURE REHABILITATION |
|
1 – 10 |
360 |
March 2014 |
View Details
|
February 03, 2012 |
|
7 -
252624
|
LA -
005 -
45.4R/59.7R
|
IN LA COUNTY IN LA AND SCLA FROM SENDO ROAD OH TO LAKE HUGHES ROAD UC |
ROADWAY REHABILITATION |
Asphalt Concrete Surfacing, Groove Pavement, Rehabilitate Pavement, Replace PCC Pavement |
60 – 80 |
800 |
August 2014 |
View Details
|
February 03, 2012 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
7 -
272304
|
LA -
210 -
23.0R/24.6R
|
IN LA COUNTY IN PSNA BET LINCOLN BLVD AND ORANGE GROVE AVENUE OC |
EXTEND CONNECTOR LANE |
|
20 – 40 |
490 |
July 2018 |
View Details
|
February 03, 2012 |
|
7 -
1992U4
|
LA -
039 -
40.0/44.4
|
IN LA COUNTY NEAR GLENDORA |
REHAB DRAIN, CONSTRUCT RETAINING WALL, RECON ROAD |
Retaining Wall, Repair Storm Damage, Repair Slope, Asphalt Concrete Surfacing |
20 – 40 |
490 |
July 2014 |
View Details
|
February 03, 2012 |
|
7 -
251904
|
VEN -
101 -
40.4R/43.6R
|
IN VEN COUNTY FROM .6M N/O MOBIL PIER UC TO VEN/SBRA COUNTY LINE |
PAVEMENT REHABILITATION |
Asphalt Concrete Surfacing, Groove Pavement, Replace PCC Pavement |
1 – 10 |
280 |
November 2013 |
View Details
|
February 03, 2012 |
|
7 -
127244
|
LA -
138 -
59.7/60.2
|
IN LA CNTY IN PMDL FR 126TH ST E TO LONGVIEW RD(SEG 9) |
WIDEN CONVENTIONAL HIGHWAY |
Widening |
1 – 10 |
200 |
November 2014 |
View Details
|
February 03, 2012 |
|
7 -
250304
|
LA -
126 -
00.0/04.6
|
IN LA COUNTY FROM COUNTY LN TO COMMERCE CTR DR IC |
MODIFY INTERSECTIONS |
|
1 – 10 |
210 |
May 2015 |
View Details
|
February 03, 2012 |
|
7 -
281604
|
VEN -
118 -
15.9 /16.5
|
IN VENTURA COUNTY IN MOORPARK JUST WEST OF GABBERT ROAD |
ROAD WIDENING |
Widening |
1 – 10 |
300 |
August 2014 |
View Details
|
February 03, 2012 |
|
7 -
203804
|
LA -
118 -
4.8R/4.8R
|
IN LA CNTY ON W/B RTE 118 AT TAMPA AVE OFF-RAMP |
WIDENING OFF-RAMP, ADDING AUX LN |
Sound Wall, Retaining Wall, Widening |
1 – 10 |
250 |
April 2017 |
View Details
|
February 03, 2012 |
|
7 -
215954
|
LA -
005 -
05.8/07.6
|
IN SFPS FROM NO ORR AND DAY OH / RTE 605 IC |
WIDENING FLORENCE AVENUE INTERCHANGE |
Reconstruct Bridge, Widening |
120 – 140 |
830 |
April 2013 |
View Details
|
February 03, 2012 |
|
3 -
412404
|
NEV -
020 -
R013.6/R014.8
|
NEAR GRASS VALLEY, AT DORSEY DRIVE OVERCROSSING. |
Interchange,Modify Roadway,Widening |
Widening, Modify Roadway, Interchange |
10 – 20 |
300 |
September 2012 |
View Details
|
January 30, 2012 |
|
1 -
0B0004
|
LAK -
020 -
013.5/ 031.4
|
IN LAKE COUNTY IN & NEAR LUCERNE FROM 0.1 MI WEST OF SAYRE AVE TO 0.2 MI WEST OF JUNCTION ROUTE 53 |
|
|
20 – 40 |
|
February 2014 |
View Details
|
January 30, 2012 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
1 -
0B7904
|
VAR -
C0999 -
VAR/
|
IN HUMBOLDT AND MENDOCINO COUNTIES AT VARIOUS LOCATIONS |
|
|
0 – 1 |
|
July 2013 |
View Details
|
January 30, 2012 |
|
7 -
292201
|
LA -
2 -
17.8R/19.5R
|
IN LA, RTE 2/134 IC |
MAINTENANCE SAFETY |
|
1 – 10 |
200 |
April 2015 |
View Details
|
January 27, 2012 |
|
7 -
292104
|
LA -
101 -
11. /11.8
|
IN LA, RTE 101/134/170 IC |
MAINTENANCE SAFETY |
|
1 – 10 |
250 |
September 2014 |
View Details
|
January 27, 2012 |
|
7 -
291204
|
LA -
057 -
7.7 /12.2
|
IN LA, RTE 57 FR PM 7.7/12.2, RTE 60 FR PM 0.0/6.9 |
ADA RAMPS |
Modify Signals, Wheelchair Ramps |
1 – 10 |
250 |
November 2014 |
View Details
|
January 27, 2012 |
|
7 -
291004
|
LA -
14 -
32.1R/59.2R
|
IN LA IN SANTA CLARITA TO SIERRA HWY,INSTALL ADA RAMPS UPGRADE ADA |
ADA INFRASTRUCTURE |
Wheelchair Ramps, Modify Signals |
0 – 1 |
270 |
September 2014 |
View Details
|
January 27, 2012 |
|
7 -
290404
|
VEN -
101 -
29.9
|
IN VEN AT ASH ST POC (PM 29.9) |
UPGRADE ADA RAMPS & ACCESSIBILITY |
|
1 – 10 |
500 |
January 2016 |
View Details
|
January 27, 2012 |
|
7 -
289904
|
LA -
19 -
4.0/8.4
|
IN LA, ALONG LA 19 UPGRADE CURB RAMPS ADD SIDEWALKS |
UPGRADE CURB RAMPS AND SIDEWALKS |
|
1 – 10 |
400 |
September 2014 |
View Details
|
January 27, 2012 |
|
7 -
290804
|
LA -
1 -
2.7/12.1
|
IN LA ON PCH BTW ANAHEIM & RTE 710 |
ADA IMPROVEMENTS - 483 new or upgraded curb ramps and 4000 feet of sidewalk. |
|
1 – 10 |
200 |
February 2015 |
View Details
|
January 27, 2012 |
|
7 -
287304
|
LA -
210 -
39.8/41.9
|
IN LA CNTY IN AZUSA FR AZUSA AVE TO BIG DALTON WASH |
STORM WATER SOURCE CONTROL |
Highway Planting, Erosion Control, Reconstruct Drainage, Irrigation System |
1 – 10 |
1000 |
September 2014 |
View Details
|
January 23, 2012 |
|
7 -
288204
|
LA -
60 -
0.3/3.1
|
IN LA CNTY IN AND NEAR LA FR BOYLE AVE TO RTE 60/710 IC |
STORM WATER SOURCE CONTROL |
Erosion Control, Highway Planting |
1 – 10 |
125 |
August 2014 |
View Details
|
January 23, 2012 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
7 -
287204
|
LA -
134 -
1.6/2.7
|
IN LA CNTY IN BRBNK FR CLYBOURN AVE TO BOB HOPE DR |
STORM WATER SOURCE CONTROL |
Erosion Control, Irrigation System |
1 – 10 |
1000 |
August 2014 |
View Details
|
January 20, 2012 |
|
7 -
256804
|
LA -
005 -
15.1/15.2
|
IN LA COUNTY SB RTE 5 BETWEEN ESPERANZA STREET AND CALZONA STREET |
WIDEN OFF RAMP |
|
1 – 10 |
240 |
March 2020 |
View Details
|
January 20, 2012 |
|
7 -
288904
|
LA -
19 -
4.8/8.4
|
In Los Angeles along Lakewood Boulevard
(LA-019) from Del Amo Boulevard to Gardendale Street. |
33 Intersections (86 Curb Ramps)
1000 Linear Feet of New Sidewalks
10 Pedestrian Push Buttons
64 Pedestrian Countdowns at 11 Signalized Intersections
10 Pedestrian Crosswalks |
Modify Signals, Wheelchair Ramps |
1 – 10 |
220 |
September 2014 |
View Details
|
January 20, 2012 |
|
3 -
3M5804
|
BUT -
099 -
044.5/ 046.0
|
ABOUT 9.5 MILES NORTH OF CHICO FROM 0.2 MILE NORTH OF BROYLES ROAD TO 0.1 MILE NORTH OF CROSS DRAIN BRIDGE 12-81 |
|
|
0 – 1 |
|
December 2012 |
View Details
|
January 06, 2012 |
|
2 -
4E2804
|
SIS -
005 -
046.8/ 062.1
|
IN SISKIYOU COUNTY IN AND NEAR YREKA FROM YREKA CREEK BRIDGE TO 0.2 MI SO OF MINER ST UNDERCROSSING & FRM 0.8 MI SO TO 0.4 MI SO OF DITCH CREEK ROAD OVERCROSSING. |
|
|
1 – 10 |
|
July 2013 |
View Details
|
January 06, 2012 |
|
3 -
4M2604
|
SIE -
089 -
027.8/ 029.6
|
NEAR CALPINE FROM SULPHUR CREEK ROAD TO THE SIERRA/PLUMAS COUNTY LINE |
|
|
0 – 1 |
|
October 2013 |
View Details
|
January 06, 2012 |
|
2 -
4E3504
|
PLU -
070 -
019.0/ 019.1
|
IN PLUMAS COUNTY AT RICH BAR AT 0.2 MILE EAST OF RICH BAR ROAD. |
|
|
0 – 1 |
|
February 2014 |
View Details
|
January 06, 2012 |
|
1 -
0B7004
|
HUM -
101 -
079.9/ 085.5
|
IN HUMBOLDT COUNTY NEAR EUREKA FROM EUREKA SLOUGH BRIDGES #4-22 TO THE ROUTE 101/255 SEPARATION #4-49 |
|
|
0 – 1 |
|
May 2012 |
View Details
|
January 06, 2012 |
|
3 -
4M5804
|
SAC -
160 -
R044.5/ 047.1
|
IN THE CITY AND COUNTY OF SACRAMENTO FROM AMERICAN RIVER BRIDGE 24-001 TO 0.8 MILE NORTH OF TRIBUTE ROAD |
|
|
1 – 10 |
|
February 2013 |
View Details
|
December 20, 2011 |
|
3 -
4M5704
|
PLA -
174 -
000.0/ 002.9
|
IN AND NEAR COLFAX FROM 174/80 SEPERATION BRIDGE 19-0086 TO NEVADA COUNTY LINE |
|
|
0 – 1 |
|
March 2013 |
View Details
|
December 20, 2011 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
3 -
4M5604
|
GLE -
032 -
L000.0/ 001.3
|
IN ORLAND FROM I-5 TO COUNTY ROAD M 1/2 |
|
|
0 – 1 |
|
February 2013 |
View Details
|
December 20, 2011 |
|
3 -
4M5504
|
GLE -
162 -
067.2/ 084.6
|
NEAR WILLOWS FROM CENTRAL IRRIGATION CANAL BRIDGE 11-0009 TO BUTTE COUNTY LINE |
|
|
1 – 10 |
|
March 2013 |
View Details
|
December 20, 2011 |
|
3 -
4M5304
|
BUT -
099 -
013.0/ 020.6
|
ABOUT 10 MILES SOUTH OF CHICO FROM 0.2 MILE SOUTH OF NORTHERN JUNCTION ROUTE 162 TO DRY CREEK BRIDGE |
|
|
1 – 10 |
|
March 2013 |
View Details
|
December 20, 2011 |
|
3 -
4M5204
|
SAC -
080 -
000.0/ 018.0
|
IN AND NEAR SACRAMENTO ON ROUTES 80 , 99, AND 160 AT VARIOUS LOCATIONS |
|
|
1 – 10 |
|
February 2013 |
View Details
|
December 20, 2011 |
|
3 -
4M5104
|
ED -
050 -
000.0/ 080.4
|
IN EL DORADO, SACRAMENTO, AND YOLO COUNTIES AT VARIOUS LOCATIONS ON ROUTES 50, 51, AND 193 |
|
|
1 – 10 |
|
March 2013 |
View Details
|
December 20, 2011 |
|
3 -
4M4804
|
COL -
005 -
000.0/R034.4
|
IN COLUSA, GLENN, AND SACRAMENTO COUNTIES ON ROUTE 5 AT VARIOUS LOCATIONS |
|
|
1 – 10 |
|
February 2013 |
View Details
|
December 20, 2011 |
|
3 -
4M4604
|
SIE -
089 -
025.9/ 027.9
|
NEAR CALPINE AT VARIOUS LOCATIONS FROM CALPINE SUMMIT TO SULPHUR CREEK ROAD |
|
|
0 – 1 |
|
December 2013 |
View Details
|
December 20, 2011 |
|
3 -
4M4404
|
ED -
050 -
049.0/ 052.0
|
NEAR KYBURZ FROM SILVER FORK ROAD TO 36 MILE STONE ROAD |
|
|
0 – 1 |
|
January 2014 |
View Details
|
December 20, 2011 |
|
2 -
4E6605
|
TEH -
005 -
034.3/
|
IN TEHAMA COUNTY ABOUT 8 MILES NORTH OF RED BLUFF AT HERBERT MILES SAFETY ROADSIDE REST AREA. |
|
|
0 – 1 |
|
August 2012 |
View Details
|
December 20, 2011 |
|
2 -
4E1404
|
SIS -
005 -
023.3/ 023.9
|
IN SISKIYOU COUNTY NEAR WEED FROM 0.3 MILE TO 0.9 MILE NORTH OF EDGEWOOD UNDERCROSSING. |
|
|
0 – 1 |
|
October 2013 |
View Details
|
December 20, 2011 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
2 -
2E8704
|
SHA -
005 -
031.1/
|
IN SHASTA COUNTY ABOUT 9 MILES NORTH OF SHASTA LAKE CITY AT O'BRIEN SAFETY ROADSIDE REST AREA |
|
|
0 – 1 |
|
July 2012 |
View Details
|
December 20, 2011 |
|
2 -
1E0004
|
MOD -
299 -
022.4/
|
IN MODOC COUNTY AT CANBY AT CANBY MAINTENANCE STATION |
|
|
0 – 1 |
|
January 2014 |
View Details
|
December 20, 2011 |
|
1 -
496504
|
HUM -
101 -
060.3/
|
IN HUMBOLDT COUNTY IN FORTUNA AT THE FORTUNA MAINTENANCE STATION |
|
|
1 – 10 |
|
February 2014 |
View Details
|
December 20, 2011 |
|
1 -
0B6304
|
DN -
101 -
022.5/ 023.0
|
IN DEL NORTE COUNTY NEAR CRESCENT CITY FROM 0.2 MI SOUTH TO 0.3 MI NORTH OF HAMILTON ROAD INTERSECTION |
|
|
1 – 10 |
|
July 2012 |
View Details
|
December 20, 2011 |
|
1 -
0B2304
|
DN -
101 -
012.2/ 040.1
|
IN DEL NORTE COUNTY AT WILSON CREEK BRIDGE #01-5, SMITH RIVER BRIDGE #1 -20 AND AT ROWDY CREEK BRIDGE #1-23 |
|
|
1 – 10 |
|
August 2013 |
View Details
|
December 20, 2011 |
|
7 -
274804
|
LA -
18 -
0.1 /0.1
|
IN LA CNTY ON RTE 18 |
REPLACE BRIDGE DECK AND RAIL |
|
1 – 10 |
400 |
August 2013 |
View Details
|
December 16, 2011 |
|
7 -
236504
|
LA -
210 -
29.5/29.6
|
IN LA COUTY IN PASADENA AT .06KM E/O SIERRA MADRE VILLA AVE |
CONSTRUCT PEDESTRIAN OVERCROSSING |
Bridge |
1 – 10 |
270 |
February 2020 |
View Details
|
December 16, 2011 |
|
7 -
256604
|
L -
010 -
00.0/48.2
|
LA COUNTY IN LA ON ROUTE 10 VARIOUS LOCATIONS |
SAFETY LIGHTING CONVERSION |
|
1 – 10 |
230 |
January 2014 |
View Details
|
December 16, 2011 |
|
7 -
491604
|
LA -
405 -
22.2/23.4
|
IN ING @ ARBOR VITAE AVENUE |
CONSTRUCT SOUTH HALF INTERCHANGE |
|
20 – 40 |
500 |
July 2014 |
View Details
|
December 16, 2011 |
|
7 -
183124
|
LA -
710 -
09.4/18.4
|
IN LA COUNTY, LB CITY/SGT FROM RTE 405/FIRESTONE BOULEVARD |
LANDSCAPE |
Repair Irrigation System, Highway Planting |
0 – 1 |
510 |
December 2014 |
View Details
|
December 16, 2011 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
7 -
272404
|
LA -
005 -
14.9/16.8
|
IN LA COUNTY IN LA FROM INDIANA STREET UC TO BOYLE STREET ST OC |
STORM WATER SOURCE CONTROL |
Highway Planting |
0 – 1 |
980 |
July 2013 |
View Details
|
December 16, 2011 |
|
7 -
251704
|
LA -
210 -
00.0/25.8
|
IN LA COUNTY IN VAR CITIES FROM IC 5/210 TO LOS ROBLES AVENUE OC |
SLAB REPLACEMENT AND GRINDING |
Replace PCC Pavement, Groove Pavement, Asphalt Concrete Surfacing |
100 – 120 |
740 |
November 2014 |
View Details
|
December 16, 2011 |
|
7 -
240404
|
LA -
5531-OS.AN/G.A -
|
MATERIALS LABORATORY AT 1616 S. MAPLE AVENUE, LOS ANGELES CA 90015 |
REHAB MATERIAL LAB BLDG |
Building |
1 – 10 |
320 |
September 2017 |
View Details
|
December 16, 2011 |
|
7 -
267304
|
LA -
101 -
10.2/10.8
|
IN LA COUNTY IN LA AT UNIV TERR PKWY IC AND AT N/B OFF-RAMP LSHIM BOULEVARD |
WIDEN FREEWAY AND RAMPS |
|
10 – 20 |
120 |
April 2017 |
View Details
|
December 16, 2011 |
|
12 -
0L9101
|
ORA -
405 -
7.5/7.8
|
OC. IN THE CITY OF IRVINE ON I-405 FOR NB & SB MACARTHUR ON-RAMPS. |
REPAIR SLOPE EMBANKMENT & DISTRESSED ASPHALT CONCRETE ROADWAY ON-RAMPS |
|
0 – 1 |
|
January 2012 |
View Details
|
November 30, 2011 |
|
12 -
0F5501
|
ORA -
405 -
6.4/7.4
|
OC. IN IRVINE ON RTE 405 FR. SAN DIEGO CREEK TO VON KARMAN AVE OVERCROSSING. |
HIGHWAY PLANTING, EROSION CONTROL, AND MINIMIZE EXPOSURE OF HIGHWAY WORKERS TO TRAFFIC |
|
0 – 1 |
|
March 2012 |
View Details
|
November 30, 2011 |
|
12 -
0M1301
|
ORA -
405 -
5.0/5.6
|
NB I-405 AT OFF-RAMP TO CULVER DR. IN CITY OF IRVINE |
WIDEN RAMP FOR DECELERATION LANE |
|
0 – 1 |
|
August 2012 |
View Details
|
November 30, 2011 |
|
12 -
0L7601
|
ORA -
405 -
1.5/24.1
|
OC. ON I-405 AT PM 1.5/24.1 & ON VARIOUS RTES AT VARIOUS POSTMILES. |
PLACE METHACRYLATE DECK SEAL TREATMENT, POLYESTER CONCRETE OVERLAY, JOINT SEALS |
|
1 – 10 |
|
April 2012 |
View Details
|
November 30, 2011 |
|
12 -
0L7101
|
ORA -
405 -
1.1/9.0
|
RTE-55 IN SANTA ANA FR. I-405 TO MCARTHUR & ON RTE 405 IN IRVINE & COSTA MESA FROM IRVINE CENTER DR. TO MACARTHUR |
CONCRETE DITCH PREVENTATIVE MAINTENANCE |
|
0 – 1 |
|
May 2012 |
View Details
|
November 30, 2011 |
|
12 -
0M1401
|
ORA -
405 -
0.3/7.8
|
I-405 FROM IRVINE CENTER DR. TO MACARTHUR BLVD. |
ADA UPGRADES. OFF-RAMP |
|
0 – 1 |
|
April 2012 |
View Details
|
November 30, 2011 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
12 -
0J4401
|
ORA -
405 -
0.0/24.2
|
IN ORANGE COUNTY. I-5 IN IRVINE TO I-605 IN SEAL BEACH |
REMOVE EXISTED HOV BUFFER. RESTRIPE FREEWAY TO PROVIDE A CONTINUOUS HOV ACCESS, STANDARD GP LN & SHOULDERS |
|
1 – 10 |
|
June 2013 |
View Details
|
November 30, 2011 |
|
12 -
0L3001
|
ORA -
405 -
17.9/0
|
SB I-405; IN CITY OF WESTMINSTER_AT THE INTERSECTION OF GOLDEN WEST ST. AND SB I-405 ON RAMP.
|
REMOVE/REPLACE PAVEMENT DELINEATION MARKINGS, ROADSIDE PANELS, CURBSIDE RAMPS & UPGRADE TRAFFIC SIGNAL.
|
|
0 – 1 |
130-160 |
January 2013 |
View Details
|
November 30, 2011 |
|
12 -
0J6701
|
ORA -
241 -
32.5/39
|
IN ORANGE COUNTY - FROM SANTIAGO CANYON ROAD TO RTE 91
|
REVEGETATION OF EXPOSED SLOPES FOR NPDES CONCERNS AND SOURCE CONTROL
|
|
1 – 10 |
1040-1300 |
June 2012 |
View Details
|
November 30, 2011 |
|
12 -
0H0261
|
OR -
133 -
0.3/13.6
|
IN IRVINE, LAGUNA BEACH FROM SR-001 TO OSO CREEK
|
CAPM SR-133 REHAB-42 LANE MILES FROM FOREST AVE (PM 0.3)TO SR-73(PM 4.1)& FROM I-405(PM 8.5)TO 241-13.6
|
|
1 – 10 |
260-330 |
May 2012 |
View Details
|
November 30, 2011 |
|
12 -
0G3311
|
ORA -
91 -
9.2/15.9
|
IN OC. CITIES OF ANAHEIM & YORBA LINDA FROM 55/91 SEPARATION TO ROUTE 241/91 SEPARATION |
HIGHWAY REPLACEMENT PLANTING |
|
1 – 10 |
|
June 2013 |
View Details
|
November 30, 2011 |
|
12 -
0C5601
|
ORA -
91 -
8.1/9.3
|
IN ANAHEIM FROM 0.2 KM W OF N OLIVE UP TO 0.2 KM OF TUSTIN AVENUE OC |
PROVIDE AN AUXILIARY LANE FROM NB SR-55 TO TUSTIN AVE OFF-RAMP |
|
20 – 40 |
|
September 2013 |
View Details
|
November 30, 2011 |
|
12 -
0K5301
|
ORA -
91 -
3.1/4.2
|
IN OC, CITY OF ANAHEIM. WB 91 FROM EAST ST. TO EUCLID AVE.
|
RESURFACE ALL LANES WITH RUBBERIZED DENSE AC
|
|
1 – 10 |
130-160 |
September 2012 |
View Details
|
November 30, 2011 |
|
12 -
0K5201
|
ORA -
91 -
2.4/2.9
|
IN OC. ON ROUTE 91 NEAR BEACH BLVD
|
OGAC OVERLAY, GROOVING, SAFETY LIGHTING, & UPGRADE ADA & GUARDRAIL TO CURRENT STANDARD
|
|
1 – 10 |
130-160 |
May 2012 |
View Details
|
November 30, 2011 |
|
12 -
0C5701
|
OR -
91 -
1.2/5.2
|
IN FULLERTON AND ANAHEIM WB DIRECTION FROM SR-57 TO I-5 PM 1.252/5.258
|
CONVERT WB AUXILIARY LANES AT VARIOUS LOCATIONS INTO A THROUGH LANES AND MODIFY RAMPS
|
|
40 – 60 |
460-570 |
October 2012 |
View Details
|
November 30, 2011 |
|
12 -
0H0291
|
OR -
91 -
0/10.1
|
IN LA PALMA, BUENA PARK, ANAHEIM, & FULLERTON FROM LA/OC LINE TO LAKEVIEW AVENUE
|
RESURFACE TRAVELED WAYS OF MAINLINE AND RAMPS. RESURFACE DETERIORATED SHOULDERS
|
|
20 – 40 |
260-330 |
November 2011 |
View Details
|
November 30, 2011 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
12 -
0K3301
|
ORA -
91 -
18/18
|
IN ORA COUNTY AT COAL CANYON ROAD INTERCHANGE
|
WILDLIFE CORRIDOR CONNECTIVITY ENHA NCEMENT (INSTALL VEGETATION)
|
|
0 – 1 |
130-160 |
November 2012 |
View Details
|
November 30, 2011 |
|
12 -
0L7501
|
ORA -
91 -
0.3/0.3
|
OC. EB RTE 91 OFF-RAMP TO ORANGTHROPE AVE.
|
SHOULDER WIDENING, SIGNING, STRIPING AND GURDRAIL MODIFICATION
|
|
0 – 1 |
260-330 |
June 2013 |
View Details
|
November 30, 2011 |
|
12 -
0L7001
|
ORA -
90 -
2.3/2.3
|
OC, IN LA HABRA AT VILLAGE DRIVE |
INVERT PAVING SSPA MAINTENANCE. MAINTENANCE |
|
0 – 1 |
|
May 2012 |
View Details
|
November 30, 2011 |
|
12 -
0M2401
|
ORA -
74 -
1.1/2.0
|
OC. IN CITY OF SAN JUAN CAPISTRANO FROM CALLE ENTRADERO RD TO SAN JUAN CAPISTRANO CITY LIMIT. |
REMOVE/REPLACE AC |
|
0 – 1 |
|
April 2012 |
View Details
|
November 30, 2011 |
|
12 -
0M0901
|
ORA -
74 -
0.0/1.8
|
RTE 74 FROM THE I-5/RTE 74 I.C. TO THE CITY OF SAN JUAN CAPISTRANO CITY LINE PM 1.8. |
UPGRADE PEDESTRIAN FACILITIES WITHIN THE CT ROW TO CURRENT ADA STANDARDS |
|
0 – 1 |
|
September 2013 |
View Details
|
November 30, 2011 |
|
12 -
0E3101
|
OR -
74 -
0/1.6
|
IN SAN JUAN CAPISTRANO FROM I-5 /EAST CITY LIMIT
|
RECONSTRUCT IC AT SR-74
|
|
20 – 40 |
570-710 |
September 2012 |
View Details
|
November 30, 2011 |
|
12 -
0H4401
|
ORA -
73 -
10.0/24.5
|
IN VARIOUS LOCATIONS |
STORM WATER MITIGATION & SLOPE STABILITY |
|
10 – 20 |
|
May 2013 |
View Details
|
November 30, 2011 |
|
12 -
0M1601
|
ORA -
57 -
13.4/14.8
|
SR-57 INTERCHANGE AT BALL RD. SR-57 INTERCHANGE AT LINCOLN AVE. |
ADA IMPROVEMENTS ON SR-57 TO MEET CURRENT STANDARDS |
|
0 – 1 |
|
April 2012 |
View Details
|
November 30, 2011 |
|
12 -
0M2201
|
ORA -
57 -
11.8/13.4
|
SR-57 INTERCHANGE AT ORANGEWOOD AVE AND AT KATELLA AVE. |
ADA IMPROVEMENTS ON ROUTE 57 TO MEET CURRENT STANDARDS |
|
0 – 1 |
|
March 2012 |
View Details
|
November 30, 2011 |
|
12 -
0M0001
|
ORA -
55 -
12.7/12.7
|
IN OC. ON RTE-55 SB CONNECTOR ON- RAMP FROM EB RTE-22. |
OVERLAY THE CONNECTOR WITH OCGA, MODIFY DRAINAGE, UPGRADE METAL BEAM GUARDRAIL, AND RESTRIPE THE RAMP |
|
0 – 1 |
|
September 2012 |
View Details
|
November 30, 2011 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
12 -
0L7401
|
ORA -
55 -
2.0/11.8
|
OC. ON SR-55 FR. 19TH ST. TO 17TH ST. IN THE CITIES OF COSTA MESA & TUSTIN. |
PAVEMENT RESURFACING INCLUDES RAMPS & APPROACH SLAB REPLACEMENT |
|
10 – 20 |
|
April 2013 |
View Details
|
November 30, 2011 |
|
12 -
0M3601
|
ORA -
55 -
2.0/11.8
|
SR-55 FROM 19TH ST IN COSTA MESA TO 17TH ST. IN SANTA ANA. |
CONSTRUCT CONCRETE MEDIAN BARRIER IN PLACE OF TEMPORARY K-RAIL TO CLOSE GAPS |
|
1 – 10 |
|
April 2013 |
View Details
|
November 30, 2011 |
|
12 -
0H20U1
|
ORA -
55 -
2.0/5.9
|
IN ORANGE COUNTY ON RTE 55 FROM 17 TH STREET TO RTE 405 AND ON RTE 73 (PM 10.0/15.20,23.4/27.8) FROM RTE5 TO GLENWOOD DRIVE AND FROM BISON AVENUE TO RTE 405 |
REMOVE DISEASED TREES AND UPGRADE HIGHWAY PLANTING |
|
1 – 10 |
|
November 2013 |
View Details
|
November 30, 2011 |
|
12 -
0L6001
|
ORA -
39 -
8.8/12.4
|
OC. IN ANAHEIM AND STANTON FROM ACACIA AVE. TO LINCOLN AVE. |
REMOVE AND REPLACE RHMA-TYPE O |
|
1 – 10 |
|
February 2012 |
View Details
|
November 30, 2011 |
|
12 -
0L77U1
|
ORA -
39 -
7.1/13.8
|
ON SR-39 @ HAZARD AVE, LAMPSON AVE, AND LA PALMA AVE. |
INSTALL ADDITIONAL SAFETY LIGHTING AND MODIFY SIGNALS |
|
0 – 1 |
|
March 2013 |
View Details
|
November 30, 2011 |
|
12 -
0L9701
|
ORA -
39 -
2.1/6.2
|
OC. ON SR-39 AT MCFADDEN AVE (PM: 6.14), MAIN/ELLIS ST. (PM: 3.12) & YORKTOWN AVE (PM: 2.14) |
ADD SAFETY LIGHTING, MODIFY SIGNALS AND PAVEMENT MARKING, ADA UPDATE |
|
0 – 1 |
|
July 2013 |
View Details
|
November 30, 2011 |
|
12 -
0L3801
|
ORA -
39 -
1.1/19.6
|
ON SR-39 FROM INDIANAPOLIS TO IMPERIAL HWY. |
INSTALL NEW & UPGRADE CURB RAMPS AT VARIOUS LOCATIONS |
|
1 – 10 |
|
May 2013 |
View Details
|
November 30, 2011 |
|
12 -
0H2081
|
ORA -
55 -
17/17.7
|
OC. CITY OF ANAHEIM. BETWEEN SANTIEGO BLVD & MAPLE TREE DR. STARTING FR. ABOUT 500 FT SW OF NOHL CYN RD. & ENDING ABOUT 1700 FT SW OF NOHL CYN RD.
|
FLATTEN THE SLOPE ABOVE THE MAINTENANCE ACCESS ROAD
|
|
1 – 10 |
|
July 2012 |
View Details
|
November 30, 2011 |
|
12 -
0F9701
|
ORA -
39 -
15.1/15.9
|
IN THE CITY OF BUENA PARK ON SR-39 FR MANCHESTER AVE TO CRAIG AVE
|
REMOVE/REPLACE THE EXISTING CURB & GUTTERS, SIDEWALK & CURB RAMPS AT VARIOUS LOCATIONS ON SR-39
|
|
1 – 10 |
|
August 2013 |
View Details
|
November 30, 2011 |
|
12 -
0M1201
|
ORA -
5 -
28.4/28.4
|
NB I-5 ON-RAMP FROM TUSTIN RANCH RD , CITY OF TUSTIN |
CONVERT THE TWO-LANE ON-RAMP TO THREE-LANE ON-RAMP (ONE HOV & TWO GP LANES) |
|
0 – 1 |
|
January 2013 |
View Details
|
November 30, 2011 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
12 -
0L8701
|
ORA -
5 -
19.4/19.5
|
IN LAKE FOREST AT THE NORHTBOUND OFF-RAMP TO LAKE FOREST DRIVE. |
MODIFY TRAFFIC SIGNALS. SAFETY/TRAFFIC OPERATION |
|
0 – 1 |
|
June 2013 |
View Details
|
November 30, 2011 |
|
12 -
0J61U1
|
ORA -
5 -
19.2/22.2
|
IN ORANGE COUNTY - ON RTE 5 FROM LAKE FOREST DR. TO ALTON PKWY AND ON RTE 405 FROM RTE 5 TO 0.2M NORTH OF IRVINE CENTER DRIVE |
REVEGETATION OF EXPOSED SLOPES FOR NPDES CONCERNS AND SOURCE CONTROL |
|
1 – 10 |
|
November 2013 |
View Details
|
November 30, 2011 |
|
12 -
0L6601
|
ORA -
5 -
10.9/15.2
|
OC. ON RTE 5 FR. PM 10.9 TO 15.2. IN CITIES OF JAN JUAN CAPISTRANO & MISSION VIEJO. |
REPLACE R/W CHAIN LINK FENCE |
|
0 – 1 |
|
February 2012 |
View Details
|
November 30, 2011 |
|
12 -
0F96E1
|
ORA -
5 -
6.2/6.8
|
OC. I-5 FROM S OF PACIFIC COAST HWY TO SAN JUAN CREEK ROAD. |
ADD ONE HOV LANE |
|
40 – 60 |
|
August 2013 |
View Details
|
November 30, 2011 |
|
12 -
0F96C1
|
ORA -
5 -
3.7/6.2
|
OC. I-5 FROM SOUTH OF AVENIDA VISTA HERMOSA TO S OF PACIFIC COAST HWY. |
ADD ONE HOV LANE |
|
40 – 60 |
|
July 2013 |
View Details
|
November 30, 2011 |
|
12 -
0F96A1
|
ORA -
5 -
3.0/3.7
|
OC. I-5 FROM SOUTH OF AVENIDA PICO TO SOUTH OF AVENIDA VISTA HERMOSA |
ADD ONE HOV LANE |
|
60 – 80 |
|
November 2013 |
View Details
|
November 30, 2011 |
|
12 -
0L0701
|
ORA -
5 -
0.0/6.8
|
IN OC. CITY OF SAN CLEMENTE FROM ORA/SAN DIEGO COUNTY LINE TO PCH |
RUBBERIZED HOT MIX ASPHALT TYPE O OVERLAY |
|
1 – 10 |
|
May 2013 |
View Details
|
November 30, 2011 |
|
12 -
0J4001
|
ORA -
39 -
8.8/19.2
|
IN CITIES OF STANTON, ANAHEIM, BUENA PARK, LA MIRADA AND LA HABRA
|
PAVEMENT REHABILITATION FROM ACACIA BLVD TO IMPERIAL HIGHWAY
|
|
10 – 20 |
480-600 |
November 2014 |
View Details
|
November 30, 2011 |
|
12 -
0F0601
|
ORA -
5 -
5.6/6.6
|
IN ORANGE COUNTY IN SAN CLEMENTE AND DANA POINT FROM 0.1 MILE SOUTH OF CAMINO DE ESTRELLA OVERCROSSING TO 0.2 MILES SOUTH OF VIA CALIFORNIA OC AT CAMINO DE ESTRALLA |
WIDEN ROAD AND BRIDGE, PLACE HMA |
Modify Overcrossing |
1 – 10 |
20-30 |
January 2012 |
View Details
|
November 30, 2011 |
|
12 -
0M0201
|
ORA -
1 -
12.2/14.1
|
IN NEWPORT BEACH FROM SCHOOL STATE PARK TO NEWPORT COAST DR |
RHMA-TYPE G OVERLAY |
|
1 – 10 |
|
January 2012 |
View Details
|
November 30, 2011 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
12 -
0H1601
|
ORA -
1 -
25.9/33.7
|
N SR-1 FROM GOLDENWEST ST TO LOS ANGELES/ORANGE COUNTY LINE |
CAPITAL PREVENTIVE MAINTENANCE - RESURFACE THE PAVEMENTS |
|
1 – 10 |
|
June 2013 |
View Details
|
November 30, 2011 |
|
12 -
0L6401
|
ORA -
1 -
23.7/25.9
|
OC. IN HUNTINGTON BEACH FROM BEACH BLVD TO GOLDEN WEST AVE. |
RHMA-TYPE G OVERLAY |
|
1 – 10 |
|
December 2011 |
View Details
|
November 30, 2011 |
|
12 -
0L6101
|
ORA -
1 -
19/0
|
IN NEW PORT BCH CAMPUS AND DOVER ST PEDESTRIAN BRIDGE OVERCROSSING
|
PEDESTRIAN BRIDGE OVERCOSSING
|
|
0 – 1 |
260-330 |
December 2012 |
View Details
|
November 30, 2011 |
|
12 -
0A4301
|
ORA -
1 -
12.1/12.2
|
NB RTE 001 (PCH) & EL MORRO SCHOOL INTERSECTION
|
PROVIDE RIGHT TURN LANE AT NB/PCH
|
|
0 – 1 |
170-220 |
September 2012 |
View Details
|
November 30, 2011 |
|
12 -
0L6901
|
ORA -
1 -
28.3/28.3
|
PCH AT THE INTERSECTION OF BOLSA CHICA SB RD.
|
REMOVE & REPLACE EXISTING PAVEMENT DELINEATION, MARKINGS, ROADSIDE PANELS, UPDGRADE TRAFFIC SIGNALS.
|
|
0 – 1 |
130-160 |
February 2012 |
View Details
|
November 30, 2011 |
|
12 -
0L2901
|
ORA -
1 -
28.7/29.7
|
ORANGE COUNTY. IN CITY HUNTINGTON BEACH, SR-001
|
REMOVE TEMPORARY K-RAILS AND PLACE APPROXIMATELY 500 FEET OF MBGR
|
|
0 – 1 |
70-80 |
November 2011 |
View Details
|
November 30, 2011 |
|
12 -
0E9721
|
ORA -
-
|
IN ORANGE COUNTY
|
CONSTRUCTION OF D-12 EQUIPMENT SERVICE CENTER (PS&E, CONSTRUCTION)
|
|
20 – 40 |
390-490 |
November 2014 |
View Details
|
November 30, 2011 |
|
1 -
459104
|
HUM -
C0999 -
VAR/
|
IN HUMBOLDT COUNTY FROM DIMMICK RD UNDERCROSSING TO APPROXIMATELY 1 MI NORTH OF ENGLEWOOD PARK UC AT VARIOUS LOCATIONS. |
Repair Culverts |
Repair Culverts |
0 – 1 |
40 |
June 2013 |
View Details
|
November 21, 2011 |
|
1 -
0B2404
|
HUM -
C0999 -
VAR/
|
IN HUMBOLDT COUNTY AT VARIOUS LOCATIONS |
|
|
0 – 1 |
|
August 2013 |
View Details
|
November 21, 2011 |
|
1 -
0A8104
|
MEN -
VAR/ -
C0999
|
IN MENDOCINO COUNTY ON ROUTE 1 AT VARIOUS LOCATIONS |
|
|
0 – 1 |
|
August 2013 |
View Details
|
November 21, 2011 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
1 -
0A4704
|
VAR -
C0999 -
VAR/
|
IN MENDOCINO AND LAKE COUNTIES AT VARIOUS LOCATIONS |
|
|
0 – 1 |
|
September 2013 |
View Details
|
November 21, 2011 |
|
1 -
0A4604
|
VAR -
C0999 -
VAR/
|
IN HUMBOLDT AND MENDOCINO COUNTIES AT VARIOUS LOCATIONS |
|
|
0 – 1 |
|
September 2013 |
View Details
|
November 21, 2011 |
|
3 -
4M1604
|
BUT -
032 -
011.7/R023.5
|
NEAR CHICO FROM BRUCE ROAD TO 0.4 MILE WEST OF NOPEL AVENUE |
|
|
1 – 10 |
|
January 2014 |
View Details
|
November 21, 2011 |
|
3 -
3M9204
|
ED -
193 -
006.0/ 012.7
|
FROM 0.2 MILE WEST OF SLIGER MINE ROAD TO GEORGETOWN |
|
|
1 – 10 |
|
January 2014 |
View Details
|
November 21, 2011 |
|
3 -
3M5704
|
SAC -
050 -
014.1/ 023.1
|
NEAR SACRAMENTO ON ROUTE 50 FROM 1.6 MILE EAST OF SUNRISE BOULEVARD TO EL DORADO COUNTY LINE AND ON ROUTE 51 FROM CAPITOL AVENUE TO 0.4 MILE NORTH OF EL CAMINO AVENUE |
|
|
1 – 10 |
|
January 2014 |
View Details
|
November 21, 2011 |
|
3 -
2F0004
|
VAR -
000 -
000.0/R022.9
|
IN BUTTE, COLUSA, GLENN, SACRAMENTO, SUTTER,YOLO, AND YUBA COUNTIES AT VARIOUS LOCATIONS |
|
|
1 – 10 |
|
November 2013 |
View Details
|
November 21, 2011 |
|
3 -
1F7404
|
COL -
020 -
000.0/ 010.2
|
ABOUT 10 MILES WEST OF WILLIAMS FROM LAKE COUNTY LINE TO 6.8 MILES EAST OF ROUTE 16 SOUTH |
|
|
1 – 10 |
|
August 2012 |
View Details
|
November 21, 2011 |
|
1 -
0B4704
|
MEN -
001 -
035.7/
|
IN MENDOCINO COUNTY NEAR ELK AT 1.8 MILES NORTH OF PHILO GREENWOOD RD- 132 |
|
|
0 – 1 |
|
December 2013 |
View Details
|
November 21, 2011 |
|
1 -
0B4604
|
HUM -
299 -
032.0/
|
IN HUMBOLDT COUNTY NEAR WILLOW CREEK AT 1.2 MILES WEST OF EAST FORK WILLOW CREEK BR#4-115 |
|
|
1 – 10 |
|
December 2013 |
View Details
|
November 21, 2011 |
|
1 -
0B4504
|
HUM -
299 -
R010.7/R026.1
|
IN HUMBOLDT COUNTY NEAR BLUE LAKE FROM 0.3 MI WEST OF N FORK MAD RIVER BR#4-194 TO 1.3 MILES WEST OF OLD THREE CR RD#6L250 |
|
|
1 – 10 |
|
December 2013 |
View Details
|
November 21, 2011 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
1 -
0B4304
|
HUM -
101 -
111.4/ 111.6
|
IN HUMBOLDT COUNTY NEAR BIG LAGOON FROM 1.9 TO 2.1 MILES NORTH OF GEORGIA PACIFIC RD |
|
|
1 – 10 |
|
December 2013 |
View Details
|
November 21, 2011 |
|
1 -
0B3804
|
HUM -
096 -
004.1/
|
IN HUMBOLDT COUNTY NEAR WILLOW CREEK AT 1.0 MILES EAST OF PIPELINE OC #4-100 |
|
|
1 – 10 |
|
December 2013 |
View Details
|
November 21, 2011 |
|
1 -
0B3504
|
HUM -
036 -
030.2/
|
IN HUMBOLDT COUNTY NEAR BRIDGEVILLE AT 0.1 MI WEST OF MCCLELLAN MTN RD #7F010 |
|
|
1 – 10 |
|
December 2013 |
View Details
|
November 21, 2011 |
|
1 -
0B3004
|
DN -
101 -
022.0/
|
IN DEL NORTE COUNTY NEAR CRESCENT CITY AT 0.6 MI SOUTH OF HAMILTON ROAD #8070 |
|
|
1 – 10 |
|
December 2013 |
View Details
|
November 21, 2011 |
|
1 -
0B2804
|
DN -
101 -
017.5/
|
IN DEL NORTE COUNTY ABOUT 10 MILES SOUTH OF CRESCENT CITY AT 2.8 MILES NORTH OF MILL CREEK PARK ENTRANCE RD#8068 |
|
|
1 – 10 |
|
December 2013 |
View Details
|
November 21, 2011 |
|
3 -
1F4905
|
SIE -
089 -
015.6/
|
ABOUT 13.0 MILES NORTH OF TRUCKEE AT 0.5 MILE NORTH OF STATE ROUTE 49 |
|
|
0 – 1 |
|
November 2013 |
View Details
|
October 25, 2011 |
|
3 -
4E7605
|
SAC -
005 -
024.5/
|
IN SACRAMENTO, YOLO, AND PLACER COUNTIES AT VARIOUS LOCATIONS |
|
|
0 – 1 |
|
March 2013 |
View Details
|
October 24, 2011 |
|
3 -
1F2904
|
COL -
005 -
000.0/ 034.0
|
IN COLUSA COUNTY ON ROUTE 5 FROM YOLO COUNTY LINE TO GLENN COUNTY LINE |
|
|
0 – 1 |
|
November 2013 |
View Details
|
October 10, 2011 |
|
2 -
4E3104
|
TRI -
299 -
045.5/ 046.2
|
IN TRINITY COUNTY ABOUT 6 MILES WEST OF WEAVERVILLE FROM 0.7 MILE TO 1.1 MILES WEST OF OAK RUN ROAD. |
|
|
0 – 1 |
|
October 2013 |
View Details
|
October 10, 2011 |
|
11 -
2T1201
|
SD -
015 -
M11.9/M31.5
|
IN SD COUNTY IN SD AND ESCONDIDO FM ROUTE 163/15 SEP TO 78/15 SEP.
|
BUS RAPID TRANSIT (BRT) STATIONS ON THE MANAGED LANES (OVERSIGHT
|
Park and Ride Facility |
20 – 40 |
750 |
January 0000 |
View Details
|
October 04, 2011 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
2 -
299714
|
MOD -
299 -
039.3/ 040.6
|
IN MODOC COUNTY IN AND NEAR ALTURAS FROM 0.2 MILE WEST OF MILL STREET TO ROUTE 299/395 SEPARATION |
|
|
1 – 10 |
|
November 2013 |
View Details
|
September 22, 2011 |
|
2 -
0E4504
|
TEH -
005 -
R000.0/ 042.1
|
IN TEHAMA COUNTY AT VARIOUS LOCATIONS FROM 0.2 MILE SOUTH OF LIBERAL AVENUE OVERCROSSING TO 0.1 MILE SOUTH OF BOWMAN ROAD OVERCROSSING |
|
|
1 – 10 |
|
August 2012 |
View Details
|
September 22, 2011 |
|
3 -
1F9004
|
BUT -
L5706 -
|
ON ROUTE 32 AT CHICO MAINTENANCE STATION |
|
|
0 – 1 |
|
February 2013 |
View Details
|
August 30, 2011 |
|
3 -
0F4804
|
GLE -
045 -
003.1/ 007.5
|
ON ROUTE 45 AT COUNTY ROAD 61 AND AT JUNCTION ROUTE 162 WEST AND ON ROUTE 162 AT COUNTY ROAD Z |
|
|
0 – 1 |
|
March 2013 |
View Details
|
August 24, 2011 |
|
1 -
363304
|
HUM -
101 -
079.8/ 087.8
|
IN HUMBOLDT COUNTY FROM EUREKA SLOUGH BRIDGE #4-22 TO ARCATA OVERHEAD BRIDGE #4-79 (KP 128.4/141.3) |
|
|
20 – 40 |
|
May 2012 |
View Details
|
August 22, 2011 |
|
3 -
4M2804
|
SAC -
016 -
T002.5/R023.9
|
IN AND NEAR SACRAMENTO FROM PERKINS JUNCTION AT HOWE AVENUE TO AMADOR COUNTY LINE |
|
|
1 – 10 |
|
March 2013 |
View Details
|
August 22, 2011 |
|
3 -
4M2704
|
BUT -
191 -
000.0/ 011.4
|
ABOUT 7 MILES NORTH OF OROVILLE FROM JUNCTION ROUTE 70 TO PEARSON ROAD IN PARADISE |
|
|
1 – 10 |
|
April 2013 |
View Details
|
August 22, 2011 |
|
3 -
4E5904
|
ED -
049 -
003.7/ 003.9
|
ON ROUTE 49 FROM POSTMILE 3.7 TO 3.9 IN THE VICINITY OF MICA STREET |
|
|
1 – 10 |
|
February 2013 |
View Details
|
August 22, 2011 |
|
3 -
1F6204
|
NEV -
049 -
031.3/ 031.8
|
ABOUT 16 MILES NORTH OF NEVADA CITY FROM 1.4 MILES TO 0.9 MILE SOUTH OF MIDDLE YUBA RIVER BRIDGE 17-09 |
|
|
0 – 1 |
|
December 2012 |
View Details
|
August 22, 2011 |
|
7 -
286604
|
LA -
1 -
0.1 /1.8
|
PROJ CERRITOS CHANNEL TMDL(LA1-.19/ 1.85,2.74/3.96.LA19-3.98/8.4) |
TMDL PROJECT - Stormwater BMP installations. |
Drainage, Reconstruct Culverts |
10 – 20 |
400 |
April 2014 |
View Details
|
August 22, 2011 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
7 -
275404
|
LA -
1 -
1.0
|
Pacific Coast Highway, At Alamitos Bay Bridge |
SEISMC RETROFIT (BRIDGE 53-0064) |
Repair Bridge |
10 – 20 |
400 |
July 2016 |
View Details
|
August 08, 2011 |
|
7 -
273604
|
VEN -
126 -
13.1/20.1
|
In Ventura County between east of Hallock Drive in the City of Santa Paula and west
of E Street in the City of Fillmore. |
INSTALL CONCRETE MEDIAN BARRIER |
Concrete Barrier, Modify Bridge, Reconstruct Bridge Railing |
40 – 60 |
450 |
April 2015 |
View Details
|
July 19, 2011 |
|
3 -
1F3304
|
ED -
193 -
018.6/ 018.8
|
IN EL DORADO COUNTY FROM POSTMILE 18.6 TO 18.8 |
|
|
1 – 10 |
|
April 2013 |
View Details
|
July 12, 2011 |
|
1 -
495604
|
DN -
101 -
022.5/ 023.0
|
IN DEL NORTE COUNTY NEAR CRESCENT CITY FROM 0.2 MI SOUTH TO 0.3 MI NORTH OF HAMILTON ROAD |
|
|
1 – 10 |
|
September 2012 |
View Details
|
July 12, 2011 |
|
1 -
476904
|
DN -
101 -
R004.0/
|
IN DEL NORTE NEAR KLAMATH AT THE KLAMATH RIVER BRIDGE #01-0028 |
|
|
1 – 10 |
180 - 200 |
October 2012 |
View Details
|
June 22, 2011 |
|
2 -
4E3404
|
LAS -
147 -
000.5/ 001.2
|
IN LASSEN COUNTY NEAR WESTWOOD FROM 0.3 MILE NORTH TO 0.5 MILE SOUTH OF SPRING CREEK BRIDGE. |
|
|
1 – 10 |
|
February 2013 |
View Details
|
June 21, 2011 |
|
3 -
0F6804
|
SAC -
080 -
M008.1/M011.1
|
IN AND NEAR SACRAMENTO AT NORTH AVENUE OVERCROSSING 24-106 AND AT THE 80/244 SEPARATION BRIDGE 24-292 R/L |
|
|
1 – 10 |
|
January 2013 |
View Details
|
June 15, 2011 |
|
11 -
29890K
|
SD -
15 -
36.3R/37.3R
|
IN SD CNTY ON I-15 FROM 0.3MI S TO 0.7MI N/O DEER SPRINGS RD |
Ramp Widen |
Ramp |
10 – 20 |
90 |
October 2012 |
View Details
|
June 15, 2011 |
|
3 -
1C0804
|
NEV -
089 -
000.1/ 000.2
|
IN TRUCKEE, AT DONNER CREEK UNDERPASS #17-16 (AKA MOUSEHOLE PROJECT) |
Asphalt Concrete Surfacing,Culverts,Drainage,Earthwork,Erosion Control,Pavement Markers,Pavement Markings,Retaining Wall,Signs,Wheelchair Ramps,Widening,Wing Wall |
Erosion Control, Pavements Markers, Wheelchair Ramps, Widening, Wing Wall, Asphalt Concrete Surfacing, Drainage, Earthwork, Retaining Wall, Signs, Pavements Markings |
20 – 40 |
|
September 2012 |
View Details
|
March 28, 2011 |
|
3 -
4M0804
|
ED -
050 -
053.3/ 056.2
|
NEAR KYBURZ FROM 0.5 MILE WEST OF WRIGHTS LAKE ROAD TO 0.4 MILE WEST OF 41 MILE TRACT ROAD |
|
|
0 – 1 |
|
February 2013 |
View Details
|
March 16, 2011 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
1 -
448304
|
DN -
199 -
026.3/ 026.5
|
NEAR PATRICK CREEK FROM 2.3 KM TO 2.5 KM NORTH OF MIDDLE FORK SMITH RIVER BR #1-16 (KP 42.3/42.6) |
|
|
1 – 10 |
|
April 2013 |
View Details
|
February 22, 2011 |
|
7 -
252404
|
LA -
005 -
27.8/32.4
|
IN GNDL, BRB AND LA FROM WESTERN AVENUE UC TO HOLLYWOOD WAY UC |
SLAB RPL AND GRIND, COLD PLANE OVERLAY |
Groove Pavement, Replace PCC Pavement |
10 – 20 |
840 |
April 2013 |
View Details
|
December 30, 2010 |
|
7 -
284501
|
LA -
2 -
14.2/23.1
|
In Antelope Valley at the Lamont Odett Vista Point. |
Install lighting, native vegetation, and interpretive signs, and provide stormwater mitigation. |
Highway Planting, Lighting |
1 – 10 |
100 |
October 2013 |
View Details
|
December 28, 2010 |
|
7 -
283904
|
LA -
210 -
25.4/28.7
|
In Pasadena, Irwindale, Azusa and Glendora at various locations. |
Vine planting |
Highway Planting |
0 – 1 |
80 |
July 2014 |
View Details
|
December 28, 2010 |
|
7 -
2332E4
|
LA -
5 -
45.4R/59.0
|
IN LA CNTY IN SCTA FR RTE 14 TO PARKER RD |
CONSTRUCT HOV AND TRUCK LANE |
Modify Bridge, Reconstruct Freeway, Reconstruct Interchange, Retaining Wall, Widening |
300 – 350 |
1000 |
December 2015 |
View Details
|
October 27, 2010 |
|
7 -
277204
|
LA -
170 -
17.7R/20.3R
|
IN LA CNTY IN LA ON N/B RTE 170 FR VANOWEN ST TO SHELDON ST |
EROSION CONTROL |
Erosion Control, Highway Planting |
1 – 10 |
250 |
April 2015 |
View Details
|
October 07, 2010 |
|
7 -
276904
|
LA -
210 -
17.7/20.3
|
IN LA CNTY IN LA ON S/B RTE 170 FR VANOWEN ST TO SHELDON ST, |
EROSION CONTROL |
|
1 – 10 |
250 |
April 2015 |
View Details
|
October 07, 2010 |
|
7 -
272504
|
LA -
405 -
12.6/21.1R
|
LA CNTY ON STE RTE 405 BTWN STE RTE 110 & 105 |
PAVEMENT REHABILITATION |
Replace PCC Pavement, Asphalt Concrete Surfacing, Modify Bridge, Freeway and Structures, Widening |
250 – 300 |
750 |
October 2015 |
View Details
|
October 07, 2010 |
|
3 -
1F0404
|
NEV -
020 -
016.7/ 017.4
|
IN NEVADA CITY FROM SACRAMENTO STREET OVERCROSSING TO UREN STREET AT JUNCTION ROUTE 49 NORTH |
|
|
0 – 1 |
|
July 2011 |
View Details
|
August 16, 2010 |
|
2 -
0E4505
|
TEH -
005 -
R000.0/ 042.1
|
IN TEHAMA COUNTY IN AND NEAR RED BLUFF FROM GLENN COUNTY LINE TO SHASTA COUNTY LINE |
|
|
0 – 1 |
|
August 2012 |
View Details
|
June 21, 2010 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
7 -
283804
|
LA -
101 -
1.4 /15.6
|
IN LOS ANGELES COUNTY IN AT VARIOUS LOCATIONS |
VINE PLANTING TRANS ENHANCEMENT |
Highway Planting |
1 – 10 |
200 |
November 2015 |
View Details
|
April 01, 2010 |
|
7 -
210604
|
LA -
71 -
0.5/4.5
|
ON RTE 71 FR RTE 10 TO RTE 60 INTERCHANGE |
RECONSTRUCTION - ADD LANES |
Widening, Freeway, Reconstruct Expressway |
80 – 100 |
1000 |
January 2015 |
View Details
|
April 01, 2010 |
|
7 -
278704
|
LA -
710 -
18.2/18.5
|
IN LOS ANGELES COUNTY, IN SOUTH GATE CITY ON I-710 AT FIRSTONE BLVD INTERCHANGE |
|
Modify Ramp |
1 – 10 |
230 |
March 2014 |
View Details
|
April 01, 2010 |
|
7 -
206904
|
LA -
005 -
47.0/47.7
|
IN LA COUNTY FROM .4 KM N/O WELDON CANYON OC TO .4 KM S/O GAVIN CANYON UC |
RECONSTRUCT PCC PAVEMENT |
|
1 – 10 |
450 |
February 2015 |
View Details
|
April 01, 2010 |
|
7 -
275704
|
LA -
103 -
0.0 /1.0
|
IN LOS ANGELES COUNTY IN LOS AANGELES CITY, BR#53-2626 - UNION PACIFIC OVERHEAD |
PAINT STEEL PORTION OF STRUCTURE |
Clean and Paint Bridge |
1 – 10 |
|
April 2014 |
View Details
|
December 15, 2009 |
|
7 -
280704
|
LA -
101 -
25.3
|
IN LA/VEN COUNTY BETWEEN RTE 27 AND RTE 23 |
BRIDGE CONSTRUCTION |
Bridge |
1 – 10 |
400 |
July 2013 |
View Details
|
December 14, 2009 |
|
7 -
2487U4
|
LA -
210 -
29.2/31.5
|
IN LA COUNTY AT VARIOUS LOCATIONS FROM SIERRA MADRE STN TO SANTA ANITA |
PGL FOOTHILL EXTENSION SEG I |
Modify Bridge |
1 – 10 |
210 |
September 2013 |
View Details
|
July 27, 2009 |
|
7 -
265104
|
LA -
138 -
0.0/36.8
|
ON SR-138, FROM I-5 TO SR-138 |
WIDEN EXISTING SR-138 TO SIX LANE FREEWAY/EXPRESSWAY |
Widening |
500 – 600 |
1080 |
October 2016 |
View Details
|
November 24, 2008 |
|
7 -
203604
|
LA -
014 -
31.8R/53.5R
|
IN LA COUNTY IN SCLA FROM .1KM S/O SANTA CLARA RIVER BR TO SIERRA HGWY OC |
PAVEMENT REHABILITATION |
|
160 – 180 |
590 |
April 2019 |
View Details
|
November 18, 2008 |