District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
1 -
0A1504
|
HUM -
211 -
R074.4/ 079.2
|
IN HUMBOLDT COUNTY NEAR FERNDALE FROM 0.2 MILE SOUTH OF SALT RIVER OVERFLOW BRIDGE TO ROUTE 101 |
|
|
0 – 1 |
|
May 2012 |
View Details
|
January 06, 2012 |
|
1 -
0A2004
|
HUM -
299 -
001.7/R005.6
|
IN HUMBOLDT COUNTY NEAR ARCATA FROM MAD RIVER BRIDGE TO BLUE LAKE UNDERCROSSING |
|
|
0 – 1 |
|
May 2012 |
View Details
|
January 06, 2012 |
|
1 -
0A2104
|
HUM -
101 -
069.9/ 074.8
|
IN HUMBOLDT COUNTY NEAR EUREKA FROM 0.7 MILE SOUTH OF FIELDS LANDING OVERHEAD TO HERRICK AVENUE OVERCROSSING |
|
|
0 – 1 |
|
April 2012 |
View Details
|
November 21, 2011 |
|
1 -
0A2304
|
MEN -
020 -
R000.0/R000.1
|
IN MENDOCINO COUNTY NEAR FORT BRAGG FROM THE JUNCTION OF ROUTE 1 AND 20 TO 0.1 MI EAST OF THE JUNCTION OF ROUTE 1 AND 20 |
|
|
0 – 1 |
|
June 2012 |
View Details
|
January 06, 2012 |
|
1 -
0A2504
|
HUM -
101 -
088.2/ 088.3
|
IN HUMBOLDT COUNTY NEAR ARCATA AT THE ROUTE 101-299 JUNCTION |
|
|
0 – 1 |
|
October 2012 |
View Details
|
October 10, 2011 |
|
1 -
0A3604
|
HUM -
299 -
019.3/ 019.8
|
IN HUMBOLDT COUNTY ABOUT 14 MILES EAST OF BLUE LAKE FROM 0.3 MILE EAST TO 0.8 MILE EAST OF BAIR ROAD |
|
|
1 – 10 |
|
February 2014 |
View Details
|
December 20, 2011 |
|
1 -
0A3804
|
HUM -
255 -
000.2/ 001.3
|
IN HUMBOLDT COUNTY NEAR EUREKA AT THREE LOCATIONS FROM EUREKA CHANNEL BRIDGE TO SAMOA CHANNEL BRIDGE |
Repair Bridge,Rehabilitate Bridge Deck,Replace Joint Seals |
Rehabilitate Bridge Deck, Bridge, Replace Joint Seals |
1 – 10 |
|
October 2012 |
View Details
|
January 06, 2012 |
|
1 -
0A3904
|
VAR -
C0999 -
VAR/
|
IN DEL NORTE & HUMBOLDT COUNTIES AT VARIOUS LOCATIONS |
Rehabilitate Bridge Deck,Replace Bridge Bearings,Replace Joint Seals |
Rehabilitate Bridge Deck, Replace Bridge Bearings, Replace Joint Seals |
0 – 1 |
|
April 2013 |
View Details
|
January 06, 2012 |
|
1 -
0A4004
|
HUM -
C0999 -
VAR/
|
IN HUMBOLDT COUNTY ON ROUTES 96, 169, 200 & 299 AT VARIOUS LOCATIONS |
Repair Bridge,Rehabilitate Bridge Deck,Replace Joint Seals |
Repair Bridge, Rehabilitate Bridge Deck, Replace Joint Seals |
0 – 1 |
|
April 2012 |
View Details
|
January 06, 2012 |
|
1 -
0A4104
|
MEN -
101 -
R089.2/
|
IN MENDOCINO COUNTY NEAR LEGGETT AT CEDAR CREEK CULVERT |
Modify Culverts |
Modify Culverts |
0 – 1 |
|
May 2013 |
View Details
|
January 06, 2012 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
1 -
0A4204
|
MEN -
C0999 -
VAR/
|
IN MENDOCINO COUNTY ON ROUTES 101 AND 253 AT VARIOUS LOCATIONS |
Repair Bridge,Rehabilitate Bridge Deck,Replace Joint Seals |
Replace Joint Seals, Repair Bridge, Rehabilitate Bridge Deck |
0 – 1 |
|
December 2012 |
View Details
|
August 22, 2011 |
|
1 -
0A4304
|
LAK -
C0999 -
VAR/
|
IN LAKE COUNTY ON ROUTES 20 & 29 AT VARIOUS LOCATIONS |
Repair Bridge,Rehabilitate Bridge Deck,Replace Joint Seals |
Replace Joint Seals, Rehabilitate Bridge Deck, Repair Bridge |
0 – 1 |
|
January 2013 |
View Details
|
August 22, 2011 |
|
1 -
0A4404
|
MEN -
C0999 -
VAR/
|
IN MENDOCINO COUNTY ON VARIOUS ROUTES AND AT VARIOUS LOCATIONS |
Clean and Paint Bridge |
Clean and Paint Bridge |
1 – 10 |
|
December 2012 |
View Details
|
October 25, 2011 |
|
1 -
0A4504
|
HUM -
C0999 -
VAR/
|
IN HUMBOLDT COUNTY ON VARIOUS ROUTES AND AT VARIOUS LOCATIONS |
Clean and Paint Bridge |
Clean and Paint Bridge |
1 – 10 |
|
December 2012 |
View Details
|
October 25, 2011 |
|
1 -
0A4604
|
VAR -
C0999 -
VAR/
|
IN HUMBOLDT AND MENDOCINO COUNTIES AT VARIOUS LOCATIONS |
|
|
0 – 1 |
|
September 2013 |
View Details
|
November 21, 2011 |
|
1 -
0A4704
|
VAR -
C0999 -
VAR/
|
IN MENDOCINO AND LAKE COUNTIES AT VARIOUS LOCATIONS |
|
|
0 – 1 |
|
September 2013 |
View Details
|
November 21, 2011 |
|
1 -
0A4904
|
HUM -
299 -
025.0/ 025.7
|
IN HUMBOLDT COUNTY ABOUT 13 MILES WEST OF WILLOW CREEK FROM 0.4 MILES EAST TO 1.1 MILES EAST OF CHEZEM ROAD |
|
|
1 – 10 |
|
January 2014 |
View Details
|
November 21, 2011 |
|
1 -
0A5904
|
MEN -
001 -
042.5/ 044.4
|
IN MENDOCINO COUNTY NEAR ELK AT SALMON CREEK BRIDGE #10-134 AND AT ALBION RIVER BRIDGE #10-136 |
Repair Bridge,Clean and Paint Bridge |
Clean and Paint Bridge, Repair Bridge |
1 – 10 |
|
May 2012 |
View Details
|
September 26, 2011 |
|
1 -
0A6804
|
VAR -
C0099 -
VAR/
|
IN HUMBOLDT, MENDOCINO & LAKE COUNTIES AT VARIOUS LOCATIONS |
|
|
0 – 1 |
|
August 2012 |
View Details
|
November 21, 2011 |
|
1 -
0A7004
|
MEN -
101 -
081.4/R084.7
|
IN MENDOCINO COUNTY NEAR LEGGETT FROM 0.1 MI SOUTH OF RATTLESNAKE CREEK BRIDGE #10-0027 TO CUMMINGS ROAD UNDERCROSSING |
|
|
1 – 10 |
|
February 2012 |
View Details
|
November 21, 2011 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
1 -
0A7304
|
MEN -
020 -
007.0/ 017.3
|
IN MENDOCINO COUNTY NEAR FORT BRAGG FROM 10.3 MILES WEST OF CHAMBERLAIN CREEK BRIDGE TO CHAMBERLAIN CREEK BRIDGE |
|
|
1 – 10 |
|
March 2012 |
View Details
|
November 21, 2011 |
|
1 -
0A7404
|
DN -
101 -
012.6/ 016.5
|
IN DEL NORTE COUNTY NEAR KLAMATH FROM WILSON CREEK BRIDGE TO 3.9 MILES NORTH OF WILSON CREEK BRIDGE |
|
|
1 – 10 |
|
March 2012 |
View Details
|
November 21, 2011 |
|
1 -
0A7804
|
HUM -
255 -
000.5/ 008.3
|
IN HUMBOLDT COUNTY ON ROUTE 255 FROM EUREKA CHANNEL BRIDGE TO 0.1 MILES SOUTH OF K STREET IN ARCATA |
|
|
1 – 10 |
|
August 2012 |
View Details
|
November 21, 2011 |
|
1 -
0A8004
|
MEN -
125 -
026.8/ 030.7
|
IN MENDOCINO COUNTY ON ROUTE 128 FROM CON CREEK TO ROBINSON CREEK BRIDGE |
|
|
1 – 10 |
|
August 2012 |
View Details
|
November 21, 2011 |
|
1 -
0A8104
|
MEN -
VAR/ -
C0999
|
IN MENDOCINO COUNTY ON ROUTE 1 AT VARIOUS LOCATIONS |
|
|
0 – 1 |
|
August 2013 |
View Details
|
November 21, 2011 |
|
1 -
0A8504
|
MEN -
C0999 -
VAT/
|
N MENDOCINO COUNTY ON ROUTE 101 AT EMPIRE CAMP ROADSIDE REST AREA AND GARBERVILLE MAINTENANCE PARK & RIDE |
|
|
0 – 1 |
|
June 2012 |
View Details
|
September 26, 2011 |
|
1 -
0B0004
|
LAK -
020 -
013.5/ 031.4
|
IN LAKE COUNTY IN & NEAR LUCERNE FROM 0.1 MI WEST OF SAYRE AVE TO 0.2 MI WEST OF JUNCTION ROUTE 53 |
|
|
20 – 40 |
|
February 2014 |
View Details
|
January 30, 2012 |
|
1 -
0B1004
|
HUM -
101 -
086.3/ 087.8
|
IN HUMBOLDT COUNTY IN ARCATA FROM THE 11TH STREET OVERCROSSING #2-424 TO THE ARCATA OVERHEAD #4-79 |
|
|
0 – 1 |
|
March 2013 |
View Details
|
January 06, 2012 |
|
1 -
0B2304
|
DN -
101 -
012.2/ 040.1
|
IN DEL NORTE COUNTY AT WILSON CREEK BRIDGE #01-5, SMITH RIVER BRIDGE #1 -20 AND AT ROWDY CREEK BRIDGE #1-23 |
|
|
1 – 10 |
|
August 2013 |
View Details
|
December 20, 2011 |
|
1 -
0B2404
|
HUM -
C0999 -
VAR/
|
IN HUMBOLDT COUNTY AT VARIOUS LOCATIONS |
|
|
0 – 1 |
|
August 2013 |
View Details
|
November 21, 2011 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
1 -
0B2704
|
DN -
101 -
015.1/ 015.3
|
IN DEL NORTE COUNTY ABOUT 10 MILES SOUTH OF CRESCENT CITY FROM 1.3 TO 1.5 MILES NORTH OF RUDISILL ROAD |
|
|
1 – 10 |
|
December 2013 |
View Details
|
December 20, 2011 |
|
1 -
0B2804
|
DN -
101 -
017.5/
|
IN DEL NORTE COUNTY ABOUT 10 MILES SOUTH OF CRESCENT CITY AT 2.8 MILES NORTH OF MILL CREEK PARK ENTRANCE RD#8068 |
|
|
1 – 10 |
|
December 2013 |
View Details
|
November 21, 2011 |
|
1 -
0B2904
|
DN -
101 -
021.7/ 022.9
|
IN DEL NORTE COUNTY NEAR CRESCENT CITY FROM 1 MILE SOUTH TO 0.2 MI NORTH OF HAMILTON ROAD #8070 |
|
|
1 – 10 |
|
September 2013 |
View Details
|
November 21, 2011 |
|
1 -
0B3004
|
DN -
101 -
022.0/
|
IN DEL NORTE COUNTY NEAR CRESCENT CITY AT 0.6 MI SOUTH OF HAMILTON ROAD #8070 |
|
|
1 – 10 |
|
December 2013 |
View Details
|
November 21, 2011 |
|
1 -
0B3104
|
DN -
199 -
008.7/
|
IN DEL NORTE COUNTY NEAR PATRICKS CREEK AT 2.3 MILES SOUTH OF HARDSCRABBLE CR BR #1-8 AND AT 0.3 MI SOUTH OF PATRICKS CR CAMPGROUND |
|
|
1 – 10 |
|
December 2013 |
View Details
|
November 21, 2011 |
|
1 -
0B3204
|
DN -
199 -
024.6/
|
IN DEL NORTE COUNTY NEAR PATRICKS CREEK AT 0.6 MI NORTH OF MID FK SMITH RIVER BR #1-15 |
|
|
1 – 10 |
|
December 2013 |
View Details
|
November 21, 2011 |
|
1 -
0B3304
|
DN -
199 -
026.3/
|
IN DEL NORTE COUNTY NEAR PATRICKS CREEK AT 0.9 MI NORTH OF SISKIYOU FORK RD |
|
|
0 – 1 |
|
December 2013 |
View Details
|
November 21, 2011 |
|
1 -
0B3404
|
HUM -
036 -
022.8/ 027.7
|
IN HUMBOLDT COUNTY NEAR SWAINS FLAT FROM 1.3 MILES WEST TO 3.9 MILES WEST OF VAN DUZEN RIVER BR#4-293 |
|
|
1 – 10 |
|
September 2013 |
View Details
|
November 21, 2011 |
|
1 -
0B3504
|
HUM -
036 -
030.2/
|
IN HUMBOLDT COUNTY NEAR BRIDGEVILLE AT 0.1 MI WEST OF MCCLELLAN MTN RD #7F010 |
|
|
1 – 10 |
|
December 2013 |
View Details
|
November 21, 2011 |
|
1 -
0B3604
|
HUM -
036 -
035.5/ 040.5
|
IN HUMBOLDT COUNTY NEAR DINSMORE FROM 0.1 MI EAST OF SFK VAN DUZEN RIVER BR#4-119 TO 0.1 MI EAST OF VAN DUZEN RIVER BR#4-129 |
|
|
1 – 10 |
|
September 2013 |
View Details
|
November 21, 2011 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
1 -
0B3704
|
HUM -
036 -
044.4/
|
IN HUMBOLDT COUNTY NEAR DINSMORE AT 1.2 MILES WEST OF THE HUMBOLDT- TRINITY COUNTY LINE |
|
|
1 – 10 |
|
December 2013 |
View Details
|
November 21, 2011 |
|
1 -
0B3804
|
HUM -
096 -
004.1/
|
IN HUMBOLDT COUNTY NEAR WILLOW CREEK AT 1.0 MILES EAST OF PIPELINE OC #4-100 |
|
|
1 – 10 |
|
December 2013 |
View Details
|
November 21, 2011 |
|
1 -
0B3904
|
HUM -
096 -
008.5/ 008.7
|
IN HUMBOLDT COUNTY NEAR WILLOW CREEK FROM 0.2 TO 0.4 MI EAST OF END SIDEHILL VIADUCT2 #4-289 |
|
|
1 – 10 |
|
December 2013 |
View Details
|
November 21, 2011 |
|
1 -
0B4004
|
HUM -
101 -
R015.0/
|
IN HUMBOLDT COUNTY NEAR REDWAY AT 1.5 MILES SOUTH OF HURLBUTT UC# 4-213 AND AT 1.1 MILES SOUTH OF WILLIFORD RD UC# 4-117 |
|
|
1 – 10 |
|
December 2013 |
View Details
|
November 21, 2011 |
|
1 -
0B4104
|
HUM -
101 -
R040.9/
|
IN HUMBOLDT COUNTY NEAR REDCREST AT 1.1 MILES NORTH OF REDCREST NB ONRAMP |
|
|
1 – 10 |
|
September 2013 |
View Details
|
November 21, 2011 |
|
1 -
0B4204
|
HUM -
101 -
110.6/
|
|
|
|
1 – 10 |
|
December 2013 |
View Details
|
November 21, 2011 |
|
1 -
0B4304
|
HUM -
101 -
111.4/ 111.6
|
IN HUMBOLDT COUNTY NEAR BIG LAGOON FROM 1.9 TO 2.1 MILES NORTH OF GEORGIA PACIFIC RD |
|
|
1 – 10 |
|
December 2013 |
View Details
|
November 21, 2011 |
|
1 -
0B4404
|
HUM -
169 -
026.4/ 029.9
|
IN HUMBOLDT COUNTY NEAR WEITCHPEC FROM 0.6 MI WEST OF MINERS CREEK BR #4-299 TO MARTINS FERRY BR#4-223 |
|
|
1 – 10 |
|
September 2013 |
View Details
|
November 21, 2011 |
|
1 -
0B4504
|
HUM -
299 -
R010.7/R026.1
|
IN HUMBOLDT COUNTY NEAR BLUE LAKE FROM 0.3 MI WEST OF N FORK MAD RIVER BR#4-194 TO 1.3 MILES WEST OF OLD THREE CR RD#6L250 |
|
|
1 – 10 |
|
December 2013 |
View Details
|
November 21, 2011 |
|
1 -
0B4604
|
HUM -
299 -
032.0/
|
IN HUMBOLDT COUNTY NEAR WILLOW CREEK AT 1.2 MILES WEST OF EAST FORK WILLOW CREEK BR#4-115 |
|
|
1 – 10 |
|
December 2013 |
View Details
|
November 21, 2011 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
1 -
0B4704
|
MEN -
001 -
035.7/
|
IN MENDOCINO COUNTY NEAR ELK AT 1.8 MILES NORTH OF PHILO GREENWOOD RD- 132 |
|
|
0 – 1 |
|
December 2013 |
View Details
|
November 21, 2011 |
|
1 -
0B5004
|
MEN -
101 -
003.7/ 005.3
|
IN MENDOCINO COUNTY NEAR HOPLAND FROM 0.6 MI NORTH OF COMMINSKY STA RD-103 TO 0.6 MI NORTH OF PIETA CR BRIDGE #10-83 |
|
|
1 – 10 |
|
December 2013 |
View Details
|
November 21, 2011 |
|
1 -
0B5104
|
MEN -
101 -
R087.4/R100.4
|
IN MENDOCINO COUNTY ABOUT 18 MILES NORTH OF LAYTONVILLE FROM 0.3 MI SOUTH OF THE ROUTE 101/271 JUNCTION TO RED MOUNTAIN CREEK BR#10-35 |
|
|
1 – 10 |
|
December 2013 |
View Details
|
November 21, 2011 |
|
1 -
0B5204
|
MEN -
128 -
039.5/ 039.8
|
IN MENDOCINO COUNTY NEAR YORKVILLE FROM 0.7 TO 1.0 MILES EAST OF BEEBE CR BR#10-52 |
|
|
1 – 10 |
|
December 2013 |
View Details
|
November 21, 2011 |
|
1 -
0B5404
|
MEN -
162 -
013.9/ 022.7
|
IN MENDOCINO COUNTY NEAR DOS RIOS FROM 1.2 MILES WEST OF MID FK EEL RIVER #10-252 TO 2.8 MILES EAST OF SAND BANK CREEK |
|
|
1 – 10 |
|
December 2013 |
View Details
|
November 21, 2011 |
|
1 -
0B5504
|
MEN -
162 -
016.1/
|
IN MENDOCINO COUNTY NEAR DOS RIOS AT 0.9 MI EAST OF LAYTONVILLE-DOS RIOS |
|
|
1 – 10 |
|
December 2013 |
View Details
|
November 21, 2011 |
|
1 -
0B5604
|
MEN -
253 -
001.5/ 001.8
|
IN MENDOCINO COUNTY NEAR BOONVILLE FROM 0.2 MI WEST TO 0.1 MI EAST OF SINGLY CATTLE PASS |
|
|
0 – 1 |
|
December 2013 |
View Details
|
November 21, 2011 |
|
1 -
0B5704
|
MEN -
253 -
006.8/
|
IN MENDOCINO COUNTY NEAR BOONVILLE AT 3.4 MILES EAST OF SODA CREEK BR# 10-229 |
|
|
1 – 10 |
|
December 2013 |
View Details
|
November 21, 2011 |
|
1 -
0B6304
|
DN -
101 -
022.5/ 023.0
|
IN DEL NORTE COUNTY NEAR CRESCENT CITY FROM 0.2 MI SOUTH TO 0.3 MI NORTH OF HAMILTON ROAD INTERSECTION |
|
|
1 – 10 |
|
July 2012 |
View Details
|
December 20, 2011 |
|
1 -
0B7004
|
HUM -
101 -
079.9/ 085.5
|
IN HUMBOLDT COUNTY NEAR EUREKA FROM EUREKA SLOUGH BRIDGES #4-22 TO THE ROUTE 101/255 SEPARATION #4-49 |
|
|
0 – 1 |
|
May 2012 |
View Details
|
January 06, 2012 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
1 -
0B7704
|
HUM -
096 -
023.1/ 029.9
|
IN HUMBOLDT COUNTY NEAR WEITCHPEC FROM KLAMATH RIVER BRIDGE #4-144 TO SLATE CREEK BRIDGE |
|
|
0 – 1 |
|
May 2013 |
View Details
|
January 30, 2012 |
|
1 -
0B7904
|
VAR -
C0999 -
VAR/
|
IN HUMBOLDT AND MENDOCINO COUNTIES AT VARIOUS LOCATIONS |
|
|
0 – 1 |
|
July 2013 |
View Details
|
January 30, 2012 |
|
1 -
0B8004
|
MEN -
001 -
040.3/ 043.7
|
IN MENDOCINO COUNTY NEAR ALBION FROM NAVARRO RIVER BRIDGE TO ALBION RIVER BRIDGE |
|
|
1 – 10 |
|
May 2013 |
View Details
|
January 30, 2012 |
|
1 -
0B8104
|
MEN -
101 -
R084.7/T091.3
|
IN MENDOCINO COUNTY NEAR LEGGETT FROM CUMMINGS ROAD UNDERCROSSING TO 0.6 MILE SOUTH OF JITNEY GULCH BRIDGE |
|
|
1 – 10 |
|
May 2013 |
View Details
|
January 30, 2012 |
|
1 -
262004
|
MEN -
101 -
R043.1/ 049.0
|
NEAR WILLITS FROM 1.3 KM S HEAHL OH TO 2.9 KM S OF REYNOLDS HIGHWAY (WILLITS BYPASS) |
Asphalt Concrete Surfacing,Bridge,Bridge Railing,Concrete Barrier,Culverts,Culverts,Drainage,Earthwork,Electrical Facilities,Erosion Control,Expressway,Fence,Flashing Beacons,Reconstruct Freeway,Freeway and Structures,Grading and Paving,Guard Railing,Interchange,Lighting,Overcrossing,Overhead,Pavement Markers,Pavement Markings,Ramp,Retaining Wall,Roadway,Rock Slope Protection,Viaduct,Wastewater Disposal System,Water Supply System,Wheelchair Ramps,Wing Wall |
Wheelchair Ramps, Water Supply System, Wastewater Disposal System, Viaduct, Guard Railing, Interchange, Lighting, Overcrossing, Erosion Control, Electrical Facilities, Overhead, Bridge Railing, Asphalt Concrete Surfacing, Earthwork, Drainage, Culverts, Concrete Barrier, Expressway, Flashing Beacons, Fence, Roadway, Retaining Wall, Ramp, Pavements Markings, Pavements Markers, Wing Wall, Reconstruct Freeway, Freeway and Structures, Bridge, Rock Slope Protection, Grading and Paving |
160 – 180 |
520 |
May 2012 |
View Details
|
August 22, 2011 |
|
1 -
296114
|
HUM -
255 -
007.7/
|
IN HUMBOLDT COUNTY NEAR ARCATA AT MCDANIEL SLU BRIDGE #4-222 |
|
|
0 – 1 |
|
June 2013 |
View Details
|
October 25, 2011 |
|
1 -
296124
|
HUM -
299 -
R004.2/
|
IN HUMBOLDT COUNTY NEAR BLUE LAKE AT MILL CREEK BRIDGE #4-188
|
|
|
0 – 1 |
|
May 2012 |
View Details
|
October 10, 2011 |
|
1 -
323304
|
HUM -
036 -
005.9/ 007.6
|
IN HUMBOLDT COUNTY AT CARLOTTA FROM WILSON LANE TO 0.5 MILE WEST OF CUMMINGS CREEK ROAD |
Widening |
Widening |
1 – 10 |
165 |
August 2012 |
View Details
|
August 22, 2011 |
|
1 -
363304
|
HUM -
101 -
079.8/ 087.8
|
IN HUMBOLDT COUNTY FROM EUREKA SLOUGH BRIDGE #4-22 TO ARCATA OVERHEAD BRIDGE #4-79 (KP 128.4/141.3) |
|
|
20 – 40 |
|
May 2012 |
View Details
|
August 22, 2011 |
|
1 -
363604
|
MEN -
128 -
031.0/ 038.8
|
IN MENDOCINO COUNTY NEAR BOONVILLE FROM 0.5 KM EAST OF ROBINSON CREEK BRIDGE TO 4.2 KM EAST OF MAPLE CREEK BRIDGE (KP 49.9/62.4) |
AC overlay, digouts, cold planing, replace AC dike, shld backing, upgrade MBGR. CAPM. |
|
1 – 10 |
100 |
May 2011 |
View Details
|
January 25, 2011 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
1 -
363704
|
MEN -
128 -
038.8/ 050.9
|
IN MENDOCINO COUNTY NEAR YORKVILLE FROM BEEBE CREEK BRIDGE TO THE SONOMA COUNTY LINE. (KP 62.4/81.9)_________ |
AC overlay, digouts, cold planing, replace AC dike, shld backing, upgrade MBGR. CAPM. |
|
1 – 10 |
100 |
May 2011 |
View Details
|
January 25, 2011 |
|
1 -
364324
|
MEN -
020 -
013.8/R032.0
|
IN MENDOCINO COUNTY NEAR WHISKEY SPRING AND WILLITS FROM SOUTH OF SOUTH FORK NOYO RIVER TO WEST OF CROPLEY LANE; ALSO ON ROUTE 1 AND ON ROUTE 101 |
Replace Culverts |
Replace Culverts |
1 – 10 |
100 |
September 2012 |
View Details
|
June 22, 2011 |
|
1 -
378124
|
MEN -
128 -
048.6/ 050.3
|
IN MENDOCINO COUNTY NEAR YORKVILLE ON RTE 128 ROM 0.2 TO 1.9 MILES EAST OF MOUNTAIN HOUSE RD AND ON ROUTE 253 FROM 0.2 MI WEST TO 9.9 MI EAST OF SODA CREEK BR #10-229 |
Replace Culverts |
Replace Culverts |
1 – 10 |
70 |
June 2012 |
View Details
|
October 10, 2011 |
|
1 -
378134
|
MEN -
128 -
030.1/ 048.4
|
IN MENDOCINO COUNTY NEAR BOONVILLE FROM 0.5 MILE EAST OF THE ROUTE 253 /128 JUNCTION TO MOUNTAIN HOUSE RD |
Replace Culverts |
Replace Culverts |
1 – 10 |
70 |
August 2012 |
View Details
|
January 06, 2012 |
|
1 -
378144
|
MEN -
128 -
010.6/ 023.3
|
IN MENDOCINO COUNTY NEAR PHILO FROM 1.0 MILE WEST OF NAVARRO RIDGE ROAD TO INDIAN CREEK BRIDGE #10-67 |
|
|
1 – 10 |
|
February 2013 |
View Details
|
January 11, 2011 |
|
1 -
378164
|
MEN -
128 -
014.3/ 040.6
|
IN MENDOCINO COUNTY NEAR BOONVILLE FROM 3.6 MILES WEST OF MILL CREEK BR #10-73 TO 1.8 MILES EAST OF BEEBE CREEK BR #10-52 |
Replace Culverts |
Replace Culverts |
1 – 10 |
170 |
September 2012 |
View Details
|
May 11, 2011 |
|
1 -
378174
|
MEN -
128 -
000.2/ 011.1
|
NEAR NAVARRO FROM EAST TO ROUTE 1 TO WEST OF FLYNN CREEK BRIDGE REHAB CULVERTS |
REPLACE CULVERTS |
Replace Culverts |
1 – 10 |
|
September 2013 |
View Details
|
July 12, 2011 |
|
1 -
385724
|
MEN -
001 -
092.8/ 092.8
|
NEAR FT. BRAGG FROM 18.6MI NORTH TO 22.7 MILES NORTH OF TEN MILE RIVER BR. REQUIRED MITIGATION (FISH PASS- AGE/CULVERT REHAB) |
Replace Culverts,Repair Drainage |
Repair Drainage, Replace Culverts |
1 – 10 |
120 - 240 |
July 2012 |
View Details
|
November 21, 2011 |
|
1 -
398704
|
MEN -
175 -
000.0/ 009.9
|
IN MENDOCINO & LAKE COUNTIES NEAR HOPLAND FROM THE JUNCTION OF ROUTES 101 & 175 TO 1.0 KM EAST OF THE MENDOCINO/LAKE COUNTY LINE. |
Asphalt Concrete Surfacing |
Asphalt Concrete Surfacing |
1 – 10 |
|
May 2011 |
View Details
|
August 22, 2011 |
|
1 -
399404
|
LAK -
175 -
004.9/ 028.0
|
IN LAKE COUNTY NEAR KELSEYVILLE FROM 7.9 KM EAST OF THE MENDOCINO/ LAKE COUNTY LINE TO ROUTE 175/29 JUNCTION. (KP 7.9/45.1) |
Asphalt Concrete Surfacing |
Asphalt Concrete Surfacing |
10 – 20 |
|
May 2011 |
View Details
|
August 31, 2011 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
1 -
402804
|
MEN -
101 -
046.2/R084.6
|
IN MENDOCINO COUNTY FROM 0.5 KM NORTH OF BAECHTEL CREEK BRIDGE #10-13 TO 0.2 KM SOUTH OF CUMMINGS ROAD UNDERCROSSING #10-172 (KP 74.3/R136.1 |
Culverts |
Culverts |
1 – 10 |
80 |
October 2012 |
View Details
|
May 11, 2011 |
|
1 -
409504
|
HUM -
254 -
006.8/ 042.1
|
IN HUMBOLDT COUNTY NEAR MIRANDA FROM 2.3 MILES SOUTH OF MIRANDA POST OFFICE TO 0.9 MILE SOUTH OF BEAR CREEK BRIDGE #4-12 |
|
|
0 – 1 |
|
August 2013 |
View Details
|
June 15, 2011 |
|
1 -
412214
|
MEN -
101 -
R084.0/
|
IN MENDOCINO COUNTY ABOUT 11.4 KM SOUTH OF LEGGETT AT RATTLESNAKE CREEK BR #10-0029 |
Reconstruct Culverts,Erosion Control,Establish Existing Planting,Rock Slope Protection |
Erosion Control, Reconstruct Culverts, Establish Existing Planting |
0 – 1 |
79 - 90 |
December 2012 |
View Details
|
November 21, 2011 |
|
1 -
423704
|
HUM -
299 -
020.2/ 020.5
|
IN HUMBOLDT COUNTY ABOUT 14 MILES EAST OF BLUE LAKE FROM 0.2 TO 0.5 MI WEST OF CHEZEM ROAD #6L200 |
|
|
10 – 20 |
|
August 2012 |
View Details
|
June 22, 2011 |
|
1 -
430604
|
HUM -
254 -
000.8/ 043.1
|
IN HUMBOLDT COUNTY AT VARIOUS LOCATIONS FROM OHMAN CREEK BRIDGE #4-7 TO BEAR CREEK BRIDGE #4-12 (KP 1.3/69.4) |
|
|
1 – 10 |
|
January 2014 |
View Details
|
December 20, 2011 |
|
1 -
431704
|
HUM -
101 -
002.3/ 066.3
|
HUM CO @ VARIOUS LOC\'S ON RT 101 FR 0.7 MI NO OF RICHARDSON GROVE UC TO 0.4 MI NO OF LOLETA DR OC & ON RT 254 FR 0.5 MI NO OF JUNCTION 101/ 254 TO 0.3 MI SO OF MYERS FLAT SEP. |
CULVERT REHABILITATION |
Repair Culverts |
0 – 1 |
50 |
April 2012 |
View Details
|
October 10, 2011 |
|
1 -
437404
|
HUM -
299 -
030.7/
|
IN HUMBOLDT COUNTY ABOUT 8 MI WEST OF WILLOW CREEK AT 2.5 MI WEST OF E FORK WILLOW CREEK BRIDGE (KP 49.5) |
Repair Slope,Repair Roadway |
Repair Slope, Repair Roadway |
0 – 1 |
60-120 |
October 2012 |
View Details
|
October 10, 2011 |
|
1 -
448304
|
DN -
199 -
026.3/ 026.5
|
NEAR PATRICK CREEK FROM 2.3 KM TO 2.5 KM NORTH OF MIDDLE FORK SMITH RIVER BR #1-16 (KP 42.3/42.6) |
|
|
1 – 10 |
|
April 2013 |
View Details
|
February 22, 2011 |
|
1 -
450004
|
DN -
199 -
022.7/ 023.0
|
IN DEL NORTE COUNTY NEAR PATRICKS CREEK FROM 0.9 KM TO 1.4 KM NORTH OF PATRICKS CREEK ROAD (KP 36.5/37.0) |
Widening |
Widening |
1 – 10 |
120 |
April 2012 |
View Details
|
August 16, 2010 |
|
1 -
450904
|
HUM -
169 -
013.6/ 033.8
|
IN HUMBOLDT COUNTY AT VARIOUS LOCATIONS FROM 0.8 MILES WEST OF PECWAN CREEK BRIDGE TO THE JUNCTION OF ROUTE 96/169 |
Asphalt Concrete Surfacing,Modify Drainage,Earthwork,Erosion Control,Grading and Paving,Guard Railing,Pavement Markers,Pavement Markings,Realign Curve,Retaining Wall,Widening |
Grading and Paving, Widening, Realign Curve, Retaining Wall, Pavements Markers, Pavements Markings, Asphalt Concrete Surfacing, Modify Drainage, Guard Railing, Earthwork, Erosion Control |
1 – 10 |
350 |
May 2013 |
View Details
|
March 29, 2011 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
1 -
454904
|
DN -
197 -
003.2/ 004.4
|
IN DEL NORTE COUNTY NEAR FORT DICK FROM 1.3 KM TO 0.5 KM SOUTH OF RUBY VANDEVENTER COUNTY PARK (KP 6.0/6.4) |
WIDENING |
Widening |
0 – 1 |
65 |
April 2013 |
View Details
|
March 29, 2011 |
|
1 -
459104
|
HUM -
C0999 -
VAR/
|
IN HUMBOLDT COUNTY FROM DIMMICK RD UNDERCROSSING TO APPROXIMATELY 1 MI NORTH OF ENGLEWOOD PARK UC AT VARIOUS LOCATIONS. |
Repair Culverts |
Repair Culverts |
0 – 1 |
40 |
June 2013 |
View Details
|
November 21, 2011 |
|
1 -
459704
|
HUM -
101 -
098.1/ 100.7
|
IN HUMBOLDT COUNTY AT VARIOUS LOCATIONS FROM WESTHAVEN DRIVE UC TO TRINIDAD ROAD UNDERCROSSING |
|
|
1 – 10 |
|
March 2013 |
View Details
|
February 22, 2011 |
|
1 -
463904
|
HUM -
CO999 -
VAR/
|
IN HUMBOLDT COUNTY AT VARIOUS LOCATIONS |
Replace Guard Railing |
Replace Guard Railing |
1 – 10 |
|
November 2012 |
View Details
|
August 22, 2011 |
|
1 -
464204
|
MEN -
C0999 -
VAR/
|
IN MENDOCINO COUNTY AT VARIOUS LOCATIONS |
Reconstruct Guard Railing |
Reconstruct Guard Railing |
1 – 10 |
300 |
January 2012 |
View Details
|
October 10, 2011 |
|
1 -
464804
|
HUM -
101 -
001.1/ 002.2
|
IN HUMBOLDT COUNTY NEAR GARBERVILLE FROM 0.5 MI SOUTH TO 0.5 MI NORTH OF RICHARDSON GROVE UC |
Asphalt Concrete Surfacing,Erosion Control,Grading and Paving,Realign Curve,Realignment,Retaining Wall |
Retaining Wall, Realignment, Realign Curve, Grading and Paving, Erosion Control, Asphalt Concrete Surfacing |
1 – 10 |
170 - 190 |
April 2011 |
View Details
|
January 11, 2011 |
|
1 -
465304
|
DN -
101 -
R002.7/ 008.8
|
IN DEL NORTE COUNTY NEAR KLAMATH FROM 2.4 MILES NORTH OF NB ON NEWTON B DRURY PARKWAY TO NEW HUNTER CREEK ROAD. |
|
|
0 – 1 |
|
May 2012 |
View Details
|
June 22, 2011 |
|
1 -
465804
|
MEN -
001 -
014.7/ 021.8
|
IN MENDOCINO COUNTY IN AND NEAR POINT ARENA FROM 0.5 MI SOUTH OF POINT ARENA SCHOOL TO 0.4 MI NORTH OF KINNEY ROAD-RD 511 |
|
|
0 – 1 |
|
February 2012 |
View Details
|
June 22, 2011 |
|
1 -
465904
|
MEN -
001 -
021.0/ 024.6
|
IN MENDOCINO COUNTY NEAR MANCHESTER FROM CRISPIN ROAD TO POMO LAKE DR. (KP 33.8/39.6) |
|
|
0 – 1 |
|
November 2013 |
View Details
|
September 22, 2011 |
|
1 -
474404
|
HUM -
299 -
R008.5/
|
IN HUMBOLDT COUNTY NEAR BLUE LAKE AT 1.8 MI EAST OF BUCKLEY ROAD AND AT 0.1 MILE EAST OF COUNTY ROAD 375 THREE CREEK ROAD. |
Asphalt Concrete Surfacing,Replace Culverts,Culverts,Drainage,Erosion Control,Grading and Paving,Realign Curve,Repair Storm Damage |
Repair Storm Damage, Drainage, Replace Culverts, Asphalt Concrete Surfacing, Realign Curve, Erosion Control, Grading and Paving |
1 – 10 |
200 |
December 2011 |
View Details
|
October 10, 2011 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
1 -
474904
|
MEN -
001 -
070.5/
|
IN MENDOCINO COUNTY NEAR WESTPORT FROM 0.8 MI NORTH OF TEN MILE RIVER BRIDGE TO 4.2 MI SOUTH OF BLUE SLIDE GULCH BRIDGE |
Repair Slope,Repair Storm Damage |
Repair Storm Damage, Repair Slope |
1 – 10 |
45 |
November 2012 |
View Details
|
January 06, 2012 |
|
1 -
475024
|
HUM -
254 -
011.0/ 011.1
|
NEAR MIRANDA, 0.2 MILE NORTH OF BRIDGE CREEK. |
Asphalt Concrete Surfacing,Replace Culverts,Repair Storm Damage,Reconstruct Roadway |
Reconstruct Roadway, Replace Culverts, Repair Storm Damage, Asphalt Concrete Surfacing |
1 – 10 |
40 |
August 2012 |
View Details
|
August 23, 2011 |
|
1 -
476604
|
MEN -
128 -
034.5/ 035.5
|
IN MENDOCINO COUNTY ABOUT 4.9 MILES EAST OF BOONVILLE FROM SHEARING CREEK BRIDGE #10-59 TO 0.7 MI WEST OF MAPLE CREEK BRIDGE #10-55 |
Repair Storm Damage |
Repair Storm Damage |
1 – 10 |
180 |
October 2012 |
View Details
|
November 16, 2010 |
|
1 -
476904
|
DN -
101 -
R004.0/
|
IN DEL NORTE NEAR KLAMATH AT THE KLAMATH RIVER BRIDGE #01-0028 |
|
|
1 – 10 |
180 - 200 |
October 2012 |
View Details
|
June 22, 2011 |
|
1 -
479404
|
DN -
199 -
020.5/ 025.7
|
IN DEL NORTE COUNTY NEAR PATRICK CREEK FROM 1.5 MI SOUTH OF PATRICK CREEK TO 5 MI NORTH OF PATRICK CREEK. |
|
|
10 – 20 |
|
August 2013 |
View Details
|
January 06, 2012 |
|
1 -
481104
|
DN -
197 -
004.5/
|
IN DEL NORTE COUNTY NEAR FORT DICK AT THE ENTRANCE TO RUBY VAN DEVENTER COUNTY PARK |
Widening |
Widening |
0 – 1 |
50 |
August 2012 |
View Details
|
October 10, 2011 |
|
1 -
484704
|
MEN -
001 -
040.1/ 040.9
|
IN MENDOCINO COUNTY ON STATE ROUTE 1 FROM 0.2 MI SOUTH TO 0.6 MI NORTH OF JUNCTION STATE ROUTE 128, AND ON STATE ROUTE 128 FROM 0.0 MI WEST TO 0.2 MI EAST OF JUNCTION STATE RTE 1 |
Asphalt Concrete Surfacing,Guard Railing,Widening |
Asphalt Concrete Surfacing, Guard Railing, Widening |
1 – 10 |
80 |
March 2013 |
View Details
|
March 29, 2011 |
|
1 -
488604
|
LAK -
020 -
008.1/ 008.6
|
IN LAKE COUNTY NEAR UPPER LAKE AT THE INTERSECTION OF ROUTES 20/29 |
Asphalt Concrete Surfacing,Channelize,Culverts,Drainage,Earthwork,Electrical Facilities,Erosion Control,Flashing Beacons,Grading and Paving,Highway Planting,Lighting,Pavement Markers,Pavement Markings,Realignment,Signals,Widening |
Earthwork, Channelize, Culverts, Drainage, Electrical Facilities, Erosion Control, Flashing Beacons, Highway Planting, Lighting, Pavements Markers, Asphalt Concrete Surfacing, Grading and Paving, Pavements Markings, Realignment, Signals, Widening |
1 – 10 |
110 |
December 2013 |
View Details
|
January 30, 2012 |
|
1 -
490704
|
MEN -
020 -
019.9/ 026.3
|
IN MENDOCINO COUNTY ABOUT 7 MILES WEST OF WILLITS FROM 0.1 MILE WEST TO 6.2 MILES EAST OF JAMES CREEK BRIDGE #10-102 |
Asphalt Concrete Surfacing |
Asphalt Concrete Surfacing |
1 – 10 |
50-70 |
March 2012 |
View Details
|
June 22, 2011 |
|
1 -
491214
|
LAK -
029 -
011.9/ 019.1
|
IN LAKE COUNTY ON ROUTE 29 FROM COYOTE CREEK BRIDGE TO JUNCTION ROUTE 53 |
|
|
1 – 10 |
|
October 2012 |
View Details
|
June 22, 2011 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
1 -
495604
|
DN -
101 -
022.5/ 023.0
|
IN DEL NORTE COUNTY NEAR CRESCENT CITY FROM 0.2 MI SOUTH TO 0.3 MI NORTH OF HAMILTON ROAD |
|
|
1 – 10 |
|
September 2012 |
View Details
|
July 12, 2011 |
|
1 -
496504
|
HUM -
101 -
060.3/
|
IN HUMBOLDT COUNTY IN FORTUNA AT THE FORTUNA MAINTENANCE STATION |
|
|
1 – 10 |
|
February 2014 |
View Details
|
December 20, 2011 |
|
1 -
496604
|
VAR -
C0999 -
VAR/
|
IN HUMBOLDT & MENDOCINO COUNTIES ON ROUTES 101 & 271 AT VARIOUS LOCATIONS |
Repair Bridge Railing,Rehabilitate Bridge Deck,Replace Bridge Bearings,Replace Joint Seals |
Repair Bridge, Replace Joint Seals, Replace Bridge Bearings, Rehabilitate Bridge Deck |
0 – 1 |
|
February 2012 |
View Details
|
November 21, 2011 |
|
1 -
497104
|
MEN -
271 -
007.2/
|
IN MENDOCINO COUNTY NEAR LEGGETT AT THE LEGGETT MAINTENANCE STATION |
Maintenance Station |
Maintenance Station |
0 – 1 |
|
June 2013 |
View Details
|
August 23, 2011 |
|
1 -
497714
|
MEN -
001 -
002.3/ 002.5
|
IN MENDOCINO COUNTY NEAR GUALALA FROM 0.1 TO 2.5 MI NORTH OF BIG GULCH ROAD RD# 543 |
Repair Culverts,Guard Railing,Repair Storm Damage |
Repair Culverts, Repair Guard Railing, Repair Storm Damage |
1 – 10 |
|
November 2013 |
View Details
|
September 22, 2011 |
|
1 -
498804
|
HUM -
101 -
R045.9/R047.6
|
IN HUMBOLDT COUNTY NEAR STAFFORD FROM THE JORDAN RD/RTE 254 JUNCTION TO 0.3 MI SOUTH OF THE STAFFORD RD OFFRAMP, NORTHBOUND |
|
|
0 – 1 |
|
March 2012 |
View Details
|
July 28, 2010 |
|
1 -
499104
|
DN -
101 -
000.9/ 020.3
|
IN DEL NORTE COUNTY FROM THE HUMBOLDT/DEL NORTE COUNTY LINE TO 3.0 MILES SOUTH OF MILL CREEK ROAD AT VARIOUS LOCATIONS |
|
|
0 – 1 |
|
April 2013 |
View Details
|
January 30, 2012 |
|
2 -
0E3604
|
TEH -
005 -
010.5/
|
IN TEHAMA COUNTY NEAR CORNING AT CORNING SAFETY ROADSIDE REST AREA |
Replace Building,Erosion Control,Highway Planting,Replace Irrigation System,Replace Lighting,Retaining Wall,Wheelchair Ramps |
Replace Irrigation System, Wheelchair Ramps, Replace Lighting, Retaining Wall, Erosion Control, Highway Planting, Replace Building |
1 – 10 |
|
June 2012 |
View Details
|
January 06, 2012 |
|
2 -
0E4004
|
SHA -
005 -
062.3/
|
IN SHASTA COUNTY NEAR DUNSMUIR AT CASTELLA VISTA POINT |
|
|
0 – 1 |
|
August 2012 |
View Details
|
January 06, 2012 |
|
2 -
0E4404
|
SIS -
097 -
002.5/ 002.9
|
IN SISKIYOU COUNTY NEAR WEED FROM 0.1 MILE SOUTH OF MAPLE AVENUE TO 0.1 MILE NORTH OF FIRST AVENUE. |
|
|
0 – 1 |
|
November 2012 |
View Details
|
October 10, 2011 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
2 -
0E4504
|
TEH -
005 -
R000.0/ 042.1
|
IN TEHAMA COUNTY AT VARIOUS LOCATIONS FROM 0.2 MILE SOUTH OF LIBERAL AVENUE OVERCROSSING TO 0.1 MILE SOUTH OF BOWMAN ROAD OVERCROSSING |
|
|
1 – 10 |
|
August 2012 |
View Details
|
September 22, 2011 |
|
2 -
0E4505
|
TEH -
005 -
R000.0/ 042.1
|
IN TEHAMA COUNTY IN AND NEAR RED BLUFF FROM GLENN COUNTY LINE TO SHASTA COUNTY LINE |
|
|
0 – 1 |
|
August 2012 |
View Details
|
June 21, 2010 |
|
2 -
0E8405
|
SIS -
003 -
047.7/ 048.5
|
IN SISKIYOU COUNTY IN YREKA FROM 4-H WAY TO LAWRENCE LANE. |
|
|
0 – 1 |
|
July 2012 |
View Details
|
November 21, 2011 |
|
2 -
1E0004
|
MOD -
299 -
022.4/
|
IN MODOC COUNTY AT CANBY AT CANBY MAINTENANCE STATION |
|
|
0 – 1 |
|
January 2014 |
View Details
|
December 20, 2011 |
|
2 -
1E0604
|
MOD -
139 -
023.2/
|
IN MODOC COUNTY ABOUT 23 MILES NORTH OF CANBY AT PEREZ INSPECTION STATION. |
|
|
0 – 1 |
|
April 2013 |
View Details
|
August 17, 2011 |
|
2 -
1E2404
|
PLU -
036 -
R013.9/
|
|
INSTALL SUPERHAR, HAR FLASHER ELEMENT, AND CCTV'S |
|
0 – 1 |
|
April 2012 |
View Details
|
October 10, 2011 |
|
2 -
299714
|
MOD -
299 -
039.3/ 040.6
|
IN MODOC COUNTY IN AND NEAR ALTURAS FROM 0.2 MILE WEST OF MILL STREET TO ROUTE 299/395 SEPARATION |
|
|
1 – 10 |
|
November 2013 |
View Details
|
September 22, 2011 |
|
2 -
2C0904
|
PLU -
070 -
050.3/ 053.0
|
IN PLUMAS COUNTY NEAR QUINCY FROM 0.3 MI WEST TO 0.5 MI EAST OF SPRING GARDEN BOH BR #09-0062 |
|
|
10 – 20 |
|
February 2014 |
View Details
|
December 20, 2011 |
|
2 -
2C1124
|
TEH -
099 -
013.9/ 014.3
|
IN TEHAMA COUNTY NEAR LOS MOLINOS FROM SOUTH FORK MILL CREEK BRIDGE TO FIRST AVENUE |
Replace Bridge |
Replace Bridge |
1 – 10 |
180 |
July 2012 |
View Details
|
October 11, 2010 |
|
2 -
2C2254
|
TEH -
036 -
091.4/
|
IN TEHAMA COUNTY ABOUT 8 MILES EAST OF MINERAL AT MILL CREEK BRIDGE |
|
|
1 – 10 |
|
December 2012 |
View Details
|
August 23, 2011 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
2 -
2E3504
|
TRI -
299 -
000.5/ 000.8
|
IN TRINITY COUNTY NEAR SALYER FROM 0.6 MILE TO 0.2 MILE WEST OF CAMBEL RIDGE ROAD |
Culverts,Earthwork,Realign Curve,Retaining Wall |
Culverts, Earthwork, Reconstruct Roadway, Retaining Wall, Realign Curve |
1 – 10 |
120 |
October 2012 |
View Details
|
August 24, 2011 |
|
2 -
2E5104
|
SHA -
299 -
004.3/ 005.5
|
IN SHASTA COUNTY ABOUT 17.3 MILES WEST OF REDDING FROM 4.3 TO 5.5 MILES EAST OF TRINITY COUNTY |
Culverts,Earthwork,Guard Railing,Realignment |
Realignment, Roadway, Guard Railing, Earthwork, Culverts |
1 – 10 |
240 |
May 2012 |
View Details
|
August 24, 2011 |
|
2 -
2E6204
|
TEH -
036 -
039.7/ 040.2
|
IN TEHAMA COUNTY NEAR RED BLUFF FROM BAKER ROAD TO 0.5 MILE EAST OF BAKER ROAD |
Culverts,Earthwork,Realignment,Rock Slope Protection |
Rock Slope Protection, Culverts, Earthwork, Realignment |
1 – 10 |
|
November 2012 |
View Details
|
January 24, 2011 |
|
2 -
2E7304
|
TEH -
032 -
022.3/ 022.8
|
IN TEHAMA COUNTY ABOUT 35 MILES EAST OF FOREST RANCH FROM 0.5 MILE EAST OF DEER CREEK BRIDGE 08-0072 TO DEER CREEK BRIDGE 08-0072 |
|
|
1 – 10 |
|
March 2013 |
View Details
|
August 24, 2011 |
|
2 -
2E7504
|
TEH -
005 -
041.6/ 041.9
|
IN SHASTA AND TEHAMA COUNTIES ON ROUTE 5 FROM 0.4 MILE S. TO 0.3 MI N OF FIRST ST. OVERCROSSING AND ON ROUTE 5 FROM BOWMAN ROAD OC TO 0.4 MI N. OF BOWMAN RD OC. |
Reconstruct Ramp |
Reconstruct Ramp |
1 – 10 |
|
February 2012 |
View Details
|
August 24, 2011 |
|
2 -
2E8204
|
SIE -
395 -
000.0/ 000.1
|
IN SIERRA COUNTY NEAR HALLELUJAH JUNCTION FROM NEVADA STATE LINE TO 0.1 MILE NORTH OF NEVADA STATE LINE |
Earthwork,Widening |
Earthwork, Widening |
0 – 1 |
|
February 2012 |
View Details
|
February 23, 2011 |
|
2 -
2E8704
|
SHA -
005 -
031.1/
|
IN SHASTA COUNTY ABOUT 9 MILES NORTH OF SHASTA LAKE CITY AT O'BRIEN SAFETY ROADSIDE REST AREA |
|
|
0 – 1 |
|
July 2012 |
View Details
|
December 20, 2011 |
|
2 -
2E8905
|
SIS -
005 -
058.0/
|
IN SISKIYOU COUNTY ABOUT 9 MILES NORTH OF YREKA AT COLLIER SAFETY ROADSIDE REST AREA |
|
|
0 – 1 |
|
December 2011 |
View Details
|
November 21, 2011 |
|
2 -
2E9604
|
SIS -
005 -
045.7/
|
IN SISKIYOU COUNTY IN YREKA AT 0.7 MILE SOUTH OF OBERLIN ROAD UNDERCROSSING |
|
|
0 – 1 |
|
April 2012 |
View Details
|
August 24, 2011 |
|
2 -
2E9905
|
TRI -
299 -
051.3/ 051.9
|
IN TRINITY COUNTY AT WEAVERVILLE FROM 0.6 MILE WEST TO MILL STREET |
|
|
0 – 1 |
|
January 2012 |
View Details
|
January 06, 2012 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
2 -
360704
|
SHA -
299 -
030.3/ 040.7
|
IN SHASTA COUNTY AT AND NEAR BELLA VISTA FROM 0.3 MILE EAST OF INTERMOUNTAIN DRIVE TO 0.3 MILE WEST OF BACKBONE RIDGE ROAD |
Asphalt Concrete Surfacing,Replace Bridge,Modify Culverts |
Asphalt Concrete Surfacing, Replace Bridge, Modify Culverts |
20 – 40 |
|
January 2013 |
View Details
|
February 23, 2011 |
|
2 -
374304
|
TRI -
299 -
023.3/
|
IN TRINITY COUNTY NEAR DEL LOMA AT BIG FRENCH CREEK BRIDGE (NO. 5.8) |
Modify Bridge,Replace Bridge Railing,Replace Guard Railing |
Replace Guard Railing, Replace Bridge Railing, Modify Bridge |
1 – 10 |
|
February 2012 |
View Details
|
February 23, 2011 |
|
2 -
3C0714
|
LAS -
395 -
061.6/ 076.6
|
IN AND NEAR JOHNSTONVILLE FROM 0.4 MILE SOUTH OF BANGHAM LANE TO 0.3 MILE SOUTH OF WENDEL RD. |
|
|
10 – 20 |
|
November 2012 |
View Details
|
November 21, 2011 |
|
2 -
3C0724
|
LAS -
395 -
056.5/ 061.0
|
IN LASSEN COUNTY AT AND NEAR JOHN- STONVILLE FROM 0.1 MILE NORTH OF SUNNYSIDE ROAD TO 0.3 MILE SOUTH OF BANGHAM LANE. |
|
|
1 – 10 |
|
April 2012 |
View Details
|
November 21, 2011 |
|
2 -
3C3004
|
PLU -
070 -
000.1/ 035.1
|
NEAR ROCK CRK FROM BUTTE CO LINE TO 0.2MI W. SPANISH CR BR #09-0015 INSTALL METAL BEAM GUARDRAIL. |
Reconstruct Guard Railing |
Reconstruct Guard Railing |
1 – 10 |
|
April 2012 |
View Details
|
August 24, 2011 |
|
2 -
3C9204
|
SIS -
005 -
R050.6/R052.1
|
IN SISKIYOU COUNTY NEAR YREKA FROM 0.6 MILE SOUTH OF SHASTA RIVER BRIDGES TO 0.2 MILE SOUTH OF VISTA POINT |
Modify Bridge,Replace Bridge Railing,Reconstruct Drainage,Earthwork,Freeway and Structures,Replace Guard Railing,Pavement Markers,Pavement Markings,Rehabilitate Bridge Deck,Replace Joint Seals,Replace Signs |
Pavements Markers, Earthwork, Freeway and Structures, Replace Guard Railing, Reconstruct Drainage, Modify Bridge, Replace Bridge Railing, Replace Signs, Replace Joint Seals, Rehabilitate Bridge Deck, Pavements Markings |
10 – 20 |
220 |
May 2012 |
View Details
|
August 24, 2011 |
|
2 -
3E0704
|
SIS -
96 -
023.2/105.0
|
IN SISKIYOU COUNTY AT VARIOUS LOCATIONS FROM SWILLUP CREEK BRIDGE TO 1.6 MILES EAST OF ROUTE 263 |
|
|
1 – 10 |
|
April 2012 |
View Details
|
February 23, 2011 |
|
2 -
3E0804
|
SIS -
096 -
068.9/
|
IN SISKIYOU COUNTY AT HAMBURG AT 2.3 MILES WEST OF SCOTT RIVER BRIDGE |
Widening |
Widening |
0 – 1 |
|
November 2012 |
View Details
|
August 24, 2011 |
|
2 -
3E5604
|
TEH -
099 -
012.3/ 012.6
|
IN TEHAMA COUNTY AT LOS MOLINOS FROM ARAMAYO WAY TO LOS MOLINOS CREEK BRIDGE |
Asphalt Concrete Surfacing,Drainage,Widening |
Asphalt Concrete Surfacing, Widening, Drainage |
0 – 1 |
|
February 2012 |
View Details
|
February 23, 2011 |
|
2 -
3E6004
|
SHA -
299 -
024.0/
|
IN SHASTA COUNTY IN REDDING ON ROUTE 44 AT SHASTA STREET AND ON ROUTE 299 AT CALIFORNIA STREET. |
|
|
0 – 1 |
|
March 2012 |
View Details
|
March 16, 2011 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
2 -
3E6105
|
PLU -
070 -
009.0
|
|
|
|
0 – 1 |
|
February 2012 |
View Details
|
September 22, 2011 |
|
2 -
3E6405
|
TEH -
005 -
019.2/
|
IN SHASTA AND TEHAMA COUNTIES AT VARIOUS LOCATIONS. |
|
|
0 – 1 |
|
February 2012 |
View Details
|
January 30, 2012 |
|
2 -
3E6504
|
SHA -
910 -
000.1/
|
|
BRIDGE MAINTENANCE |
Bridge |
0 – 1 |
|
January 2013 |
View Details
|
October 10, 2011 |
|
2 -
3E6904
|
MOD -
299 -
035.9/ 036.2
|
IN MODOC COUNTY NEAR ALTURAS FROM 1.2 MILES TO 0.9 MILES WEST OF CROWDER FLAT ROAD. |
|
|
1 – 10 |
|
November 2012 |
View Details
|
February 22, 2011 |
|
2 -
3E7104
|
VAR -
036 -
030.4/ 030.7
|
IN TRINITY COUNTY ABOUT 12 MILES EAST OF FOREST GLEN FROM 1.7 MILES TO 2.1 MILES EAST OF ROUTE 3. |
|
|
0 – 1 |
|
March 2013 |
View Details
|
November 21, 2011 |
|
2 -
3E8204
|
SHA -
299 -
036.6/ 036.8
|
IN TRINITY COUNTY NEAR HELENA FROM 0.3 MILE TO 0.1 MILE WEST OF NORTH FORK TRINITY RIVER BRIDGE |
|
|
0 – 1 |
|
April 2012 |
View Details
|
August 24, 2011 |
|
2 -
3E8704
|
SHA -
299 -
018.3/ 020.2
|
IN SHASTA COUNTY AT SHASTA FROM 0.1 MILE WEST OF TRINITY ALLEY TO 0.1 MILE WEST OF IRON MOUNTAIN |
|
|
0 – 1 |
|
February 2012 |
View Details
|
November 21, 2011 |
|
2 -
3E8705
|
SHA -
299 -
018.3/ 020.2
|
|
|
|
0 – 1 |
|
October 2011 |
View Details
|
June 15, 2011 |
|
2 -
3E8904
|
SHA -
005 -
028.8/ 039.2
|
IN SHASTA COUNTY ABOUT 6 MILES NORTH OF SHASTA LAKE CITY FROM PIT RIVER BRIDGE TO 0.2 MILE NORTH OF ANTLER'S SUMMIT OVERCROSSING |
|
|
1 – 10 |
|
February 2012 |
View Details
|
January 06, 2012 |
|
2 -
3E8905
|
SHA -
005 -
028.8/ 039.2
|
IN SHASTA COUNTY ABOUT 6 MILES NORTH OF SHASTA LAKE CITY FROM PIT RIVER BRIDGE TO 0.2 MILE NORTH OF ANTLER'S SUMMIT OVERCROSSING |
|
|
0 – 1 |
|
January 2012 |
View Details
|
May 11, 2011 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
2 -
3E9104
|
VAR -
911 -
024.3/ 034.0
|
IN TRI & SIS CO. ON RTE 3 FRM 0.4 MI SO OF AIRPORT RD TO 0.1 MI NO OF RUSH CREEK RD & ON RTE 89 FRM 0.5 MI SO OF BROADWAY AVE TO 0.3 MI SO OF MT. SHASTA BLVD. |
|
|
1 – 10 |
|
February 2012 |
View Details
|
November 21, 2011 |
|
2 -
3E9304
|
TRI -
299 -
064.1/ 072.2
|
IN SHASTA AND TRINITY COUNTIES NEAR DOUGLAS CITY FROM 0.6 MILE EAST OF LEWISTON ROAD TO 0.1 MILE EAST OF SHASTA COUNTY LINE. |
|
|
1 – 10 |
|
February 2012 |
View Details
|
January 06, 2012 |
|
2 -
3E9305
|
TRI -
299 -
064.0/ 072.2
|
IN SHASTA AND TRINITY COUNTIES AT AND NEAR DOUGLAS CITY FROM 0.5 MILE EAST OF LEWISTON ROAD TO 0.1 MILE EAST OF SHASTA COUNTY LINE. |
|
|
0 – 1 |
|
February 2012 |
View Details
|
November 21, 2011 |
|
2 -
3E9505
|
LAS -
395 -
128.7/ 131.0
|
IN LASSEN COUNTY AT AND NEAR MADELINE FROM 0.5 MILE SOUTH TO 1.8 MILE NORTH OF ASH VALLEY ROAD. |
|
|
0 – 1 |
|
February 2012 |
View Details
|
June 21, 2011 |
|
2 -
3E9605
|
MOD -
299 -
033.5/ 037.5
|
IN MODOC COUNTY NEAR ALTURAS FROM 1.8 MILES WEST OF COUNTY ROAD 75 TO 0.3 MILE WEST OF RATTLESNAKE CREEK BRIDGE. |
|
|
0 – 1 |
|
March 2012 |
View Details
|
November 21, 2011 |
|
2 -
3E9904
|
SHA -
044 -
001.7/ 004.3
|
IN SHASTA COUNTY NEAR REDDING FROM 0.1 MILE WEST OF ROUTE 5 SEPARATION TO STILLWATER CREEK BRIDGE. |
|
|
1 – 10 |
|
February 2012 |
View Details
|
January 06, 2012 |
|
2 -
3E9905
|
SHA -
044 -
001.7/ 004.3
|
IN SHASTA COUNTY NEAR REDDING FROM 0.1 MILE WEST OF ROUTE 5 SEPARATION TO STILLWATER CREEK BRIDGE. |
|
|
1 – 10 |
|
February 2012 |
View Details
|
November 21, 2011 |
|
2 -
4C58U4
|
TEH -
099 -
011.6/ 012.6
|
IN TEHAMA COUNTY AT LOS MOLINOS FROM 0.1 MILE SOUTH OF PALM STREET TO LOS MOLINOS CREEK. |
|
|
1 – 10 |
|
February 2012 |
View Details
|
November 21, 2011 |
|
2 -
4C9604
|
TRI -
003 -
007.1/ 007.7
|
IN TRINITY COUNTY AT HAYFORK FROM MAIN STREET TO 0.1 MILE NORTH OF FOREST AVENUE. |
|
|
0 – 1 |
|
June 2012 |
View Details
|
January 30, 2012 |
|
2 -
4E1404
|
SIS -
005 -
023.3/ 023.9
|
IN SISKIYOU COUNTY NEAR WEED FROM 0.3 MILE TO 0.9 MILE NORTH OF EDGEWOOD UNDERCROSSING. |
|
|
0 – 1 |
|
October 2013 |
View Details
|
December 20, 2011 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
2 -
4E2804
|
SIS -
005 -
046.8/ 062.1
|
IN SISKIYOU COUNTY IN AND NEAR YREKA FROM YREKA CREEK BRIDGE TO 0.2 MI SO OF MINER ST UNDERCROSSING & FRM 0.8 MI SO TO 0.4 MI SO OF DITCH CREEK ROAD OVERCROSSING. |
|
|
1 – 10 |
|
July 2013 |
View Details
|
January 06, 2012 |
|
2 -
4E3104
|
TRI -
299 -
045.5/ 046.2
|
IN TRINITY COUNTY ABOUT 6 MILES WEST OF WEAVERVILLE FROM 0.7 MILE TO 1.1 MILES WEST OF OAK RUN ROAD. |
|
|
0 – 1 |
|
October 2013 |
View Details
|
October 10, 2011 |
|
2 -
4E3204
|
LAS -
395 -
070.1/ 070.2
|
IN LASSEN COUNTY AT STANDISH AT BUNTINGVILLE. |
|
|
0 – 1 |
|
May 2012 |
View Details
|
November 21, 2011 |
|
2 -
4E3404
|
LAS -
147 -
000.5/ 001.2
|
IN LASSEN COUNTY NEAR WESTWOOD FROM 0.3 MILE NORTH TO 0.5 MILE SOUTH OF SPRING CREEK BRIDGE. |
|
|
1 – 10 |
|
February 2013 |
View Details
|
June 21, 2011 |
|
2 -
4E3504
|
PLU -
070 -
019.0/ 019.1
|
IN PLUMAS COUNTY AT RICH BAR AT 0.2 MILE EAST OF RICH BAR ROAD. |
|
|
0 – 1 |
|
February 2014 |
View Details
|
January 06, 2012 |
|
2 -
4E3604
|
PLU -
070 -
023.8/ 023.9
|
IN PLUMAS COUNTY NEAR RICH BAR AT 0.1 MILE EAST OF RUSH CREEK ROAD. |
|
|
0 – 1 |
|
February 2013 |
View Details
|
June 21, 2011 |
|
2 -
4E3804
|
SHA -
151 -
005.8/ 006.9
|
IN SHASTA COUNTY IN SHASTA LAKE CITY FROM LOCUST AVENUE TO ROUTE 5. |
|
|
1 – 10 |
|
March 2012 |
View Details
|
October 10, 2011 |
|
2 -
4E4804
|
SIS -
089 -
024.7/ 024.8
|
IN SISKIYOU COUNTY AT MCCLOUD AT BROADWAY AVENUE. |
|
|
0 – 1 |
|
August 2012 |
View Details
|
January 06, 2012 |
|
2 -
4E4905
|
SHA -
005 -
025.7/ 026.0
|
IN SHASTA COUNTY NEAR SHASTA LAKE CITY FROM 0.3 MILE SOUTH OF FAWNDALE OVERCROSSING TO FAWNDALE OVERCROSSING |
|
|
0 – 1 |
|
April 2012 |
View Details
|
July 18, 2011 |
|
2 -
4E5005
|
SHA -
910 -
000.1/ 000.2
|
|
|
|
0 – 1 |
|
March 2012 |
View Details
|
July 18, 2011 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
2 -
4E5104
|
SIS -
005 -
025.8/ 025.8
|
IN SISKIYOU COUNTY NEAR WEED AT WEED SAFETY ROADSIDE REST AREA. |
|
|
0 – 1 |
|
March 2012 |
View Details
|
July 18, 2011 |
|
2 -
4E5204
|
SHA -
044 -
021.1/ 021.3
|
IN SHASTA COUNTY ABOUT 10 MILES WEST OF SHINGLETOWN FROM 0.3 MILE TO 0.1 MILE WEST OF BLACK BUTTE ROAD. |
|
|
0 – 1 |
|
February 2013 |
View Details
|
November 21, 2011 |
|
2 -
4E6004
|
TRI -
003 -
030.8/ 031.2
|
IN TRINITY COUNTY AT WEAVERVILLE FROM TRINITY RIVER BRIDGE TO WASHINGTON STREET. |
|
|
0 – 1 |
|
January 2014 |
View Details
|
November 21, 2011 |
|
2 -
4E6304
|
SIS -
096 -
056.0/
|
IN SISKIYOU COUNTY NEAR SEIAD VALLEY AT 3.5 MILES EAST OF THOMPSON CREEK BRIDGE |
|
|
0 – 1 |
|
March 2012 |
View Details
|
December 20, 2011 |
|
2 -
4E6605
|
TEH -
005 -
034.3/
|
IN TEHAMA COUNTY ABOUT 8 MILES NORTH OF RED BLUFF AT HERBERT MILES SAFETY ROADSIDE REST AREA. |
|
|
0 – 1 |
|
August 2012 |
View Details
|
December 20, 2011 |
|
2 -
4E7004
|
SHA -
299 -
018.4/ 018.7
|
IN SHASTA COUNTY AT SHASTA FROM 0.1 MILE WEST OF FRENCH ALLEY TO RED BLUFF ROAD. |
|
|
0 – 1 |
|
January 2014 |
View Details
|
December 20, 2011 |
|
2 -
4E8004
|
SIS -
161 -
009.0/ 011.3
|
IN SISKIYOU COUNTY ABOUT 12 MILES EAST OF DORRIS FROM 2.2 MILES WEST TO 0.2 MILES EAST OF FUGATE ROAD. |
|
|
0 – 1 |
|
August 2013 |
View Details
|
December 20, 2011 |
|
2 -
4E8404
|
SHA -
911 -
000.0/ 000.1
|
IN LASSEN, SHASTA, SISKIYOU, AND TEHAMA COUNTIES AT VARIOUS LOCATION S. |
|
|
0 – 1 |
|
February 2012 |
View Details
|
January 30, 2012 |
|
3 -
0F0104
|
PLA -
267 -
001.1/
|
NEAR TRUCKEE AT MARTIS CREEK LAKE ROAD |
WIDENING |
Widening |
0 – 1 |
60 |
April 2012 |
View Details
|
January 30, 2012 |
|
3 -
0F0904
|
PLA -
080 -
000.8/ 002.3
|
IN PLACER COUNTY ON ROUTE 80 AT VARIOUS LOCATIONS |
|
|
0 – 1 |
|
March 2012 |
View Details
|
January 27, 2012 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
3 -
0F2204
|
ED -
050 -
R031.3/
|
ABOUT 11.0 MILES EAST OF PLACERVILLE AT SLY PARK ROAD UNDERCROSSING 25-42 |
|
|
1 – 10 |
|
February 2014 |
View Details
|
December 20, 2011 |
|
3 -
0F2605
|
BUT -
099 -
045.5/
|
ABOUT 10 MILES NORTH OF CHICO AT PINE CREEK BRIDGE 12-28 |
|
|
0 – 1 |
|
March 2013 |
View Details
|
January 11, 2011 |
|
3 -
0F3004
|
ED -
050 -
017.8/ 019.6
|
IN PLACERVILLE AT COLOMA STREET OVERCROSSING AND AT SMITH FLAT ROAD UNDERCROSSING |
|
|
1 – 10 |
|
March 2013 |
View Details
|
November 21, 2011 |
|
3 -
0F4804
|
GLE -
045 -
003.1/ 007.5
|
ON ROUTE 45 AT COUNTY ROAD 61 AND AT JUNCTION ROUTE 162 WEST AND ON ROUTE 162 AT COUNTY ROAD Z |
|
|
0 – 1 |
|
March 2013 |
View Details
|
August 24, 2011 |
|
3 -
0F6804
|
SAC -
080 -
M008.1/M011.1
|
IN AND NEAR SACRAMENTO AT NORTH AVENUE OVERCROSSING 24-106 AND AT THE 80/244 SEPARATION BRIDGE 24-292 R/L |
|
|
1 – 10 |
|
January 2013 |
View Details
|
June 15, 2011 |
|
3 -
1A4644
|
SUT -
099 -
R019.5/R020.5
|
NEAR TUDOR FROM 1.8 MILE NORTH OF WILSON ROAD TO 2.1 MILE SOUTH OF OBANION ROAD |
|
|
10 – 20 |
|
July 2012 |
View Details
|
January 06, 2012 |
|
3 -
1A7314
|
ED -
050 -
067.6/ 072.9
|
NEAR SOUTH LAKE TAHOE FROM MEYERS ROAD TO 0.1 MILE EAST OF INCLINE ROAD |
Storm water treatment BMPs, erosion control, C&G, construct drainage facilities, rehab existing drainage facilities |
Drainage, Erosion Control |
10 – 20 |
125 |
December 2012 |
View Details
|
January 06, 2012 |
|
3 -
1A7324
|
ED -
050 -
073.7/ 075.4
|
IN AND NEAR SOUTH LAKE TAHOE FROM SOUTH TAHOE AIRPORT ENTRANCE ROAD TO ROUTE 89 (KP 118.6/121.3) |
Asphalt Concrete Surfacing,Replace Culverts,Culverts,Repair Drainage,Earthwork,Erosion Control,Pavement Markers,Pavement Markings,Reconstruct Roadway,Reconstruct Signs |
Reconstruct Signs, Earthwork, Asphalt Concrete Surfacing, Replace Culverts, Erosion Control, Reconstruct Roadway, Pavements Markings, Pavements Markers, Repair Drainage |
1 – 10 |
|
October 2012 |
View Details
|
July 18, 2011 |
|
3 -
1A7344
|
ED -
050 -
079.3/ 080.4
|
IN SOUTH LAKE TAHOE FROM SKI RUN BOULEVARD TO NEVADA STATE LINE |
WATER QUALITY IMPROVEMENTS |
Drainage |
1 – 10 |
368 |
February 2012 |
View Details
|
March 28, 2011 |
|
3 -
1A8424
|
ED -
089 -
008.6/ 013.8
|
IN AND NEAR SOUTH LAKE TAHOE FROM ROUTE 50 TO CASCADE ROAD |
Asphalt Concrete Surfacing,Modify Culverts,Replace Drainage,Earthwork,Erosion Control,Reconstruct Guard Railing,Pavement Markers,Pavement Markings,Rehabilitate Pavement,Reconstruct Roadway,Replace Signs,Wheelchair Ramps,Widening |
Asphalt Concrete Surfacing, Pavements Markings, Rehabilitate Pavement, Reconstruct Roadway, Replace Signs, Wheelchair Ramps, Widening, Reconstruct Guard Railing, Pavements Markers, Replace Drainage, Earthwork, Erosion Control, Modify Culverts |
10 – 20 |
|
July 2013 |
View Details
|
July 18, 2011 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
3 -
1A8444
|
ED -
089 -
018.0/ 024.9
|
ABOUT 8.3 MILES NORTH OF SOUTH LAKE TAHOE FROM NORTH OF THE SIDEHILL VIADUCTS TO MEEKS CREEK |
Asphalt Concrete Surfacing,Replace Culverts,Reconstruct Drainage,Earthwork,Rock Slope Protection |
Asphalt Concrete Surfacing, Replace Culverts, Rock Slope Protection, Earthwork, Reconstruct Drainage |
10 – 20 |
|
October 2012 |
View Details
|
July 12, 2011 |
|
3 -
1C0804
|
NEV -
089 -
000.1/ 000.2
|
IN TRUCKEE, AT DONNER CREEK UNDERPASS #17-16 (AKA MOUSEHOLE PROJECT) |
Asphalt Concrete Surfacing,Culverts,Drainage,Earthwork,Erosion Control,Pavement Markers,Pavement Markings,Retaining Wall,Signs,Wheelchair Ramps,Widening,Wing Wall |
Erosion Control, Pavements Markers, Wheelchair Ramps, Widening, Wing Wall, Asphalt Concrete Surfacing, Drainage, Earthwork, Retaining Wall, Signs, Pavements Markings |
20 – 40 |
|
September 2012 |
View Details
|
March 28, 2011 |
|
3 -
1E0004
|
PLA -
089 -
013.5/ 021.7
|
SOUTH OF TRUCKEE FROM 0.2 MILE SOUTH OF SQUAW VALLEY ROAD TO NEVADA COUNTY LINE |
|
|
1 – 10 |
|
April 2012 |
View Details
|
January 06, 2012 |
|
3 -
1E5104
|
BUT -
070 -
028.2/
|
ABOUT 12.3 MILES EAST OF OROVILLE AT WEST BRANCH FEATHER RIVER BRIDGE #12-0134 |
Reconstruct Bridge |
Reconstruct Bridge |
10 – 20 |
700-800 |
June 2012 |
View Details
|
July 12, 2011 |
|
3 -
1F0404
|
NEV -
020 -
016.7/ 017.4
|
IN NEVADA CITY FROM SACRAMENTO STREET OVERCROSSING TO UREN STREET AT JUNCTION ROUTE 49 NORTH |
|
|
0 – 1 |
|
July 2011 |
View Details
|
August 16, 2010 |
|
3 -
1F2504
|
SAC -
050 -
007.0/ 007.5
|
IN SACRAMENTO AND YOLO COUNTIES AT VARIOUS LOCATIONS |
|
|
0 – 1 |
|
March 2012 |
View Details
|
January 06, 2012 |
|
3 -
1F2505
|
SAC -
050 -
007.0/ 007.5
|
NEAR SACRAMENTO FROM MAYHEW ROAD OVERCROSSING TO .25 MILE WEST OF BRADSHAW ROAD OVERCROSSING |
|
|
0 – 1 |
|
July 2010 |
View Details
|
January 06, 2012 |
|
3 -
1F2804
|
GLE -
005 -
000.0/ 029.0
|
IN GLENN COUNTY ON ROUTE 5 FROM COLUSA COUNTY LINE TO TEHEMA COUNTY LINE |
|
|
0 – 1 |
|
November 2013 |
View Details
|
October 10, 2011 |
|
3 -
1F2904
|
COL -
005 -
000.0/ 034.0
|
IN COLUSA COUNTY ON ROUTE 5 FROM YOLO COUNTY LINE TO GLENN COUNTY LINE |
|
|
0 – 1 |
|
November 2013 |
View Details
|
October 10, 2011 |
|
3 -
1F3304
|
ED -
193 -
018.6/ 018.8
|
IN EL DORADO COUNTY FROM POSTMILE 18.6 TO 18.8 |
|
|
1 – 10 |
|
April 2013 |
View Details
|
July 12, 2011 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
3 -
1F4905
|
SIE -
089 -
015.6/
|
ABOUT 13.0 MILES NORTH OF TRUCKEE AT 0.5 MILE NORTH OF STATE ROUTE 49 |
|
|
0 – 1 |
|
November 2013 |
View Details
|
October 25, 2011 |
|
3 -
1F5104
|
YOL -
L5730 -
|
IN WEST SACRAMENTO AT THE WEST SACRAMENTO MAINTENANCE STATION |
|
|
0 – 1 |
|
November 2012 |
View Details
|
October 10, 2011 |
|
3 -
1F5904
|
PLA -
193 -
009.4/
|
ABOUT 8.9 MILES EAST OF LINCOLN AT 0.2 MILE WEST OF NEWCASTLE TUNNEL UNDERCROSSING |
|
|
0 – 1 |
|
April 2013 |
View Details
|
August 31, 2011 |
|
3 -
1F6004
|
ED -
193 -
023.4/
|
ABOUT 10.7 MILES EAST GEORGETOWN AT 0.5 MILE WEST OF ROCK CREEK ROAD |
|
|
0 – 1 |
|
April 2012 |
View Details
|
January 30, 2012 |
|
3 -
1F6204
|
NEV -
049 -
031.3/ 031.8
|
ABOUT 16 MILES NORTH OF NEVADA CITY FROM 1.4 MILES TO 0.9 MILE SOUTH OF MIDDLE YUBA RIVER BRIDGE 17-09 |
|
|
0 – 1 |
|
December 2012 |
View Details
|
August 22, 2011 |
|
3 -
1F6904
|
NEV -
L5729 -
|
IN TRUCKEE AT THE TRUCKEE MAINTENANCE STATION |
|
|
0 – 1 |
|
August 2012 |
View Details
|
December 20, 2011 |
|
3 -
1F7404
|
COL -
020 -
000.0/ 010.2
|
ABOUT 10 MILES WEST OF WILLIAMS FROM LAKE COUNTY LINE TO 6.8 MILES EAST OF ROUTE 16 SOUTH |
|
|
1 – 10 |
|
August 2012 |
View Details
|
November 21, 2011 |
|
3 -
1F9004
|
BUT -
L5706 -
|
ON ROUTE 32 AT CHICO MAINTENANCE STATION |
|
|
0 – 1 |
|
February 2013 |
View Details
|
August 30, 2011 |
|
3 -
1F9104
|
NEV -
049 -
004.5/ 005.8
|
9 MILES SOUTH OF GRASS VALLEY AT CARRIAGE ROAD, LADYBIRD DRIVE, AND HOLCOMB/CHERRY CREEK ROAD |
|
|
0 – 1 |
|
January 2013 |
View Details
|
January 30, 2012 |
|
3 -
2E9204
|
SAC -
104 -
000.0/ 000.1
|
IN SACRAMENTO COUNTY ON SR 104 AT THE INTERSECTION OF EAST STOCKTON AND WEST STOCKTON BLVD |
Modify Signals |
Modify Signals |
1 – 10 |
345 |
March 2012 |
View Details
|
January 06, 2012 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
3 -
2F0004
|
VAR -
000 -
000.0/R022.9
|
IN BUTTE, COLUSA, GLENN, SACRAMENTO, SUTTER,YOLO, AND YUBA COUNTIES AT VARIOUS LOCATIONS |
|
|
1 – 10 |
|
November 2013 |
View Details
|
November 21, 2011 |
|
3 -
2F1504
|
ED -
049 -
031.1/
|
ABOUT 8.8 MILES SOUTH OF AUBURN AT RATTLESNAKE BAR ROAD |
|
|
0 – 1 |
|
June 2013 |
View Details
|
April 13, 2011 |
|
3 -
2F1804
|
COL -
005 -
000.0/ 034.4
|
IN COLUSA, GLEN, AND YOLO COUNTIES ON ROUTE 5 AT VARIOUS LOCATIONS |
|
|
0 – 1 |
|
May 2012 |
View Details
|
January 30, 2012 |
|
3 -
2F2604
|
PLA -
080 -
034.9/
|
NEAR COLFAX AT 0.1 MILE WEST OF LONG RAVINE UNDERCROSSING BRIDGE #1990 |
|
|
1 – 10 |
|
August 2012 |
View Details
|
January 30, 2012 |
|
3 -
2F2804
|
PLA -
L5727 -
|
IN TAHOE CITY AT TAHOE CITY MAINTENANCE STATION |
|
|
0 – 1 |
|
April 2012 |
View Details
|
November 21, 2011 |
|
3 -
2F3004
|
BUT -
070 -
009.2/ 017.0
|
IN AND NEAR OROVILLE FROM 0.1 MILE EAST OF PALERMO ROAD TO 0.4 MILE EAST OF GARDEN DRIVE OVERCROSSING |
|
|
1 – 10 |
|
August 2012 |
View Details
|
November 21, 2011 |
|
3 -
2F3804
|
ED -
050 -
017.1/
|
IN PLACERVILLE AT PLACERVILLE DRIVE AND EASTBOUND ONRAMP TO ROUTE 050 |
|
|
0 – 1 |
|
April 2012 |
View Details
|
January 06, 2012 |
|
3 -
2F6704
|
YOL -
113 -
000.3/ 010.3
|
AT VARIOUS LOCATIONS IN AND NEAR DAVIS AND IN WOODLAND FROM 0.3 MILE NORTH OF SOLANO COUNTY LINE TO EAST MAIN STREET UNDERCROSSING |
|
|
0 – 1 |
|
March 2012 |
View Details
|
June 15, 2011 |
|
3 -
2F6904
|
SAC -
051 -
005.5/
|
IN THE CITY AND COUNTY OF SACRAMENTO AT MARCONI AVENUE OVERCROSSING |
|
|
0 – 1 |
|
May 2012 |
View Details
|
October 10, 2011 |
|
3 -
2F7004
|
YOL -
080 -
002.5/ 002.9
|
IN THE CITY OF DAVIS AT MACE BOULEVARD OVERCROSSING |
|
|
0 – 1 |
|
May 2012 |
View Details
|
July 18, 2011 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
3 -
2F8104
|
PLA -
065 -
R007.7/M008.1
|
IN AND NEAR ROSEVILLE AT BLUE OAKS BOULEVARD OVERCROSSING ONRAMPS |
|
|
0 – 1 |
|
April 2012 |
View Details
|
January 06, 2012 |
|
3 -
333824
|
PLA -
065 -
R015.0/R023.8
|
NEAR LINCOLN FROM 3.1 MILES NORTH OF TWELVE BRIDGES OVERCROSSING TO 0.1 MILE SOUTH OF BEAR RIVER BRIDGE |
|
|
10 – 20 |
|
February 2012 |
View Details
|
January 30, 2012 |
|
3 -
371504
|
SAC -
099 -
035.4/ 036.0
|
NEAR SACRAMENTO AT ELVERTA ROAD
|
|
|
20 – 40 |
|
February 2012 |
View Details
|
March 28, 2011 |
|
3 -
374224
|
YOL -
005 -
R006.4/R006.8
|
CONSTRUCT NORTHBOUND I-5 TO SOUTHBOUND SR 113 DIRECT CONNECTOR (YOL-5 KPR10.3/R10.9) & |
|
|
40 – 60 |
|
December 2012 |
View Details
|
July 18, 2011 |
|
3 -
3A7124
|
ED -
050 -
002.9/R006.5
|
ABOUT 9.0 MILES WEST OF PLACERVILLE FROM 1.0 MILE EAST OF CARSON CREEK BRIDGE TO CAMERON PARK UNDERCROSSING 25-84 |
CONSTRUCT HOV LANES BY ADDING ADDITIONAL LANES IN THE MEDIAN
Bridge Railing,Concrete Barrier,Culverts,Drainage,Earthwork,Freeway and Structures,Grading and Paving,Guard Railing,Pavement Markings,Modify Roadway,Widening |
Bridge Railing, Widening, Modify Roadway, Pavements Markings, Guard Railing, Grading and Paving, Freeway, Earthwork, Drainage, Culverts, Concrete Barrier |
10 – 20 |
275 |
January 2012 |
View Details
|
July 18, 2011 |
|
3 -
3C3804
|
ED -
050 -
075.4/ 077.3
|
IN SOUTH LAKE TAHOE FROM ROUTE 89 NORTH TO TROUT CREEK BRIDGE #25-13 |
|
|
20 – 40 |
|
August 2013 |
View Details
|
July 18, 2011 |
|
3 -
3E1004
|
PLA -
080 -
008.1/ 037.8
|
IN AND NEAR LOOMIS AT VARIOUS LOCATIONS FROM BRACE ROAD OVERCROSSING TO MAGRA ROAD OVERCROSSING |
|
|
20 – 40 |
|
February 2013 |
View Details
|
July 18, 2011 |
|
3 -
3E6204
|
BUT -
099 -
028.4/ 029.2
|
NEAR CHICO FROM ESTATES DRIVE TO 0.4 MILE NORTH OF BUTTE CREEK BRIDGE 12-126R |
REPLACE BRIDGE. (SCOUR) BRIDGE REPLACEMENT |
Replace Bridge |
1 – 10 |
100 |
August 2012 |
View Details
|
September 13, 2010 |
|
3 -
3E6304
|
ED -
049 -
009.6/ 010.5
|
FROM PLEASANT VALLEY ROAD NORTH TO LAKE OAKS WEST |
Replace Culverts,Modify Drainage,Grading and Paving |
Grading and Paving, Modify Drainage, Replace Culverts |
0 – 1 |
40 |
April 2012 |
View Details
|
November 21, 2011 |
|
3 -
3E9104
|
BUT -
032 -
R009.5/
|
IN CHICO AT 9TH AND MAIN STREET AND AT 9TH AND OROVILLE STREET |
|
|
0 – 1 |
|
March 2012 |
View Details
|
November 22, 2010 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
3 -
3F0304
|
NEV -
080 -
R012.3/ 013.4
|
IN TRUCKEE FROM 0.9 MILE WEST OF DONNER PARK OVERCROSSING TO 0.1 MILE WEST OF CALIFORNIA AGRICULTURE INSPECTION STATION |
|
|
0 – 1 |
|
January 2013 |
View Details
|
September 22, 2011 |
|
3 -
3M5704
|
SAC -
050 -
014.1/ 023.1
|
NEAR SACRAMENTO ON ROUTE 50 FROM 1.6 MILE EAST OF SUNRISE BOULEVARD TO EL DORADO COUNTY LINE AND ON ROUTE 51 FROM CAPITOL AVENUE TO 0.4 MILE NORTH OF EL CAMINO AVENUE |
|
|
1 – 10 |
|
January 2014 |
View Details
|
November 21, 2011 |
|
3 -
3M5804
|
BUT -
099 -
044.5/ 046.0
|
ABOUT 9.5 MILES NORTH OF CHICO FROM 0.2 MILE NORTH OF BROYLES ROAD TO 0.1 MILE NORTH OF CROSS DRAIN BRIDGE 12-81 |
|
|
0 – 1 |
|
December 2012 |
View Details
|
January 06, 2012 |
|
3 -
3M7204
|
SAC -
160 -
005.9/L007.0
|
NEAR ISLETON AT THE ISLETON BRIDGE AND AT THE THREE MILE SLOUGH BRIDGE |
Clean and Paint Sign Structure |
Clean and Paint Sign Structure |
1 – 10 |
|
March 2013 |
View Details
|
March 28, 2011 |
|
3 -
3M8104
|
NEV -
020 -
036.0/ 038.2
|
ABOUT 18 MILES EAST OF NEVADA CITY FROM 0.3 MILE EAST OF OMEGA REST AREA TO 3.1 MILE WEST OF BEAR RIVER BRIDGE 17-22 |
DRAINAGE REHABILITATION. LINE CULVERTS. |
Drainage, Culverts |
0 – 1 |
40-50 |
April 2012 |
View Details
|
February 22, 2011 |
|
3 -
3M8204
|
ED -
050 -
053.0/ 056.4
|
NEAR KYBURZ FROM 0.8 MILE WEST OF WRIGHTS LAKE ROAD TO FORNI TRACT ROAD |
DRAINAGE REHABILITATION. LINE CULVERTS. |
Drainage, Culverts |
0 – 1 |
40-50 |
February 2012 |
View Details
|
July 18, 2011 |
|
3 -
3M9204
|
ED -
193 -
006.0/ 012.7
|
FROM 0.2 MILE WEST OF SLIGER MINE ROAD TO GEORGETOWN |
|
|
1 – 10 |
|
January 2014 |
View Details
|
November 21, 2011 |
|
3 -
3M9304
|
PLA -
049 -
R007.7/ 011.3
|
NEAR AUBURN FROM 0.3 MILE NORTH OF DRY CREEK ROAD TO BEAR RIVER BRIDGE 19-22 |
REPLACE AC SURFACING |
Asphalt Concrete Surfacing |
0 – 1 |
|
March 2012 |
View Details
|
July 18, 2011 |
|
3 -
3M9504
|
PLA -
174 -
000.0/ 002.8
|
IN AND NEAR COLFAX FROM 174/80 SEPARATION TO BEAR RIVER BRIDGE 19-65 |
DRAINAGE REHABILITATION. LINE CULVERTS. |
Drainage, Culverts |
0 – 1 |
|
March 2012 |
View Details
|
August 22, 2011 |
|
3 -
406604
|
SUT -
099 -
000.0/ 001.6
|
IN SACRAMENTO AND SUTTER COUNTIES FROM 0.6 MILES SOUTH OF SUTTER COUNTY LINE TO 0.7 MILES NORTH OF RIEGO ROAD MITIGATED NEGATIVE DECLARATION
|
Asphalt Concrete Surfacing,Bridge,Bridge Railing,Channelize,Culverts,Drainage,Earthwork,Electrical Facilities,Erosion Control,Establish Existing Planting,Fence,Grading and Paving,Guard Railing,Highway Planting,Interchange,Irrigation System,Lighting,Pavement Markers,Pavement Markings,Ramp,Roadway,Signals,Signs,Wheelchair Ramps,Wing Wall |
Lighting, Asphalt Concrete Surfacing, Fence, Grading and Paving, Guard Railing, Highway Planting, Interchange, Irrigation System, Wing Wall, Wheelchair Ramps, Signs, Establish Existing Planting, Erosion Control, Electrical Facilities, Earthwork, Drainage, Culverts, Channelize, Bridge, Bridge Railing, Pavements Markers, Roadway, Ramp, Pavements Markings, Signals |
20 – 40 |
400 |
May 2012 |
View Details
|
January 30, 2012 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
3 -
412404
|
NEV -
020 -
R013.6/R014.8
|
NEAR GRASS VALLEY, AT DORSEY DRIVE OVERCROSSING. |
Interchange,Modify Roadway,Widening |
Widening, Modify Roadway, Interchange |
10 – 20 |
300 |
September 2012 |
View Details
|
January 30, 2012 |
|
3 -
4E3805
|
SAC -
160 -
L006.9/
|
NEAR ISLETON AT THREE MILE SLOUGH BRIDGE |
|
|
0 – 1 |
|
February 2012 |
View Details
|
March 28, 2011 |
|
3 -
4E5004
|
SIE -
089 -
004.5/ 005.5
|
ABOUT 12.0 MILES NORTH OF TRUCKEE FROM 2.3 MILES NORTH OF LITTLE TRUCKEE RIVER BRIDGE TO 0.2 MILE NORTH OF COTTONWOOD ROAD |
Fence,Rock Slope Protection |
Fence, Rock Slope Protection |
0 – 1 |
|
April 2013 |
View Details
|
October 10, 2011 |
|
3 -
4E5404
|
SIE -
049 -
048.3/ 049.2
|
ABOUT 10 MILES SOUTH OF LOYALTON FROM 0.5 MILE TO 1.3 MILES NORTH OF LEMON CANYON ROAD |
UPGRADE CULVERTS AND PAVE LOW SPOTS. Modify Culverts |
Asphalt Concrete Surfacing, Culverts |
1 – 10 |
|
November 2012 |
View Details
|
August 22, 2011 |
|
3 -
4E5904
|
ED -
049 -
003.7/ 003.9
|
ON ROUTE 49 FROM POSTMILE 3.7 TO 3.9 IN THE VICINITY OF MICA STREET |
|
|
1 – 10 |
|
February 2013 |
View Details
|
August 22, 2011 |
|
3 -
4E7605
|
SAC -
005 -
024.5/
|
IN SACRAMENTO, YOLO, AND PLACER COUNTIES AT VARIOUS LOCATIONS |
|
|
0 – 1 |
|
March 2013 |
View Details
|
October 24, 2011 |
|
3 -
4E9704
|
PLA -
049 -
000.9/
|
NEAR AUBURN AT 1.0 MILE NORTH OF EL DORADO COUNTY LINE |
|
|
0 – 1 |
|
April 2012 |
View Details
|
October 25, 2011 |
|
3 -
4E9904
|
BUT -
099 -
026.0/
|
NEAR CHICO AT NEAL ROAD |
|
|
0 – 1 |
|
June 2012 |
View Details
|
August 22, 2011 |
|
3 -
4M0104
|
SIE -
049 -
000.6/ 002.3
|
IN SIERRA AND YUBA COUNTIES ABOUT 15 MILES SOUTH OF DOWNIEVILLE AT VARIOUS LOCATIONS FROM 3.5 MILES SOUTH OF MARYSVILLE ROAD TO 8.1 MILES NORTH OF MARYSVILLE ROAD |
|
|
0 – 1 |
|
February 2012 |
View Details
|
October 25, 2011 |
|
3 -
4M0704
|
NEV -
020 -
027.6/ 038.0
|
ABOUT 18 MILES EAST OF NEVADA CITY FROM MISSOURI BAR ROAD TO 0.4 MILE EAST OF EXCELSIOR POINT ROAD |
|
|
0 – 1 |
|
December 2012 |
View Details
|
January 06, 2012 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
3 -
4M0804
|
ED -
050 -
053.3/ 056.2
|
NEAR KYBURZ FROM 0.5 MILE WEST OF WRIGHTS LAKE ROAD TO 0.4 MILE WEST OF 41 MILE TRACT ROAD |
|
|
0 – 1 |
|
February 2013 |
View Details
|
March 16, 2011 |
|
3 -
4M1204
|
COL -
005 -
R021.0/R034.4
|
NEAR WILLIAMS FROM 1.3 MILES SOUTH OF LURELINE CREEK BRIDGE 15-72 TO GLENN COUNTY LINE |
RAC OVERLAY |
|
1 – 10 |
|
March 2012 |
View Details
|
August 22, 2011 |
|
3 -
4M1604
|
BUT -
032 -
011.7/R023.5
|
NEAR CHICO FROM BRUCE ROAD TO 0.4 MILE WEST OF NOPEL AVENUE |
|
|
1 – 10 |
|
January 2014 |
View Details
|
November 21, 2011 |
|
3 -
4M1904
|
ED -
050 -
019.1/
|
IN EL DORADO, PLACER, AND YOLO COUNTIES AT VARIOUS LOCATIONS |
|
|
0 – 1 |
|
March 2012 |
View Details
|
October 25, 2011 |
|
3 -
4M2004
|
COL -
005 -
R022.3/
|
IN COLUSA, BUTTE, AND GLENN COUNTIES ON ROUTES 5, 20, 32,149, AND 162 AT VARIOUS LOCATIONS |
Rock Slope Protection |
Rock Slope Protection |
0 – 1 |
|
February 2014 |
View Details
|
January 06, 2012 |
|
3 -
4M2104
|
SUT -
099 -
005.8/
|
IN SUTTER, YUBA, AND GLENN COUNTIES AT VARIOUS LOCATIONS |
|
|
1 – 10 |
|
April 2012 |
View Details
|
August 22, 2011 |
|
3 -
4M2404
|
SAC -
051 -
001.4/
|
IN AND NEAR SACRAMENTO ON ROUTES 05, 50, 51, AND 160 AT VARIOUS LOCATIONS |
|
|
1 – 10 |
|
April 2012 |
View Details
|
August 22, 2011 |
|
3 -
4M2604
|
SIE -
089 -
027.8/ 029.6
|
NEAR CALPINE FROM SULPHUR CREEK ROAD TO THE SIERRA/PLUMAS COUNTY LINE |
|
|
0 – 1 |
|
October 2013 |
View Details
|
January 06, 2012 |
|
3 -
4M2704
|
BUT -
191 -
000.0/ 011.4
|
ABOUT 7 MILES NORTH OF OROVILLE FROM JUNCTION ROUTE 70 TO PEARSON ROAD IN PARADISE |
|
|
1 – 10 |
|
April 2013 |
View Details
|
August 22, 2011 |
|
3 -
4M2804
|
SAC -
016 -
T002.5/R023.9
|
IN AND NEAR SACRAMENTO FROM PERKINS JUNCTION AT HOWE AVENUE TO AMADOR COUNTY LINE |
|
|
1 – 10 |
|
March 2013 |
View Details
|
August 22, 2011 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
3 -
4M2904
|
YOL -
505 -
000.0/ 013.2
|
IN YOLO COUNTY FROM SOLANO COUNTY LINE TO 0.4 MILE SOUTH OF LONG CREEK BRIDGE 22-57 |
|
|
1 – 10 |
|
March 2012 |
View Details
|
August 22, 2011 |
|
3 -
4M3004
|
NEV -
080 -
000.0/R002.6
|
IN PLACER COUNTY FROM TROY UNDERCROSIING TO NEVADA COUNTY LINE AND IN NEVADA COUNTY FROM PLACER COUNTY LINE TO 0.1 MILE EAST OF SODA SPRINGS UNDERCROSSING |
|
|
1 – 10 |
|
April 2012 |
View Details
|
October 10, 2011 |
|
3 -
4M3104
|
NEV -
174 -
000.0/ 010.2
|
IN AND NEAR GRASS VALLEY FROM PLACER COUNTY LINE TO ROUTE 20 |
|
|
1 – 10 |
|
September 2012 |
View Details
|
October 25, 2011 |
|
3 -
4M3404
|
ED -
049 -
015.6/ 023.9
|
ON ROUTE 49 FROM ROUTE 193 TO LOTUS ROAD AND ON ROUTE 153 FROM ROUTE ROUTE 49 TO MARSHALL MONUMENT |
|
|
0 – 1 |
|
March 2012 |
View Details
|
January 06, 2012 |
|
3 -
4M3504
|
PLA -
065 -
R004.9/R009.0
|
IN AND NEAR ROSEVILLE FROM ROUTE 80 TO 0.6 MILE SOUTH OF SUNSET BOULEVARD OVERCROSSING |
|
|
0 – 1 |
|
April 2012 |
View Details
|
March 28, 2011 |
|
3 -
4M3704
|
SAC -
005 -
001.5/
|
IN EL DORADO, PLACER, SACRAMENTO, AND YOLO COUNTIES AT VARIOUS LOCATIONS |
|
|
0 – 1 |
|
December 2012 |
View Details
|
August 22, 2011 |
|
3 -
4M3804
|
SAC -
080 -
008.9/ 011.3
|
IN YOLO COUNTY ON ROUTES 50 AND 80
|
|
|
0 – 1 |
|
March 2012 |
View Details
|
August 31, 2011 |
|
3 -
4M4204
|
SIE -
049 -
013.0/
|
NEAR SIERRA CITY AT 2.5 MILES WEST OF OLD GOLD LAKE ROAD |
|
|
0 – 1 |
|
April 2012 |
View Details
|
August 22, 2011 |
|
3 -
4M4404
|
ED -
050 -
049.0/ 052.0
|
NEAR KYBURZ FROM SILVER FORK ROAD TO 36 MILE STONE ROAD |
|
|
0 – 1 |
|
January 2014 |
View Details
|
December 20, 2011 |
|
3 -
4M4604
|
SIE -
089 -
025.9/ 027.9
|
NEAR CALPINE AT VARIOUS LOCATIONS FROM CALPINE SUMMIT TO SULPHUR CREEK ROAD |
|
|
0 – 1 |
|
December 2013 |
View Details
|
December 20, 2011 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
3 -
4M4804
|
COL -
005 -
000.0/R034.4
|
IN COLUSA, GLENN, AND SACRAMENTO COUNTIES ON ROUTE 5 AT VARIOUS LOCATIONS |
|
|
1 – 10 |
|
February 2013 |
View Details
|
December 20, 2011 |
|
3 -
4M4904
|
YOL -
113 -
000.0/ 022.1
|
IN SUTTER AND YOLO COUNTIES ON ROUTES 113/45/80 AT VARIOUS LOCATIONS |
|
|
0 – 1 |
|
December 2012 |
View Details
|
December 20, 2011 |
|
3 -
4M5004
|
NEV -
080 -
005.0/
|
IN NEVADA, PLACER, AND SIERRA COUNTIES AT VARIOUS LOCATIONS |
|
|
0 – 1 |
|
January 2013 |
View Details
|
December 20, 2011 |
|
3 -
4M5104
|
ED -
050 -
000.0/ 080.4
|
IN EL DORADO, SACRAMENTO, AND YOLO COUNTIES AT VARIOUS LOCATIONS ON ROUTES 50, 51, AND 193 |
|
|
1 – 10 |
|
March 2013 |
View Details
|
December 20, 2011 |
|
3 -
4M5204
|
SAC -
080 -
000.0/ 018.0
|
IN AND NEAR SACRAMENTO ON ROUTES 80 , 99, AND 160 AT VARIOUS LOCATIONS |
|
|
1 – 10 |
|
February 2013 |
View Details
|
December 20, 2011 |
|
3 -
4M5304
|
BUT -
099 -
013.0/ 020.6
|
ABOUT 10 MILES SOUTH OF CHICO FROM 0.2 MILE SOUTH OF NORTHERN JUNCTION ROUTE 162 TO DRY CREEK BRIDGE |
|
|
1 – 10 |
|
March 2013 |
View Details
|
December 20, 2011 |
|
3 -
4M5404
|
ED -
050 -
018.1/ 019.1
|
IN PLACERVILLE ON ROUTE 50 FROM 0.1 MILE EAST OF BEDFORD AVENUE TO WILTSE ROAD UC AND ON ROUTE 193 NEAR PLACERVILLE FROM SOUTH FORK AMRICAN RV BRIDGE 25-33 TO ROUTE 49 |
|
|
0 – 1 |
|
November 2012 |
View Details
|
December 20, 2011 |
|
3 -
4M5504
|
GLE -
162 -
067.2/ 084.6
|
NEAR WILLOWS FROM CENTRAL IRRIGATION CANAL BRIDGE 11-0009 TO BUTTE COUNTY LINE |
|
|
1 – 10 |
|
March 2013 |
View Details
|
December 20, 2011 |
|
3 -
4M5604
|
GLE -
032 -
L000.0/ 001.3
|
IN ORLAND FROM I-5 TO COUNTY ROAD M 1/2 |
|
|
0 – 1 |
|
February 2013 |
View Details
|
December 20, 2011 |
|
3 -
4M5704
|
PLA -
174 -
000.0/ 002.9
|
IN AND NEAR COLFAX FROM 174/80 SEPERATION BRIDGE 19-0086 TO NEVADA COUNTY LINE |
|
|
0 – 1 |
|
March 2013 |
View Details
|
December 20, 2011 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
3 -
4M5804
|
SAC -
160 -
R044.5/ 047.1
|
IN THE CITY AND COUNTY OF SACRAMENTO FROM AMERICAN RIVER BRIDGE 24-001 TO 0.8 MILE NORTH OF TRIBUTE ROAD |
|
|
1 – 10 |
|
February 2013 |
View Details
|
December 20, 2011 |
|
3 -
4M6004
|
PLA -
080 -
044.7/ 054.9
|
11 MILES EAST OF COLFAX FROM ALTA ROAD UNDERCROSSING 19-111 TO PUTTS LAKE UNDERCROSSING 19-116 |
|
|
1 – 10 |
|
June 2012 |
View Details
|
December 20, 2011 |
|
4 -
0120T4
|
SF -
80 -
7.83/8.64
|
IN THE COUNTY OF SAN FRANCISCO ON ROUTE 80 AT THE SAN FRANCISCO-OAKLAND BAY BRIDGE EAST SPAN |
CONSTRUCT BRIDGE STRUCTURES & ROADWAY |
Roadway, Bridge, Freeway and Structures |
40 – 60 |
1200 |
March 2012 |
View Details
|
January 10, 2012 |
|
4 -
014074
|
ALA -
80 -
1.7/2.2
|
IN ALAMEDA COUNTY ON I-80 AT THE SFOBB TOLL PLAZA |
MEDIAN LANDSCAPE PLANTING & IRRIGATION |
Highway Planting, Irrigation System |
0 – 1 |
870 |
June 2012 |
View Details
|
January 06, 2012 |
|
4 -
0A7904
|
CC -
4 -
0.2/31.5
|
IN CONTRA COSTA AND ALAMEDA COUNTY ON VARIOUS ROUTES AT APPROXIMATELY 168 LOCATIONS |
UPGRADE TRAFFIC BARRIER AND GUARDRAIL END TERMINALS |
Modify Guard Railing |
1 – 10 |
600 |
September 2012 |
View Details
|
January 06, 2012 |
|
4 -
0G1304
|
SCL -
82 -
20.9
|
IN SANTA CLARA COUNTY ON ROUTE 82 IN MOUNTAIN VIEW AT CLARK AVENUE INTERSECTION |
INSTALL TRAFFIC SIGNALS, CONSTRUCT WHEELCHAIR RAMPS, EXTEND MEDIAN ISLAND, AND OVERLAY PAVEMENT |
Asphalt Concrete Surfacing, Wheelchair Ramps, Signals |
0 – 1 |
80 |
July 2012 |
View Details
|
January 06, 2012 |
|
4 -
0G1404
|
SCL -
85 -
9.0/9.3
|
IN SANTA CLARA COUNTY ON ROUTE 85 FROM 0.23 MILES NORTH OF THE LEIGH AVENUE OVERCROSSING TO THE UNION AVENUE OVERCROSSING |
CONSTRUCT DRAINAGE IMPROVEMENTS |
Modify Drainage |
0 – 1 |
40 |
February 2012 |
View Details
|
February 08, 2012 |
|
4 -
0G1704
|
SM -
1 -
28.2
|
IN SANTA CLARA COUNTY IN HALF MOON BAY ON ROUTE 1 AT POPLAR STREET |
INSTALL TRAFFIC SIGNALS |
Signals |
0 – 1 |
50 |
August 2012 |
View Details
|
January 06, 2012 |
|
4 -
0G3104
|
SON -
121 -
3.4/6.5
|
IN SONOMA COUNTY ON ROUTE 121 FROM 1.8 MILES NORTH OF MANGEL RANCH ROAD TO BONNEAU ROAD |
CONSTRUCT SOFT MEDIAN BARRIER |
Modify Roadway |
0 – 1 |
60 |
April 2012 |
View Details
|
January 06, 2012 |
|
4 -
151134
|
ALA -
580 -
R9.5/M31.0
|
IN ALAMEDA COUNTY ON ROUTE 580 AT VARIOUS LOCATIONS |
INSTALL RAMP METERING AND HOV BYPASS LANES |
Asphalt Concrete Surfacing, Ramp Metering System, Pavements Markings |
1 – 10 |
350 |
October 2012 |
View Details
|
February 10, 2012 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
4 -
153004
|
ALA -
92 -
0.0/6.3
|
IN ALAMEDA COUNTY ON ROUTE 92 FROM THE SAN MATEO-HAYWARD BRIDGE TO THE I-880 INTERCHANGE |
INSTALL RAMP METERING |
Ramp Metering System |
1 – 10 |
90 |
July 2012 |
View Details
|
January 06, 2012 |
|
4 -
153204
|
SCL -
680 -
M0.0/M9.9
|
IN SANTA CLARA COUNTY ON I-680 FROM THE ROUTE 101 INTERCHANGE TO SCOTT CREEK ROAD |
INSTALL RAMP METERING |
Ramp Metering System |
10 – 20 |
190 |
October 2012 |
View Details
|
February 10, 2012 |
|
4 -
153504
|
SOL -
80 -
0.0/R28.4
|
IN SOLANO COUNTY ON I-80 FROM THE CARQUINEZ BRIDGE TO THE I-505 SEPARATION |
INSTALL RAMP METERING |
Ramp Metering System |
20 – 40 |
260 |
October 2012 |
View Details
|
February 10, 2012 |
|
4 -
154204
|
SCL -
85 -
R18.0/R23.9
|
IN SANTA CLARA COUNTY ON ROUTE 85 FROM THE I-280 INTERCHANGE TO THE ROUTE 101 INTERCHANGE |
INSTALL RAMP METERING |
Ramp Metering System, Asphalt Concrete Surfacing, Pavements Markings |
1 – 10 |
350 |
November 2012 |
View Details
|
February 10, 2012 |
|
4 -
1A3204
|
CC -
580 -
5.5/6.1
|
IN CONTRA COSTA COUNTY ON ROUTE 580 AT THE SCOFIELD AVENUE UC AND WESTERN DRIVE ON-RAMP |
BRIDGE DECK REPLACEMENT |
Replace Bridge |
10 – 20 |
435 |
March 2012 |
View Details
|
January 06, 2012 |
|
4 -
1E2404
|
SM -
1 -
34.8/37.9
|
IN SAN MATEO COUNTY ON ROUTE 1 FROM 0.1 MILE SOUTH OF MARINE BLVD TO 1.3 MILE NORTH OF SECOND STREET |
RESURFACING WITH HOT-MIX ASPHALT (BONDED WEARING COURSE) |
Asphalt Concrete Surfacing |
1 – 10 |
45 |
February 2012 |
View Details
|
January 30, 2012 |
|
4 -
1F3104
|
SON -
12 -
33.3
|
IN SONOMA COUNTY ON ROUTE 12 AT HOOKER CREEK BRIDGE #20-0030 |
SCOUR MITIGATION |
Erosion Control |
0 – 1 |
30 |
March 2012 |
View Details
|
January 06, 2012 |
|
4 -
1G2004
|
ALA -
880 -
4.5/4.9
|
IN ALAMEDA COUNTY ON I-880 AT THE AUTO MALL PARKWAY INTERCHANGE |
RESURFACE PAVEMENT ON NORTHBOUND AND SOUTHBOUND LANES WITH OPEN GRADED FRICTION COURSE (OGFC) |
Asphalt Concrete Surfacing, Rehabilitate Pavement |
0 – 1 |
65 |
June 2012 |
View Details
|
January 06, 2012 |
|
4 -
1G2404
|
SON -
116 -
34.1/34.5
|
IN SONOMA COUNTY IN COTATI ON ROUTE 116 AT MADRONE AVENUE |
LEFT-TURN CHANNELIZATION |
Widening, Modify Drainage, Asphalt Concrete Surfacing |
1 – 10 |
105 |
August 2012 |
View Details
|
January 06, 2012 |
|
4 -
1G5504
|
CC -
80 -
7.5
|
IN CONTRA COSTA COUNTY ON I-80 WESTBOUND APPIAN AVENUE ON-RAMP IN RICHMOND, AND ON ROUTE 4 EASTBOUND BETWEEN PORT CHICAGO HWY ON-RAMP AND WILLOW AVENUE OFF-RAMP IN CONCORD |
INSTALL GUARDRAIL AND RESURFACE WITH OPEN GRADED HOT-MIX ASPHALT |
Guard Railing, Asphalt Concrete Surfacing |
1 – 10 |
70 |
July 2012 |
View Details
|
January 06, 2012 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
4 -
1G5604
|
ALA -
880 -
31.0/31.6
|
IN ALAMEDA COUNTY ON I-880 IN OAKLAND FROM OAK-MADISON UNDERCROSSING TO WASHINGTON STREET UNDERCROSSING |
REMOVE EXISTING MEDIAN GUARDRAIL |
Guard Railing |
1 – 10 |
80 |
August 2012 |
View Details
|
January 06, 2012 |
|
4 -
1G9404
|
CC -
4 -
27.3/R29.0
|
IN CONTRA COSTA COUNTY IN ANTIOCH FROM THE G STREET OVERCROSSING TO 0.1 MILE EAST OF HILLCREST AVENUE OVERCROSSING |
WIDEN FREEWAY TO 8 LANES, RECONSTRUCT A STREET UNDERCROSSING, RETAINING AND SOUND WALLS |
Widening, Retaining Wall, Freeway and Structures |
40 – 60 |
660 |
February 2012 |
View Details
|
February 08, 2012 |
|
4 -
283824
|
SON -
116 -
41.8/44.7
|
IN SONOMA COUNTY ON ROUTE 116 NEAR SCHELLVILLE AT VARIOUS LOCATIONS |
MITIGATION - TREE PLANTING AND CREEK CHANNELIZATION |
Channelize, Highway Planting, Irrigation System |
1 – 10 |
720 |
March 2012 |
View Details
|
February 10, 2012 |
|
4 -
2908C4
|
ALA -
580 -
R8.4/14.6
|
IN ALAMEDA COUNTY ON ROUTE 580 FROM THE GREENVILLE ROAD UNDERCROSSING TO THE ROUTE 84/580 SEPARATION |
CONSTRUCT WESTBOUND HOV LANE AND AUXILIARY LANE |
Asphalt Concrete Surfacing, Replace PCC Pavement, Pavements Markings, Ramp Metering System |
60 – 80 |
520 |
March 2012 |
View Details
|
February 09, 2012 |
|
4 -
2908E4
|
ALA -
580 -
R14.6/R21.6
|
IN ALAMEDA COUNTY ON I-580 WESTBOUND FROM AIRWAY BLVD OVERCROSSING TO SAN RAMON ROAD/FOOTHILL ROAD OVERCROSSING |
CONSTRUCT WESTBOUND HOV LANE AND AUXILIARY LANE |
Ramp Metering System, Pavements Markings, Asphalt Concrete Surfacing, Replace PCC Pavement |
40 – 60 |
490 |
March 2012 |
View Details
|
February 09, 2012 |
|
4 -
292264
|
ALA -
80 -
2.5/3.2
|
IN ALAMEDA COUNTY ON I-80 FROM WEST GRAND AVENUE TO THE SHELLMOUNT STREET EXTENSION, AND ON I-880 AT MARITIME STREET |
CONSTRUCT BIKEWAY (PHASE 2) |
Roadway |
1 – 10 |
1000 |
March 2012 |
View Details
|
February 10, 2012 |
|
4 -
2A4404
|
SCL -
152 -
16.2/R19.5
|
IN SANTA CLARA COUNTY ON ROUTE 152 BETWEEN LAKE ROAD AND SAN FELIPE ROAD |
IMPROVE SIGHT DISTANCE, UPGRADE SHOULDERS, AND MINOR REALIGNMENT |
Realign Curve, Modify Roadway, Realignment |
10 – 20 |
185 |
July 2012 |
View Details
|
January 06, 2012 |
|
4 -
2A6204
|
SOL -
12 -
22.7/R23.7
|
IN SOLANO COUNTY ON ROUTE 12 AT CURIE, MCCLOSKEY, AND AZEVEDO ROADS, FROM AZEVEDO RD TO LIBERTY ISLAND RD |
INSTALL LEFT-TURN POCKETS, SHOULDER WIDENING |
Modify Roadway, Asphalt Concrete Surfacing, Widening |
1 – 10 |
120 |
May 2012 |
View Details
|
January 09, 2012 |
|
4 -
2E3804
|
SM -
82 -
20.8/21.9
|
IN SAN MATEO COUNTY IN SOUTH SAN FRANCISCO FROM ARROYO DRIVE TO HICKEY BLVD |
DIGOUTS |
Asphalt Concrete Surfacing, Repair Roadway |
0 – 1 |
30 |
March 2012 |
View Details
|
January 06, 2012 |
|
4 -
2E4204
|
SOL -
113 -
6.0/14.0
|
IN SOLANO COUNTY ON ROUTE 113 FROM 0.7 MILES NORTH OF HASTINGS ROAD TO 1.0 MILES SOUTH OF HAWKINS ROAD |
DIGOUTS |
Asphalt Concrete Surfacing, Repair Roadway |
0 – 1 |
30 |
February 2012 |
View Details
|
January 31, 2012 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
4 -
2E4304
|
NAP -
29 -
24.6/35.6
|
IN NAPA COUNTY ON ROUTE 29 FROM JUNCTION OF ROUTE 128 EAST RUTHERFORD TO JUNCTION ROUTE 128 NORTHWEST |
DIGOUTS |
Asphalt Concrete Surfacing, Repair Roadway |
0 – 1 |
30 |
February 2012 |
View Details
|
January 06, 2012 |
|
4 -
2E4504
|
SM -
35 -
29.7/31.5
|
IN SAN MATEO COUNTY ON ROUTE 35 FROM WEST MOORE AVENUE TO THE SAN MATEO/SAN FRANCISCO COUNTY LINE |
HOT-MIX ASPHALT (HMA) OVERLAY |
Asphalt Concrete Surfacing |
0 – 1 |
40 |
February 2012 |
View Details
|
January 06, 2012 |
|
4 -
2E4604
|
SCL -
130 -
9.0/15.0
|
IN SANTA CLARA COUNTY ON ROUTE 130 FROM 1 MILE EAST OF THREE SPRINGS ROAD TO 0.8 WEST OF SMITH CREEK |
CHIP SEAL SURFACING |
Seal Cracks |
0 – 1 |
30 |
February 2012 |
View Details
|
January 06, 2012 |
|
4 -
2E4704
|
SCL -
237 -
9.3/11.1
|
IN SANTA CLARA COUNTY IN MILPITAS FROM ROUTE 237/880 SEPARATION TO ROUTE 237/680 |
PLACE MICROSURFACING |
Asphalt Concrete Surfacing |
0 – 1 |
35 |
February 2012 |
View Details
|
February 08, 2012 |
|
4 -
2E5104
|
MRN -
1 -
0.0/15.0
|
IN MARIN COUNTY ON ROUTE 1 FROM ROUTE 101 TO 2.8 MILES NORTH OF PANORAMIC HIGHWAY |
BONDED WEARING COURSE (BWC) OVERLAY |
Asphalt Concrete Surfacing |
1 – 10 |
60 |
February 2012 |
View Details
|
January 31, 2012 |
|
4 -
2E5204
|
SOL -
220 -
0.0/3.1
|
IN SOLANO COUNTY ON ROUTE 220 ABOUT 7 MILES NORTH OF RIO VISTA FROM ROUTE 84 TO STEAMBOAT SLOUGH FERRY |
COLD PLANE AND HOT-MIX ASPHALT (HMA) OVERLAY |
Asphalt Concrete Surfacing, Rehabilitate Pavement |
0 – 1 |
30 |
February 2012 |
View Details
|
January 31, 2012 |
|
4 -
2E5404
|
SM -
82 -
0.0/2.7
|
IN SAN MATEO COUNTY ON ROUTE 82 FROM THE SAN MATEO/SANTA CLARA COUNTY LINE TO BERKSHIRE AVENUE |
BONDED WEARING COURSE (BWC) OVERLAY |
Rehabilitate Pavement, Asphalt Concrete Surfacing |
1 – 10 |
100 |
March 2012 |
View Details
|
January 06, 2012 |
|
4 -
2E5504
|
SCL -
35 -
0.0/21.0
|
IN SANTA CLARA AND SAN MATEO COUNTIES ON ROUTE 35 FROM THE SAN MATEO/SANTA CLARA COUNTY LINE TO 2 MILES SOUTH OF SOUTH JUNCTION ROUTE 92 |
RUBBERIZED HOT-MIX ASPHALT (RHMA) SEAL COAT |
Seal Coat |
1 – 10 |
40 |
February 2012 |
View Details
|
January 31, 2012 |
|
4 -
2E5604
|
SM -
101 -
11.9/13.4
|
IN SAN MATEO COUNTY ON ROUTE 101 FROM 0.1 MILE NORTH OF FASHION ISLAND BLVD TO 0.1 MILE NORTH OF THIRD AVENUE OVERCROSSING |
BONDED WEARING COURSE (BWC) OVERLAY |
Asphalt Concrete Surfacing |
1 – 10 |
80 |
February 2012 |
View Details
|
January 06, 2012 |
|
4 -
2E5804
|
NAP -
128 -
19.1/34.3
|
IN NAPA COUNTY ON ROUTE 128 NEAR NAPA FROM KNOXVILLE ROAD TO SOLANO COUNTY LINE |
REPLACE HOT-MIX ASPHALT (HMA) |
Asphalt Concrete Surfacing |
1 – 10 |
50 |
February 2012 |
View Details
|
February 08, 2012 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
4 -
2E5904
|
SON -
12 -
38.7/41.3
|
IN SONOMA COUNTY ON ROUTE 12 FROM NAPA ROAD TO ROUTE 121 |
REPLACE HOT-MIX ASPHALT (HMA) |
Asphalt Concrete Surfacing |
0 – 1 |
50 |
February 2012 |
View Details
|
February 10, 2012 |
|
4 -
2E6004
|
SCL -
130 -
15.0/22.5
|
IN SANTA CLARA COUNTY ON ROUTE 130 FROM 0.8 MILES WEST OF SMITH CREEK TO 5.3 MILES EAST OF KINCAID ROAD |
REPLACE HOT-MIX ASPHALT (HMA) |
Asphalt Concrete Surfacing |
0 – 1 |
40 |
February 2012 |
View Details
|
January 06, 2012 |
|
4 -
2E6104
|
ALA -
580 -
0.9/4.5
|
IN ALAMEDA COUNTY ON I-580 FROM 0.15 MILES WEST OF MIDWAY ROAD UNDERCROSSING TO 1.5 MILES EAST OF NORTH FLYNN ROAD |
SLAB AND HMA REPLACEMENT |
Replace PCC Pavement, Asphalt Concrete Surfacing |
0 – 1 |
50 |
February 2012 |
View Details
|
February 09, 2012 |
|
4 -
2E6204
|
ALA -
13 -
4.2/10.0
|
IN ALAMEDA COUNTY ON ROUTE 13 AT VARIOUS LOCATIONS FROM POSTMILE 4.2 TO 10.0 |
REPLACE HOT-MIX ASPHALT SURFACING |
Asphalt Concrete Surfacing |
0 – 1 |
40 |
February 2012 |
View Details
|
February 08, 2012 |
|
4 -
2E6404
|
SON -
121 -
7.3/11.6
|
IN SONOMA COUNTY FROM SONOMA CREEK TO NAPA COUNTY LINE |
RUBBERIZED HOT-MIX ASPHALT (RHMA) SURFACING |
Asphalt Concrete Surfacing |
1 – 10 |
50 |
February 2012 |
View Details
|
February 08, 2012 |
|
4 -
2E6504
|
NAP -
121 -
9.4/22.9
|
IN NAPA COUNTY ON ROUTE 121 NEAR NAPA FROM TRANCAS STREET TO ROUTE 128 |
RUBBERIZED HOT-MIX ASPHALT (RHMA) OVERLAY |
Asphalt Concrete Surfacing |
1 – 10 |
50 |
February 2012 |
View Details
|
January 06, 2012 |
|
4 -
2E6704
|
NAP -
128 -
18.5/27.9
|
IN NAPA COUNTY ON ROUTE 128 AT SODA CREEK BRIDGE AND WRAGG CREEK BRIDGE |
INVERT PAVING |
Bridge |
1 – 10 |
30 |
March 2012 |
View Details
|
January 06, 2012 |
|
4 -
2E6904
|
MRN -
12 -
VAR
|
IN MARIN COUNTY ON ROUTES 12, 101, AND 121 AT VARIOUS BRIDGE LOCATIONS |
METHACRYLATE BRIDGE DECK, RECONSTRUCT APPROACH SLABS, REPLACE JOINT SEALS, POLYESTER CONCRETE OVERLAY |
Replace PCC Pavement, Replace Joint Seals, Rehabilitate Bridge Deck |
0 – 1 |
160 |
November 2012 |
View Details
|
January 06, 2012 |
|
4 -
2E7104
|
SCL -
82 -
R0.0/14.3
|
IN SANTA CLARA COUNTY ON ROUTE 82 AT VARIOUS BRIDGE LOCATIONS |
TREAT BRIDGE DECK WITH METHACRYLATE, REPLACE JOINT SEALS, AND CONCRETE SLAB REPAIR |
Replace Joint Seals, Rehabilitate Bridge Deck |
1 – 10 |
180 |
November 2012 |
View Details
|
January 06, 2012 |
|
4 -
2E7204
|
SOL -
12 -
1.8/R2.8
|
IN SOLANO COUNTY ON ROUTE 12 AT VARIOUS BRIDGE LOCATIONS |
METHACRYLATE BRIDGE DECK, REPLACE JOINT SEALS, AND REPAIR CONCRETE SLABS |
Replace Joint Seals, Replace PCC Pavement, Rehabilitate Bridge Deck |
0 – 1 |
100 |
November 2012 |
View Details
|
January 06, 2012 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
4 -
2E7404
|
ALA -
580 -
VAR
|
IN ALAMEDA COUNTY ON ROUTES 580, 680, AND 880 AT VARIOUS BRIDGE LOCATIONS |
METHACRYLATE BRIDGE DECKS, REPLACE JOINT SEALS, AND PATCH SPALLS |
Rehabilitate Bridge Deck, Replace Joint Seals, Replace PCC Pavement |
0 – 1 |
120 |
November 2012 |
View Details
|
January 06, 2012 |
|
4 -
2E7504
|
SM -
84 -
25.8/27.6
|
IN SAN MATEO COUNTY ON ROUTE 84 AT VARIOUS BRIDGE LOCATIONS |
METHACRYLATE BRIDGE DECK, REPLACE JOINTS SEALS, AND REPAIR CONCRETE SLABS |
Replace PCC Pavement, Replace Joint Seals, Rehabilitate Bridge Deck |
1 – 10 |
160 |
November 2012 |
View Details
|
January 06, 2012 |
|
4 -
2E7604
|
SM -
1 -
43.7/47.0
|
IN SAN MATEO AND SAN FRANCISCO COUNTY ON ROUTE 1 AT VARIOUS BRIDGE LOCATIONS |
TREAT BRIDGE DECKS WITH METHACRYLATE, REPLACE JOINT SEALS, REPAIR CONCRETE |
Rehabilitate Bridge Deck, Replace Joint Seals, Replace PCC Pavement |
0 – 1 |
120 |
November 2012 |
View Details
|
January 06, 2012 |
|
4 -
2E7704
|
ALA -
580 -
VAR
|
IN ALAMEDA, MARIN, SAN FRANCISCO, SAN MATEO, SANTA CLARA, SOLANO, SONOMA COUNTIES ON VARIOUS ROUTES AT VARIOUS LOCATIONS |
CHANGE XEON CHANGEABLE MESSAGE SIGNS (CMS) TO LED |
Modify Signs |
0 – 1 |
60 |
March 2012 |
View Details
|
January 06, 2012 |
|
4 -
2G5904
|
SCL -
101 -
44.0
|
IN SANTA CLARA COUNTY ON ROUTE 101 AT VARIOUS LOCATIONS |
REPLACE OVERHEAD SIGNS |
Replace Signs |
0 – 1 |
60 |
March 2012 |
View Details
|
January 06, 2012 |
|
4 -
2G6004
|
SON -
101 -
R53.5/R55.6
|
IN SONOMA COUNTY ON ROUTE 101 IN CLOVERDALE FROM THE 101/128 SEPARATION TO THE SONOMA/MENDOCINO COUNTY LINE |
PAVING AND DRAINAGE |
Asphalt Concrete Surfacing, Drainage |
0 – 1 |
90 |
March 2012 |
View Details
|
January 06, 2012 |
|
4 -
2G6304
|
SM -
280 -
9.6/11.0
|
IN SAN MATEO COUNTY ON I-280 FROM LAS PULGAS UNDERCROSSING TO 0.2 MILES NORTH OF ROUTE 82 |
HOT-MIX ASPHALT SURFACING |
Asphalt Concrete Surfacing |
0 – 1 |
80 |
March 2012 |
View Details
|
January 06, 2012 |
|
4 -
2G7204
|
SF -
80 -
7.8/8.85
|
IN SAN FRANCISCO COUNTY ON ROUTE 80 AT THE SAN FRANCISCO-OAKLAND BAY BRIDGE |
PAINTING REPAIRS AT EAST SPAN EYEBARS |
Clean and Paint Bridge |
0 – 1 |
80 |
November 2012 |
View Details
|
January 06, 2012 |
|
4 -
2L1404
|
SM -
84 -
8.3/19.4
|
IN SAN MATEO COUNTY ON ROUTE 84 FROM PESCADERO ROAD TO TRIPP ROAD |
INSTALL CENTERLINE RUMBLE STRIP |
Pavements Markers, Pavements Markings |
0 – 1 |
80 |
April 2012 |
View Details
|
January 06, 2012 |
|
4 -
3A23U4
|
SON -
101 -
25.0/29.3
|
IN SONOMA COUNTY ON ROUTE 101 FROM 0.3 MILES SOUTH OF FULTON ROAD OVERCROSSING TO 0.2 MILES SOUTH OF WINDSOR LANE OVERCROSSING |
RECONSTRUCT AIRPORT BLVD INTERCHANGE, CONSTRUCT SOUND WALLS |
Sound Wall, Reconstruct Interchange, Freeway and Structures |
20 – 40 |
475 |
October 2012 |
View Details
|
February 10, 2012 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
4 -
3A3304
|
SON -
12 -
32.8/32.9
|
IN SONOMA COUNTY NEAR ELDRIDGE ON ROUTE 12 AT MADRONE ROAD |
INSTALL TRAFFIC SIGNALS AND WIDEN ROADWAY INTERSECTION |
Pavements Markings, Modify Roadway, Signals |
1 – 10 |
220 |
September 2012 |
View Details
|
January 06, 2012 |
|
4 -
3A7204
|
SM -
1 -
35.9
|
IN SAN MATEO IN MONTARA ON ROUTE 1 AT 16TH STREET AND CARLOS STREET |
CONSTRUCT LEFT TURN CHANNELIZATION |
Modify Roadway, Pavements Markings, Channelize |
0 – 1 |
80 |
April 2012 |
View Details
|
January 06, 2012 |
|
4 -
3A7764
|
ALA -
80 -
3.8/8.0
|
IN ALAMEDA AND CONTRA COSTA COUNTY ON I-80 AT VARIOUS LOCATIONS |
WIDEN RAMPS AND INSTALL RAMP METERING SYSTEM |
Modify Ramp, Ramp Metering System |
1 – 10 |
375 |
April 2012 |
View Details
|
January 06, 2012 |
|
4 -
3A7774
|
ALA -
80 -
1.9/8.0
|
IN ALAMEDA COUNTY AND CONTRA COSTA COUNTY ON I-80 AT VARIOUS LOCATIONS |
TOS ACTIVE TRAFFIC MANAGEMENT |
Interconnect Signals, Ramp Metering System |
20 – 40 |
360 |
June 2012 |
View Details
|
February 10, 2012 |
|
4 -
3A9214
|
ALA -
880 -
22.6/24.0
|
IN ALAMEDA COUNTY ON I-880 SOUTHBOUND FROM 0.2 MILES SOUTH OF MARINA BLVD OVERCROSSING TO 0.4 MILES NORTH OF DAVIS STREET OVERCROSSING |
CONSTRUCT SOUTHBOUND HOV LANE |
Modify Freeway, Pavements Markings, Freeway and Structures, Widening |
40 – 60 |
520 |
August 2012 |
View Details
|
February 10, 2012 |
|
4 -
3A9224
|
ALA -
880 -
23.8/25.5
|
IN ALAMEDA COUNTY ON I-880 SOUTHBOUND FROM 0.15 MILES NORTH OF DAVIS STREET OVERCROSSING TO HEGENBERGER ROAD OVERCROSSING |
CONSTRUCT SOUTHBOUND HOV LANE |
Widening, Pavements Markings, Modify Freeway, Freeway and Structures |
20 – 40 |
420 |
September 2012 |
View Details
|
February 10, 2012 |
|
4 -
3A9604
|
ALA -
580 -
R9.2
|
IN ALAMEDA COUNTY ON EASTBOUND I-580 BETWEEN SOUTH VASCO ROAD AND THE LIVERMORE WEIGH STATION |
REPAIR PCC PAVEMENT, RESURFACE AND ENLARGE PARKING AREA |
Asphalt Concrete Surfacing, Replace PCC Pavement, Scale Facility |
1 – 10 |
70 |
April 2012 |
View Details
|
January 06, 2012 |
|
4 -
3S5704
|
MRN -
1 -
37.1
|
IN MARIN COUNTY ON ROUTE 1 1.5 MILES SOUTH OF MARSHALL |
REPLACE CULVERT AND CONSTRUCT ROCK SLOPE PROTECTION |
Rock Slope Protection, Culverts |
0 – 1 |
90 |
March 2012 |
View Details
|
January 06, 2012 |
|
4 -
3S7514
|
SON -
1 -
29.9
|
IN SONOMA COUNTY ON ROUTE 1 NEAR TIMBER COVE AT 3.1 MILES SOUTH OF FORT ROSS ROAD |
REPLACE CULVERT AND CONSTRUCT ROCK SLOPE PROTECTION |
Replace Culverts, Rock Slope Protection |
1 – 10 |
80 |
June 2012 |
View Details
|
January 06, 2012 |
|
4 -
3S7524
|
SON -
1 -
40.1
|
IN SONOMA COUNTY ON ROUTE 1 AT POSTMILE 40.1 |
REPLACE CULVERT AND ROCK SLOPE |
Replace Culverts, Rock Slope Protection |
0 – 1 |
80 |
March 2012 |
View Details
|
January 06, 2012 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
4 -
3S8304
|
SCL -
17 -
1.9/5.8
|
IN SANTA CLARA COUNTY ON ROUTE 17 BETWEEN BRUSH ROAD AND SOUTH SANTA CRUZ AVENUE |
CONSTRUCT HEADWALL AND SOIL NAIL WALL |
Wing Wall, Retaining Wall |
0 – 1 |
85 |
March 2012 |
View Details
|
January 06, 2012 |
|
4 -
4A0104
|
SOL -
80 -
30.6/38.7
|
IN SOLANO COUNTY ON I-80 FROM 0.7 MILES EAST OF LEISURE TOWN ROAD UNDERCROSSING TO 1.0 MILE WEST OF THE PEDRICK ROAD OVERCROSSING |
CRACK, SEAT, AND OVERLAY EXISTING ROADWAY |
Rehabilitate Pavement, Asphalt Concrete Surfacing |
20 – 40 |
400 |
March 2012 |
View Details
|
January 06, 2012 |
|
4 -
4A2504
|
SOL -
80 -
0.9/45.0
|
IN SOLANO COUNTY ON ROUTE 80 AT 21 EASTBOUND AND 16 WESTBOUND LOCATIONS |
INSTALL METAL BEAM GUARDRAIL |
Guard Railing |
1 – 10 |
100 |
September 2012 |
View Details
|
January 06, 2012 |
|
4 -
4A3204
|
SM -
280 -
VAR
|
IN SAN MATEO COUNTY ON I-280 AND ROUTE 101 AT VARIOUS LOCATIONS |
INSTALL METAL BEAM GUARDRAIL |
Guard Railing |
1 – 10 |
140 |
August 2012 |
View Details
|
January 06, 2012 |
|
4 -
4S0204
|
NAP -
29 -
41.0/41.3
|
IN NAPA COUNTY NEAR CALISTOGA ON ROUTE 29 1.6 MILES NORTH OF TUBBS LANE |
RECONSTRUCT SLOPE |
Earthwork, Repair Slope |
1 – 10 |
150 |
September 2012 |
View Details
|
January 06, 2012 |
|
4 -
4S0304
|
NAP -
128 -
10.3
|
IN NAPA COUNTY ON ROUTE 128 NEAR LAKE HENNESSEY 2.8 MILES EAST OF SILVERADO TRAIL |
CONSTRUCT SHEET PILE WALL |
Retaining Wall |
1 – 10 |
70 |
July 2012 |
View Details
|
January 06, 2012 |
|
4 -
4S0604
|
SCL -
85 -
0.3
|
IN SANTA CLARA COUNTY ON ROUTE 85 AT BERNAL ROAD |
PAVEMENT LEVELING AND GRINDING |
Rehabilitate Pavement, Asphalt Concrete Surfacing |
0 – 1 |
45 |
March 2012 |
View Details
|
January 06, 2012 |
|
4 -
4S0804
|
SCL -
101 -
36.92
|
IN SANTA CLARA COUNTY ON ROUTE 101 AT TAYLOR STREET |
RECONSTRUCT SLOPE WITH GEOGRID |
Repair Slope |
0 – 1 |
45 |
August 2012 |
View Details
|
January 06, 2012 |
|
4 -
4S1204
|
SM -
35 -
24.8
|
IN SAN MATEO COUNTY ON ROUTE 35 AT SNEATH LANE |
GABION EMBANKMENT REPAIR |
Repair Slope |
0 – 1 |
60 |
May 2012 |
View Details
|
January 06, 2012 |
|
4 -
4S2204
|
MRN -
1 -
10.9
|
IN MARIN COUNTY ON ROUTE 1 IN THE VICINITY OF STINSON BEACH |
CONSTRUCT SOLDIER PILE/TIE-BACK RETAINING WALL |
Retaining Wall, Repair Slope |
1 – 10 |
200 |
September 2012 |
View Details
|
January 06, 2012 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
4 -
4S2704
|
CC -
24 -
1.4
|
IN CONTRA COSTA COUNTY ON ROUTE 24 0.1 MILES EAST OF THE WILDER ROAD OVERCROSSING |
REPLACE CULVERT, REPAIR SLOPE, DRAINAGE IMPROVEMENTS |
Replace Culverts, Modify Drainage, Repair Slope |
0 – 1 |
60 |
July 2012 |
View Details
|
January 06, 2012 |
|
4 -
4S5304
|
MRN -
1 -
11.0
|
IN MARIN COUNTY ON ROUTE 1 AT WEBB CREEK |
CONSTRUCT SOIL NAIL WALL AND ROCK SLOPE PROTECTION |
Retaining Wall, Rock Slope Protection |
1 – 10 |
90 |
June 2012 |
View Details
|
January 06, 2012 |
|
4 -
4S5804
|
SM -
1 -
18.6
|
IN SAN MATEO COUNTY ON ROUTE 1 NEAR HALF MOON BAY AT 0.4 MILES NORTH OF LA HONDA ROAD |
CONSTRUCT DRAINAGE DITCH AND ROCK SLOPE PROTECTION |
Rock Slope Protection, Modify Drainage |
0 – 1 |
55 |
July 2012 |
View Details
|
January 06, 2012 |
|
4 -
4S5904
|
SM -
84 -
22.1
|
IN SAN MATEO COUNTY IN WOODSIDE AT 0.6 MILE NORTH OF ROUTE 280/84 SEPARATION |
CONSTRUCT TIEBACK WALL |
Repair Drainage, Retaining Wall, Repair Roadway |
1 – 10 |
370 |
February 2012 |
View Details
|
February 08, 2012 |
|
4 -
4S6204
|
SON -
1 -
34.5
|
IN SONOMA COUNTY ON ROUTE 1 APPROXIMATELY 1.5 MILES NORTH OF FORT ROSS ROAD |
CONSTRUCT SOLDIER PILE TIE-BACK WALL |
Retaining Wall |
1 – 10 |
200 |
October 2012 |
View Details
|
January 06, 2012 |
|
5 -
0G160_
|
SB -
166 -
0.9/2.4,3.8/4.8
|
ON ROUTE 166 IN SANTA BARBARA COUNTY NEAR GUADALUPE FROM SIMAS STREET TO 1.4 MILES WEST OF BONITA SCHOOL ROAD AND FROM BONITA SCHOOL ROAD TO BLACK ROAD |
RELOCATE DRAINAGE DITCHES |
Fence, Guard Railing, Modify Lighting, Rock Slope Protection, Modify Signals, Earthwork, Modify Drainage, Replace Culverts |
1 – 10 |
100 |
December 2012 |
View Details
|
February 08, 2012 |
|
5 -
0K230_
|
SCR -
9 -
8.5
|
ON RTE 9 IN SANTA CRUZ CO NEAR BEN LOMOND FROM 0.2 MILES NORTH OF GLEN ARBOR RD TO HOLIDAY LANE AT HIGHLAND CO PARK |
GUARDRAIL UPGRADE & SHOULDER WIDENING |
Asphalt Concrete Surfacing, Retaining Wall, Concrete Barrier |
1 – 10 |
123 |
February 2012 |
View Details
|
October 06, 2011 |
|
5 -
0M750_
|
SCR -
1 -
R0.0/10.2
|
ON RTE 1 IN SANTA CRUZ CO FROM PM R0.04 AT THE PAJARO RIVER BRIDGE TO PM 10.2 AT THE NORTH APTOS UNDERPASS |
PAVEMENT REHABILITATION |
Seal Coat, Rock Slope Protection, Rehabilitate Pavement, Pavements Markings, Asphalt Concrete Surfacing, Bridge Railing, Concrete Barrier, Drainage, Modify Gores, Guard Railing, Pavements Markers, Erosion Control |
20 – 40 |
120 |
October 2011 |
View Details
|
October 06, 2011 |
|
5 -
0M970_
|
SCR -
1 -
17.4/26.0
|
ON RTE 1 IN AND NEAR SANTA CRUZ BETWEEN SAN LORENZO RIVER BRIDGE PM 17.4 AND LAGUNA RD PM 26.00 |
GUARDRAIL & CRASH CUSIONS |
Guard Railing |
1 – 10 |
65 |
May 2012 |
View Details
|
October 06, 2011 |
|
5 -
0M980_
|
SCR -
1 -
26.8/36.3
|
ON STATE ROUTE 1 IN SANTA CRUZ COUNTY BETWEEN LAGUNA ROAD (PM 26.8)AND WADDELL CREEK BRIDGE(PM 36.3) |
GUARDRAIL UPGRADE |
|
1 – 10 |
|
October 2012 |
View Details
|
January 27, 2012 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
5 -
0N400_
|
SLO -
1 -
R36.7/39.7
|
IN SAN LUIS OBISPO COUNTY NEAR CAYUCOS ON ROUTE 1 FROM 0.1 MILE SOUTH OF NORTH OCEAN AVENUE TO 1.0 MILE SOUTH OF VILLA CREEK ROAD |
TRANSPORTATION ENHANCEMENT COSTAL ACCESS AND PROJECTION |
Asphalt Concrete Surfacing, Earthwork, Erosion Control, Highway Planting, Irrigation System |
1 – 10 |
90+ |
April 2012 |
View Details
|
February 08, 2012 |
|
5 -
0Q570_
|
MON -
101 -
61.0/64.6,66.8/69.4
|
ON HIGHWAY 101 IN SOLEDAD AND GONZALES BETWEEN THE SALINAS RIVER BRIDGE (NO. 44-02) AND SOUTH GONZALES OVERCROSSING |
INSTALL MEDIAN BARRIER |
|
10 – 20 |
|
January 2013 |
View Details
|
January 27, 2012 |
|
5 -
0Q620_
|
SLO -
101 -
7.8/12.5
|
ON ROUTE 101 FROM LOS BERROS ROAD UNDERCROSSING TO BRIDGE STREET UNDERCROSSING |
CONSTRUCT MEDIAN BARRIER |
Concrete Barrier |
1 – 10 |
150 |
July 2012 |
View Details
|
January 27, 2012 |
|
5 -
0Q630_
|
SLO -
1 -
17.4/26.0
|
ON RTE 101 IN SAN LUIS OBISPO CO NEAR SANTA MARGARITA BETWEEN PM 36.0 (0.8 MI SO OF TASSAJARA CREEK RD) AND PM 37.5 (0.7 MI NO OF TASSAJARA CREEK RD) |
CONSTRUCT MEDIAN BARRIER |
Concrete Barrier |
1 – 10 |
90 |
June 2012 |
View Details
|
October 06, 2011 |
|
5 -
0R300_
|
SLO -
166 -
R36.0/40.5
|
ON ROUTE 166 BETWEEN 1.1 MILES EAST OF CUYAMA RIVER BRIDGE NO. 51-41 AND 3.8 MILES WEST OF CARRIZO CANYON BRIDGE NO 49-41 |
CURVE CORRECTION, CULVERT, PAVING AND EARTHWORK |
Realign Curve, Bridge |
1 – 10 |
215 |
July 2012 |
View Details
|
January 27, 2012 |
|
5 -
0R840_
|
SBT -
25 -
0.0
|
ON ROUTES 25 & 156 IN SAN BENITO CO & ROUTES 68, 101 & 183 IN MONTEREY CO AT VARIOUS LOCATIONS |
ADA CURB RAMPS & MINOR SIDEWALKS |
Wheelchair Ramps |
0 – 1 |
|
April 2012 |
View Details
|
October 06, 2011 |
|
5 -
0S310_
|
SCR -
1 -
17.5/18.2
|
IN SANTA CRUZ CO IN SANTA CRUZ FROM 0.1 MILE WEST OF RTE 9 TO 0.1 MILES SOUTH OF HIGH STREET PEDESTRIAN OC |
CONCRETE MEDIAN BARRIER |
Concrete Barrier, Signs, Asphalt Concrete Surfacing |
1 – 10 |
70 |
September 2011 |
View Details
|
October 06, 2011 |
|
5 -
0T020_
|
SLO -
166 -
42.5/48.9
|
ON RTE 166 IN SAN LUIS OBISPO CO BETWEEN 2.4 MILES EAST OF GIFFORD CREEK BRIDGE AND 2.1 MILES WEST OF CUYAMA RIVER BRIDGE |
CENTERLINE RUMBLE STRIP |
Signs, Pavements Markings |
0 – 1 |
30 |
December 2011 |
View Details
|
October 06, 2011 |
|
5 -
31580_
|
MON -
101 -
10.0/101.3, 0.0/1.6
|
ON ROUTE 101 NEAR PRUNEDALE FROM 0.4 MILES SOUTH OF DUNBARTON ROAD (NORTH) IN MONTEREY CO TO 1.0 MILES NORTH OF COLE ROAD IN SAN BENITO CO |
CONSTRUCT NEW INTERCHANGE AT SAN JUAN ROAD "SAN JUAN INTERCHANGE" |
|
40 – 60 |
|
July 2012 |
View Details
|
October 06, 2011 |
|
5 -
33075_
|
SLO -
46 -
39.9/40.1
|
ESTRELLA RIVER BRIDGE REPLACEMENT NEAR PASO ROBLES, AT ESTRELLA RIVER BRIDGE |
BRIDGE REPLACEMENT |
Bridge Railing, Bridge, Drainage, Earthwork, Erosion Control, Fence, Guard Railing, Rock Slope Protection, Asphalt Concrete Surfacing, Grading and Paving |
1 – 10 |
250 |
January 2013 |
View Details
|
January 27, 2012 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
5 -
33077_
|
SLO -
46 -
41.0/46.3
|
NEAR PASO ROBLES FROM 0.1 MILES EAST OF ALMOND DRIVE TO 0.8 MILES EAST OF MCMILLIAN CANYON ROAD |
CONVERT TO 4-LANE EXPRESSWAY |
Signs, Retaining Wall, Pavements Markings, Asphalt Concrete Surfacing, Bridge, Culverts, Drainage, Pavements Markers, Guard Railing, Fence, Expressway, Erosion Control, Earthwork, Widening |
40 – 60 |
500 |
May 2012 |
View Details
|
October 06, 2011 |
|
5 -
34951_
|
MON -
101 -
85.0/85.8
|
IN MONTEREY CO IN AND NEAR SALINAS FROM 0.6 MILES SOUTH TO 0.2 MILES NORTH OF AIRPORT BOULEVARD OC |
LANDSCAPE |
Highway Planting, Irrigation System |
0 – 1 |
850 |
November 2011 |
View Details
|
October 06, 2011 |
|
5 -
46380_
|
SB -
101 -
83.4/83.8
|
ON RTE 101 IN SANTA BARBARA FROM 1.2 MILES NORTH OF CLARK AVE OC TO 0.9 MILES SOUTH OF SANTA MARIA UC |
CONSTRUCT INTERCHANGE |
Sound Wall, Signs, Bridge, Bridge Railing, Asphalt Concrete Surfacing, Rock Slope Protection, Ramp, Pavements Markings, Wheelchair Ramps, Roadway, Pavements Markers, Overcrossing, Lighting, Irrigation System, Interchange, Highway Planting, Freeway, Freeway and Structures, Fence, Erosion Control, Electrical Facilities, Earthwork, Drainage, Culverts |
20 – 40 |
300 |
June 2012 |
View Details
|
October 06, 2011 |
|
6 -
0C130_
|
FRE -
33 -
0.0
|
VARIOUS BRIDGES IN FRESNO, MADERA, KINGS, TULARE COUNTIES |
SEISMIC RESTORATION |
|
1 – 10 |
|
May 2012 |
View Details
|
October 06, 2011 |
|
6 -
0E670_
|
TUL -
99 -
6.1/29.9
|
ON ROUTE 99 IN TULARE COUNTY AT VARIOUS LOCATIONS FROM AVENUE 48 OVERROSSING TO CROSS AVENUE OVERCROSSING |
99 CORRIDOR-BRIDGE ENHANCEMENT |
|
0 – 1 |
|
December 2012 |
View Details
|
January 27, 2012 |
|
6 -
0E971_
|
FRE -
41 -
R27.6/R29.8
|
IN FRESNO AT VARIOUS LOCATIONS FROM ASHLAN AVE OC TO 0.2 MI NORTH OF BULLARD AVE OC REPLACE PLANTING. REQUIRED LANDSCAPE MITIGATION FOR PPNO 2057 |
REPLACEMENT PLANTING |
Highway Planting, Irrigation System |
0 – 1 |
900 |
February 2012 |
View Details
|
October 06, 2011 |
|
6 -
0G270_
|
KER -
58 -
R108.0/R108.3
|
IN KERN CO ON SR58 AT THE EXIT SR165 (BUSINESS RTE 58) NEAR MOJAVE |
INSTALL WINDSCREEN |
Guard Railing, Concrete Barrier, Bridge Railing, Bridge, Fence, Grading and Paving |
0 – 1 |
85 |
May 2012 |
View Details
|
February 08, 2012 |
|
6 -
0H170_
|
FRE -
180 -
77.2
|
ON ROUTE 180 IN FRESNO COUNTY AT KINGS RIVER OVERFLOW BRIDGE (#42-0074) BETWEEN PM 77.1 AND PM 77.2. |
BRIDGE REPLACEMENT |
Replace Bridge |
1 – 10 |
290 |
December 2012 |
View Details
|
February 08, 2012 |
|
6 -
0H180_
|
KER -
14 -
39.9
|
ON ROUTE 14 IN KERN COUNTY AT PM 39.9, 24 MILES NORTH OF MOJAVE AT RED ROCK CANYON BRIDGE #50-0178 |
BRIDGE REPLACEMENT (SCOUR) |
Replace Bridge, Asphalt Concrete Surfacing, Rock Slope Protection, Modify Roadway, Grading and Paving, Reconstruct Guard Railing, Earthwork, Widening |
10 – 20 |
250 |
December 2012 |
View Details
|
January 27, 2012 |
|
6 -
0H940_
|
FRE -
168 -
14.4/15.0
|
ON ROUTE 168 IN FRESNO CO NEAR FRESNO FROM 0.25 MILES WEST OF SHEPHERD AVENUE TO 0.25 MILES EAST OF SHEPHERD AVENUE |
REALIGN THE HORIZONTAL CURVE |
|
1 – 10 |
|
September 2012 |
View Details
|
October 06, 2011 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
6 -
0J040_
|
KIN -
41 -
R37.5/R38.1
|
ON RTE 41 AT THE INTERSECTION WITH JACKSON AVE FROM 0.3 MILES SOUTH OF JACKSON AVE TO 0.3 MILES NORTH OF JACKSON AVE |
CONSTRUCT LEFT-TURN LANES |
Pavements Markings, Realignment, Drainage, Earthwork, Lighting, Grading and Paving, Seal Cracks, Pavements Markers, Widening, Asphalt Concrete Surfacing, Fence, Culverts, Channelize, Erosion Control, Electrical Facilities, Roadway, Signs |
1 – 10 |
200 |
July 2012 |
View Details
|
October 06, 2011 |
|
6 -
0J050_
|
KIN -
43 -
24.2/24.8
|
ON ROUTE 43 NEAR HANFORD, IN KINGS COUNTY BETWEEN 0.78 MILES NORTH OF ELDER AVE AND 0.77 MILES SOUTH OF DOVER AVE |
CHANNELIZE WITH SIGNALS |
Channelize, Erosion Control, Electrical Facilities, Earthwork, Signals, Widening |
1 – 10 |
|
August 2012 |
View Details
|
January 27, 2012 |
|
6 -
0K390_
|
KER -
58 -
R99.3/R99.7
|
ON ROUTE 58 IN KERN COUNTY BETWEEN PM R99.3 AND PM R99.7. |
BRIDGE REPLACEMENT |
|
1 – 10 |
|
November 2012 |
View Details
|
January 31, 2012 |
|
6 -
0K450_
|
KER -
14 -
15.3
|
IN KERN CO NEAR MOJAVE AT THE SOUTH MOJAVE OH BRIDGE #50-0402R. |
REMOVE AC PLACE METHACRYLATE & POLYESTER CONCRETE OVERLAY |
|
0 – 1 |
|
April 2012 |
View Details
|
January 31, 2012 |
|
6 -
0K540_
|
TUL -
63 -
3.0
|
IN TULARE CO - INTERSECTION OF AVE 256(OAKDALE AVE) AND RTE 63 |
REALIGN INTERSECTION & INSTALL SIGNAL |
Realignment, Reconstruct Signals |
1 – 10 |
68 |
April 2012 |
View Details
|
October 06, 2011 |
|
6 -
0L050_
|
KIN -
198 -
R21.5/R28.3
|
NEAR HANFORD FROM 0.5 MILE E OF RTE 43 TO 0.4 MILE W OF RTE 99 |
HIGHWAY PLANTING |
Irrigation System, Highway Planting, Water Supply System |
1 – 10 |
900 |
March 2012 |
View Details
|
October 06, 2011 |
|
6 -
0L200_
|
MAD -
99 -
23.8/28.2
|
ON RTE 99 IN MADERA CO BETWEEN AVE 24 OC BRIDGE (#41-54) AND LE GRAND AVE OC BRIDGE (#41-57) |
INSTALL MEDIAN BARRIER |
Reconstruct Guard Railing |
0 – 1 |
75 |
May 2012 |
View Details
|
October 06, 2011 |
|
6 -
0L220_
|
KER -
5 -
69.6/73.1
|
ON RTE 5 BETWEEN MAIN DRAIN ROAD OC AND SR 46/5 SEPARATION |
INSTALL MEDIAN BARRIER |
|
1 – 10 |
|
February 2012 |
View Details
|
October 06, 2011 |
|
6 -
0L720_
|
KER -
58 -
R106.7R107.6
|
IN KERN CO ON RTE 58 FROM PM R106.7 TO CACHE CREEK BR#50-201 |
INSTALL CONCRETE MEDIAN BARRIER |
Asphalt Concrete Surfacing, Concrete Barrier |
1 – 10 |
45 |
June 2012 |
View Details
|
October 06, 2011 |
|
6 -
0L890_
|
KER -
99 -
26.8/R28.4
|
ON RTE 99 IN KERN CO NEAR BAKERSFIELD BETWEEN AIRPORT DRIVE OC AND BEARDSLEY CANAL BRIDGE |
WIDEN SHOULDER & GRIND IN RUMBLE STRIPS |
Widening |
0 – 1 |
30 |
April 2012 |
View Details
|
October 06, 2011 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
6 -
0L900_
|
KER -
184 -
11.1/11.3
|
ON ROUTE 184 NEAR BAKERSFIELD BETWEEN 0.05 MILES WEST OF ROUTE 184 AND ROUTE 178 INTERSECTION AND 10 MILES EAST OF LAMONT |
VERTICAL CURVE IMPROVEMENTS |
|
0 – 1 |
|
May 2012 |
View Details
|
January 31, 2012 |
|
6 -
0M210_
|
FRE -
5 -
7.9/65.7, 4.9/25.1, 0.4/13.3
|
|
PLACE METHACRYLATE & REPLACE BRIDGE JOINT SEALS |
|
0 – 1 |
|
March 2012 |
View Details
|
February 08, 2012 |
|
6 -
0M220_
|
KER -
5 -
13.5, 70.0, 38.8
|
IN KERN COUNTY AT VARIOUS LOCATIONS |
PAINT STRUCTURAL STEEL AND JOINT SEALS |
|
0 – 1 |
|
March 2012 |
View Details
|
January 27, 2012 |
|
6 -
0M230_
|
FRE -
41 -
R24.2/R24.7, R24.7, R6.8, R56.6/R59.9
|
FRE 41 R24.2 & R24.7; FRE 168 R6.8; FRE 180 R56.6, 57.0, 57.2, 57.3, 57.4, 57.8, 59.0, 59.9. |
PLACE METHACRYLATE AND REPLACE BRIDGE JOINT SEALS |
|
0 – 1 |
|
March 2012 |
View Details
|
February 08, 2012 |
|
6 -
0M270_
|
KER -
58 -
26.3/R53.5, 20.6/57.5, R1.9/R39.8
|
|
PLACE METHACRYLATE AND REPLACE BRIDGE JOINT SEALS |
|
0 – 1 |
|
March 2012 |
View Details
|
February 08, 2012 |
|
6 -
0M280_
|
KER -
178 -
41.6
|
IN KERN CO NEAR BAKERSFIELD AT ERSKINE CREEK BRIDGE #50-0463 |
BOX CULVERT REHAB |
|
0 – 1 |
|
April 2012 |
View Details
|
February 08, 2012 |
|
6 -
0M290_
|
KER -
58 -
M108.4
|
IN KERN COUNTY AT VARIOUS LOCATION |
PLACE METHACRYLATE DECK |
|
0 – 1 |
|
April 2012 |
View Details
|
February 08, 2012 |
|
6 -
0M730_
|
FRE -
5 -
22.8/26.8
|
MEDIAN OF I-5 FROM DOMINGINE UNDERCROSSING BR# 42-271 TO PARKHURST EQ. UNDERCROSSING BR#42-275 |
INSTALL MEDIAN BARRIER |
Modify Culverts, Guard Railing, Grading and Paving, Earthwork, Modify Signs |
1 – 10 |
35 |
April 2012 |
View Details
|
October 06, 2011 |
|
6 -
0M800_
|
MAD -
99 -
23.3/23.8, 25.2/25.6
|
ON RTE 99 IN MAD CO BET 0.2 MILE N OF CALIF OH TO AVE 24 OC NEAR CHOWCHILLA & ON RTE 65 IN TUL CO BET 0.1 MILE N OF AVE 196 TO 0.1 MILE S OF AVE 200 NEAR STRATHMORE |
INSTALL MEDIAN BARRIER |
Grading and Paving, Guard Railing, Pavements Markings, Asphalt Concrete Surfacing, Concrete Barrier |
0 – 1 |
50 |
December 2012 |
View Details
|
February 08, 2012 |
|
6 -
0N400_
|
KER -
58 -
67.9
|
ABOUT 5 MILES EAST OF EDISON AT NEWMARKLE ROAD UNDERCROSSING |
PLACE ROCK SLOPE PROTECTION AND CHANNEL ARMORING |
|
0 – 1 |
|
March 2012 |
View Details
|
October 06, 2011 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
6 -
0N850_
|
TUL -
99 -
23.5
|
IN TULARE COUNTY 5 MILES NORTH OF THE ROUTE 99/180 JCT AT THE AVENUE 184 OC @ TUL-99-23.49 |
BRIDGE HIT REPAIR |
|
0 – 1 |
|
July 2012 |
View Details
|
February 08, 2012 |
|
6 -
32450_
|
TUL -
99 -
41.3/53.9, 0.0/1.2
|
IN TULARE AND FRESNO COUNTIES NEAR KINGSBURG FROM 0.2 MI N OF GOSHEN OH TO 0.2 MI N OF CONEJO AVE SEPARATION SPLIT PROJECT |
GOSHEN TO KINGSBURG REPLACEMENT PLANTING "GOSHEN-KINGSBURG REPLACEMENT PLANTING" |
Highway Planting, Irrigation System, Water Supply System |
1 – 10 |
900 |
August 2012 |
View Details
|
January 27, 2012 |
|
6 -
32550_
|
KIN -
198 -
8.9/10.1
|
ON ROUTE 198 IN KINGS CO FROM RTE 41 TO 18 1/2 AVENUE |
CONSTRUCT INTERCHANGE |
Pavements Markings, Ramp, Wing Wall, Widening, Wheelchair Ramps, Sound Wall, Signs, Signals, Roadway, Retaining Wall, Guard Railing, Erosion Control, Freeway and Structures, Electrical Facilities, Lighting, Freeway, Interchange, Irrigation System, Grading and Paving, Bridge Railing, Bridge, Concrete Barrier, Culverts, Drainage, Earthwork, Fence, Overhead, Pavements Markers, Modify Gores, Overcrossing, Asphalt Concrete Surfacing |
20 – 40 |
455 |
March 2012 |
View Details
|
January 04, 2012 |
|
6 -
33741_
|
TUL -
190 -
21.2/26.4
|
IN TULARE COUNTY NEAR PORTERVILLE FROM 0.1 MILES EAST OF ROAD 284 TO PLEASANT OAK DRIVE |
PAVEMENT REHABILITATION |
|
1 – 10 |
|
February 2012 |
View Details
|
October 06, 2011 |
|
6 -
34256_
|
FRE -
180 -
62.8/66.3
|
ON RTE 180 IN THE CITY OF FRESNO FROM 0.3 MILES WEST OF CLOVIS AVE OVERCROSSING TO 0.8 MILES EAST OF TEMPERANCE AVE |
HIGHWAY PLANTING & IRRIGATION ON NEW FWY |
Highway Planting, Irrigation System, Water Supply System |
1 – 10 |
900 |
May 2012 |
View Details
|
October 06, 2011 |
|
6 -
36021_
|
TUL -
99 -
37.3/41.3
|
ON SR 99 IN TULARE CO NEAR COSHEN FROM 0.9 MI SOUTH OF WEST VISALIA OH (46-226)TO 0.2 MI NORTH OF NORTH GOSHEN OH (46-055) |
4-LN FWY TO 6-LN FWY |
|
0 – 1 |
|
July 2012 |
View Details
|
October 06, 2011 |
|
6 -
41600_
|
KIN -
41 -
R42.1/R44.7
|
NEAR LEMOORE FROM HANFORD/ARMONA RD TO 0.8 KM NORTH OF GRANGEVILLE BLVD |
REHAB ROADWAY & WIDEN SHOULDERS |
Earthwork, Remove Drainage, Asphalt Concrete Surfacing, Channelize, Reconstruct Concrete Barrier, Realignment, Rehabilitate Pavement, Modify Roadway, Rock Slope Protection, Reconstruct Signs, Modify Water Supply System, Establish Existing Planting, Reconstruct Fence, Reconstruct Guard Railing, Modify Lighting, Erosion Control, Pavements Markers, Pavements Markings, Modify Signals |
10 – 20 |
220 |
February 2012 |
View Details
|
January 04, 2012 |
|
6 -
43070_
|
TUL -
216 -
1.9/2.9
|
ON ROUTE 216 FROM LOVERS LANE PM 1.9 TO EAST OF MCAULIFF STREET AT PM 2.9 IN THE CITY OF VISALIA |
WIDEN & REALIGNMENT OF HOUSTON AVENUE (SR 216) |
|
1 – 10 |
|
July 2012 |
View Details
|
October 06, 2011 |
|
6 -
44262_
|
FRE -
99 -
30.3/31.6
|
IN THE CITY OF FRESNO & WITHIN MADERA CO FROM 0.2 MILES SO OF THE GRANTLAND AVE UNDERCROSSING TO 0.6 MILES NO OF THE AVENUE 7 OVERCROSSING |
WIDEN 4-LANE FWY TO 6-LANE FWY |
Asphalt Concrete Surfacing, Replace Bridge, Concrete Barrier, Replace PCC Pavement, Fence, Freeway, Guard Railing, Lighting, Widening, Signs, Electrical Facilities, Earthwork, Culverts, Rock Slope Protection, Rehabilitate Pavement |
40 – 60 |
650 |
April 2012 |
View Details
|
October 06, 2011 |
|
6 -
44771_
|
FRE -
41 -
R29.8/R30.4
|
ON RTE 41 IN FRESNO CO FROM BULLARD AVE OC TO HERNDON AVE OC |
REPLACEMENT PLANTING |
Highway Planting, Irrigation System |
0 – 1 |
900 |
February 2012 |
View Details
|
October 06, 2011 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
6 -
46220_
|
KIN -
198 -
R14.8/17.9
|
IN AND NEAR HANFORD AT THE 14TH AVE UC HANFORD/ARMONA RD UC AND THE 11TH AVE UC |
REHAB 3 BRIDGE DECKS |
Asphalt Concrete Surfacing, Replace Bridge Railing, Reconstruct Bridge, Modify Concrete Barrier, Modify Drainage, Modify Electrical Facilities, Reconstruct Freeway, Replace Guard Railing, Rehabilitate Bridge Deck, Rehabilitate Pavement, Replace Roadway, Modify Signs |
1 – 10 |
|
July 2012 |
View Details
|
October 06, 2011 |
|
6 -
47100_
|
MAD -
99 -
R7.1/R7.9
|
ON RTE 99 FROM 0.5 MILES SOUTH OF AVENUE 12 OVERCROSSING TO 0.5 MILES NORTH OF AVENUE 12 OVERCROSSING |
MODIFY INTERCHANGE |
Asphalt Concrete Surfacing, Bridge Railing, Bridge, Concrete Barrier, Drainage, Earthwork, Fence, Grading and Paving, Guard Railing, Highway Planting, Interchange, Irrigation System, Modify Gores, Overcrossing, Overhead, Pavements Markings, Ramp, Realignment, Retaining Wall, Roadway, Signals, Signs, Wheelchair Ramps, Widening, Wing Wall |
40 – 60 |
60 |
June 2012 |
View Details
|
October 06, 2011 |
|
6 -
48750_
|
KIN -
198 -
R16.5/R17.2
|
ON ROUTE 198 FROM 0.4 MILES WEST OF 12TH AVENUE OVERCROSSING TO 0.3 MILES EAST OF 12TH AVENUE OVERCROSSING |
RECONSTRUCT INTERCHANGE |
|
10 – 20 |
|
November 2012 |
View Details
|
January 31, 2012 |
|
7 -
000001
|
LA -
VAR -
VAR
|
In Los Angeles County on various routes. |
7 Pavement Rehabilitation Projects (Profile grinding, Replace Slabs, OGAC, sealing, etc.) |
Seal Cracks, Slurry Seal Coat, Asphalt Concrete Surfacing, Groove Pavement |
1 – 10 |
|
January 2012 |
View Details
|
December 16, 2011 |
|
7 -
000002
|
VEN -
VAR -
VAR
|
In Ventura County on various Routes |
3 Pavement Rehabilitation Projets (slurry and chip sealing, etc.) |
Slurry Seal Coat, Asphalt Concrete Surfacing |
1 – 10 |
|
February 2012 |
View Details
|
December 16, 2011 |
|
7 -
000003
|
-
VAR -
|
In Los Angeles and Ventura County on various routes. |
Minor A (between $250,001 and $1 million) and Minor B (up to $250,000) projects.
See link for a listing of upcoming projects:
http://www.dot.ca.gov/dist07/travel/projects/D7MinorProjects_Jan-2011.pdf
|
|
0 – 1 |
|
January 2012 |
View Details
|
December 16, 2011 |
|
7 -
105964
|
VEN -
118 -
10.9/11.0
|
AT SOMIS FROM ROUTE 34 TO DONLON ROAD B7 |
MODIFY INTERSECTION |
Widening |
1 – 10 |
330 |
June 2013 |
View Details
|
November 17, 2008 |
|
7 -
1170U4
|
LA -
010 -
33.4/37.5
|
IN LA COUNTY IN BALDWIN PARK & WEST COVINA FROM PUENTE AVENUE TO CITRUS STREET |
CONSTRUCT ONE HOV LANE IN EACH DIRECTION |
Widening, Sound Wall, Freeway and Structures |
100 – 120 |
940 |
August 2012 |
View Details
|
December 16, 2011 |
|
7 -
119344
|
LA -
010 -
37.5/42.4
|
IN LA COUNTY FROM CITRUS STREET IN WEST COVINA TO ROUTE 57 IN POMONA |
CONSTRUCT HOV LANE IN EACH DIRECTION |
Freeway and Structures, Widening |
120 – 140 |
940 |
October 2013 |
View Details
|
December 16, 2011 |
|
7 -
120944
|
LA -
710 -
15.7R/27.5
|
IN LYNWOOD TO ALHAMBRA FROM 105 TO VALLEY BOULEVARD |
INSTALL COMMUNICATION SYSTEMS |
Electrical Facilities |
1 – 10 |
400 |
October 2012 |
View Details
|
December 16, 2011 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
7 -
1218W4
|
LA -
005 -
29.4/31.6
|
IN LA CNTY FR MAGNOLIA BL / JUST NO BUENA VISTA |
Const HOV Lane, IC Mod, & Railroad Work |
Bridge, Freeway and Structures, Retaining Wall, Widening |
200 – 250 |
700 |
July 2012 |
View Details
|
February 03, 2012 |
|
7 -
127244
|
LA -
138 -
59.7/60.2
|
IN LA CNTY IN PMDL FR 126TH ST E TO LONGVIEW RD(SEG 9) |
WIDEN CONVENTIONAL HIGHWAY |
Widening |
1 – 10 |
200 |
November 2014 |
View Details
|
February 03, 2012 |
|
7 -
129994
|
LA -
30 -
00.0R/02.7
|
IN GEDR/LVN FROM JCT 210/66 AND LA-60; R25.4/30.5 AND LA-71; RI.3-R4.8 |
INSTALL COMM/TOS #4 FIELD HARDWARE |
Electrical Facilities |
1 – 10 |
480 |
September 2013 |
View Details
|
February 03, 2012 |
|
7 -
183124
|
LA -
710 -
09.4/18.4
|
IN LA COUNTY, LB CITY/SGT FROM RTE 405/FIRESTONE BOULEVARD |
LANDSCAPE |
Repair Irrigation System, Highway Planting |
0 – 1 |
510 |
December 2014 |
View Details
|
December 16, 2011 |
|
7 -
1952U4
|
VEN -
101 -
00.1/03.0
|
IN VEN COUNTY NR THOUSAND OAKS FROM VEN COUNTY LINES TO 101/23 IC |
INTERCHANGE IMPROVEMENT |
Reconstruct Interchange |
10 – 20 |
570 |
October 2012 |
View Details
|
November 25, 2008 |
|
7 -
1992U4
|
LA -
039 -
40.0/44.4
|
IN LA COUNTY NEAR GLENDORA |
REHAB DRAIN, CONSTRUCT RETAINING WALL, RECON ROAD |
Retaining Wall, Repair Storm Damage, Repair Slope, Asphalt Concrete Surfacing |
20 – 40 |
490 |
July 2014 |
View Details
|
February 03, 2012 |
|
7 -
199614
|
LA -
405 -
39.4/40.5
|
IN LA FROM SB AT BURBANK BL/N&S BND RTE 101 CONN (LA-101;17.0/18.5) |
RECONST SB CONN, RAMP TO N&S BND 101 |
Freeway and Structures, Reconstruct Interchange |
140 – 160 |
1,000 |
August 2013 |
View Details
|
December 30, 2010 |
|
7 -
202114
|
LA -
710 -
17.2/26.4
|
STHGT-MNTRY PRK FRM LA RVR BRDG-RMN BLVD UNDRCSS REHAB RDWY |
LONG LIFE PAVEMENT & WIDEN BRIDGES |
Widening, Modify Bridge, Asphalt Concrete Surfacing, Replace PCC Pavement |
160 – 180 |
640 |
September 2011 |
View Details
|
August 01, 2011 |
|
7 -
202124
|
LA -
710 -
21.9/23.1
|
IN CMMRC & BLL FRM SOUTH ATLNTC BLV TO TRIGGS ST REHAB RDWY |
LONG LIFE PAVEMENT & WIDEN BRIDGES |
Widening, Modify Bridge, Replace PCC Pavement |
80 – 100 |
650 |
April 2013 |
View Details
|
February 03, 2011 |
|
7 -
203604
|
LA -
014 -
31.8R/53.5R
|
IN LA COUNTY IN SCLA FROM .1KM S/O SANTA CLARA RIVER BR TO SIERRA HGWY OC |
PAVEMENT REHABILITATION |
|
160 – 180 |
590 |
April 2019 |
View Details
|
November 18, 2008 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
7 -
203804
|
LA -
118 -
4.8R/4.8R
|
IN LA CNTY ON W/B RTE 118 AT TAMPA AVE OFF-RAMP |
WIDENING OFF-RAMP, ADDING AUX LN |
Sound Wall, Retaining Wall, Widening |
1 – 10 |
250 |
April 2017 |
View Details
|
February 03, 2012 |
|
7 -
204904
|
LA -
405 -
39.1/
|
ON S/B ROUTE 405 AT VENTURA BOULEVARD ON-RAMP |
ADDING A LANE TO THE ON-RAMP |
Widening |
1 – 10 |
290 |
February 2013 |
View Details
|
July 27, 2009 |
|
7 -
205604
|
LA -
001 -
44.0/44.2
|
IN MAL AT LAS FLORES CANYON BETWEEN PM 44.0 AND 44.2 |
DRAINAGE FACILITY IMPROVEMENTS |
|
1 – 10 |
280 |
June 2013 |
View Details
|
October 28, 2008 |
|
7 -
206904
|
LA -
005 -
47.0/47.7
|
IN LA COUNTY FROM .4 KM N/O WELDON CANYON OC TO .4 KM S/O GAVIN CANYON UC |
RECONSTRUCT PCC PAVEMENT |
|
1 – 10 |
450 |
February 2015 |
View Details
|
April 01, 2010 |
|
7 -
209704
|
LA -
5812 -
LE.ND/A.N
|
943 W. DORAN STREET - GLENDALE |
UPGRADE MAINTENANCE STATION |
|
0 – 1 |
290 |
August 2013 |
View Details
|
July 27, 2009 |
|
7 -
210604
|
LA -
71 -
0.5/4.5
|
ON RTE 71 FR RTE 10 TO RTE 60 INTERCHANGE |
RECONSTRUCTION - ADD LANES |
Widening, Freeway, Reconstruct Expressway |
80 – 100 |
1000 |
January 2015 |
View Details
|
April 01, 2010 |
|
7 -
213404
|
LA -
010 -
18.4/21.0
|
IN LA COUNTY IN LA FROM STATE STREET OC TO CAMPUS ROAD OC |
HIGHWAY PLANING RESTORATION |
|
0 – 1 |
980 |
January 2015 |
View Details
|
February 03, 2012 |
|
7 -
215924
|
LA -
005 -
00.0/01.5
|
IN LMRD FROM ARTESIA BOULEVARD/COYOTE CK OC |
WIDENING VALLEY VIEW AVENUE INTERCHANGE |
|
120 – 140 |
650 |
February 2013 |
View Details
|
December 30, 2010 |
|
7 -
215934
|
LA -
005 -
02.7/04.0
|
IN NRW FROM SHOEMAKER AVENUE/SILVERBOW AVENUE |
WIDENING SHOWMAKER, ROSECRAN,BLOOMF BRD |
Reconstruct Bridge, Widening |
120 – 140 |
820 |
April 2012 |
View Details
|
February 03, 2012 |
|
7 -
215944
|
LA -
005 -
04.0/05.8
|
IN NRW FROM NO SILVERBOW AVENUE ORR AND DAY ROAD OH |
WIDENING SA,IMP HWY & ORR AND DAY |
Reconstruct Bridge, Widening |
140 – 160 |
630 |
May 2012 |
View Details
|
February 03, 2012 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
7 -
215954
|
LA -
005 -
05.8/07.6
|
IN SFPS FROM NO ORR AND DAY OH / RTE 605 IC |
WIDENING FLORENCE AVENUE INTERCHANGE |
Reconstruct Bridge, Widening |
120 – 140 |
830 |
April 2013 |
View Details
|
February 03, 2012 |
|
7 -
220504
|
LA -
001 -
23.7/23.9
|
IN MANB/ESEG FROM 33RD STREET /ROSECRANS AVENUE |
ROADWAY WIDENING |
|
1 – 10 |
270 |
January 2014 |
View Details
|
December 16, 2011 |
|
7 -
224104
|
LA -
60 -
21.5R/23.0R
|
CITY OF INDUSTRY & DIAMOND BAR FROM FAIRWAY DR UC TO OLD BREA CYN RD UC |
CONSTRUCT INTERCHANGE |
Interchange |
10 – 20 |
250 |
October 2013 |
View Details
|
February 07, 2012 |
|
7 -
225904
|
LA -
101 -
24.7/25.8
|
IN LOS ANGELES AT NORTHBOUND EXIT TO CANOGA AVENUE & SOUTHBOUND EXIT VENTURA/TOPANGA CANYON BOULEVARD |
Widen exit ramps |
Modify Ramp |
1 – 10 |
290 |
March 2014 |
View Details
|
February 07, 2012 |
|
7 -
226504
|
LA -
001 -
00.0/34.0
|
LA/VEN AT VARIOUS LOCATION ON ALL UC AND OC STRUCTURES |
INST. VERT CLEARANCE AND WARNING SIGNS |
|
1 – 10 |
410 |
December 2012 |
View Details
|
December 16, 2011 |
|
7 -
228204
|
VEN -
001 -
22.4/26.7
|
IN VENTURA COUNTY FR W/O EMMA WOOD BCH TO 049M E/O HOBSON CO PRK |
STRUCTURE (SEAWALL) RESTORATION |
Reconstruct Retaining Wall |
10 – 20 |
300 |
March 2012 |
View Details
|
February 03, 2012 |
|
7 -
232804
|
LA -
134 -
10.8/11.4
|
FROM RTE 134 TO SHERMAN WAY AND 0N RTE 405 FR N/S STAGG AV |
CONSTRUCTION OF SOUNDWALL |
|
40 – 60 |
340 |
April 2013 |
View Details
|
December 16, 2011 |
|
7 -
233004
|
LA -
405 -
06.4/43.1
|
VARIOUS CITY FROM LONG BEACH LOULEVARD TO S STAGG STREET, NB & SB |
CONSTRUCTION OF SOUND WALL |
|
20 – 40 |
230 |
January 2013 |
View Details
|
October 27, 2008 |
|
7 -
2332A4
|
LA -
5 -
46.3 /50.0
|
IN LA/SCTA FROM RTE 14 TO PICO CANYON RD |
CONSTRUCT TRUCK LANE |
Widening |
60 – 80 |
430 |
July 2011 |
View Details
|
July 19, 2011 |
|
7 -
2332E4
|
LA -
5 -
45.4R/59.0
|
IN LA CNTY IN SCTA FR RTE 14 TO PARKER RD |
CONSTRUCT HOV AND TRUCK LANE |
Modify Bridge, Reconstruct Freeway, Reconstruct Interchange, Retaining Wall, Widening |
300 – 350 |
1000 |
December 2015 |
View Details
|
October 27, 2010 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
7 -
234504
|
LA -
110 -
00.0/21.2
|
FROM 9TH & GAFFEY STREET IN SAN PEDRO TO WAHSINGTON BOULEVARD IN DOWNTOWN LA |
REPL OH GUIDE-RETRO-REFL SIGN PANEL |
|
1 – 10 |
200 |
November 2012 |
View Details
|
October 27, 2008 |
|
7 -
236504
|
LA -
210 -
29.5/29.6
|
IN LA COUTY IN PASADENA AT .06KM E/O SIERRA MADRE VILLA AVE |
CONSTRUCT PEDESTRIAN OVERCROSSING |
Bridge |
1 – 10 |
270 |
February 2020 |
View Details
|
December 16, 2011 |
|
7 -
239704
|
LA -
001 -
51.0/52.0
|
IN LOS ANGELES FROM WEST OF LATIGO CANYON TO EAST OF MALIBU COVE COLONY DRIVE |
CONSTRUCT RETAINING WALL |
|
1 – 10 |
520 |
March 2013 |
View Details
|
October 28, 2008 |
|
7 -
240404
|
LA -
5531-OS.AN/G.A -
|
MATERIALS LABORATORY AT 1616 S. MAPLE AVENUE, LOS ANGELES CA 90015 |
REHAB MATERIAL LAB BLDG |
Building |
1 – 10 |
320 |
September 2017 |
View Details
|
December 16, 2011 |
|
7 -
244104
|
LA -
210 -
18.7/22.0
|
IN LA CANADA/FLINTRIDGE CITY, FROM OAK PLACE TO CTY'S S/E BOUNDARY |
CONSTRUCTION OF SOUNDWALL |
|
10 – 20 |
350 |
November 2013 |
View Details
|
July 27, 2009 |
|
7 -
2487U4
|
LA -
210 -
29.2/31.5
|
IN LA COUNTY AT VARIOUS LOCATIONS FROM SIERRA MADRE STN TO SANTA ANITA |
PGL FOOTHILL EXTENSION SEG I |
Modify Bridge |
1 – 10 |
210 |
September 2013 |
View Details
|
July 27, 2009 |
|
7 -
249404
|
LA -
101 -
13.0/13.8
|
IN LA COUNTY IN LA BETWEEN LAUREL CANYON BOULEVARD AND COLD WATER AVENUE |
CONSTRUCT AUXILARY LANE |
Retaining Wall, Sound Wall, Reconstruct Interchange |
10 – 20 |
310 |
December 2013 |
View Details
|
July 27, 2009 |
|
7 -
249704
|
LA -
101 -
23.4/24.1
|
IN LA COUNTY IN LA BETWEEN WINNETKA AVENUE NB AND DE SOTO AVENUE NB |
ADDING AUXILIARY LANE |
Reconstruct Interchange, Retaining Wall, Sound Wall |
1 – 10 |
310 |
December 2013 |
View Details
|
July 27, 2009 |
|
7 -
250304
|
LA -
126 -
00.0/04.6
|
IN LA COUNTY FROM COUNTY LN TO COMMERCE CTR DR IC |
MODIFY INTERSECTIONS |
|
1 – 10 |
210 |
May 2015 |
View Details
|
February 03, 2012 |
|
7 -
250504
|
LA -
605 -
00.1/16.6R
|
IN LA AT RTE 605 FROM COYOTE CR BRDG TO N/B OFF PECK ROAD |
INSTALL METAL BEAM GUARDRAIL AT VARIOUS LOCATIONS |
|
1 – 10 |
520 |
April 2012 |
View Details
|
February 03, 2012 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
7 -
251704
|
LA -
210 -
00.0/25.8
|
IN LA COUNTY IN VAR CITIES FROM IC 5/210 TO LOS ROBLES AVENUE OC |
SLAB REPLACEMENT AND GRINDING |
Replace PCC Pavement, Groove Pavement, Asphalt Concrete Surfacing |
100 – 120 |
740 |
November 2014 |
View Details
|
December 16, 2011 |
|
7 -
251904
|
VEN -
101 -
40.4R/43.6R
|
IN VEN COUNTY FROM .6M N/O MOBIL PIER UC TO VEN/SBRA COUNTY LINE |
PAVEMENT REHABILITATION |
Asphalt Concrete Surfacing, Groove Pavement, Replace PCC Pavement |
1 – 10 |
280 |
November 2013 |
View Details
|
February 03, 2012 |
|
7 -
252004
|
LA -
405 -
34.3/48.6
|
IN LA COUNTY IN VARIOUS CITIES FROM GETTY CTR DRIVE TO NEAR ROUTE 5 |
SLAB REPLACEMENT, GRINDING OVERLAY |
Rehabilitate Pavement, Replace Joint Seals, Replace PCC Pavement |
40 – 60 |
400 |
September 2012 |
View Details
|
January 27, 2012 |
|
7 -
252404
|
LA -
005 -
27.8/32.4
|
IN GNDL, BRB AND LA FROM WESTERN AVENUE UC TO HOLLYWOOD WAY UC |
SLAB RPL AND GRIND, COLD PLANE OVERLAY |
Groove Pavement, Replace PCC Pavement |
10 – 20 |
840 |
April 2013 |
View Details
|
December 30, 2010 |
|
7 -
252624
|
LA -
005 -
45.4R/59.7R
|
IN LA COUNTY IN LA AND SCLA FROM SENDO ROAD OH TO LAKE HUGHES ROAD UC |
ROADWAY REHABILITATION |
Asphalt Concrete Surfacing, Groove Pavement, Rehabilitate Pavement, Replace PCC Pavement |
60 – 80 |
800 |
August 2014 |
View Details
|
February 03, 2012 |
|
7 -
252634
|
LA -
5 -
45.4R/59.7R
|
IN LA CNTY IN LA AND SCLA FR ROUTE 5/14 IC TO LAKE HUGHES RD UC |
ROADWAY REHABILITATION |
Groove Pavement, Rehabilitate Pavement, Replace Joint Seals, Replace PCC Pavement |
10 – 20 |
300 |
September 2012 |
View Details
|
January 27, 2012 |
|
7 -
253104
|
LA -
213 -
00.6/04.1
|
ON LA COUNTY AT WESTERN AVENUE FROM 14TH STREET/PENINSULA VERDE DRIVE |
CONSTRUCT AUXILARY LANE |
Replace Drainage |
10 – 20 |
500 |
February 2013 |
View Details
|
November 17, 2008 |
|
7 -
254004
|
VEN -
126 -
22.0/34.6
|
IN VEN COUNTY IN FILMORE AND VEN FROM ENTRANCE TO TEXACO LT TO VEN/LA |
COLD PLANE AND OVERLAY |
Asphalt Concrete Surfacing |
100 – 120 |
170 |
September 2013 |
View Details
|
February 03, 2012 |
|
7 -
254504
|
VEN -
150 -
14.8/31.4
|
IN VENTURA COUNTY FROM ORCHARD DRIVE TO BRIDGE ROAD |
SEAL COAT |
Rehabilitate Pavement, Seal Coat |
1 – 10 |
270 |
November 2013 |
View Details
|
December 16, 2011 |
|
7 -
254904
|
LA -
014 -
52.6R/59.2R
|
IN LA COUNTY IN AND NEAR PLMDL FROM N/O SIERRA HIGHWAY OC TO RAYBURN ROAD UC |
PCC REPLACE GRIND, COLD PLANE |
Replace PCC Pavement, Rehabilitate Pavement, Asphalt Concrete Surfacing, Groove Pavement |
10 – 20 |
300 |
September 2011 |
View Details
|
August 02, 2011 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
7 -
255104
|
LA -
60 -
24.2R/24.7R
|
LA CNTY IN DIAMOND BAR AND INDUSTRY GRAND AV/SR 57/60 |
IC MODIFICATION and CONTRUCT ON-RAMPS |
|
10 – 20 |
280 |
March 2013 |
View Details
|
February 07, 2012 |
|
7 -
255904
|
LA -
710 -
05.6/24.2
|
LA COUNTY, LA CITY AT VARIOUS LOCATION ON ROUTE 710 |
UPGRADE MEDIAN BARRIER |
Replace Signs, Lighting, Reconstruct Freeway, Reconstruct Concrete Barrier |
10 – 20 |
560 |
June 2013 |
View Details
|
December 16, 2011 |
|
7 -
256504
|
LA -
405 -
00.0/48.6
|
LA COUNTY IN LA ON RTE 405 VARIOUS LOCATIONS |
SAFETY LIGHTING CONVERSION |
|
1 – 10 |
420 |
October 2013 |
View Details
|
December 16, 2011 |
|
7 -
256604
|
L -
010 -
00.0/48.2
|
LA COUNTY IN LA ON ROUTE 10 VARIOUS LOCATIONS |
SAFETY LIGHTING CONVERSION |
|
1 – 10 |
230 |
January 2014 |
View Details
|
December 16, 2011 |
|
7 -
256704
|
LA -
005 -
44.4/46.5
|
IN LA COUNTY IN LA ON RTE 5, 10, 14, AND 60 (VARIOUS LOCATIONS) |
SAFETY LIGHTING CONVERSION |
|
1 – 10 |
230 |
January 2016 |
View Details
|
February 07, 2012 |
|
7 -
256804
|
LA -
005 -
15.1/15.2
|
IN LA COUNTY SB RTE 5 BETWEEN ESPERANZA STREET AND CALZONA STREET |
WIDEN OFF RAMP |
|
1 – 10 |
240 |
March 2020 |
View Details
|
January 20, 2012 |
|
7 -
257104
|
LA -
001 -
01.0/01.0
|
IN LA COUNTY AT VARIOUS LOCATIONS/RTS |
UPGRADE TCRMS-INST CHNGBL MESSG SIGN |
|
1 – 10 |
580 |
July 2013 |
View Details
|
July 27, 2009 |
|
7 -
258404
|
LA -
5 -
16.5
|
IN LA NAD BURBANK FROM RTE 60 TO RTE 170 |
STORM WATER MITIGATION (TRASH TMDL) |
Reconstruct Drainage |
1 – 10 |
180 |
January 2014 |
View Details
|
December 16, 2011 |
|
7 -
258704
|
LA -
000 -
00.0/00.0
|
LA COUNTY IN LA AT VARIOUS LOCATIONS |
SOIL STABILIZATION AND REVEGATION |
|
1 – 10 |
210 |
September 2012 |
View Details
|
December 30, 2010 |
|
7 -
258804
|
LA -
-
00.0/00.0
|
LA COUNTY IN LA AT VARIOUS LOCATIONS |
SOIL STABILIZATION AND REVEGATION |
|
0 – 1 |
210 |
September 2012 |
View Details
|
December 30, 2010 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
7 -
258934
|
LA -
101 -
01.0/01.0
|
LA COUNTY IN LA RIVER METALS TMDL |
SAND FILTERS AND INFILTRATION DEVICES |
|
10 – 20 |
200 |
August 2012 |
View Details
|
December 30, 2010 |
|
7 -
259004
|
LA -
001 -
01.0/01.0
|
LA COUNTY IN LA RIVER METALS TMDL |
SAND FILTERS AND INFILTRATION DEVICES |
|
20 – 40 |
210 |
May 2013 |
View Details
|
February 07, 2012 |
|
7 -
259104
|
LA -
090 -
01.0/01.0
|
LA COUNTY @ BALLONA CREEK METALS AND TOXICS TMDL |
SAND FILTERS AND INFILTRATION DEVICES |
|
1 – 10 |
200 |
June 2012 |
View Details
|
December 16, 2011 |
|
7 -
259204
|
LA -
010 -
05.5R/14.8
|
LA COUNTY IN LA @ BALLONA CREEK METALS AND TOXICS TMDL |
SAND FILTERS AND INFILTRATION DEVICES |
|
1 – 10 |
200 |
May 2013 |
View Details
|
February 03, 2012 |
|
7 -
259404
|
LA -
210 -
00.0/09.8
|
LA COUNTY, CITY OF LA/SAN FERNANDO & LA CANADA FLINTRIDGE AT VAR LOC |
STORM WATER MITIGATION (TRASH TMDL) |
|
1 – 10 |
520 |
September 2013 |
View Details
|
December 16, 2011 |
|
7 -
260404
|
LA -
039 -
31.0/33.0
|
IN LA COUNTY AT THE NF SAN GABRIEL BRIDGE |
BRIDGE SCOUR MITIGATION |
Repair Bridge, Replace Bridge Railing |
1 – 10 |
360 |
June 2013 |
View Details
|
February 03, 2012 |
|
7 -
264904
|
LA -
001 -
23.7/23.8
|
LA COUNTY, MANHATTAN UC BRIDGE 53-00 62 I MANHATTAN BEACH CITY |
BRIDGE SEISMIC RESTORATION |
|
1 – 10 |
280 |
July 2014 |
View Details
|
February 07, 2012 |
|
7 -
265104
|
LA -
138 -
0.0/36.8
|
ON SR-138, FROM I-5 TO SR-138 |
WIDEN EXISTING SR-138 TO SIX LANE FREEWAY/EXPRESSWAY |
Widening |
500 – 600 |
1080 |
October 2016 |
View Details
|
November 24, 2008 |
|
7 -
265204
|
LA -
405 -
34.3/34.6
|
LA COUNTY ON S/B AT SEPULVEDA BOULEVARD ON-RAMP |
CONSTRUCT ACCELERATION LANE |
|
0 – 1 |
320 |
November 2014 |
View Details
|
February 07, 2012 |
|
7 -
265604
|
LA -
138 -
69.3/74.9
|
IN LOS ANGELES COUNTY FR RTE 18 TO SBDO CNTY LINE |
WIDEN ROADWAY AND PAVE SHOULDERS |
Asphalt Concrete Surfacing, Grading and Paving, Pavements Markings, Widening |
10 – 20 |
500 |
November 2013 |
View Details
|
November 04, 2010 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
7 -
265904
|
LA -
101 -
01.0/11.0
|
LA COUNTY IN LA BETWEEN GRAND AVENUE AND VINELAND AVENUE |
UPGRADE BRIDGE RAILS |
Replace Bridge Railing |
1 – 10 |
340 |
March 2013 |
View Details
|
December 30, 2010 |
|
7 -
266004
|
LA -
5 -
16.7/39.4
|
IN LA, GNDL, BRB BW RTE 60 & RTE 118 |
INSTALL METAL BEAM GAURDRAIL |
Guard Railing |
1 – 10 |
200 |
April 2013 |
View Details
|
February 07, 2012 |
|
7 -
266104
|
LA -
134 -
00.0/13.3
|
IN LA COUNTY IN VARIOUS CITIES BETWEEN ROUTE 170 & ROUTE 210 |
INSTALL MBGR |
Guard Railing |
1 – 10 |
210 |
July 2012 |
View Details
|
November 17, 2008 |
|
7 -
266904
|
LA -
002 -
15.9/20.4
|
LA COUNTY IN VARIOUS CITIES AT VARIOUS LOCATIONS |
GORE AREA CLEAN-UP/UPGRADES (CURE) |
Modify Gores |
1 – 10 |
240 |
February 2012 |
View Details
|
February 03, 2012 |
|
7 -
267004
|
LA -
210 -
30.7R/41.4R
|
IN LA COUNTY IN VARIOUS CITIES FROM BALDWIN AVENUE TO GRAND AVENUE |
FREEWAY MAINTENANCE ACCESS |
Modify Gores |
0 – 1 |
180 |
January 2012 |
View Details
|
December 16, 2011 |
|
7 -
267304
|
LA -
101 -
10.2/10.8
|
IN LA COUNTY IN LA AT UNIV TERR PKWY IC AND AT N/B OFF-RAMP LSHIM BOULEVARD |
WIDEN FREEWAY AND RAMPS |
|
10 – 20 |
120 |
April 2017 |
View Details
|
December 16, 2011 |
|
7 -
267504
|
LA -
010 -
04.9/14.8
|
LA COUNTY AT VARIOUS LOCATIONS |
INSTALL NEW MBGR/CONCRETE RAILING |
Concrete Barrier |
1 – 10 |
260 |
June 2012 |
View Details
|
November 17, 2008 |
|
7 -
272304
|
LA -
210 -
23.0R/24.6R
|
IN LA COUNTY IN PSNA BET LINCOLN BLVD AND ORANGE GROVE AVENUE OC |
EXTEND CONNECTOR LANE |
|
20 – 40 |
490 |
July 2018 |
View Details
|
February 03, 2012 |
|
7 -
272404
|
LA -
005 -
14.9/16.8
|
IN LA COUNTY IN LA FROM INDIANA STREET UC TO BOYLE STREET ST OC |
STORM WATER SOURCE CONTROL |
Highway Planting |
0 – 1 |
980 |
July 2013 |
View Details
|
December 16, 2011 |
|
7 -
272504
|
LA -
405 -
12.6/21.1R
|
LA CNTY ON STE RTE 405 BTWN STE RTE 110 & 105 |
PAVEMENT REHABILITATION |
Replace PCC Pavement, Asphalt Concrete Surfacing, Modify Bridge, Freeway and Structures, Widening |
250 – 300 |
750 |
October 2015 |
View Details
|
October 07, 2010 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
7 -
273004
|
LA -
710 -
06.0/06.4
|
IN LA COUNTY IN LBCH FROM BRWY TO SHMKR BR |
REPLACE BRIDGE |
|
100 – 120 |
670 |
October 2014 |
View Details
|
February 03, 2012 |
|
7 -
273104
|
LA -
110 -
09.0/14.0
|
LA COUNTY BRIDGES ALONG LA-105 PM 7/8 AT LA-105/110 IC & LA-110 PM |
STRUCTURE REHABILITATION |
|
1 – 10 |
360 |
March 2014 |
View Details
|
February 03, 2012 |
|
7 -
273404
|
LA -
134 -
00.0/10.0
|
IN LA COUNTY IN THE CITIES OF N HLWD BRNK, GLNDL BET RTE 170 N AND 210 N |
BRIDGE RAIL REPLACEMENT |
Replace Bridge Railing |
1 – 10 |
420 |
December 2013 |
View Details
|
July 27, 2009 |
|
7 -
273604
|
VEN -
126 -
13.1/20.1
|
In Ventura County between east of Hallock Drive in the City of Santa Paula and west
of E Street in the City of Fillmore. |
INSTALL CONCRETE MEDIAN BARRIER |
Concrete Barrier, Modify Bridge, Reconstruct Bridge Railing |
40 – 60 |
450 |
April 2015 |
View Details
|
July 19, 2011 |
|
7 -
273704
|
LA -
001 -
08.2/08.6
|
IN LA COUNTY @ LB BETWEEN TRE 47-DOMIN CHANNEL |
BRIDGE REPLACEMENT/RAMP MODIFICATION |
Replace Bridge |
20 – 40 |
200 |
April 2014 |
View Details
|
February 07, 2012 |
|
7 -
274304
|
LA -
91 -
6.8/13.4
|
In Los Angeles County on varoius routes |
UPGRADE MBGR, TREATMENTS & CRASH CUSHIONS |
Replace Guard Railing |
1 – 10 |
220 |
January 2014 |
View Details
|
July 15, 2009 |
|
7 -
274504
|
LA -
101 -
0.8/6.5
|
In Los Angeles County at various locations on routes 5, 10, and 101 |
Upgrade MBGR and crash cushions |
Replace Guard Railing |
1 – 10 |
200 |
August 2012 |
View Details
|
February 03, 2012 |
|
7 -
274804
|
LA -
18 -
0.1 /0.1
|
IN LA CNTY ON RTE 18 |
REPLACE BRIDGE DECK AND RAIL |
|
1 – 10 |
400 |
August 2013 |
View Details
|
December 16, 2011 |
|
7 -
274904
|
LA -
110 -
23.5/23.9
|
IN LA CNTY IN LA ON S/B RTE 110 AT THE RTE 101 IC |
SOURCE CONTROL |
Highway Planting, Erosion Control |
1 – 10 |
250 |
May 2013 |
View Details
|
October 07, 2010 |
|
7 -
275004
|
VEN -
33 -
0.0/05.6
|
IN VENTURA CNTY IN VEN FR JCT RTE 101 TO NB OFF TO VISTA R |
INSTALL BEST MANAGEMENT PARACTICE (BMP) DEVICES FOR STORM WATER MITIGATION |
Modify Drainage |
20 – 40 |
200 |
January 2014 |
View Details
|
September 01, 2009 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
7 -
275404
|
LA -
1 -
1.0
|
Pacific Coast Highway, At Alamitos Bay Bridge |
SEISMC RETROFIT (BRIDGE 53-0064) |
Repair Bridge |
10 – 20 |
400 |
July 2016 |
View Details
|
August 08, 2011 |
|
7 -
275504
|
LA -
710 -
5.0/7.0
|
In Los Angeles County from Ocean Boulevard to Pacific Coast Highway |
Roadway Rehabilitation |
Rehabilitate Pavement |
10 – 20 |
600 |
October 2013 |
View Details
|
July 09, 2009 |
|
7 -
275704
|
LA -
103 -
0.0 /1.0
|
IN LOS ANGELES COUNTY IN LOS AANGELES CITY, BR#53-2626 - UNION PACIFIC OVERHEAD |
PAINT STEEL PORTION OF STRUCTURE |
Clean and Paint Bridge |
1 – 10 |
|
April 2014 |
View Details
|
December 15, 2009 |
|
7 -
275804
|
LA -
90 -
1.7 /2.6
|
IN LA COUNTY AT MARINA FREEWAY(SR-90) EB & WB BTW I-405 CONN-CENTINELA AVE |
INSTALLATION OF EMBANKMENT GUARDRAILING |
Guard Railing |
1 – 10 |
250 |
February 2012 |
View Details
|
February 03, 2012 |
|
7 -
275904
|
LA -
110 -
23.5/23.9
|
IN LA CNTY IN LA ON N/B RTE 110 AT THE RTE 101 IC |
SOURCE CONTROL |
Highway Planting, Erosion Control |
1 – 10 |
250 |
April 2013 |
View Details
|
October 07, 2010 |
|
7 -
276104
|
LA -
110 -
3.8 /6.5
|
IN LA COUNTY ON LA 110, FROM PACIFIC COAST HIGHWAY TO 223RD STRET OC |
GROSS SOLID REMOVAL DEVICES AND OTHER PERMANENT TREATMENT BMP'S |
Reconstruct Drainage, Retaining Wall |
1 – 10 |
350 |
February 2015 |
View Details
|
February 07, 2012 |
|
7 -
276704
|
VEN -
1 -
10.6/18.8
|
IN VEN COUNTY ON ROUTE 1,33,101,126 AT VAR LOC |
INSTALL ADA CURB RAMPS |
Wheelchair Ramps |
0 – 1 |
120 |
July 2012 |
View Details
|
February 03, 2012 |
|
7 -
2768U4
|
LA -
210 -
0.8R/04.9R
|
IN LA CNTY IN LA ON S/B RTE 210 FR MACLAY AVE TO YARNELL ST |
EROSION CONTROL |
Erosion Control, Highway Planting |
1 – 10 |
250 |
May 2013 |
View Details
|
January 20, 2012 |
|
7 -
276904
|
LA -
210 -
17.7/20.3
|
IN LA CNTY IN LA ON S/B RTE 170 FR VANOWEN ST TO SHELDON ST, |
EROSION CONTROL |
|
1 – 10 |
250 |
April 2015 |
View Details
|
October 07, 2010 |
|
7 -
2769U4
|
LA -
170 -
17.7/20.3
|
IN LA CNTY IN NHLWD N/SBOUND FR VANOWEN ST TO SHELDON ST |
EROSION CONTROL |
Erosion Control |
1 – 10 |
450 |
September 2012 |
View Details
|
January 20, 2012 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
7 -
2770U4
|
LA -
118 -
11.5/13.7
|
IN LA CNTY IN LA ON RTE 118 FR RTE 5 IC TO RTE 210 IC E/W BOUND |
EROSION CONTROL |
Erosion Control, Highway Planting |
1 – 10 |
450 |
September 2012 |
View Details
|
January 20, 2012 |
|
7 -
277204
|
LA -
170 -
17.7R/20.3R
|
IN LA CNTY IN LA ON N/B RTE 170 FR VANOWEN ST TO SHELDON ST |
EROSION CONTROL |
Erosion Control, Highway Planting |
1 – 10 |
250 |
April 2015 |
View Details
|
October 07, 2010 |
|
7 -
2777U4
|
LA -
5 -
25.2/27.0
|
IN LOS ANGELES ON ROUTE 5 FROM COLORADO EXTENSION TO HAZEL STREET PUC AND ON ROUTE 134 FROM VICTORY BOULEVARD/RIVERSIDE DRIVE TO SAN FERNANDO ROAD |
EROSION CONTROL |
Highway Planting, Erosion Control |
1 – 10 |
250 |
January 2013 |
View Details
|
January 20, 2012 |
|
7 -
277904
|
VEN -
23 -
22.8/23.5
|
In Ventura County Between Guiberson Road and Santa Clara River |
DRAINAGE SYSTEM RESTORATION |
Repair Culverts |
1 – 10 |
200 |
December 2013 |
View Details
|
June 27, 2011 |
|
7 -
278204
|
LA -
10 -
18.3/46.8
|
LA CNTY @ VAR LOC ON RTE 10, 14, 30 , 57, 71, 110, 118, 134, 210, & 710 |
INSTALL ADA CURB RAMPS |
Wheelchair Ramps |
1 – 10 |
260 |
July 2012 |
View Details
|
February 03, 2012 |
|
7 -
278304
|
LA -
405 -
3.5/5.5
|
IN LA COUNTY IN LONG BEACH AT TEMPLE AVE OC |
BRIDGE REHAB |
Replace Bridge |
1 – 10 |
500 |
June 2013 |
View Details
|
February 03, 2012 |
|
7 -
278401
|
LA -
210 -
22.5/24.6
|
IN PASADENA FROM ARROYO BLVD TO ORANGE GROVE |
SOUNDWALL CONSTRUCTION |
Sound Wall |
1 – 10 |
210 |
February 2013 |
View Details
|
December 16, 2011 |
|
7 -
278504
|
LA -
4054 -
8.7
|
IN LOS ANGELES COUNTY,IN CARSON - DELORES YARD OVER HEAD (53-1168) |
PAINT ENTIRE STEEL PORTION OF STRUCTURE AND POLYESTER CONCRETE DECK OVERLAY |
Rehabilitate Bridge Deck |
10 – 20 |
|
July 2013 |
View Details
|
September 09, 2009 |
|
7 -
278604
|
LA -
210 -
20.8/21.5
|
IN LCF FROM FOOTHILL BLVD TO BIRKSHIRE PL UC |
SOUNDWALL CONSTRUCTION |
Sound Wall |
1 – 10 |
210 |
October 2013 |
View Details
|
December 16, 2011 |
|
7 -
278704
|
LA -
710 -
18.2/18.5
|
IN LOS ANGELES COUNTY, IN SOUTH GATE CITY ON I-710 AT FIRSTONE BLVD INTERCHANGE |
|
Modify Ramp |
1 – 10 |
230 |
March 2014 |
View Details
|
April 01, 2010 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
7 -
278804
|
LA -
5 -
54.4R/54.8R
|
IN LOS ANGELES COUNTY IN SCTA BETWEEN RYE CANYON ROAD AND RTE 5/126 IC |
UPGRADE WEIGH STATION |
Modify Scale Facility |
1 – 10 |
150 |
January 2013 |
View Details
|
December 14, 2009 |
|
7 -
278904
|
Ven -
101 -
9.1
|
IN VEN CNTY IN THOAOKS/CAMRLLO BET WENDY DR AND PLSNT VALLEY |
UPGRADE WEIGH STATION |
Modify Scale Facility, Signs |
0 – 1 |
125 |
August 2012 |
View Details
|
February 03, 2012 |
|
7 -
279104
|
LA -
57 -
4.3R/4.8R
|
LA COUNTY IN DIAMOND BAR & CITY OF INDUSTRY FR OC 53-1848R/UC53-1941 |
ADD WB AUXILIARY LANE/OC/RAMP/CONN |
Reconstruct Interchange, Widening |
180 – 200 |
700 |
September 2013 |
View Details
|
December 10, 2009 |
|
7 -
279204
|
Ven -
23 -
10.0/10.4
|
In Moorpark from Tierra Rejada Road exit ramp to westbound Tierrs Road entrance ramp |
construct Soundwall |
Sound Wall |
1 – 10 |
350 |
April 2012 |
View Details
|
February 03, 2012 |
|
7 -
280304
|
LA -
5 -
16.2 /63.4
|
IN LOS ANGELES CNTY AT VAR LOC (LA-5, 10, 101, 110, 134, 170, 405) |
INSTALL ADA CURB RAMPS |
Wheelchair Ramps |
1 – 10 |
130 |
September 2013 |
View Details
|
June 22, 2011 |
|
7 -
280704
|
LA -
101 -
25.3
|
IN LA/VEN COUNTY BETWEEN RTE 27 AND RTE 23 |
BRIDGE CONSTRUCTION |
Bridge |
1 – 10 |
400 |
July 2013 |
View Details
|
December 14, 2009 |
|
7 -
281004
|
LA -
5 -
00.0 /13.8
|
IN LA, LA-5(0/13.8),LA-22(0.9/1.3), LA-57(0/4.5),LA-60(3.2/28.3),LA-91 |
ADA-MISSING CURB RAMP |
Wheelchair Ramps |
0 – 1 |
200 |
August 2012 |
View Details
|
October 27, 2010 |
|
7 -
281104
|
LA -
110 -
24.7/24.9
|
LA COUNTY IN LA BETWEEN STADIUM WAY UC & FIGUEROA ST TUNNEL (SOUTHBOUND) |
Retrofit Stadium Way Sidehill Viaduct |
Repair Bridge |
0 – 1 |
125 |
February 2015 |
View Details
|
February 07, 2012 |
|
7 -
281504
|
LA -
101 -
29.2 /38.1
|
IN LA & VEN CNTY, IN LA101 (PM29.26 /38.19) & VEN101 (PM0.00/1.21 |
GSRD'S OR OTHER TREATMENT BMPs |
Reconstruct Culverts, Erosion Control, Highway Planting |
20 – 40 |
750 |
February 2013 |
View Details
|
February 07, 2012 |
|
7 -
281604
|
VEN -
118 -
15.9 /16.5
|
IN VENTURA COUNTY IN MOORPARK JUST WEST OF GABBERT ROAD |
ROAD WIDENING |
Widening |
1 – 10 |
300 |
August 2014 |
View Details
|
February 03, 2012 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
7 -
282704
|
LA -
101 -
00.0/39.5
|
IN LA FR JCT ST 5 TO CNTY LN |
INSTALL MBGR - GAP CLOSURES |
Guard Railing |
1 – 10 |
250 |
March 2015 |
View Details
|
February 07, 2012 |
|
7 -
283804
|
LA -
101 -
1.4 /15.6
|
IN LOS ANGELES COUNTY IN AT VARIOUS LOCATIONS |
VINE PLANTING TRANS ENHANCEMENT |
Highway Planting |
1 – 10 |
200 |
November 2015 |
View Details
|
April 01, 2010 |
|
7 -
283904
|
LA -
210 -
25.4/28.7
|
In Pasadena, Irwindale, Azusa and Glendora at various locations. |
Vine planting |
Highway Planting |
0 – 1 |
80 |
July 2014 |
View Details
|
December 28, 2010 |
|
7 -
284501
|
LA -
2 -
14.2/23.1
|
In Antelope Valley at the Lamont Odett Vista Point. |
Install lighting, native vegetation, and interpretive signs, and provide stormwater mitigation. |
Highway Planting, Lighting |
1 – 10 |
100 |
October 2013 |
View Details
|
December 28, 2010 |
|
7 -
285004
|
LA -
5 -
54.3
|
IN LA COUNTY IN SCTA AT THE S/B ON-RAMP FROM RYE CANYON RD |
|
Reconstruct Signals |
0 – 1 |
60 |
July 2012 |
View Details
|
February 03, 2012 |
|
7 -
286604
|
LA -
1 -
0.1 /1.8
|
PROJ CERRITOS CHANNEL TMDL(LA1-.19/ 1.85,2.74/3.96.LA19-3.98/8.4) |
TMDL PROJECT - Stormwater BMP installations. |
Drainage, Reconstruct Culverts |
10 – 20 |
400 |
April 2014 |
View Details
|
August 22, 2011 |
|
7 -
286704
|
LA -
1 -
07.7 /09.2
|
PROJ DOMINGUEZ CHENNEL VAR TMDLS(LA 1 PM7.7-9.24,LA91 PM6-8.43,LA105, |
IMPLEMENT STORM WATER TREATMMENT |
Earthwork, Erosion Control, Highway Planting, Irrigation System |
60 – 80 |
750 |
March 2017 |
View Details
|
January 27, 2012 |
|
7 -
287204
|
LA -
134 -
1.6/2.7
|
IN LA CNTY IN BRBNK FR CLYBOURN AVE TO BOB HOPE DR |
STORM WATER SOURCE CONTROL |
Erosion Control, Irrigation System |
1 – 10 |
1000 |
August 2014 |
View Details
|
January 20, 2012 |
|
7 -
287304
|
LA -
210 -
39.8/41.9
|
IN LA CNTY IN AZUSA FR AZUSA AVE TO BIG DALTON WASH |
STORM WATER SOURCE CONTROL |
Highway Planting, Erosion Control, Reconstruct Drainage, Irrigation System |
1 – 10 |
1000 |
September 2014 |
View Details
|
January 23, 2012 |
|
7 -
288204
|
LA -
60 -
0.3/3.1
|
IN LA CNTY IN AND NEAR LA FR BOYLE AVE TO RTE 60/710 IC |
STORM WATER SOURCE CONTROL |
Erosion Control, Highway Planting |
1 – 10 |
125 |
August 2014 |
View Details
|
January 23, 2012 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
7 -
288504
|
LA -
405 -
11.7
|
NB 405 at Carson Commercial Vehicle Enforcement Facility. |
Improve and Upgrade Commercial Vehicle Enforcement Facility. |
Repair Inspection Facility |
1 – 10 |
250 |
May 2013 |
View Details
|
August 01, 2011 |
|
7 -
288904
|
LA -
19 -
4.8/8.4
|
In Los Angeles along Lakewood Boulevard
(LA-019) from Del Amo Boulevard to Gardendale Street. |
33 Intersections (86 Curb Ramps)
1000 Linear Feet of New Sidewalks
10 Pedestrian Push Buttons
64 Pedestrian Countdowns at 11 Signalized Intersections
10 Pedestrian Crosswalks |
Modify Signals, Wheelchair Ramps |
1 – 10 |
220 |
September 2014 |
View Details
|
January 20, 2012 |
|
7 -
289004
|
LA -
10 -
37.2/42.4
|
IN LA CNTY FR SOUTH MEADOW RD TO RTE 57 |
MAINLINE PAVEMENT REHABILITATION |
Rehabilitate Pavement, Asphalt Concrete Surfacing, Replace PCC Pavement |
20 – 40 |
600 |
November 2013 |
View Details
|
August 08, 2011 |
|
7 -
289904
|
LA -
19 -
4.0/8.4
|
IN LA, ALONG LA 19 UPGRADE CURB RAMPS ADD SIDEWALKS |
UPGRADE CURB RAMPS AND SIDEWALKS |
|
1 – 10 |
400 |
September 2014 |
View Details
|
January 27, 2012 |
|
7 -
290404
|
VEN -
101 -
29.9
|
IN VEN AT ASH ST POC (PM 29.9) |
UPGRADE ADA RAMPS & ACCESSIBILITY |
|
1 – 10 |
500 |
January 2016 |
View Details
|
January 27, 2012 |
|
7 -
290804
|
LA -
1 -
2.7/12.1
|
IN LA ON PCH BTW ANAHEIM & RTE 710 |
ADA IMPROVEMENTS - 483 new or upgraded curb ramps and 4000 feet of sidewalk. |
|
1 – 10 |
200 |
February 2015 |
View Details
|
January 27, 2012 |
|
7 -
290904
|
LA -
210 -
7.1/7.8
|
IN LA CNTY IN LA BET TERRA BELLA AND MOBIL HOMES |
REPLACING MBGR TO CONCRETE BARRIER |
Concrete Barrier |
1 – 10 |
150 |
March 2013 |
View Details
|
January 27, 2012 |
|
7 -
291004
|
LA -
14 -
32.1R/59.2R
|
IN LA IN SANTA CLARITA TO SIERRA HWY,INSTALL ADA RAMPS UPGRADE ADA |
ADA INFRASTRUCTURE |
Wheelchair Ramps, Modify Signals |
0 – 1 |
270 |
September 2014 |
View Details
|
January 27, 2012 |
|
7 -
291104
|
LA -
101 -
30.9/38.2
|
IN LA FR CALBASAS/AGURA HILLS |
INSTL & MODIFY ADA RAMPS,CONST SIDEWALKS, ADA IMPROVEMENTS |
Wheelchair Ramps, Modify Signals |
1 – 10 |
250 |
September 2013 |
View Details
|
January 27, 2012 |
|
7 -
291204
|
LA -
057 -
7.7 /12.2
|
IN LA, RTE 57 FR PM 7.7/12.2, RTE 60 FR PM 0.0/6.9 |
ADA RAMPS |
Modify Signals, Wheelchair Ramps |
1 – 10 |
250 |
November 2014 |
View Details
|
January 27, 2012 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
7 -
292104
|
LA -
101 -
11. /11.8
|
IN LA, RTE 101/134/170 IC |
MAINTENANCE SAFETY |
|
1 – 10 |
250 |
September 2014 |
View Details
|
January 27, 2012 |
|
7 -
292201
|
LA -
2 -
17.8R/19.5R
|
IN LA, RTE 2/134 IC |
MAINTENANCE SAFETY |
|
1 – 10 |
200 |
April 2015 |
View Details
|
January 27, 2012 |
|
7 -
293904
|
LA -
60 -
7.7
|
IN LA, RTE 60 @ PARAMOUNT BL OC (BR 53-1910) |
Emergency Bridge Replacement. |
Replace Bridge |
1 – 10 |
110 |
February 2012 |
View Details
|
February 03, 2012 |
|
7 -
2X8401
|
LA -
210 -
17.8
|
In La Cresenta, at Pickens Canyon Flume. |
Replace flume protective liner. |
Repair Bridge |
1 – 10 |
120 |
October 2012 |
View Details
|
December 28, 2010 |
|
7 -
2X9301
|
LA -
105 -
13.0/13.6
|
In Paramount, from Route 710 to Garfield. |
Repair slopes. |
Repair Slope |
1 – 10 |
340 |
June 2012 |
View Details
|
January 20, 2012 |
|
7 -
2X9401
|
LA -
110 -
1.1/8.8
|
In Wilmington and Carson, from McCarthur Avenue to Route 405. |
Repair slopes. |
Repair Slope |
1 – 10 |
500 |
July 2012 |
View Details
|
December 28, 2010 |
|
7 -
2X9501
|
LA -
405 -
0.5/10.5
|
In Long Beach and Carson, from Studebaker Street to Carson Street. |
Repair slopes. |
Repair Slope |
1 – 10 |
200 |
June 2012 |
View Details
|
December 28, 2010 |
|
7 -
2X9604
|
LA -
710 -
5.8/12.0
|
In Long Beach, from Pico Avenue to Long Beach Boulevard. |
Repair slopes. |
Repair Slope |
1 – 10 |
280 |
June 2012 |
View Details
|
December 16, 2011 |
|
7 -
2X9804
|
LA -
14 -
58.1/77.0
|
In Palmdale and Lancaster, from Avenue S to Avenue A. |
Repair slopes. |
Repair Slope |
1 – 10 |
375 |
July 2012 |
View Details
|
December 29, 2010 |
|
7 -
3X0004
|
Ven -
33 -
15.7/15.8
|
In Meiners Oaks, near North Folk Matilija Creek. |
Construct soldier pile wall with tie-backs. |
Retaining Wall |
1 – 10 |
300 |
June 2012 |
View Details
|
December 29, 2010 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
7 -
3X0104
|
LA -
10 -
55.2
|
In San Dimas, at the west bound Route 10/71 transition to Route 57. |
Slope stabilization. |
Repair Slope |
0 – 1 |
180 |
July 2012 |
View Details
|
February 03, 2012 |
|
7 -
3X0204
|
Ven -
150 -
27.4/29.4
|
Near Sulphur Springs, between Camp Bartlett and Rancho La Cuesta. |
Construct soldier pile walls |
Retaining Wall, Repair Slope |
1 – 10 |
250 |
July 2012 |
View Details
|
February 03, 2012 |
|
7 -
3X3004
|
LA -
10 -
0.4S
|
In the City of Los Angeles, west of Soto Street offramp. |
Reconstruct slope and construct retaining wall. |
Repair Slope, Retaining Wall |
1 – 10 |
200 |
July 2012 |
View Details
|
August 01, 2011 |
|
7 -
3X3204
|
LA -
10 -
42.6/42.8
|
In San Dimas, on westbound Route 10 transition to northbound Route 57. |
Construct a debris barrier system. |
Drainage |
0 – 1 |
200 |
July 2012 |
View Details
|
February 03, 2012 |
|
7 -
3Y6204
|
LA -
210 -
0.0R/9.9R
|
IN LA COUNTY ON RTE 210 FROM RTE 5 TO TO BIG TUJUNGA WASH AT VAR LOC |
REPAIR DECKS & REPLACE SLABS & SEAL |
Replace Joint Seals, Seal Cracks, Repair Bridge |
1 – 10 |
250 |
December 2012 |
View Details
|
April 01, 2010 |
|
7 -
491604
|
LA -
405 -
22.2/23.4
|
IN ING @ ARBOR VITAE AVENUE |
CONSTRUCT SOUTH HALF INTERCHANGE |
|
20 – 40 |
500 |
July 2014 |
View Details
|
December 16, 2011 |
|
7 -
4H9004
|
LA -
060 -
20.6/
|
IN LA COUNTY IN ROWLAND HEIGHTS FROM W/B OFF-RAMP TO NOGALES STREET |
WIDEN OFF-RAMP |
Modify Interchange, Widening |
1 – 10 |
190 |
May 2013 |
View Details
|
February 07, 2012 |
|
7 -
4L2204
|
LA -
001 -
51.6/51.6
|
IN MALIBU, PACIFIC COAST HWY @ PM 51.6 (THE ESCONDIDO GRADE) |
PLC RETAINING STRUCTURE BOTH SIDE |
Repair Slope, Retaining Wall |
1 – 10 |
340 |
July 2012 |
View Details
|
February 03, 2012 |
|
7 -
4Y1504
|
LA -
1 -
0.0/28.6
|
IN LA CNTY, AT VARIOUS LOCATIONS LA-1/90/405 |
BRIDGE PRESERVATION |
Replace Joint Seals, Repair Bridge |
1 – 10 |
500 |
April 2012 |
View Details
|
February 06, 2012 |
|
7 -
4Y7004
|
LA -
405 -
8.7
|
IN LA, LA-405 @ DOLORES YARD OH |
PAINT STEEL GIRDERS |
Clean and Paint Bridge |
1 – 10 |
100 |
April 2013 |
View Details
|
February 03, 2012 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
7 -
4Y7504
|
LA -
19 -
0.0R/19.2R
|
IN LA, LA-19, 22, 47, 91, 110, 405, 605,& 710 VARIOUS |
METHACRYLTE DECK, JOINT SEALS, COLUMN & SLOPE REPAIR, APPROACH SLABS, AND SIGNS |
Repair Slope, Repair Bridge, Replace Joint Seals |
1 – 10 |
180 |
July 2012 |
View Details
|
January 20, 2012 |
|
8 -
0C1211
|
SBd -
395 -
19.0/35.6
|
IN SAN BERNARDINO COUNTY FROM 7.9 MILES NORTH OF STATE ROUTE 18 TO 10.4 MILES SOUTH OF STATE ROUTE 58 |
Widen median & shoulders, install median & shoulder rumble strips |
Widening |
20 – 40 |
300 |
January 2012 |
View Details
|
October 25, 2011 |
|
8 -
0F2401
|
Riv -
15 -
R1.0
|
IN RIVERSIDE COUNTY NEAR TEMECULA ABOUT 1.2 MILES NORTH OF SAN DIEGO COUNTY LINE AT THE RAINBOW TRUCK INSPECTION FACILITY |
Make improvements to the Rainbow Truck Inspection Facility. |
Modify Inspection Facility |
0 – 1 |
25 |
January 2012 |
View Details
|
November 14, 2011 |
|
8 -
0F3601
|
Riv -
10 -
135
|
RIV CO W/O BLYTHE AT WILEY'S WELL SAFETY ROADSIDE REST AREA |
UPGRADE EXISTING SRRA FOR ADA |
|
0 – 1 |
165 |
May 2012 |
View Details
|
October 26, 2011 |
|
8 -
0G6201
|
SBd -
38 -
15.0/49.5
|
NEAR BIG BEAR LAKE FR VALLEY OF THE FALLS DR TO NORTH JCT RTE 18 |
GRIND & OVERLAY DGAC TYPE A |
Rehabilitate Pavement |
10 – 20 |
100 |
May 2012 |
View Details
|
May 19, 2011 |
|
8 -
0J0101
|
SBd -
18 -
53.3/53.6
|
IN BIG BEAR CITY AT BIG TREE DRIVE |
CONSTRUCT LEFT TURN IN BOTH DIRECTION, WIDEN SHOULDER WB |
Widening |
0 – 1 |
50 |
July 2012 |
View Details
|
August 11, 2011 |
|
8 -
0J1401
|
Riv -
74 -
29.6/29.9
|
NEAR PERRIS AT THE INTERSECTION OF SR 74 AND MENIFEE ROAD |
WIDEN, EXTEND LEFT-TURN POCKET & CONSTRUCT CURB RAMPS |
Widening, Wheelchair Ramps |
1 – 10 |
50 |
April 2012 |
View Details
|
August 11, 2011 |
|
8 -
0K1501
|
SBd -
15 -
70.6/74.9
|
SAN BERNARDINO COUNTY IN AND NEAR BARSTOW FROM 0.5 MILE NORTH OF ROUTE 15/58 SEPARATION TO EAST MAIN STREET UNDERCROSSING |
Cold Plane and Overlay |
Rehabilitate Pavement |
1 – 10 |
100 |
October 2011 |
View Details
|
October 25, 2011 |
|
8 -
0K2001
|
SBd -
18 -
75.3/75.7
|
SAN BERNARDINO COUNTY FROM 0.2 MILE WEST OF CUSTER AVENUE TO 0.1 MILE WEST OF CHRISTENSON ROAD |
CONSTRUCT LEFT TURN LANE |
|
0 – 1 |
45 |
April 2012 |
View Details
|
October 25, 2011 |
|
8 -
0K2401
|
SBd -
40 -
28.1/51.0
|
NEAR BARSTOW FROM 0.2 MI W/O DESERT OASIS SRRA TO 1.0 MILES E/O CRUCERO RD |
GRIND AND OVERLAY PAVEMENT, UPGRADE EXISTING GUARDRAIL & REPLACE DIKE |
Rehabilitate Pavement |
20 – 40 |
220 |
December 2011 |
View Details
|
November 14, 2011 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
8 -
0K2501
|
SBd -
40 -
3.0/28.1
|
FROM 0.25 MILES W/O PELELIU DITCH TO DESERT OASIS SRRA NEAR BARSTOW |
GRIND AND OVERLAY AC |
Rehabilitate Pavement |
20 – 40 |
200 |
August 2012 |
View Details
|
October 25, 2011 |
|
8 -
0K2601
|
SBd -
40 -
138.3/154.5
|
IN /NEAR NEEDLES FROM BUZZARD WASH TO ARIZONA STATE LINE |
GRIND AND OVERLAY AC |
Rehabilitate Pavement |
20 – 40 |
200 |
August 2012 |
View Details
|
October 25, 2011 |
|
8 -
0K2701
|
SBd -
40 -
119.0/138.3
|
FROM 0.5 MILES W/O TANK TOWER DITCH TO BUZZARD WASH NEAR NEEDLES |
GRIND AND OVERLAY AC |
Rehabilitate Pavement |
20 – 40 |
200 |
August 2012 |
View Details
|
October 25, 2011 |
|
8 -
0K2801
|
SBd -
40 -
73.0/89.0
|
NEAR LUDLOW FROM 1.5 MI W/O OLD DAD WASH TO 1.5 MI W/O FORTRESS WASH |
GRIND AND OVERLAY AC |
Rehabilitate Pavement |
20 – 40 |
120 |
February 2012 |
View Details
|
October 21, 2011 |
|
8 -
0L5901
|
Riv -
10 -
135.0
|
17.5 MILES WEST OF BLYTHE AT WILEY WELL SAFETY ROADSIDE REST AREA |
REPLACE SEWER SYSTEM AND WATER SUPPLY SYSTEM |
Replace Water Supply System |
0 – 1 |
255 |
January 2012 |
View Details
|
February 10, 2011 |
|
8 -
0L9301
|
Riv -
10 -
15.8
|
NEAR BANNING AT DESERT HILLS TRUCK INSPECTION FACILITY |
BUILD A NEW ADMINISTRATION BUILDING & INSTALL NEW SEPTIC TANK AND LEACH FIELD |
|
1 – 10 |
250 |
January 2012 |
View Details
|
May 19, 2011 |
|
8 -
0M2101
|
Riv -
74 -
40.3
|
IN THE CITY OF HEMET INTERSECTION OF SR-74 AND GILBERT ST |
INSTALL TRAFFIC SIGNALS |
Signals |
0 – 1 |
60 |
August 2012 |
View Details
|
October 24, 2011 |
|
8 -
0M3101
|
Riv -
60 -
13.3/16.6
|
ALSO RIV-91-15.6/16.6 & SBD-210-24.1; IN CITIES OF MORENO VALLEY, RIVERSIDE AND SAN BERNARDINO |
UPGRADE PEDESTRIAN FACILITIES (CURB RAMPS) |
Wheelchair Ramps |
0 – 1 |
30 |
April 2012 |
View Details
|
August 11, 2011 |
|
8 -
0M4001
|
SBd -
215 -
14.1
|
IN THE CITY OF SAN BERNARDINO N/B & S/B-215 RAMPS TO PALM AVE/KENDALL DR |
INSTALL TRAFFIC SIGNALS |
Signals |
0 – 1 |
70 |
April 2012 |
View Details
|
October 25, 2011 |
|
8 -
0M6901
|
SBd -
95 -
57.0/57.3
|
IN NEEDLES FROM SAFARI DRIVE TO I-40/SR-95 |
CONSTRUCT SIDEWALKS AND CURB RAMPS |
Wheelchair Ramps |
0 – 1 |
45 |
April 2012 |
View Details
|
August 11, 2011 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
8 -
0M8301
|
SBd -
18 -
7.6/8.1
|
IN SAN BERNARDINO BETWEEN 40TH ST AND 48TH ST |
UPGRADE PEDESTRIAN FACILITIES, REMOVE MBGR AND PAVE WALKWAY |
Wheelchair Ramps, Remove Guard Railing |
0 – 1 |
|
April 2012 |
View Details
|
October 21, 2011 |
|
8 -
0M8701
|
Riv -
74 -
27.4/27.7
|
IN CITY OF PERRIS INTERSECTION OF SR 74 AND I-215 N/B RAMPS |
INSTALL TRAFFIC SIGNALS |
Signals |
0 – 1 |
60 |
April 2012 |
View Details
|
October 24, 2011 |
|
8 -
0M8801
|
SBd -
15 -
14.6
|
AT THE INTERSECTION OF I-15 NB OFF-RAMP AND GLEN HELEN PKWY |
INSTALL TRAFFIC SIGNALS AND CONSTRUCT CURB RAMPS |
Wheelchair Ramps, Signals |
0 – 1 |
45 |
April 2012 |
View Details
|
October 24, 2011 |
|
8 -
0M9401
|
SBd -
215 -
0.0/5.1
|
ALSO RIV-215-43.2/45.3 & RIV-91-21.5/21.7; IN RIV FR I-215/SR-60/SR-91 IC TO ORANGE SHOW RD IC IN SBD |
HOV LANE IN EACH DIRECTION |
Widening, Freeway and Structures |
120 – 140 |
600 |
May 2012 |
View Details
|
October 26, 2011 |
|
8 -
0N1401
|
SBd -
VAR -
VAR
|
VARIOUS MAINTENANCE STATIONS: CAJON, NEEDLES, BARSTOW, MTN PASS, VICTORVILLE, FAWNSKIN & ESSEX |
REPLACE EMULSION TANKS |
Maintenance Station |
0 – 1 |
60 |
February 2012 |
View Details
|
October 25, 2011 |
|
8 -
0N2401
|
SBd -
10 -
37.4/38.3
|
IN CALIMESA, FROM 0.4 MI E/O LIVE OAK CANYON RD OC TO 0.8 MI W/O COUNTY LINE ROAD UC |
INSTALL OUTER SEPARATION CONCRETE BARRIER |
Concrete Barrier |
0 – 1 |
55 |
May 2012 |
View Details
|
October 25, 2011 |
|
8 -
0N2601
|
Riv -
15 -
34.9/35.5
|
IN AND NEAR CORONA FR 1.38 MI N/O GLEN IVY UC TO 0.1 MI S/O WEIRICK RD |
INSTALL OUTER SEPARATION BARRIER |
Concrete Barrier |
0 – 1 |
35 |
May 2012 |
View Details
|
October 24, 2011 |
|
8 -
0N4101
|
SBd -
210 -
9.9/12.5
|
IN RANCHO CUCAMONGA FR ETIWANDA AVE OC TO SAN SEVAINE RD |
REPLACE CONCRETE BARRIER |
Replace Concrete Barrier |
1 – 10 |
80 |
October 2012 |
View Details
|
October 25, 2011 |
|
8 -
0N5901
|
SBd -
40 -
85.2
|
NEAR ESSEX AT VAN WINKLE WASH BRIDGE |
BRIDGE REPLACEMENT |
Replace Bridge |
10 – 20 |
360 |
August 2012 |
View Details
|
October 26, 2011 |
|
8 -
0N8901
|
Riv -
215 -
41.2/42.2
|
IN RIVERSIDE FROM BLAINE ST SB OFF RAMP TO UNIVERSITY AVE OFF RAMP |
WIDENING SB I-215 TO EXTEND LANE NO. 4 |
Widening |
0 – 1 |
45 |
April 2012 |
View Details
|
October 26, 2011 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
8 -
0N9101
|
Riv -
62 -
0.50/1.0
|
NEAR PALM SPRINGS AT INTERSECTION OF SR-62 AND DILLION ROAD |
INSTALL TRAFFIC SIGNALS |
Signals |
0 – 1 |
60 |
July 2012 |
View Details
|
October 26, 2011 |
|
8 -
0P5601
|
SBd -
95 -
25.1/48.3
|
FROM 12.0 MI S/O HAVASU LAKE ROAD TO 9.0 MI S/O INTERSTATE I-40 |
INSTALL CENTERLINE RUMBLE STRIPS |
|
0 – 1 |
20 |
August 2012 |
View Details
|
October 24, 2011 |
|
8 -
0P6801
|
Riv -
86 -
0.1/22.1
|
ALSO RIV 111 PM 23.7 AT VARIOUS LOCATIONS |
SEAL DECK, REPAIR SPALLS AND BACKFILL AND PLACE RIPRAPS |
Rehabilitate Bridge Deck |
1 – 10 |
80 |
January 2012 |
View Details
|
November 14, 2011 |
|
8 -
0P6901
|
Riv -
10 -
135.1/154.1
|
ALSO RIV 78 PM 8.06/15.15 AT VARIOUS LOCATIONS |
SEAL DECK, REPLACE JOINT SEALS AND REPAIR AC PAVEMENT |
Rehabilitate Bridge Deck, Replace Joint Seals |
1 – 10 |
50 |
January 2012 |
View Details
|
October 24, 2011 |
|
8 -
0P9601
|
Riv -
79 -
34.2/401.1
|
IN SAN JACINTO FR 1.3 MI N/O INTERSECTION SANDERSON AVE/GILMAN SPRINGS RD TO 1ST ST IN BEAUMONT |
INSTALL MARKERS AND RUMBLE STRIPS |
Pavements Markers |
0 – 1 |
25 |
June 2012 |
View Details
|
May 19, 2011 |
|
8 -
0Q2401
|
SBd -
138 -
26.5/29.5
|
FROM WEST FORK MOJAVE RIVER TO 0.1 MI E/O BURNT MILL CANYON. |
REPAIR/REPLACE 42" CULVERTS REPAIR SLOPES & ROADWAY |
Replace Culverts |
0 – 1 |
200 |
September 2012 |
View Details
|
October 25, 2011 |
|
8 -
0Q7301
|
SBd -
62 -
15.1/29.3
|
IN YUCCA VALLEY TO 29 PALMS, ON ST RTE 62, FR MESA RD TO BERMUDA AVE |
GRIND AND OVERLAY WITH RHMA & DIGOUTS |
Rehabilitate Pavement |
20 – 40 |
200 |
August 2012 |
View Details
|
October 25, 2011 |
|
8 -
334881
|
Riv -
215 -
38.6/39.7
|
IN RIVERSIDE FROM W/O JCT 60/215 TO W/O EL CERRITO AVE |
HIGHWAY PLANTING |
Highway Planting |
0 – 1 |
100 |
May 2012 |
View Details
|
October 25, 2011 |
|
8 -
368501
|
SBD -
15 -
177.3/181.1
|
NEAR WHEATON SPRINGS, EAST OF NIPTON RD TO NR NEVADA STATE LINE / YERMO, EAST YERMO RD TO MINEOLA RD |
CONSTRUCT COMMERCIAL VEHICLE ENFORCEMENT FACILITY AND AGRICULTURAL INSPECTION FACILITY AND DEMOLISH EXISTING CDFA |
Replace Inspection Facility |
60 – 80 |
380 |
April 2012 |
View Details
|
October 26, 2011 |
|
8 -
384341
|
SBD -
10 -
9.9/24.5
|
FROM 0.1 MI E/O RTE 10/15 JCT TO 0.3 MI E/O RTE 10/215 JCT |
INSTALL RMS & WIDEN ON-RAMPS |
Ramp Metering System |
10 – 20 |
250 |
January 2012 |
View Details
|
October 21, 2011 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
8 -
438901
|
SBd -
178 -
5.0/14.3
|
EAST OF RIDGECREST FROM 5.0 MILES EAST TO 14.3 MILES EAST OF KERN COUNTY LINE |
Replace and Improve Drainage Facilities |
Replace Drainage |
0 – 1 |
40 |
February 2012 |
View Details
|
October 24, 2011 |
|
8 -
448301
|
Riv -
15 -
33.4/38.4
|
IN AND NR CORONA FROM 0.8 MI N/O GLEN IVY UC TO 0.4 M S/O ONTARIO AVE UC |
REHABILITATE ROADWAY & WIDEN MEDIAN SHOULDER |
Rehabilitate Pavement |
20 – 40 |
120 |
July 2012 |
View Details
|
August 11, 2011 |
|
8 -
448401
|
RIV -
91 -
15.6/21.6
|
IN RIVERSIDE FROM ADAMS ST TO RTE 60/91/215 INTERCHANGE |
CONSTRUCT 2 HOV LANES & MODIFY IC'S |
Modify Interchange, Widening |
120 – 140 |
1000 |
September 2011 |
View Details
|
October 21, 2011 |
|
8 -
472221
|
SBd -
15 -
3.8/12.8
|
SAN BERNARDINO COUNTY IN RANCHO CUCAMONGA, FONTANA AND RIALTO FROM SEVENTH STREET UNDERCROSSING TO SIERRA AVENUE UNDERCROSSING |
Pavment rehab, slab replacement, replace br. railing & approach slabs |
Rehabilitate Pavement |
100 – 120 |
600 |
November 2011 |
View Details
|
October 21, 2011 |
|
9 -
23770_
|
MNO -
395 -
118.7/119.6
|
IN MON CO NEAR TOPAZ LAKE FROM 1.7 MILES NORTH OF SR 89 TO 0.9 MILES SOUTH OF THE NEVADA BORDER |
REALIGN & CURVE CORRECTION |
Asphalt Concrete Surfacing, Retaining Wall, Realignment, Realign Curve, Guard Railing, Grading and Paving, Erosion Control, Earthwork, Widening |
10 – 20 |
110 |
December 2011 |
View Details
|
October 06, 2011 |
|
9 -
28750_
|
INY -
190 -
65.9/66.5
|
IN INYO CO ABOUT 10.5 MILES EAST OF PANAMINT SPRINGS FROM 8.0 MILES EAST OF PANAMINT VALLEY RD TO 10.0 MILES WEST OF WILDROSE RD TO 10.0 |
ROCKFALL MITIGATION |
Earthwork, Realign Curve |
1 – 10 |
150 |
June 2012 |
View Details
|
October 06, 2011 |
|
10 -
0A872_
|
STA -
219 -
2.9/4.9
|
ROUTE 219 FROM MORROW RD TO ROUTE 108 - WIDEN TO 4 LANE |
WIDEN TO 4 LANES AND INTERSECTION IMPROVEMENTS |
|
20 – 40 |
|
February 2012 |
View Details
|
February 09, 2012 |
|
10 -
0E612_
|
SJ -
99 -
10.6/15.0
|
IN MANTECA ON ROUTE 99 FROM 1.4 MILE NORTH OF LATHROP ROAD TO 0.4 MILE NORTH OF ARCH ROAD |
FRENCH CAMP INTERCHANGE (PHASE 2) |
Reconstruct Freeway, Freeway and Structures, Retaining Wall, Reconstruct Interchange, Asphalt Concrete Surfacing, Bridge |
20 – 40 |
495 |
February 2012 |
View Details
|
February 09, 2012 |
|
10 -
0E613_
|
SJ -
99 -
6.9/15.0
|
IN MANTECA ON ROUTE 99 FROM 0.6 MILE SOUTH OF COTTAGE AVENUE TO 0.4 MILE NORTH OF ARCH ROAD |
LATHROP INTERCHANGE (PHANSE 3) |
Asphalt Concrete Surfacing, Reconstruct Interchange |
20 – 40 |
470 |
July 2012 |
View Details
|
February 09, 2012 |
|
10 -
0G350_
|
SJ -
12/120 -
R4.4, R0.8
|
IN SAN JOAQUIN CO NEAR TERMINOUS AT LITTLE POTATO SLOUGH BRIDGE AND NEAR MANTECA AT W120-N5 CONNECTOR OH |
REPLACE BEARING PADS, JOINT SEALS |
Replace Bridge Bearings, Replace Joint Seals, Repair Bridge |
1 – 10 |
330 |
October 2012 |
View Details
|
February 09, 2012 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
10 -
0G800_
|
SJ -
12 -
0.1/R4.4
|
IN SAN JOAQUIN COUNTY NEAR TERMINOUS FROM MOKELUMNE RIVER BRIDGE TO POTATO SLOUGH BRIDGE |
ROADWAY REHABILITATION |
|
20 – 40 |
|
December 2012 |
View Details
|
February 09, 2012 |
|
10 -
0K330_
|
SJ -
5, 132, 580 -
0.1/47.8, 0.1/6.1, 3.8/13.7
|
IN SAN JOAQUIN COUNTY ON ROUTES 5, 132 AND 580 AT VARIOUS LOCATIONS TO INSTALL TRAFFIC MONITORING STATIONS(TMS) |
INSTALL TRAFFIC MONITORINGS STATIONS (TMS) |
Electrical Facilities |
1 – 10 |
150 |
February 2013 |
View Details
|
February 09, 2012 |
|
10 -
0M780_
|
SJ -
5 -
25.1/28.6
|
IN SAN JOAQUIN COUNTY NEAR AND IN THE CITY OF STOCKTON ON SR5 FROM CHARTER WAY TO COUNTRY CLUB BLVD. |
ROADWAY REHABILITATION |
Bridge |
1 – 10 |
|
October 2012 |
View Details
|
February 09, 2012 |
|
10 -
0S780_
|
STA -
99 -
R2.3/R20.2
|
ON ROUTE 99 FROM LINWOOD AVENUE OVERCROSSING TO BECKWITH ROAD OVERCROSSING |
BRIDGE ENHANCEMENT, 16 STRUCTURES |
|
1 – 10 |
|
October 2012 |
View Details
|
February 09, 2012 |
|
10 -
0S860_
|
SJ -
99 -
32.0/32.6
|
STATE RTE 99 NORTHBOUND FROM PM 32.0 TO 32.6 IN SAN JOAQUIN CO |
HOTMIX ASPHALT OVERLAY |
Roadway, Grading and Paving, Asphalt Concrete Surfacing |
0 – 1 |
40 |
June 2012 |
View Details
|
February 09, 2012 |
|
10 -
0S940_
|
MER -
152 -
R6.2/R10.1
|
IN MERCED CO ABOUT 9 MILES WEST OF LOS BANOS ON SR 152 FROM 4 MILES WEST OF SAN LUIS FOREBAY BRIDGE TO SAN LUIS FOREBAY BRIDGE (BR#39145) |
INSTALL DOUBLE THRIE BEAM BARRIER IN CENTER MEDIAN |
Earthwork, Concrete Barrier |
1 – 10 |
60 |
October 2012 |
View Details
|
February 09, 2012 |
|
10 -
0T800_
|
AMA -
12 -
0.0
|
IN AMADOR, CALAVERAS AND TUOLUMNE COUNTIES ON STATE ROUTES 12 AND 49 AT VARIOUS LOCATIONS |
INSTALL ADA CURB RAMPS |
Wheelchair Ramps |
0 – 1 |
30 |
May 2012 |
View Details
|
February 09, 2012 |
|
10 -
0U680_
|
AMA -
88 -
22.2
|
IN AMADOR CO ON STATE RTE 88 ABOUT 0.1 MILES WEST OF CLIMAX ROAD NEAR PINE GROVE |
INSTALL RETAINING WALL AND GUARDRAIL |
Retaining Wall, Earthwork, Erosion Control, Guard Railing, Repair Slope, Replace Culverts, Replace Drainage |
0 – 1 |
50 |
January 2012 |
View Details
|
January 05, 2012 |
|
10 -
0W070_
|
TUO -
120 -
R44.8
|
ON STATE ROUTE 120 AT BIG OAK SIDEHILL VIADUCT |
REPLACE BRIDGE DECK |
|
1 – 10 |
|
June 2012 |
View Details
|
August 17, 2011 |
|
10 -
26444_
|
AMA -
88 -
0.0/5.5
|
ON RTE 88 IN AMADOR CO FROM THE AMADOR CO LINE TO THE JUNCTION OF RTE 88 AND RTE 124 |
ROADWAY REHABILITATION |
Pavements Markings, Pavements Markers, Replace Guard Railing, Replace Fence, Retaining Wall, Realign Curve, Rehabilitate Pavement, Replace Signs, Replace Drainage, Earthwork, Reconstruct Electrical Facilities, Erosion Control, Replace Culverts, Bridge Railing, Replace Bridge |
10 – 20 |
520 |
January 2012 |
View Details
|
July 15, 2011 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
10 -
38150_
|
MER -
165 -
26.7/30.0
|
NEAR STEVINSEN FROM RTE 140 TO 0.2 KM SOUTH OF WESTSIDE BLVD RIGHT |
AC OVERLAY, DIGOUTS, INTERSECTION IMPROVEMENTS & SHOULDER WIDENING |
Widening, Reconstruct Drainage, Asphalt Concrete Surfacing |
1 – 10 |
155 |
June 2012 |
View Details
|
January 05, 2012 |
|
10 -
3A100_
|
SJ -
99 -
15.0/18.6
|
ON RTE 99 IN SAN JOAQUIN CO IN STOCKTON, FROM 0.4 MILES NORTH OF ARCH ROAD TO 0.1 MILES SOUTH OF RTE 4 WEST/RTE 99 NORTH CONNECTOR |
WIDEN TO 6 LANES |
Asphalt Concrete Surfacing, Remove Bridge Railing, Replace Bridge, Reconstruct Concrete Barrier, Repair Culverts, Replace Drainage, Earthwork, Reconstruct Electrical Facilities, Erosion Control, Establish Existing Planting, Replace Fence, Freeway and Structures, Reconstruct Freeway, Grading and Paving, Replace Guard Railing, Highway Planting, Reconstruct Interchange, Interconnect Signals, Replace Irrigation System, Reconstruct Lighting, Replace Overcrossing, Replace Overhead, Park and Ride Facility, Pavements Markers, Pavements Markings, Replace Pumping Plant Equipment, Replace Ramp, Ramp Metering System, Realign Curve, Realignment, Rehabilitate Pavement, Repair Slope, Replace PCC Pavement, Replace Retaining Wall, Reconstruct Roadway, Rock Slope Protection, Reconstruct Signals, Replace Signs, Reconstruct Sound Wall, Wheelchair Ramps, Widening, Replace Wing Wall |
140 – 160 |
670 |
March 2012 |
View Details
|
May 18, 2011 |
|
10 -
41570_
|
MER -
99 -
4.6/10.5
|
ON ROUTE 99 FROM BUCHANAN HOLLOW ROAD TO 0.5KM NORTH OF MCHENRY ROAD IN MERCED COUNTY (KP7.4/16.9) |
4E TO 6F ON 8F R/W ALIGNMENT |
Wing Wall, Wheelchair Ramps, Signs, Seal Cracks, Rock Slope Protection, Roadway, Retaining Wall, Rehabilitate Pavement, Realignment, Overcrossing, Lighting, Irrigation System, Interchange, Guard Railing, Grading and Paving, Freeway, Freeway and Structures, Fence, Erosion Control, Earthwork, Drainage, Culverts, Bridge, Bridge Railing |
80 – 100 |
600 |
January 2012 |
View Details
|
January 05, 2012 |
|
10 -
41580_
|
Mer -
99 -
0.0/4.6
|
ON ROUTE 99 FROM MADERA/MERCED COUNTY LINE TO BUCHANAN HOLLOW ROAD (KP 0.0/7.4) |
Construct freeway
4E TO 6F ON 8F R/W ALIGNMENT |
Asphalt Concrete Surfacing, Freeway and Structures, Freeway |
80 – 100 |
Approx. 500 |
March 2012 |
View Details
|
January 05, 2012 |
|
11 -
00260K
|
SD -
056 -
00.0 /09.2
|
IN SD CNTY IN SAN DIEGO FROM CARMEL VALLEY RD OC TO JCT RTE 15
|
CONSTRUCT HOV/GENERAL PURPOSE LANES
|
Widening |
120 – 140 |
750 |
January 0000 |
View Details
|
October 04, 2011 |
|
11 -
002700
|
SD -
005 -
R19.9/R21.2
|
ON I-5 FR 0.2 KM S OF 8/5 SEP.OH I8 TO 0.5KM N.OF TECOLOTE CREEK BRIDG
|
CONSTRUCT AUXILIARY LANES/ WIDEN CONNECTOR
|
Widening |
10 – 20 |
360 |
December 2012 |
View Details
|
October 07, 2011 |
|
11 -
022330
|
SD -
005 -
R28.6/R30.1
|
IN SD CTNY IN SD FROM 1.4 KM SOUTH TO 1.O KM NORTH OF GENESEE AVE.
|
RECONST INTERCHANGE, ADD SE & NW LOOPS, SIGNALIZE INTERSECTION |
Signals, Reconstruct Interchange |
60 – 80 |
500 |
November 2012 |
View Details
|
October 07, 2011 |
|
11 -
0223U0
|
SD -
005 -
R 028.6/R 030.1
|
IN SAN DIEGO COUNTY IN SAN DIEGO FROM 0.4 MI SOUTH OF GENESEE AVE OVERCROSSING TO ROSELLE STREET UNDERCROSSING |
RECONST INTERCHANGE, SIGNAL INTERSECTION AND ADD AUX LANES |
Widening, Reconstruct Interchange, Reconstruct Signals |
60 – 80 |
638 |
December 2012 |
View Details
|
January 27, 2012 |
|
11 -
056300
|
SD -
011 -
00.0 /02.7
|
FROM 3.2 KM E RT 905/OTAY MESA BORDER XING TO FUTURE ALGNMNT
|
CONSTRUCT 4-LANE FREEWAY
|
Freeway and Structures |
350 – 400 |
750 |
January 0000 |
View Details
|
October 04, 2011 |
|
11 -
056310
|
SD -
011 -
00.0 /02.8
|
IN SD CO IN AND NEAR SD FRM MEXICO BORDER TO NB JUNCTION RTE 125
|
CONSTRUCT FREEWAY & PORT OF ENTRY
|
Building, Freeway and Structures |
500 – 600 |
750 |
June 2013 |
View Details
|
October 04, 2011 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
11 -
056321
|
SD -
11 -
0.00/1.30
|
IN SAN DIEGO COUNTY NEAR SAN DIEGO ON ROUTE 905 FROM 0.1 MILE WEST OF BRITANNIA BOULEVARD OVERCROSSING TO 1.6 MILES EAST OF LA MEDIA ROAD UNDERCROSSING |
CONSTRUCT FREEWAY TO FREEWAY CONNECTORS |
Overcrossing, Freeway and Structures, Interchange |
60 – 80 |
350 |
April 2013 |
View Details
|
November 23, 2011 |
|
11 -
056331
|
SD -
11 -
0.00/2.80
|
IN SAN DIEGO COUNTY NEAR SAN DIEGO ON ROUTE 11 FROM 0.1 MILE EAST OF SANYO AVENUE UNDERCROSSING TO 1.9 MILES EAST OF SANYO AVENUE UNDERCROSSING |
CONSTRUCT NEW 4 LANE HIGHWAY AND COMMERCIAL VEHICLE ENFORCEMENT FACILITY |
Freeway |
0 – 1 |
550 |
July 2013 |
View Details
|
November 23, 2011 |
|
11 -
056341
|
SD -
11 -
2.40/2.40
|
IN SAN DIEGO COUNTY NEAR SAN DIEGO ON ROUTE 11 FROM 2.4 MILES EAST OF SANYO AVENUE UNDERCROSSING TO MEXICO
BORDER |
CONSTRUCT LAND PORT OF ENTRY |
Building |
0 – 1 |
110 |
August 2013 |
View Details
|
November 23, 2011 |
|
11 -
056350
|
SD -
11 -
0.80/1.40
|
NO INFO |
NO INFO |
|
0 – 1 |
190 |
April 2013 |
View Details
|
November 23, 2011 |
|
11 -
063804
|
SD -
8 -
017.4/R 018.7
|
IN SAN DIEGO COUNTY IN EL CAJON FROM THE SECOND STREET
UNDERCROSSING TO THE GREENFIELD DRIVE
UNDERCROSSSING _______________ |
WIDEN FREEWAY AND BRIDGE |
Widening, Modify Bridge |
10 – 20 |
90 |
July 2009 |
View Details
|
October 03, 2011 |
|
11 -
063811
|
SD -
008 -
17.4 /R18.7
|
IN SD COUNTY IN EL CAJON FROM 2ND ST UC TO GRNFLD DR UCR UC
|
HIGHWAY PLANTING/IRRIGATION SYSTEM FOR PPNO 0187P
|
Irrigation System, Highway Planting |
1 – 10 |
375 |
September 2012 |
View Details
|
October 04, 2011 |
|
11 -
065000
|
SD -
005 -
R29.3R/R30.5
|
IN SAN DIEGO FROM GENESEE AVE OC TO ROSELLE STREET.
|
CONST AUXILIARY LANE S/B
|
Widening |
1 – 10 |
250 |
October 2012 |
View Details
|
October 07, 2011 |
|
11 -
068024
|
IMP -
7 -
003.7/006.9
|
IN IMPERIAL COUNTY NEAR CALEXICO ON ROUTE 7 AND ON ROUTE 8 |
HIGHWAY PLANTING AND IRRIGATION |
Drainage, Highway Planting, Irrigation System |
1 – 10 |
190 |
October 2007 |
View Details
|
October 03, 2011 |
|
11 -
070404
|
SD -
15 -
R 003.2/M 004.1
|
IN SAN DIEGO COUNTY IN SAN DIEGO ON ROUTE 15 AND ON
ROUTE 805 |
PLANTING AND IRRIGATION |
Highway Planting, Irrigation System |
1 – 10 |
375 |
August 2007 |
View Details
|
October 03, 2011 |
|
11 -
076704
|
Imp -
999 -
|
IN IMPERIAL COUNTY NEAR EL CENTRO AT THE EL CENTRO FED PROGRAM REQUIREMENT MAINTENANCE STATION |
CONSTRUCT MAINTENANCE STATION |
Maintenance Station, Asphalt Concrete Surfacing, Building |
10 – 20 |
250 |
March 2012 |
View Details
|
October 24, 2011 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
11 -
077600
|
SD -
005 -
R36.3 /R37.4
|
IN SD CO IN SD & SOLANA BEACH SAN DIEQUITO BR TO LSF BR
|
SPECIAL GRIND FOR NOISE REDUCTION
|
Groove Pavement |
1 – 10 |
20-80 |
September 2011 |
View Details
|
June 06, 2011 |
|
11 -
07890K
|
SD -
005 -
R50.0/R52.0
|
IN CARLSBAD & OCEANSIDE ON RTE 5 FROM 0.2 KM S OF ELM ST UC TO 0.3
|
MODIFY INTERCHANGE/CONST AUX LANE/ CONST DIRECT CONNECTORS
|
Modify Interchange, Ramp, Widening |
120 – 140 |
1000 |
January 0000 |
View Details
|
October 04, 2011 |
|
11 -
079001
|
IMP -
008 -
R36.5/R37.4
|
IN IMPERIAL COUNTY IN EL CENTRO FROM 0.8 KM WEST OF IMPERIAL AVE OC
|
RECONSTRUCT INTERCHANGE |
Reconstruct Interchange |
20 – 40 |
500 |
April 2019 |
View Details
|
October 07, 2011 |
|
11 -
080104
|
SD -
76 -
R 007.3/013.1
|
IN SAN DIEGO COUNTY IN AND NEAR OCEANSIDE FROM 0.8 KM
WEST OF MELROSE DRIVE TO 1.0 KM EAST OF SOUTH MISSION
ROAD |
CONSTRUCT FOUR LANE HIGHWAY |
Asphalt Concrete Surfacing, Roadway |
140 – 160 |
750 |
September 2009 |
View Details
|
September 30, 2011 |
|
11 -
080231
|
IMP -
098 -
30.9 /32.6
|
IN IMPERIAL COUNTY IN CALEXICO ON ROUTE 98
|
WIDEN HIGHWAY
|
Widening, Asphalt Concrete Surfacing |
1 – 10 |
320 |
January 2017 |
View Details
|
October 07, 2011 |
|
11 -
080261
|
IMP -
098 -
32.1 /32.4
|
IMP 98 VV WILLIAMS AVE TO OLLIE AVE WIDEN HWY FRM 2 TO 4 LANES.
|
WIDEN HIGHWAY
|
Asphalt Concrete Surfacing, Widening |
1 – 10 |
320 |
February 2014 |
View Details
|
October 07, 2011 |
|
11 -
080404
|
SD -
5 -
R 000.3/R 010.0
|
IN SAN DIEGO COUNTY IN SAN DIEGO CHULA VISTA
AND NATIONAL CITY FROM CAMINO DE LA PLAZA OVERCROSSING TO 24TH STREET UNDERCROSSING |
PAVEMENT REHABILITATION |
Rehabilitate Pavement |
10 – 20 |
320 |
October 2010 |
View Details
|
October 03, 2011 |
|
11 -
081610
|
SD -
805 -
04.4 /15.8
|
IN SAN DIEGO COUNTY FROM PALOMAR ST OC TO LANDIS ST OC
|
CONSTRUCT EXPRESS AND HOV LANES SOUTH
|
Modify Bridge, Widening |
900 – 1000 |
500 |
January 0000 |
View Details
|
June 16, 2011 |
|
11 -
081630
|
SD -
805 -
023.3/027.7
|
IN SD COUNTY IN SD ON R805 FROM 0.4 MILE S OF R805/52 SEP
TO 0.6M S OF THE SORRENTO VALLEY UC & ON R52 FRM .2M W
TO .4M E OF R805/52 SEPARATION PM 23.3/27.7;R52 3.5/4.1 |
CONSTRUCT MANAGE LANES-NORTH |
Widening |
450 – 500 |
250 |
January 0000 |
View Details
|
October 03, 2011 |
|
11 -
081634
|
SD -
805 -
23.3/27.7
|
IN SD COUNTY IN SD ON R805 FROM 0.4 MILE S OF R805/52 SEP TO
0.6M S OF THE SORRENTO VALLEY UC & ON R52 FRM .2M W TO .4M E
OF R805/52 SEPARATION PM 23.3/27.7;R52 3.5/4.1 |
CONSTRUCT MANAGED LANES-NORTH |
Roadway, Freeway and Structures, Bridge, Asphalt Concrete Surfacing, Retaining Wall |
600 – 700 |
1095 |
June 2013 |
View Details
|
June 01, 2011 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
11 -
081654
|
SD -
805 -
7.7/9.1
|
IN CHULA VISTA & NATIONAL CITY FROM SOUTH OF BONITA ROAD TO
SWEETWATER ROAD. REQUIRED LAND= SCAPING FOR ARRA PROJ
PPNO 11-0948 |
LANDSCAPE MITIGATION AS REQUIRED |
Highway Planting |
0 – 1 |
1000 |
May 2011 |
View Details
|
June 01, 2011 |
|
11 -
085780
|
SD -
163 -
00.6 /01.4
|
IN SAN DIEGO COUNTY IN SAN DIEGO FROM 0.6MILES S TO 1.4 M N OF FRIAR
|
REVISE INTERCHANGE/WIDEN OC AND APPROACH
|
Modify Bridge, Widening, Modify Interchange |
20 – 40 |
625 |
January 0000 |
View Details
|
October 04, 2011 |
|
11 -
089754
|
SD -
805 -
025.2/026.3
|
IN SAN DIEGO COUNTY IN SAN DIEGO FROM 0.2 KM SOUTH OF
NOBEL DRIVE OVERCROSSING TO 0.1 KM NORTH OF EASTGATE
MALL OVERCROSSING |
INTERCHANGE IMPROVEMENTS & ROAD WIDENING |
Widening, Modify Interchange |
0 – 1 |
375 |
August 2010 |
View Details
|
September 30, 2011 |
|
11 -
091834
|
SD -
905 -
R 005.2/R 006.1
|
IN SAN DIEGO COUNTY IN SAN DIEGO ON RTE 905 FR 0.1 KM E TO
1.5 KM E OF RTE 905/805 SEP AND ON RTE 805 FR 0.2 KM N OF
RTE 905/805 SEP TO 0.5 KM S OF PALM AVE OC |
CONSTRUCT NEW FREEWAY (PHASE 2) |
Asphalt Concrete Surfacing, Freeway and Structures |
1 – 10 |
500 |
November 2010 |
View Details
|
September 30, 2011 |
|
11 -
146650
|
SD -
094 -
10.0 /R11.8
|
IN & NEAR LA MESA AND LEMON GROVE ON RTE 94 AND 125
|
OUTSIDE LANE WIDENING/CONST FWY TO FWY CONNNECTORS
|
Widening, Modify Interchange |
40 – 60 |
750 |
October 2015 |
View Details
|
October 04, 2011 |
|
11 -
167894
|
IMP -
78 -
R 009.2/R 012.1
|
IN IMPERIAL COUNTY NEAR BRAWLEY ON ROUTE 78 AND ON ROUTE 86 |
CONSTRUCT FOUR LANE EXPRESSWAY |
Expressway |
60 – 80 |
625 |
June 2010 |
View Details
|
October 03, 2011 |
|
11 -
17370K
|
SD -
805 -
02.6 /03.2
|
IN SAN DIEGO FROM 0.3 MI S TO 0.3 0.3 MI N OF PALM AVE OC
|
REVISE INTERCHANGE
|
Modify Interchange |
1 – 10 |
250-375 |
January 0000 |
View Details
|
October 04, 2011 |
|
11 -
175200
|
IMP -
098 -
31.9 /39.7
|
IN IMPERIAL COUNTY IN AND NEAR CALEXICO WEST OF JCT 111
|
WIDEN TO 4-LANE CONVENTIONAL HWY
|
Widening |
20 – 40 |
325 |
February 2025 |
View Details
|
October 07, 2011 |
|
11 -
177900
|
SD -
005 -
R32.9/R33.4
|
IN SD RTE 5,FR CARMEL VLY RD UC TO 0.8 KM N OF CARMEL VLY RD UC & ON
|
CONSTRUCT DIRECT FWY TO FWY CONNECTORS
|
Modify Interchange |
200 – 250 |
725 |
January 2014 |
View Details
|
October 07, 2011 |
|
11 -
235800
|
SD -
005 -
R34.1/R54.6
|
ROUTE 5 - WIDEN FOR HOV, MIXED FLOW AND AUX LANES.
|
CONST HOV/GENERAL PURPOSE/AUX LANES
|
Widening |
900 – 1000 |
1000 |
January 0000 |
View Details
|
October 07, 2011 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
11 -
236404
|
SD -
8 -
R 021.6 R 025.9
|
IN SAN DIEGO COUNTY NEAR EL CAJON FROM 0.2 MILE WEST OF
LAKE JENNINGS PARK ROAD UNDERCROSSING TO 0.2 MILE EAST
OF HARBISON CANYON UNDERCROSSING |
HOT MIX ASPHALT PAVEMENT REHABILITATION |
Asphalt Concrete Surfacing |
1 – 10 |
250 |
September 2010 |
View Details
|
October 03, 2011 |
|
11 -
238401
|
IMP -
007 -
00.0 /01.2
|
IN IMPERIAL COUNTY ON STATE RTE7 FROM THE INTL BORDER TO SR98
|
PAVEMENT REHABILITATION
|
Rehabilitate Pavement |
10 – 20 |
320 |
November 2012 |
View Details
|
October 07, 2011 |
|
11 -
238601
|
SD -
52 -
000.3/003.8
|
IN SAN DIEGO COUNTY AT VARIOUS LOCATIONS |
BRIDGE APPROACH & DEPARTURE SLAB REPLACEMENT |
Replace Joint Seals, Replace PCC Pavement |
1 – 10 |
400 |
July 2012 |
View Details
|
June 06, 2011 |
|
11 -
239304
|
SD -
163 -
003.8R/011.1
|
IN SAN DIEGO COUNTY IN SAN DIEGO FROM ROUTE 8/163
SEPARATION TO TO ROUTE 163/15 SEPARATION |
PAVEMENT REHABILITATION |
Rehabilitate Pavement |
1 – 10 |
380 |
September 2010 |
View Details
|
September 30, 2011 |
|
11 -
239504
|
SD -
5 -
R 052.8/R 054.9
|
IN SAN DIEGO COUNTY IN OCEANSIDE FROM BROOKS STREET OVERCROSSING TO 0.1 KM NORTH OF CAMP DEL MAR OVERCROSSING |
PLANTING AND IRRIGATION |
Highway Planting, Irrigation System |
1 – 10 |
190 |
June 2007 |
View Details
|
October 03, 2011 |
|
11 -
239604
|
SD -
005 -
R50.9/R52.8
|
IN SAN DIEGO COUNTY IN CARLSBAD AND OCEANSIDE FROM
BUENA VISTA LAGOON BRIDGE TO BROOKS STREET
OVERCROSSING |
HIGHWAY PLANTING |
Highway Planting, Irrigation System |
1 – 10 |
750 |
August 2006 |
View Details
|
August 03, 2011 |
|
11 -
240104
|
SD -
5 -
R 010.0/R 020.0
|
IN SAN DIEGO COUNTY IN NATIONAL CITY AND SAN DIEGO FROM
24TH STREET UNDERCROSSING TO 0.1 MILE SOUTH OF ROUTE
8/5 SEPARATION AND OVERHEAD |
PAVEMENT REHABILITATION |
Rehabilitate Pavement |
20 – 40 |
375 |
October 2010 |
View Details
|
October 03, 2011 |
|
11 -
241511
|
SD -
163 -
08.2 /09.4
|
IN SD CNTY, IN SD FRM 0.6 MI S TO 0.6MI N OF CLAIREMONT BLVD. OC
|
INTERCHANGE RECONFIGURATION FOR TRAFFIC HANDLING IMPROVEMENTS
|
Modify Interchange |
1 – 10 |
250 |
January 0000 |
View Details
|
October 04, 2011 |
|
11 -
24310K
|
SD -
005 -
R20.1/R30.6
|
IN SAN DIEGO COUNTY IN SAN DIEGO ON ROUTE 5 FROM JCT 8
|
CONSTRUCT HOV/GEN PURPOSE/AUX LANES
|
Widening, Modify Bridge |
400 – 450 |
750 |
January 0000 |
View Details
|
October 07, 2011 |
|
11 -
243204
|
SD -
8 -
R 049.0/R 049.0
|
IN SAN DIEGO COUNTY NEAR PINE VALLEY AT BUCKMAN SPRINGS
REST AREA |
RESTORE SAFETY ROADSIDE REST |
Reconstruct Building, Highway Planting, Irrigation System |
1 – 10 |
250 |
October 2009 |
View Details
|
October 03, 2011 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
11 -
246400
|
SD -
067 -
R00.7/R01.5
|
IN SAN DIEGO COUNTY FROM GREENFIELD DRIVE OVERCROSSING TO N OF BRADLEY
|
MODIFY EXISTING INTERCHANGE
|
Modify Interchange |
20 – 40 |
500 |
January 0000 |
View Details
|
October 04, 2011 |
|
11 -
251200
|
SD -
094 -
20.7 /38.9
|
IN SD COUNTY AT VARIOUS LOCATIONS FROM MELODY ROAD TO ROUTE 188
|
ROAD WIDENING,CURVE REALIGNMENTS, ADD PASSING LANES & TRUCK TURNOUTS
|
Asphalt Concrete Surfacing, Passing Lane, Realign Curve, Widening |
160 – 180 |
500 |
May 2017 |
View Details
|
October 04, 2011 |
|
11 -
251900
|
IMP -
008 -
R88.7/R89.3
|
IN IMP CO NEAR WINTERHAVEN AT SIDEWINDER OC
|
REST AREA RESTORATION
|
Reconstruct Building |
1 – 10 |
250 |
January 2014 |
View Details
|
October 07, 2011 |
|
11 -
257110
|
SD -
076 -
12.4 /R17.7
|
IN SD CTN AT BONSALL FROM SO MISSION RD TO 76/15 SEPARATION.
|
CONSTRUCT 4 LANE HIGHWAY
|
Widening, Roadway, Grading and Paving, Earthwork, Bridge |
140 – 160 |
1250 |
January 0000 |
View Details
|
October 04, 2011 |
|
11 -
257141
|
SD -
076 -
R16.7/R17.7
|
IN SD CNTY NEAR BONSALL & FALLBROOK TO RTE E/O 76/15 SEPARATION
|
INTERCHANGE
|
Asphalt Concrete Surfacing, Reconstruct Interchange, Highway Planting, Modify Drainage |
20 – 40 |
350-550 |
February 2012 |
View Details
|
October 04, 2011 |
|
11 -
257151
|
SD -
076 -
12.1 /17.7
|
IN SD CNTY AT AND NEAR BONSALL FROM W/O SO MISSION RD TO E/O 76/15 SEP
|
SR-76 EAST ROADWAY
|
Bridge, Grading and Paving, Highway Planting |
100 – 120 |
1500 |
September 2013 |
View Details
|
June 09, 2011 |
|
11 -
257304
|
SD -
005 -
14.1
|
IN SD CO IN SD AT 5/75 (CHICANO PARK, BARRIO LOGAN COMMUNITY)
|
RESTORATION OF MURALS
|
Bridge |
1 – 10 |
250 |
January 0000 |
View Details
|
October 03, 2011 |
|
11 -
259804
|
SD -
78 -
15.3/15.7
|
IN SAN DIEGO COUNTY IN ESCONDIDO AND SAN MARCOS FROM 0.2
MILE WEST TO 0.2 MILE EAST OF NORDAHL ROAD OVERCROSSING. |
REPLACE NORDAHL BRIDGE & WIDEN OFF RAMP:CT PROVIDE 100%
OVERSIGHT |
Widening, Ramp, Replace Bridge |
10 – 20 |
400 |
July 2011 |
View Details
|
September 30, 2011 |
|
11 -
260410
|
SD -
008 -
R37.8/R39.4
|
IN SAN DIEGO COUNTY FROM ROUTE 79 T0 1.6 MILES EAST OF ROUTE 79
|
DRAINAGE IMPROVEMENTS
|
Modify Drainage |
1 – 10 |
125 |
April 2014 |
View Details
|
October 04, 2011 |
|
11 -
260420
|
SD -
8 -
R37.8
|
IN SAN DIEGO COUNTY ABOUT 8 MILES EAST OF ALPINE AT ROUTE
8/79 SEPARATION. |
DRAINAGE IMPROVEMENTS |
Drainage |
0 – 1 |
100 |
April 2012 |
View Details
|
October 04, 2011 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
11 -
260714
|
SD -
15 -
M 018.8/M 021.9
|
IN SAN DIEGO COUNTY IN SAN DIEGO ON ROUTE 15 FROM 1.4 KM
SOUTH OF RTE 56/15 SEPARATION TO CAMINO DEL NORTE UC
AND ON RTE 56 FROM 0.5 KM WEST TO 0.2KM EAST OF RTE 56/15
SEP |
HIGHWAY PLANTING AND IRRIGATION |
Highway Planting, Irrigation System |
1 – 10 |
500 |
February 2008 |
View Details
|
September 30, 2011 |
|
11 -
260724
|
SD -
15 -
M 021.9/M 023.9
|
IN SAN DIEGO COUNTY IN SAN DIEGO FROM CAMINO DEL NORTE
UNDERCROSSING TO 0.4 KM NORTH OF RANCHO BERNARDO
ROAD UNDERCROSSING |
INSTALL PLANTING AND WATER SYSTEM |
Highway Planting, Irrigation System, Water Supply System |
1 – 10 |
500 |
December 2008 |
View Details
|
September 30, 2011 |
|
11 -
260734
|
SD -
15 -
M 023.8 M 026.2
|
IN SAN DIEGO COUNTY IN SAN DIEGO FROM 0.2 KM NORTH OF
RANCHO BERNARDO ROAD UNDERCROSSING TO LAKE HODGES
BRIDGE |
INSTALL HIGHWAY PLANTING SYSTEMS |
Highway Planting |
1 – 10 |
500 |
July 2010 |
View Details
|
September 30, 2011 |
|
11 -
261404
|
SD -
5 -
R 059.4/R 060.0
|
IN SAN DIEGO COUNTY ABOUT 5.2 MILES NORTH OF OCEANSIDE
AT THE ALISO CREEK SAFETY ROADSIDE REST AREA |
REPLACE BUILDINGS |
Replace Building |
1 – 10 |
190 |
August 2010 |
View Details
|
October 03, 2011 |
|
11 -
261514
|
IMP -
8 -
R 031.3/R 031.3
|
IN IMPERIAL COUNTY NEAR EL CENTRO AT EASTBOUND AND WESTBOUND SUNBEAM REST AREAS |
INSTALL SEWAGE TREATMENT SYSTEM REST AREA
RESTORATION |
Wastewater Disposal System |
1 – 10 |
250 |
March 2010 |
View Details
|
October 03, 2011 |
|
11 -
261524
|
IMP -
8 -
R 031.3/R 031.3
|
IN IMPERIAL COUNTY NEAR EL CENTRO AT SUNBEAM REST
AREAS (EASTBOUND AND WESTBOUND) |
UPGRADE RECREATIONAL VEHICLE DUMP |
Wastewater Disposal System |
0 – 1 |
190 |
April 2011 |
View Details
|
October 03, 2011 |
|
11 -
26160K
|
SD -
005 -
04.0 /R22.3
|
IN SD CO AT VAR LOC FR CORONADO AVE OC TO CLAIREMONT DR OC
|
FREEWAY MAINTENANCE ACCESS
|
Modify Fence |
1 – 10 |
180 |
November 2016 |
View Details
|
October 07, 2011 |
|
11 -
261704
|
SD -
8 -
003.0/012.6
|
IN SAN DIEGO COUNTY IN SAN DIEGO AND LA MESA AT VARIOUS
LOCATIONS FROM MISSION CENTER RD OVERCROSSING TO
SEVERIN DRIVE OVERCROSSING _ |
FREEWAY MAINTENANCE ACCESS PAVING |
Asphalt Concrete Surfacing |
1 – 10 |
190 |
June 2010 |
View Details
|
October 03, 2011 |
|
11 -
262004
|
SD -
75 -
11.0/17.4
|
IN SAN DIEGO COUNTY IN IMPERIAL BEACH AND CORONADO FROM RAINBOW DRIVE TO THE NAVAL AMPHIBIOUS BASE |
PAVEMENT REHABILITATION OF MAILINE, SHOULDERS, AND RAMPS. |
Rehabilitate Pavement |
1 – 10 |
250 |
October 2011 |
View Details
|
November 23, 2011 |
|
11 -
263300
|
IMP -
008 -
R38.7/R39.3
|
IN IMP CNTY NEAR EL CENTRO FROM WEST TO EAST OF DOGWOOD RD OC
|
REVISED INTERCHANGE
|
Modify Interchange |
20 – 40 |
325 |
July 2013 |
View Details
|
October 07, 2011 |
| |
District -
EA
|
County -
Route -
Post Miles
|
Location
|
Detailed Project Scope
|
Type of Work
|
Estimate Cost Range (x $ million)
|
Working Days Range
|
Proposed Advertise Date
|
Other Information |
Information Last Updated
|
|
11 -
263400
|
SD -
005 -
R41.3/R41.7
|
IN SAN DIEGO COUNTY IN ENCINITAS AT ENCINITAS BOULEVARD
|
ENCINITAS BLVD I/C IMPROVEMENT
|
Modify Interchange |
20 – 40 |
500 |
April 2014 |
View Details
|
October 07, 2011 |
|
11 -
26380K
|
SD -
805 -
03.4 /04.0
|
IN SAN DIEGO COUNTY IN CHULA VISTA AROUND MAIN STREET/AUTO PARK DRIVE
|
REVISE INTERCHANGE
|
Modify Interchange |
1 – 10 |
500 |
January 0000 |
View Details
|
October 04, 2011 |
|
11 -
263901
|
SD -
805 -
010.0/010.6
|
IN SAN DIEGO COUNTY IN NATIONAL CITY FROM 0.5 KM SOUTH TO 0.5 KM NORTH OF PLAZA BOULEVARD UNDERCROSSING |
REVISE INTERCHANGE |
Modify Interchange |
1 – 10 |
125 |
April 2014 |
View Details
|
October 04, 2011 |
|
11 -
264004
|
IMP -
8 -
R 004.9/R 007.2
|
IN IMPERIAL COUNTY NEAR OCOTILLO AT DEVIL'S CANYON BRIDGE NUMBER 2 AND AT MYER CREEK BRIDGE |
REHABILITATE BRIDGE |
Modify Bridge |
1 – 10 |
100 |
April 2010 |
View Details
|
October 03, 2011 |
|
11 -
264110
|
SD -
163 -
1.4
|
IN SAN DIEGO COUNTY IN SAN DIEGO AT LAUREL STREET
OVERCROSSING 57-0215 (57C-0596) |
SEISMIC RETROFIT |
Repair Bridge |
20 – 40 |
520 |
August 2012 |
View Details
|
October 04, 2011 |
|
11 -
265004
|
SD -
163 -
001.7/003.2
|
IN SAN DIEGO COUNTY IN SAN DIEGO FROM 0.1 MILE SOUTH OF
RICHMOND STREET OVERCROSSING TO 0.2 MILE NORTH OF 6TH
AVENUE UNDERCROSSING |
PLANTING AND IRRIGATION |
Highway Planting |
1 – 10 |
500 |
July 2009 |
View Details
|
September 30, 2011 |
|
11 -
265010
|
SD -
163 -
00.5 /01.8
|
IN SD CTY IN SD FROM "A" STREET TO RICHMOND STREET OVERCROSSING.
|
SCENIC/HISTORIC HIGHWAY PRESERVATIO (PHASE 2A) TRANSPORTATION ENHANCEMT
|
|
1 – 10 |
250-750 |
April 2013 |
View Details
|
October 04, 2011 |
|
11 -
265304
|
SD -
15 -
000.5/M5.0
|
IN SAN DIEGO COUNTY IN SAN DIEGO FROM MAIN ST UNDERCROSSING TO 0.6 KM SOUTH OF LANDIS ST PEDESTRIAN
OVERCROSSING |
PAVEMENT REHABILITATION |
Rehabilitate Pavement |
1 – 10 |
190 |
October 2011 |
|