Listing for all primes seeking assistance with project 04-235844. 17 results found.
Contractor: Golden State Bridge, Inc. Contact: Brian Stopper
Address: 2990 Bay Vista Court, Suite D Benicia, CA 94510
Phone: 925-372-8000 Fax: 925-372-8001 Email: bstopper@gsbridge.com
Services needed: 1 070030 LEAD COMPLIANCE PLAN LS LUMP SUM 2 080050 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS LUMP SUM 3 090100 TIME-RELATED OVERHEAD (WDAY) WDAY 600 4 120090 CONSTRUCTION AREA SIGNS LS LUMP SUM 5 120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM 6 120120 TYPE III BARRICADE EA 14 7 120165 CHANNELIZER (SURFACE MOUNTED) EA 190 8 128652 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS LUMP SUM 9 129000 TEMPORARY RAILING (TYPE K) LF 38,800 10 129100 TEMPORARY CRASH CUSHION MODULE EA 330 11 026978 TEMPORARY ALTERNATIVE CRASH CUSHION EA 19 12 129150 TEMPORARY TRAFFIC SCREEN LF 13,100 13 130100 JOB SITE MANAGEMENT LS LUMP SUM 14 026979 TEMPORARY CREEK DIVERSION SYSTEM LS LUMP SUM 15 130300 PREPARE STORM WATER POLLUTION PREVENTIONPLAN LS LUMP SUM 16 130310 RAIN EVENT ACTION PLAN EA 101 17 130320 STORM WATER SAMPLING AND ANALYSIS DAY EA 40 18 130330 STORM WATER ANNUAL REPORT EA 3 19 130505 MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) EA 41 20 130530 TEMPORARY HYDRAULIC MULCH (BONDED FIBER MATRIX) SQYD 26,500 21 130570 TEMPORARY COVER SQYD 1,350 22 130610 TEMPORARY CHECK DAM LF 100 23 130620 TEMPORARY DRAINAGE INLET PROTECTION EA 95 24 130640 TEMPORARY FIBER ROLL LF 3,330 25 130670 TEMPORARY REINFORCED SILT FENCE LF 2,050 26 130680 TEMPORARY SILT FENCE LF 3,330 27 130710 TEMPORARY CONSTRUCTION ENTRANCE EA 27 28 130730 STREET SWEEPING LS LUMP SUM 29 026980 DEWATERING AND NON STORM WATER DISCHARGE SYSTEM LS LUMP SUM 30 130900 TEMPORARY CONCRETE WASHOUT LS LUMP SUM 31 131103 WATER QUALITY SAMPLING AND ANALYSIS DAY EA 30 32 131104 WATER QUALITY MONITORING REPORT EA 5 33 140003 ASBESTOS COMPLIANCE PLAN LS LUMP SUM 34 141000 TEMPORARY FENCE (TYPE ESA) LF 2,440 35 141103 REMOVE YELLOW THERMOPLASTIC TRAFFIC STRIPE (HAZARDOUS WASTE) LF 15,700 36 141109 ADL BURIAL LOCATION REPORT LS LUMP SUM 37 141120 TREATED WOOD WASTE LB 25,600 38 148005 NOISE MONITORING LS LUMP SUM 39 150204 ABANDON CULVERT (LF) LF 250 40 150221 ABANDON INLET EA 1 41 150227 ABANDON PIPELINE LF 340 42 026981 ABANDON SEWER LINE LF 660 43 150608 REMOVE CHAIN LINK FENCE LF 1,450 44 150661 REMOVE GUARDRAIL LF 2,240 45 150685 REMOVE IRRIGATION FACILITY LS LUMP SUM 46 150711 REMOVE PAINTED TRAFFIC STRIPE LF 199,000 47 150712 REMOVE PAINTED PAVEMENT MARKING SQFT 11,000 48 150714 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 35,900 49 150715 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 950 50 150722 REMOVE PAVEMENT MARKER EA 7,050 51 150742 REMOVE ROADSIDE SIGN EA 170 52 150743 REMOVE SIGN FROM ELECTROLIER EA 3 53 150757 REMOVE SIGN STRUCTURE (EA) EA 2 54 026982 REMOVE METAL STRUCTURE EA 13 55 150763 REMOVE SIGN PANEL EA 1 56 150812 REMOVE PIPE (LF) LF 4,090 57 150820 REMOVE INLET EA 27 58 150824 REMOVE SEWER MANHOLE EA 12 59 150826 REMOVE MANHOLE EA 1 60 026983 REMOVE WATER VALVES EA 4 61 150841 REMOVE SEWER PIPE LF 4,500 62 150860 REMOVE BASE AND SURFACING CY 2,690 63 026984 SALVAGE WATER METER EA 18 64 151251 SALVAGE IRRIGATION FACILITY LS LUMP SUM 65 152390 RELOCATE ROADSIDE SIGN EA 6 66 152400 ADJUST SEWER CLEANOUT TO GRADE EA 3 67 152430 ADJUST INLET EA 5 68 152440 ADJUST MANHOLE TO GRADE EA 4 69 152469 ADJUST UTILITY COVER TO GRADE EA 11 70 152604 MODIFY INLET EA 2 71 026935 MODIFY SEWER MANHOLE EA 2 72 153103 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 64,800 73 153123 REMOVE CONCRETE (SQYD) SQYD 4,780 74 153221 REMOVE CONCRETE BARRIER LF 1,600 75 155003 CAP INLET EA 1 76 155232 SAND BACKFILL CY 170 77 156585 REMOVE CRASH CUSHION EA 4 78 157550 BRIDGE REMOVAL LS LUMP SUM 79 160102 CLEARING AND GRUBBING (LS) LS LUMP SUM 80 170101 DEVELOP WATER SUPPLY LS LUMP SUM 81 190101 ROADWAY EXCAVATION CY 33,000 82 190106 ROADWAY EXCAVATION (TYPE Z-3) (AERIALLY DEPOSITED LEAD) CY 410 83 190107 ROADWAY EXCAVATION (TYPE Y-1) (AERIALLY DEPOSITED LEAD) CY 3,180 84 190108 ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) CY 20,000 85 (F) 192001 STRUCTURE EXCAVATION CY 90 86 (F) 192020 STRUCTURE EXCAVATION (TYPE D) CY 3,715 87 (F) 193003 STRUCTURE BACKFILL (BRIDGE) CY 2,550 88 (F) 193013 STRUCTURE BACKFILL (RETAINING WALL) CY 1,678 89 (F) 193030 PERVIOUS BACKFILL MATERIAL CY 243 90 (F) 193031 PERVIOUS BACKFILL MATERIAL (RETAINING WALL) CY 107 91 198010 IMPORTED BORROW (CY) CY 61,900 92 026986 LIGHTWEIGHT EMBANKMENT MATERIAL (CELLULAR CONCRETE) CY 11,100 93 198209 SUBGRADE ENHANCEMENT GEOTEXTILE, CLASS B2 SQYD 12,800 94 026987 SOIL-CEMENT CY 71,600 95 200002 ROADSIDE CLEARING LS LUMP SUM 96 200122 WEED GERMINATION SQYD 7,230 97 200123 CULTIVATION SQYD 7,230 98 202006 SOIL AMENDMENT CY 610 99 202038 PACKET FERTILIZER EA 21,900 100 026988 PLANT (GROUP K48)(48" BOX) EA 33 101 026989 PLANT (GROUP K60)(60" BOX) EA 11 102 204035 PLANT (GROUP A) EA 16,000 103 204036 PLANT (GROUP B) EA 2,750 104 204096 MAINTAIN EXISTING PLANTED AREAS LS LUMP SUM 105 204099 PLANT ESTABLISHMENT WORK LS LUMP SUM 106 205035 WOOD MULCH CY 1,010 107 205062 ROOT BARRIER LF 1,500 108 206400 CHECK AND TEST EXISTING IRRIGATION FACILITIES LS LUMP SUM 109 206402 OPERATE EXISTING IRRIGATION FACILITIES LS LUMP SUM 110 206559 CONTROL AND NEUTRAL CONDUCTORS (ARMOR-CLAD) LS LUMP SUM 111 206560 CONTROL AND NEUTRAL CONDUCTORS LS LUMP SUM 112 206562 1" REMOTE CONTROL VALVE EA 29 113 206564 1 1/2" REMOTE CONTROL VALVE EA 21 114 206565 2" REMOTE CONTROL VALVE EA 4 115 206631 1" WYE STRAINER ASSEMBLY EA 10 116 206634 2" WYE STRAINER ASSEMBLY EA 14 117 206761 24-32 STATION IRRIGATION CONTROLLER (PEDESTAL MOUNTED) EA 1 118 206762 30-42 STATION IRRIGATION CONTROLLER (PEDESTAL MOUNTED) EA 1 119 206921 SOLAR POWERED IRRIGATION CONTROLLER EA 1 120 (F) 208026 2" SUPPLY LINE (BRIDGE) LF 295 121 026990 5/8" PLASTIC PIPE IRRIGATION LINE WITH INTEGRAL EMITTERS LF 12,400 122 208301 IRRIGATION CONTROLLER ENCLOSURE CABINET EA 3 123 208416 CERTIFY EXISTING BACKFLOW PREVENTERS LS LUMP SUM 124 208426 2" BACKFLOW PREVENTER ASSEMBLY EA 4 125 208442 FLOW SENSOR EA 4 126 026991 FLOW SENSOR CABLE IN CONDUIT LF 490 127 208447 POP-UP SPRINKLER ASSEMBLY (GEAR DRIVEN) EA 14 128 026992 RISER SPRINKLER ASSEMBLY (TYPE C-2) EA 3,380 129 208575 2" GATE VALVE EA 4 130 208576 2 1/2" GATE VALVE EA 4 131 208588 3" GATE VALVE EA 13 132 (F) 208594 3/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) LF 9,615 133 (F) 208595 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) LF 1,684 134 (F) 208596 1 1/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) LF 1,076 135 (F) 208597 1 1/2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) LF 540 136 (F) 208598 2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) LF 3,582 137 (F) 208599 2 1/2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) LF 80 138 208640 PRESSURE REGULATING VALVE EA 18 139 208649 QUICK COUPLING VALVE EA 16 140 026993 FLUSHING VALVE EA 28 141 208683 BALL VALVE EA 24 142 208738 8" CORRUGATED HIGH DENSITY POLYETHYLENE PIPE CONDUIT LF 1,620 143 210010 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 3 144 210110 IMPORTED TOPSOIL (CY) CY 5,140 145 026994 IMPORTED BIOFILTIRATION SOIL (CY) CY 1,700 146 210270 ROLLED EROSION CONTROL PRODUCT (NETTING) SQFT 29,000 147 210300 HYDROMULCH SQFT 296,000 148 210350 FIBER ROLLS LF 3,690 149 210420 STRAW SQFT 267,000 150 210430 HYDROSEED SQFT 296,000 151 210600 COMPOST SQFT 296,000 152 240105 LIME STABILIZED SOIL SQYD 12,800 153 250401 CLASS 4 AGGREGATE SUBBASE CY 14,500 154 260203 CLASS 2 AGGREGATE BASE (CY) CY 13,700 155 280000 LEAN CONCRETE BASE CY 99 156 377501 SLURRY SEAL TON 47 157 390011 PREPAVING INERTIAL PROFILER LS LUMP SUM 158 390020 PREPAVING GRINDING DAY EA 10 159 390131 HOT MIX ASPHALT TON 29,100 160 390134 HOT MIX ASPHALT (OPEN GRADED) TON 4,880 161 390137 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 2,090 162 394060 DATA CORE LS LUMP SUM 163 394090 PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 33 164 397005 TACK COAT TON 81 165 401050 JOINTED PLAIN CONCRETE PAVEMENT CY 27 166 (F) 477021 MECHANICALLY STABILIZED EMBANKMENT, LOCATION A SQFT 2,370 167 (F) 477022 MECHANICALLY STABILIZED EMBANKMENT, LOCATION B SQFT 9,560 168 (F) 477023 MECHANICALLY STABILIZED EMBANKMENT, LOCATION C SQFT 6,610 169 (F) 477024 MECHANICALLY STABILIZED EMBANKMENT, LOCATION D SQFT 900 170 (F) 477025 MECHANICALLY STABILIZED EMBANKMENT, LOCATION E SQFT 1,020 171 (F) 477026 MECHANICALLY STABILIZED EMBANKMENT, LOCATION F SQFT 910 172 026995 TEMPORARY SHORING (SQFT) SQFT 14,900 173 490601 16" CAST-IN-DRILLED-HOLE CONCRETE PILING LF 45 174 044567 FURNISH PILING (CLASS 90) (ALTERNATIVE X MODIFIED) LF 5,053 175 044568 DRIVE PILE (CLASS 90) (ALTERNATIVE X MODIFIED) EA 123 176 044569 FURNISH PILING (CLASS 140) (ALTERNATIVE X MODIFIED) LF 12,910 177 044570 DRIVE PILE (CLASS 140) (ALTERNATIVE X MODIFIED) EA 220 178 495115 FURNISH 24" CAST-IN-STEEL SHELL CONCRETE PILING LF 4,180 179 495116 DRIVE 24" CAST-IN-STEEL SHELL CONCRETE PILE EA 80 180 500020 PRESTRESSING PRECAST GIRDER LS LUMP SUM 181 (F) 510050 STRUCTURAL CONCRETE CY 147 182 (F) 510051 STRUCTURAL CONCRETE, BRIDGE FOOTING CY 1,033 183 (F) 510053 STRUCTURAL CONCRETE, BRIDGE CY 2,325 184 (F) 510060 STRUCTURAL CONCRETE, RETAINING WALL CY 604 185 (F) 510072 STRUCTURAL CONCRETE, BARRIER SLAB CY 740 186 (F) 510086 STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N) CY 44 187 (F) 510088 STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 533 188 (F) 510090 STRUCTURAL CONCRETE, BOX CULVERT CY 63 189 (F) 510502 MINOR CONCRETE (MINOR STRUCTURE) CY 159 190 510526 MINOR CONCRETE (BACKFILL) CY 360 191 (F) 511064 FRACTURED RIB TEXTURE SQFT 3,568 192 (F) 044571 FRACTURED RIB (TREE PATTERN) SQFT 5,820 193 512206 FURNISH PRECAST PRESTRESSED CONCRETE GIRDER (70'-80') EA 7 194 512207 FURNISH PRECAST PRESTRESSED CONCRETE GIRDER (80'-90') EA 7 195 044572 FURNISH PRECAST PRESTRESSED CONCRETE GIRDER (120'-130') EA 14 196 (F) 512500 ERECT PRECAST PRESTRESSED CONCRETE GIRDER EA 28 197 (F) 044573 CORBEL CAP (PRECAST CONCRETE) EA 8 198 519081 JOINT SEAL (MR 1/2") LF 105 199 519091 JOINT SEAL (MR 1 1/2") LF 232 200 (F) 520101 BAR REINFORCING STEEL LB 19,630 201 (F) 520102 BAR REINFORCING STEEL (BRIDGE) LB 868,060 202 (F) 520103 BAR REINFORCING STEEL (RETAINING WALL) LB 104,000 203 (F) 520107 BAR REINFORCING STEEL (BOX CULVERT) LB 20,443 204 (F) 520110 BAR REINFORCING STEEL (EPOXY COATED) (BRIDGE) LB 2,550 205 (F) 520120 HEADED BAR REINFORCEMENT EA 580 206 560205 INSTALL REMOVABLE SIGN PANEL FRAME EA 2 207 (F) 560218 FURNISH SIGN STRUCTURE (TRUSS) LB 22,500 208 (F) 560219 INSTALL SIGN STRUCTURE (TRUSS) LB 22,500 209 560244 FURNISH LAMINATED PANEL SIGN (1"-TYPE A) SQFT 320 210 560245 FURNISH LAMINATED PANEL SIGN (1"-TYPE B) SQFT 350 211 560248 FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED) SQFT 620 212 560249 FURNISH SINGLE SHEET ALUMINUM SIGN (0.080"-UNFRAMED) SQFT 420 213 560251 FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-FRAMED) SQFT 94 214 560252 FURNISH SINGLE SHEET ALUMINUM SIGN (0.080"-FRAMED) SQFT 160 215 562001 METAL (ROADSIDE SIGN) LB 2,040 216 566011 ROADSIDE SIGN - ONE POST EA 32 217 566012 ROADSIDE SIGN - TWO POST EA 17 218 568001 INSTALL SIGN (STRAP AND SADDLE BRACKET METHOD) EA 37 219 597600 PREPARE AND PAINT CONCRETE SQFT 6 220 620060 12" ALTERNATIVE PIPE CULVERT LF 98 221 620100 18" ALTERNATIVE PIPE CULVERT LF 2,740 222 620140 24" ALTERNATIVE PIPE CULVERT LF 1,760 223 620220 36" ALTERNATIVE PIPE CULVERT LF 540 224 026996 CONCRETE BACKFILL (RAPID STRENGTH CONCRETE) CY 10 225 623000 TEMPORARY CULVERT LF 1,090 226 026997 6" PLASTIC PIPE LF 780 227 026998 8" PLASTIC PIPE LF 10 228 650018 24" REINFORCED CONCRETE PIPE LF 1,000 229 026999 14"X23" OVAL SHAPED REINFORCED CONCRETE PIPE LF 290 230 680902 6" PERFORATED PLASTIC PIPE UNDERDRAIN LF 1,000 231 680905 8" PERFORATED PLASTIC PIPE UNDERDRAIN LF 710 232 700617 DRAINAGE INLET MARKER EA 89 233 703233 GRATED LINE DRAIN LF 1,120 234 705307 12" ALTERNATIVE FLARED END SECTION EA 1 235 705311 18" ALTERNATIVE FLARED END SECTION EA 10 236 705315 24" ALTERNATIVE FLARED END SECTION EA 3 237 705500 AUTOMATIC DRAINAGE GATE EA 3 238 (F) 721015 ROCK SLOPE PROTECTION (LIGHT, METHOD B) (CY) CY 184 239 729011 ROCK SLOPE PROTECTION FABRIC (CLASS 8) SQYD 360 240 (F) 730040 MINOR CONCRETE (GUTTER) (LF) LF 294 241 731502 MINOR CONCRETE (MISCELLANEOUS CONSTRUCTION) CY 1,200 242 731518 MINOR CONCRETE (BRUSHED CONCRETE) SQFT 5,080 243 731519 MINOR CONCRETE (STAMPED CONCRETE) SQFT 4,750 244 731530 MINOR CONCRETE (TEXTURED PAVING) CY 140 245 (F) 750001 MISCELLANEOUS IRON AND STEEL LB 30,776 246 027000 REMOVE FIRE HYDRANT EA 3 247 027001 JACKED 14" STEEL CASING LF 28 248 027002 JACKED 16" STEEL CASING LF 120 249 027003 JACKED 36" STEEL CASING LF 370 250 (F) 750002 MISCELLANEOUS IRON AND STEEL (SEWER SYSTEM) LB 8,265 251 027004 STEEL SLEEVE LF 40 252 027005 6" PVC SEWER PIPE LF 60 253 027006 6" PVC FORCE MAIN SEWER PIPE LF 590 254 027007 6" HDPE LATERAL (PIPE BURST) LF 160 255 027008 8" PVC SEWER PIPE LF 660 256 027009 10" PVC SEWER PIPE LF 760 257 027010 16" PVC FORCE MAIN SEWER PIPE LF 510 258 027011 24" PVC SEWER PIPE LF 980 259 027012 30" PVC FORCE MAIN SEWER PIPE LF 770 260 027013 SEWER MANHOLE (TYPE 1) EA 8 261 027014 SEWER MANHOLE (TYPE 2) EA 1 262 027015 SEWER MANHOLE (TYPE 3) EA 6 263 027016 PRESSURED MANHOLE EA 4 264 027017 TEMPORARY BYPASS SEWER LS LUMP SUM 265 027018 TEMPORARY BYPASS CONNECTION LS LUMP SUM 266 027019 FIRE HYDRANT EA 3 267 027020 12" BUTTERFLY VALVE EA 8 268 027021 CONNECT TO EXISTING WATER LINES EA 3 269 027022 WATER METER WITH WATER METER BOX EA 17 270 027023 INSTALL DROP IN VALVE EA 2 271 027024 ADJUST WATER VALVE BOX EA 23 272 027025 2" LATERAL WATER LINE LF 250 273 027026 12" PVC PIPE (WATER LINE) LF 1,200 274 027027 ARCHITECTURAL CONCRETE CY 79 275 (F) 027028 STONE VENEER SQFT 2,910 276 027029 36" JACKED REINFORCED CONCRETE PIPE LF 200 277 800302 CHAIN LINK FENCE (TYPE CL-3, VINYL-CLAD) LF 613 278 800361 CHAIN LINK FENCE (TYPE CL-6, VINYL-CLAD) LF 302 279 802520 6' CHAIN LINK GATE (TYPE CL-6) EA 6 280 802540 8' CHAIN LINK GATE (TYPE CL-6) EA 2 281 820107 DELINEATOR (CLASS 1) EA 78 282 820130 OBJECT MARKER EA 24 283 832006 MIDWEST GUARDRAIL SYSTEM (STEEL POST) LF 1,560 284 832070 VEGETATION CONTROL (MINOR CONCRETE) SQYD 1,100 285 (F) 044574 ORNAMENTAL RAILING LF 516 286 (F) 044575 CHAIN LINK RAILING (TYPE 2 - ST-10 MODIFIED 4.5, VINYL-CLAD) LF 134 287 (F) 044576 CHAIN LINK RAILING (TYPE 2 - ST-10 MODIFIED 6, VINYL-CLAD) LF 140 288 833072 WILDLIFE PASSAGE WAY (TYPE S) EA 77 289 (F) 833088 TUBULAR HANDRAILING LF 480 290 (F) 833142 CONCRETE BARRIER (TYPE 26 MODIFIED) LF 239 291 (F) 833143 CONCRETE BARRIER (TYPE 26A MODIFIED) LF 27 292 (F) 839514 HANDRAILING LF 59 293 839543 TRANSITION RAILING (TYPE WB-31) EA 6 294 839581 END ANCHOR ASSEMBLY (TYPE SFT) EA 3 295 839584 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 6 296 839585 ALTERNATIVE FLARED TERMINAL SYSTEM EA 1 297 027030 CRASH CUSHION (TYPE SCI-100GM) EA 2 298 839699 CONCRETE BARRIER (TYPE 60P) LF 24 299 839701 CONCRETE BARRIER (TYPE 60) LF 200 300 839703 CONCRETE BARRIER (TYPE 60C) LF 4,470 301 839704 CONCRETE BARRIER (TYPE 60D) LF 930 302 839709 CONCRETE BARRIER (TYPE 60GE) LF 87 303 027031 CONCRETE BARRIER (TYPE 60R MODIFIED) LF 240 304 (F) 839725 CONCRETE BARRIER (TYPE 736) LF 116 305 (F) 027032 CONCRETE BARRIER (TYPE 736A MODIFIED) LF 118 306 (F) 839727 CONCRETE BARRIER (TYPE 736 MODIFIED) LF 1,541 307 (F) 839740 CALIFORNIA ST-10 BRIDGE RAIL LF 274 308 840515 THERMOPLASTIC PAVEMENT MARKING SQFT 5,380 309 840655 PAINT TRAFFIC STRIPE (1-COAT) LF 199,000 310 840665 PAINT PAVEMENT MARKING (1-COAT) SQFT 11,000 311 840666 PAINT PAVEMENT MARKING (2-COAT) SQFT 810 312 846001 4" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) LF 31,000 313 846002 4" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 6-1) LF 260 314 846004 4" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 17-7) LF 11,300 315 846005 4" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36-12) LF 21,200 316 846007 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) LF 4,340 317 846008 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 8-4) LF 550 318 846009 8" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) LF 13,000 319 846010 8" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 12-3) LF 410 320 850101 PAVEMENT MARKER (NON-REFLECTIVE) EA 2,180 321 850111 PAVEMENT MARKER (RETROREFLECTIVE) EA 5,690 322 860090 MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION LS LUMP SUM 323 027033 SIGNAL AND LIGHTING (LOCATION 1)(TEMPORARY) LS LUMP SUM 324 027034 SIGNAL AND LIGHTING (LOCATION 2)(TEMPORARY) LS LUMP SUM 325 027035 SIGNAL AND LIGHTING (LOCATION 3)(TEMPORARY) LS LUMP SUM 326 027036 SIGNAL AND LIGHTING (LOCATION 4)(TEMPORARY) LS LUMP SUM 327 027037 SIGNAL AND LIGHTING (LOCATION 5)(TEMPORARY) LS LUMP SUM 328 027038 SIGNAL AND LIGHTING (LOCATION 6)(TEMPORARY) LS LUMP SUM 329 027039 SIGNAL AND LIGHTING (LOCATION 7)(TEMPORARY) LS LUMP SUM 330 860251 SIGNAL AND LIGHTING (LOCATION 1) LS LUMP SUM 331 860252 SIGNAL AND LIGHTING (LOCATION 2) LS LUMP SUM 332 860253 SIGNAL AND LIGHTING (LOCATION 3) LS LUMP SUM 333 860254 SIGNAL AND LIGHTING (LOCATION 4) LS LUMP SUM 334 860255 SIGNAL AND LIGHTING (LOCATION 5) LS LUMP SUM 335 860401 LIGHTING LS LUMP SUM 336 860460 LIGHTING AND SIGN ILLUMINATION LS LUMP SUM 337 027040 LIGHTING AND SIGN ILLUMINATION (TEMPORARY) LS LUMP SUM 338 860705 INTERCONNECTION CONDUIT AND CABLE (LS) LS LUMP SUM 339 860797 ELECTRIC SERVICE (IRRIGATION) LS LUMP SUM 340 027041 TRAFFIC OPERATIONS SYSTEM LS LUMP SUM 341 999990 MOBILIZATION LS LUMP SUM
Requirements:
Date posted: 02/24/2014
Contractor: Golden State Bridge, Inc. Contact: David Riccitiello
Address: 2990 Bay Vista Court Suite D Benicia, CA 94510
Phone: 925-372-8000 Fax: 925-372-8001 Email: dave@gsbridge.com
Services needed: Lead Compliance Plan, Construction Area Signs, Traffic Control System, Type II Barricade, Channelizer, P.C.M.S., Temp. Railing, Temp. Crash Cushion Module, Temp. Alternative Crash Cushion, Temp. Traffic Screen, Temp. Creek Diversion System, Prepare SWPPP, Rain Event Action Plan, Storm Water Sampling and Analysis Day, Storm Water Annual Report, Move-In/Move-Out (Temp Erosion Control), Temp. Hydraulic Mulch (Bonded Fiber Matrix), Temp. Cover, Temp. Check Dam, Temp. Drainage Inlet Protection, Temp. Fiber Roll, Temp. Reinforced Silt Fence, Temp. Construction Entrance, Street Sweeping, Dewatering and Non Storm Water Discharge System, Temp. Concrete Washout, Water Quality Sampling and Analysis Day, Water Quality Monitoring Report, Asbestos Compliance Plan, Temp. Fence, Remove Yellow Thermoplastic Traffic Stripe (Hazardous Waste), ADL Burial Location Report, Treated Wood Waste, Noise Monitoring, Abandon Culvert (LF), Abandon Inlet, Abandon Pipeline, Abandon Sewer Line, Remove Chain Link Fence, Remove Guardrail, Remove Irrigation Facility Remove Painted Traffic Stripe, Remove Painted Pavement Marking, Remove Thermoplastic Traffic Stripe, Remove Thermoplastic Pavement Marking, Remove Pavement Marker, Remove Roadside Sign, Remove Sign From Electrolier, Remove Sign Structure, Remove Metal Structure, Remove Sign Panel, Remove Pipe, Remove Inlet, Remove Sewer Manhole, Remove Manhole, Remove Water Valves, Remove Sewer Pipe, Remove Base and Surfacing, Salvage Water Meter, Salvage Irrigation Facility, Relocate Roadside Sign, Adjust Sewer Cleanout to Grade, Adjust Inlet, Adjust Manhole to Grade, Adjust Utility Cover to Grade, Modify Inlet, Modify Sewer Manhole, Cold Plane Asphalt Concrete Pavement, Remove Concrete, Remove Concrete Barrier, Cap Inlet, Sand Backfill, Remove Crash Cushion, Bridge Removal, Clearing and Grubbing, Develop Water Supply, Roadway Excavation, Structure Excavation, Structure Backfill, Pervious Backfill Material, Pervious Backfill Material (Retaining Wall), Imported Borrow, Lightweight Embankment Material (Cellular Concrete), Subgrade Enhancement Geotextile, Class B2, Soil-Cement, Roadside Clearing, Weed Germination, Cultivation, Soil Amendment, Packet Fertilizer, Plant, Maintain Existing Planted Areas, Plant Establishment Work, Wood Mulch, Root Barrier, Check and Test Existing Irrigation Facilities, Operate Existing Irrigation Facilities, Control and Neutral Conductors, 1 in., 1 1/2 in. and 2 in. Remote Control Valve, 1 in. and 2 in. WYE Strainer Assembly, 24-32 Station Irrigation Controller, 30-42 Station Irrigation Controller, Solar Powered Irrigation Controller, 2 in. Supply Line, 5/8 in. Plastic Pipe Irrigation Line with Integral Emitters, Irrigation Controller Enclosure Cabinet, Certify Existing Backflow Preventers, 2 in. Backflow Preventer Assembly, Flow Sensor, Flow Sensor Cable in Conduit, Pop-Up Sprinkler Assembly, Riser Sprinkler Assembly, 2 in. Gate Valve, 2 ? in Gate Valve, 3 in. Gate Valve, ? in. Plastic Pipe, 1 in. Plastic Pipe, 1 ? in. Plastic Pipe, 1 ? in. Plastic Pipe, 2 in. Plastic Pipe, 2 ? in. Plastic Pipe, Pressure Regulating Valve, Quick Coupling Valve, Flushing Valve, Ball Valve, 8 in. Corrugated High Density, Move-In/Move-Out (Erosion Control), Imported Topsoil, Imported Biofiltration Soil, Rolled Erosion Control Product, Hydromulch, Fiber Rolls, Straw, Hydroseed, Compost, Lime Stabilized Soil, Class 4 Aggregate Subbase, Class 2 Aggregate Base, Lean Concrete Base, Slurry Seal, Prepaving Inertial Profiler, Prepaving Grinding Day, Hot Mix Asphalt, Hot Mix Asphalt (Open Graded), Rubberized Hot Mix Asphalt, Data Core, Place Hot Mix Asphalt (Misc. Area), Tack Coat, Jointed Plain Concrete Pavement, Mechanically Stabilized Embankment (Location A, B, C, D E and F), Temp. Shoring, 16 in. CIDH Concrete Piling, Furnish Piling, Drive Pile, Furnish 24 in. CIS Shell Concrete, Drive 24 in CIS Shell Concrete, Prestressing Precast Girder, Structural Concrete (Various), Minor Concrete, Fractured Rib Texture, Fractured Rib (Tree Pattern), Furnish Precast Prestressed Concrete, Corbel Cap, Joint Seal, Rebar, Bar Reinforcing Steel, Headed Bar Reinforcement, Install Removable Sign panel Frame, Furnish Sign Structure, Furnish laminated Panel Sign, Furnish Single Sheet Aluminum Sign, Metal (Roadside Sign), Roadside Sign ? One and Two Post, Install sign, Prepare and Paint Concrete, 12 in., 18 in., 24 in., 36 in. Alternative Pipe Culvert, Concrete Backfill, Temp. Culvert, 6 in. and 8 in. Plastic Pipe, 24 in. Reinforced Concrete Pipe, 14 in x 23 in. Oval Shaped Reinforced Concrete Pipe, 6 in. and 8 in. Perforated plastic Pipe Underdrain, Drainage Inlet Marker, Grated Line Drain, 12 in., 18 in., and 24 in. Alternative Flared End Section, Automatic Drainage Gate, Rock Slope Protection, Misc. Iron and Steel, Remove Fire Hydrant, Jacked 14 in., 16 in. and 36 in. Steel Casing, Steel Sleeve, 6 in. PVC Sewer Pipe, 6 in. PVC Force main Sewer Pipe, 6 in. HDPE Lateral, 8 in. PVC Sewer Pipe, 10 in. PVC Sewer Pipe, 16 in. PVC Force Main Sewer Pipe, 24 PVC Sewer Pipe, 30 in. PVC Force Main Sewer Pipe, Sewer Manhole, Pressured Manhole, Temp. Bypass Sewer, Temp. Bypass Connection, Fire Hydrant, 12 in. Butterfly Valve, Connect to Existing Water Lines, Water Meter with Water Meter Box, Install Drop in Valve, Adjust Water Valve Box, 2 in. Lateral Water Line, 12 in. PVC Pipe (Water Line), Architectural Concrete, Stone Veneer, 36 in. Jacked Reinforced Concrete Pipe, Chain Link Fence, Chain Link Gate, Delineator, Object Marker, Midwest Guardrail System, Vegetation Control, Ornamental Railing, Chain Link Railing, Wildlife Passage Way, Tubular Handrailing, Concrete Barrier, Handrailing, Transition Railing, End Anchor Assembly, Alternative In-Line Terminal System, Alternative Flared Terminal System, Crash Cushion, Concrete Barrier, California St-10 Bridge Rail, Thermoplastic Pavement Marking, Paint Traffic Stripe, Paint Pavement Marking, Thermoplastic Traffic Stripe, Pavement Marker, Maintaining Existing Traffic Management System Elements During Construction, Signal and Lighting, Lighting, Lighting and Sign Illumination Interconnection Conduit and Cable, Electric Service, Traffic Operations System,
Requirements: Please call to discuss how Golden State Bridge, Inc. can assist you in your bonding, credit, and/or insurance needs. Also, let us know if you need assistance in obtaining necessary equipment, supplies, or materials for this project. If you are interested in submitting a subcontractor bid for this project, please call us at 925-372-8000 or fax us your quote at 925-372-8001. Should you have any questions regarding this bid, you may contact David Riccitiello or Brian Stopper.
Date posted: 02/24/2014
Contractor: C. C. Myers, Inc. Contact: Steve Alexander
Address: 3286 Fitzgerald Rd. Rancho Cordova, CA 95742
Phone: 916-635-9370 Fax: 916-635-1527 Email: salexander@ccmyersinc.com
Services needed: This is a highway project with the typical items of work associated, but not limited to: Aggregate, Rip Rap Material, Bridge Deck Overlay, CIDH Pile, Clear and Grubbing, Concrete Barrier, Concrete Crack Sealing, Construction Area Signs, Consult - Enviro Compliance, Core and Saw, Demo Bridge, Demo Minor, Earthwork and Base, Imported Borrow, Electrical H'Way, Fence & MBGR, Minor Flat Concrete, Joint Seals, K-Rail, Landscape, Erosion Control, Metal Bridge Rail, Minor Concrete Structure, Pavement Grinding, Paving PCC, Plane A C, Paving ASPH Concrete, A C Dike and Misc, Pile Drive, Pipe - Coor Steel, Precast Concrete Pipe, Prestress Concrete, Ready Mix Concrete, Rebar, Rock Slope Protect, Sign Structures, Signs Roadside, Stripe and Mark, Structure Excavate Bridge, Structure Excavate Site, Traffic Control, Trucking. C.C. Myers, Inc. is willing to break down items of work into economically feasible units to encourage DBE participation. If you are interested in any of this work, please contact us immediately.
Requirements: Each Subcontractor shall be prepared to submit faithful performance and payment bonds equal to 100% of their quotation. The Contractor will pay standard industry rates for these bonds. Contact C. C. Myers, Inc. for assistance with bonds, insurance, lines of credit, equipment, supplies or project plans and specifications. AN EQUAL OPPORTUNITY EMPLOYER
Date posted: 02/25/2014
Contractor: Disney Construction, Inc. Contact: Richard Disney
Address: 859 Cowan Rd, Suite #3 Burlingame, CA 94010
Phone: 650-259-9545 Fax: 650-259-9651 Email:
Services needed: Disney Construction, Inc. (DCI) is requesting qualified DBE, and all other subcontractors and supplies for the following trades (includes but are not limited to): Lead Compliance Plan, Progress Schedule (Critical Path Method), Time-Related Overhead, Construction Area Signs, Traffic Control System, Type III Barricade, Channelizer , Portable Changeable Message Sign, Temporary Railing, Temporary Crash Cusion Module, Temporary Alternative Crash Cushion, Temporary Traffic Screen, SWPPP, Storm Water Sampling and Analysis Day, Storm Water Annual Report, Move-in/Move-out (Temporary Erosion Control), Temporary Hydraulic Mulch, Temporary Cover, Temporary Check Dam, Temporary DI Protection, Temporary Fiber Rolls, Temporary Reinforced Silt Fence, Temporary Silt Fence, Temporary Construction Entrance, Street Sweeping, Dewatering and Non Storm Water Discharge System, Temporary Concrete Washout, Water Quality Sampling and Analysis Day, Asbestos Compliance Plan, Temporary Fence, Remove Yellow Thermoplastic Traffic Stripe, ADL Burial Location Report, Treated Wood Waste, Noise Monitoring, Abandon Culvert/Inlet/Pipeline/Sewer Line, Remove Chain Link Fence/Guardrail/Irrigation Facility/Painted Traffic Stripe/Painted Pavement Marking/Thermoplastic Traffic Stripe/Thermoplastic Pavement Marking/Pavement Marker/Roadside Sign/Sign from Electrolier/Sign Structure/Metal Structure/Sign Panel/Pipe/Inlet/Sewer Manhole/Manhole/Water Valves/Sewer Pipe/Base and Surfacing, Salvage Water Meter/Irrigation Facility, Relocate Roadside Sign, Adjust Sewer Cleanout to Grade/Inlet/Manhole to Grade/Utility Cover to Grade, Modify Inlet, Modify Sewer Manhole, Cold Plane Asphalt, Remove Concrete, Remove Concrete Barrier, Cap Inlet, Sand Backfill, Remove Crash Cushion, Bridge Removal, Clearing and Grubbing, Develop Water Supply, Roadway Excavation, Structure Excavation, Structure Backfill, Pervious Backfill Material, Imported Borrow, Lightweight Embankment Material, Subgrade Enhancement Geotextile, Soil-Cement, Roadside Clearing, Weed Germination, Cultivation, Soil Amendment, Packet Fertilizer, Plant, Maintain Existing Planted Areas, Plant Establishment Work, Wood Mulch, Root Barrier, Check and Test Existing Irrigation Facilities, Operate Existing Irrigation Facilities, Control and Neutral Conductors, Remote Control Valve, Wye Stainer Assembly, Station Irrigation Controller, Solar Powered Irrigation Controller, 2" Supply Line, 5/8" Plastic Pipe Irrigation Line with Integral Emitters, Irrigation Controller Enclosure Cabinet, Certify Existing Backflow Preventers, 2" Backflow Preventer Assembly, Flow Sensor, Flow Sensor Cable in Conduit, Pop-up Sprinkler Assembly, Riser Sprinkler Assembly, Gate Valves, Plastic Pipe (Schedule 40), Pressure Regulating Valve, Quick Coupling Valve, Flushing Valve, Ball Valve, Corrugated High Density Polyethylene Pipe Conduit, Imported Topsoil, Imported Biofiltration Soil, Rolled Erosion Control Product, Hydromulch, Fiber Rolls, Straw, Hydroseed, Compost, Lime Stabilized Soil, Class 4 Aggregate Subbase, Class 2 Aggregate Base, Lean Concrete Base, Slurry Seal, Prepaving Inertial Profiler/Grinding Day, Hot Mix Asphalt, Rubberized Hot Mix Asphalt, Data Core, Place HMA, Tack Coat, Jointed Plain Concrete Pavement, Mechanically Stabilized Embankment, Temporary Shoring, 16" CIDH Concrete Piling, Furnish/Drive Piles (Class 90/140), Furnish/Drive Cast-In-Steel Sehll Concrete Piles, Prestressing Precast Girder, Structural Concrete, Minor Concrete, Fractured Rib, Furnish Precast Prestressed Concrete Girder, Erect Precast Prestresed Concrete Girder, Corbel Cap, Joint Seal, Rebar, Headed Bar Reinforcement, Install Removable Sign Panel Frame, Furnish Sign Structure, Install Sign Structure, Furnish Laminated Panel Sign, Furnish Single Sheet Aluminum, Metal (Roadside Sign), Roadside Sign - One/Two Post, Alternative Pipe Culvert, Prepare and Paint Concrete, Install Sign, Concrete Backfill, Temporary Culvert, Plastic Pipe, 24" Reinforced Concrete Pipe, 14"x23" Oval Shaped Reinforced Concrete Pipe, Perforated Plastic Pipe, DI Marker, Grated Line Drain, Alternative Flared End Section, Automatic Drainage Gate, Rock Slope Protection, Miscellaneous Iron and Steel, Remove Fire Hydrants, Jacked Steel Casing, Steel Sleeve, PVC Sewer Pipe, PVC Force Main Sewer Pipe, HDPE Lateral, Sewer Manhole, Pressurized Manhole, Butterfly Valve, Connect to Existing Water Lines, Water Meter with Water Box, Install Drop in Valve, Adjust Water Valve Box, PVC Pipe, Architectural Concrete, Stone Veneer, Jacked Reinforced Concrete Pipe, Chain Link Fence, Chain Link Gate, Delineator, Object Marker, Midwest Guardrail System, Vegetation Control, Ornamental Railing, Chain Link Railing, Wildlife Passage Way, Tubular Handrailing, Concrete Barrier, Handrailing, Transition Railing, End Anchor Assembly, Alternative In-Line Terminal System, Crash Cushion, Maintaing Existing Traffic Management System Elements During Construction, Signal and Lighting, Lighting and Sign Illumination, Interconnection Conduit and Cable, Electric Service.
Requirements: 100% performance and payment bonds with a surety company subject to approval of Disney Construction, Inc. are required of subcontractors for this project. Disney Construction, Inc. will pay bond premium up to 1.5%. Subcontractor must possess a valid contractor?s license, current insurance and worker?s compensation meeting Disney Construction?s requirement. Subcontractors will be required to abide by terms and conditions of the AGC Master Labor Agreements and to execute an agreement utilizing the latest DCI Subcontract incorporating prime contract terms and conditions, including payment provisions. Disney Construction is signatory to the Laborers, Carpenters, and Operator Engineers. Disney Construction, Inc.?s listing of a subcontractor is not to be construed as an acceptance of all the subcontractor?s conditions or exceptions included with the subcontractor?s price quote. We will make efforts to assist interested DBE Businesses in obtaining specifications and plans, technical assistance, bonding, lines of credit, insurance, equipment, materials, or related services supplies. We are willing to break out any portion of work to encourage participation. Please call if you need assistance.
Date posted: 02/28/2014
Contractor: Ghilotti Construction Company, Inc. Contact: Jim Petnic
Address: 246 Ghilotti Avenue Santa Rosa, CA 95407
Phone: 707-585-1221 Fax: 707-585-1601 Email: jimp@ghilotti.com
Services needed: Ghilotti Construction Company, Inc. is seeking certified DBE subcontractors, suppliers & truckers for quotes including, but not limited to, the following scopes of work: CAS, TRAFFIC CONTROL SYSTEM, PORTABLE CMS, TEMPORARY CRASH CUSHION MODULE, TEMPORARY ALTERNATIVE CRASH CUSHION, TEMPORARY CREEK DIVERSION, EROSION CONTROL, STREET SWEEPING, COLD PLANE AC PAVEMENT, BRIDGE REMOVAL, CLEAR & GRUB, STRUCTURE EXCAVATION, STRUCTURE BACKFILL, LIGHTWEIGHT EMBANKMENT MATERIAL (CELLULAR CONCRETE), SOIL-CEMENT, LANDSCAPE, IRRIGATION, LIME STABILIZED SOIL, LEAN CONCRETE BASE, SLURRY SEAL, PREPAVING INERTIAL PROFILER, PREPAVING GRINDING DAY, TACK COAT, JOINED PLAIN CONCRETE PAVEMENT, FURNISH PILING (CLASS 90), DRIVE PILE (CLASS 90), FURNISH PILING (CLASS 140), DRIVE PILE (CLASS 140), FURNISH 24? CAST-IN-STEEL SHELL CONCRETE PILING, DRIVE 24? CAST-IN-STEEL SHELL CONCRETE PILE, PRESTRESSING PRECAST GIRDER, STRUCTURAL CONCRETE (BRIDGE, RETAINING WALL, BARRIER SLAB, APPROACH SLAB (TYPE N), BOX CULVERT), MINOR CONCRETE (MINOR STRUCTURE), FURNISH PRECAST PRESTRESSED CONCRETE GIRDER (70?-80?). ERECT PRECAST PRESTRESSED CONCRETE GIRDER, JOINT SEAL (MR 1 ??), BAR REINFORCING STEEL, FURNISH SIGN STRUCTURE, INSTALL SIGN STRUCTURE, ROADSIDE SIGN, MINOR CONCRETE (MISC. CONSTRUCTION), JACKED STEEL CASING (14?, 16? AND 36?), CONCRETE BARRIER, THERMOPLASTIC TRAFFIC STRIPING & PAVEMENT MARKERS, SIGNAL & LIGHTING, ELECTRICAL, ASPHALT & AGGREGATE SUPPLY AND TRUCKING. Contact our estimator for more information. GCC is available to discuss breaking out any portion of work to encourage minority participation.
Requirements: Mr. Jim Petnic (707/585-1221 or jimp@ghilotti.com) is the Estimator for this project and is available to provide you with assistance to clarify any questions regarding the scope of work, including interpretation of plans, specifications and requirements, bid preparation and obtaining bonds, lines of credit, insurance and any technical assistance. GCC may also assist in obtaining any necessary equipment, supplies, materials or related services. (Please note: G.C.C. may require Payment & Performance Bonds on all sub-contracts over $25,000 per Ca. Public Contract Code Sect. 4108. G.C.C. will pay bond premiums up to 1 ?% of contract cost. G.C.C. is a UNION CONTRACTOR. Any non-signatory subcontractors will be required to sign an agreement for trades covered under our agreements.) Plans, specifications and project requirements may be reviewed at our office in Santa Rosa. Bid Documents may also be viewed and/or downloaded through local plan rooms, builder?s exchanges, Dodge Scan or a GCC closer to your location as well as in trade publications such as Daily Pacific Builder or Daily Construction Services. Ghilotti Construction Company encourages the use of minority and women subcontractors and suppliers and considers such to be an important aspect of the project. Req: By submitting a proposal, the bidder affirms that they have carefully examined ALL the bidding documents/Addenda and that from his/her own investigation, they have satisfied themselves as to the nature and location of the work. GCC?s written subcontract document execution is required of all successful subcontract bidders. A copy is available for inspection on GCC?s website (www.ghilotti.com) and/or can be provided upon written request prior to bid submission. Inconsistent bid terms and conditions shall be void. Insurance: As per our insurance requirements, your bid must include the cost of naming GCC as additional insured; including completed operations coverage; Use form ?CG-2010-1185? or equivalent; include Primary and Non-Contributing wording on your certificate of insurance and waiver of subrogation is required. We are an equal opportunity employer.
Date posted: 03/14/2014
Contractor: Brosamer and Wall Contact: Robert Rosas
Address: 1777 Oakland Blvd Suite 110 Walnut Creek, CA 94596
Phone: 925-932-7900 Fax: 925-279-2269 Email: rrosas@brosamerwall.com
Services needed: Brosamer & Wall, Inc. is requesting quotes from all qualified Subcontractors and Suppliers including certified DBE firms for the following items of work, including but not limited to: Lead Compliance Plan, Progress Schedule (Critical Path Method), Construction Area Signs, Traffic Control System, Type III Barricade, Channelizers, Portable Changeable Message Sign, Temporary Railing, Temporary Crash Cushion Module, Temporary Alternative Crash Cushion, Temporary Traffic Screen, SWPPP, Storm Water Sampling and Analysis Day, Storm Water Annual Report, Temp Erosion Control and Related: (Move-in/Move-out (Temporary Erosion Control), Temporary Hydraulic Mulch, Temporary Cover, Temporary Check Dam, Temporary DI Protection, Temporary Fiber Rolls, Temporary Reinforced Silt Fence, Temporary Silt Fence, and Temporary Construction Entrance) Street Sweeping, Dewatering and Non Storm Water Discharge System, Temporary Concrete Washout, Water Quality Sampling and Analysis Day, Asbestos Compliance Plan, Temporary Fence, Remove Yellow Thermoplastic Traffic Stripe, ADL Burial Location Report, Treated Wood Waste, Noise Monitoring, Abandon Underground: (Culverts, Inlets, SD Pipeline and Sewer Line) Remove Chain Link Fence, Remove Guardrail, Remove Striping and Related: (Painted Traffic Stripe, Painted Pavement Marking, Thermoplastic Traffic Stripe, Thermoplastic Pavement Marking, and Pavement Markers) Remove Signs: (Roadside Signs, Sign from Electrolier, Sign Structure, Metal Structure, Sign Panel), Remove Underground and Related: (Pipe, Inlet, Sewer Manhole, Manhole, Water Valves, and Sewer Pipe), Remove Base and Surfacing, Salvage Water Meter, Remove Irrigation Facility, Relocate Roadside Sign, Adjust Utilities to Grade: (Sewer Cleanout, Inlet, Manhole, and Utility Covers) Modify Inlet, Modify Sewer Manhole, Cold Plane Asphalt, Remove Concrete, Remove Concrete Barrier, Cap Inlet, Sand Backfill, Remove Crash Cushion, Bridge Removal, Building Removal, Clearing and Grubbing, Develop Water Supply, Roadway Excavation, Roadway Excavation ADL (Type Z-3, Y-1. Y-2), Structure Excavation, Structure Backfill, Pervious Backfill Material, Buy/Haul/Place Imported Borrow, Cell Concrete - Lightweight Embankment Material, Subgrade Enhancement Geotextile, Soil-Cement, Roadside Clearing, Weed Germination, Cultivation, Soil Amendment, Packet Fertilizer, Plant, Maintain Existing Planted Areas, Plant Establishment Work, Wood Mulch, Root Barrier, Check and Test Existing Irrigation Facilities, Operate Existing Irrigation Facilities, Control and Neutral Conductors, Remote Control Valve, Wye Strainer Assembly, Station Irrigation Controller, Solar Powered Irrigation Controller, 2" Supply Line, 5/8" Plastic Pipe Irrigation Line with Integral Emitters, Irrigation Controller Enclosure Cabinet, Certify Existing Backflow Preventers, 2" Backflow Preventer Assembly, Flow Sensor, Flow Sensor Cable in Conduit, Pop-up Sprinkler Assembly, Riser Sprinkler Assembly, Gate Valves, Plastic Pipe (Schedule 40), Pressure Regulating Valve, Quick Coupling Valve, Flushing Valve, Ball Valve, Corrugated High Density Polyethylene Pipe Conduit, Imported Topsoil, Imported Bio-filtration Soil, Rolled Erosion Control Product, Hydro-mulch, Fiber Rolls, Straw, Hydro-seed, Compost, Lime Stabilized Soil, Class 4 Aggregate Sub-base, Class 2 Aggregate Base, Lean Concrete Base, Slurry Seal, Pre-paving Inertial Profiler Pre-paving Grinding Day, Hot Mix Asphalt, Rubberized Hot Mix Asphalt, Data Core, Place HMA, Tack Coat, Jointed Plain Concrete Pavement, Mechanically Stabilized Embankment, Temporary Shoring, 16" CIDH Concrete Piling, Furnish/Drive Piles (Class 90/140), Furnish/Drive Cast-In-Steel Shell Concrete Piles, Pre-stressing Precast Girder, Structural Concrete, Minor Concrete, Fractured Rib, Furnish Precast Pre-stressed Concrete Girder, Erect Precast Pre-stressed Concrete Girder, Corbel Cap, Joint Seal, Rebar, Headed Bar Reinforcement, Install Removable Sign Panel Frame, Furnish Sign Structure, Install Sign Structure, Furnish Laminated Panel Sign, Furnish Single Sheet Aluminum, Metal (Roadside Sign), Roadside Sign ? One & Two Post, Alternative Pipe Culvert, Prepare and Paint Concrete, Install Sign, Concrete Backfill, Temporary Culvert, Plastic Pipe, 24" Reinforced Concrete Pipe, 14"x23" Oval Shaped Reinforced Concrete Pipe, Perforated Plastic Pipe, Drain Inlet Marker, Grated Line Drain, Alternative Flared End Section, Automatic Drainage Gate, Rock Slope Protection, Miscellaneous Iron and Steel, Remove Fire Hydrants, Jacked Steel Casing, Steel Sleeve, PVC Sewer Pipe, PVC Force Main Sewer Pipe, HDPE Lateral, Sewer Manhole, Pressurized Manhole, Butterfly Valve, Connect to Existing Water Lines, Water Meter with Water Box, Install Drop in Valve, Adjust Water Valve Box, PVC Pipe, Architectural Concrete, Stone Veneer, Jacked Reinforced Concrete Pipe, Chain Link Fence, Chain Link Gate, Delineator, Object Marker, Midwest Guardrail System, Vegetation Control, Ornamental Railing, Chain Link Railing, Wildlife Passage Ways, Tubular Hand railing, Concrete Barrier, Hand railing, Transition Railing, End Anchor Assembly, Alternative In-Line Terminal System, Crash Cushion, Maintaining Existing Traffic Management System Elements during Construction, Signal and Lighting, Lighting and Sign Illumination, Interconnection Conduit and Cable, Electric Service, Trucking (Load & Hourly), Water Truck, Rental of Portable Toilets
Requirements: Brosamer & Wall, Inc. will work with interested subcontractors to identify opportunities to break down items into economically feasible packages. Brosamer & Wall, Inc. is a union signatory contractor. Subcontractors must possess a current contractor?s license, insurance coverage and worker?s compensation for the entire length of the contract. All subcontractors will be required to sign our standard Subcontract Agreement. 100% payment and performance bonds may be required. If you have any questions regarding this project or need assistance in obtaining insurance, bonding, equipment, materials and/or supplies please call Robert Rosas at (925) 932-7900. Plans and specifications can be viewed at our office located at 1777 Oakland Blvd Suite 110, Walnut Creek, Ca. 94596. Brosamer & Wall, intends to work cooperatively with all qualified firms seeking work on this project. We are an equal opportunity employer and will work with any interested subcontractor to identify opportunities to break items into economically feasible packages
Date posted: 03/17/2014
Contractor: Granite Construction Company Contact: Barbara Jacob
Address: 715 Comstock St. Santa Clara, CA 95054
Phone: 408-327-7013 Fax: 408-327-7090 Email: barbara.jacob@gcinc.com
Services needed: Granite Construction Company (Granite) is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for the following items of work, including but not limited to:. LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL, BARRICADES, PORTABLE MEASSGE SIGNS, K-RAIL, CRASH CUSHIONS, CREEK DIVERSION SYSTEM, SWPPP,AND RAIN EVENT PLAN, STORM WATER SAMPLING, EROSION CONTROL, SILT FENCE, CONSTRUCTION ENTRANCE, STREET SWEEPING, DEWATERING, WATER QUALITY SAMPLING, ASBESTOS COMPLIANCE PLAN, FENCING, STRIPINGAND MARKINGS, TREATED WOOD WASTE, NOISE MONITORING, GUARDRAIL, REMOVE AND ADJUST UTILITIES, COLD PLAN ASPHALT, MINOR CONCRETE, BRIDGE REMOVAL, CLEAR AND GRUB, ROADWAY EXCAVATION, STRUCTURE EXCAVATION, CEMENT TREAT, PERVIOUS BACKFILL MATERIAL, ROADSIDE CLEARING, LANDSCAPING, PLASTIC PIPE AND IRRIGATION CONTROLS, LEAN CONCRETE BASE, SLURRY SEAL, TACK COAT, SHORING, CONCRETE PILING, JACK AND BORE STEEL CASING, PRECAST GIRDER, STRUCTURAL CONCRETE, JOINT SEAL, REBAR, SIGNS AND SIGN STRUCTURE, CONCRETE PIPE, ROCK SLOPE PROTECTION, MISCELLANEOUS IRON AND STEEL, STEEL CASINGS, PVC PIPE, DUCTILE IRON PIPE AND FITTINGS HANDRAILING, RAILING, CONCRETE BARRIER, ELECTRICAL, TRENCHLESS CONSTRUCTION ( PIPE BURSTING) AND TRUCKING
Requirements: Granite Construction Company (Granite) is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons and Carpenters unions. 100% performance and payment bonds may be required for the full amount of subcontract price. Granite will pay for bond premium up to 1.5%. Subcontractors must possess a current contractor?s license, insurance and worker?s compensation coverage meeting Granite?s requirements and will be required to sign the standard Granite Subcontract Agreement. A copy of the insurance requirements and agreement can be obtained by contacting the estimator. Plans and specifications are available for viewing at our office located at 715 Comstock St., Santa Clara, CA., 95054 or Caltrans Web site http://www.dot.ca.gov/hq/esc/oe/contract_awards_services.html . Please call if you need assistance in obtaining bonding, insurance, equipment, materials and/or supplies. Granite intends to work cooperatively with all qualified firms seeking work on this project. Granite is an equal opportunity employer. Portions of work can be made available upon request prior to bid date. Please call if any assistance is needed.
Date posted: 03/19/2014
Contractor: Diablo Contractors, Inc. Contact: Estimating Department
Address: 7 Crow Canyon Court, Suite 100 San Ramon, CA 94583
Phone: 925-552-8250 Fax: 925-552-8254 Email: estimating@diablocontractors.com
Services needed: We are soliciting quotes from certified DBE Subcontractors and Suppliers for the following categories of work (including but not limited to): CAS, traffic control, demo, ac pavement, bridge removal, clear/grub, excavation, backfill, landscape & irrigation, aggregate, HMA, CIDH, piling, concrete, rebar, signs, fencing, barriers, striping, electrical. Work will be broken down to accommodate subcontractor quotes. Quotes are due by Monday, April 14, 2014.
Requirements: Diablo Contractors, Inc. (DCI) adheres to the requirement for Affirmative Action to ensure Equal Employment Opportunity according to Executive Order 11246, and requires proof from all subcontractors that they are in accordance. 100% Performance and Payment Bonds with a surety company thereof, subject to the approval of DCI, will be required of all subcontractors. DCI will pay bond premium up to 1.5%. Please contact DCI for assistance with bonding, insurance, or lines of credit. All subcontractors are expected to sign a standard contract, refer to our website: www.diablocontractors.com. Any bid provided by your company constitutes an acceptance on each and every term of the general contractor?s standard contract. Subcontractor will be deemed to understand and accept those terms by providing a bid. Any attempt by a subcontractor to revise or limit those terms will be null and void and not recognized by DCI. Prevailing wages must be met. Plans & specifications are available for downloading from the Caltrans website: http://www.dot.ca.gov/hq/esc/oe/contract_awards_services.html or viewing at our offices or at Caltrans Plans Counter. Please call DCI for more information. Contact: Tiffany White.
Date posted: 03/20/2014
Contractor: R.M. Harris Co Contact: John Tymo
Address: 901 Howe Road, Martinez, CA, 94553
Phone: (925)335-3000 Fax: (925)335-2663 Email: jtymo@rmhci.com
Services needed: R.M. Harris Company is seeking certified DBE subcontractors and suppliers for trucking, lead compliance plan, asbestos compliance plan, construction area signs, signs, traffic control, crash cushions, SWPPP services, street sweeping, noise monitoring, cold plane ac pavement, HMA, clear & grub, roadside clearing, sign removal, bridge demolition, roadway excavation, structural excavation/backfill, pervious backfill, erosion control, landscape & irrigation, piling, shoring, structural concrete, slurry seal, tack coat, miscellaneous iron and steel, prestressing, precast concrete, minor concrete, joint seal, bar reinforcing steel, fencing, concrete barrier, railing, signal & lighting, striping and all other related items of work including partial items of work.
Requirements: R.M. Harris Co. is an equal opportunity employer. We encourage DBE certified firms to seek assistance from our Project Estimator for any technical assistance or information related to plans, specifications & requirements for the work. Waiver of Subrogation required. Performance and payment bonds may be required. Assistance with bonds, lines of credit, insurance and equipment is offered from RMH Contract Administrator, John Tymo. All interested parties are further encouraged to meet either party in person to help facilitate requests. Technical questions shall be directed to RMH?s Estimator.
Date posted: 03/25/2014
Contractor: RGW Construction Inc Contact: John Pitsch
Address: 550 Greenville Road Livermore, CA 94551
Phone: 925-606-2400 Fax: 925-961-1925 Email: jpitsch@rgwconstruction.com
Services needed: RGW is seeking qualified subcontractor and suppliers (including, but not limited to)the following: Fabric and Oils, Construction Area Signs, Traffic Control, Raise Iron-Utilities, Cold Plane, Demolition/Bridge Removal, Clear & Grub, Landscaping, Hydroseeding, Erosion Control, Irrigation, Limetreatment, Slurry Seal, AC Dike, Grinding, Pile Driving, Prestressing Concrete Cast-in-Place, Precast Concrete Girders, Joint Seal, Reinforcing Steel, Sign Structure, Signs Roadside, Rock Slope Protection, Concrete Curb & Sidewalk-Misc.-Ditches-Textured-Stamped, Fencing, Object Marker, MBGR, Metal Railing, Concrete Barrier, Thermoplastic & Painted Traffic Stripe & Marking, Pavement Marking, Signal and Lighting, Message Signs, Lighting & Sign Illumination, Surveyor, SWPPP Planning, Water Truck, Sweeper, Hazardous Substance Removal, Prepare and Paint Concrete, Underground-Sewer-Storm-Water, Stone Veneer, Import Topsoil/Biofiltration Soil, Pipe (Underground) Materials
Requirements: Plans and specs are available for review at our Livermore office, the Caltrans website www.dot.ca.gov/hq/esc/oe/, local plan rooms or builders exchange. RGW can provide assistance with bonding (if required), lines of credit and/or insurance as well as any technical assistance. RGW can also provide assistance in obtaining any necessary equipment, supplies or materials. RGW is signatory to Operating Engineers, Laborers, and Carpenters. 100% performance and payment bonds may be required for the full amount of subcontract price. Subcontractor must possess current insurance and worker?s compensation coverage meeting RGW?s requirements. RGW is an equal opportunity employer.
Date posted: 03/25/2014
Contractor: A. Teichert & Son, Inc. dba Teichert Construction Contact: John Thomassen
Address: 24207 County Rd. 100A Davis, CA 95616
Phone: 530-406-4200 Fax: 530-406-4299 Email: jthomassen@teichert.com
Services needed: Teichert Construction is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for the following items of work, including but not limited to: all materials, labor and equipment for Hazardous Material Reports, Construction Area Signs, Roadside Signs, Trucking, Temporary Creek Diversion System, Temporary and Permanent Erosion Control, Erosion Control Materials, Street Sweeping, Dewatering System, Noise Monitoring, Demolition and Clearing, Striping, Underground Subcontractors, Cold Plane, Bridge Removal, Bridge Structure, Excavation and Backfill, Imported Borrow, Cellular Concrete, Geotextile, Soil-Cement Mixing, Landscaping, Electrical, Imported Topsoil, Imported Biofiltration Soil, Lime Stabilized Soil, Lean Concrete Base, Slurry Seal, Prepaving Inertial Profiler, Prepaving Grinding, Hot Mix Asphalt, Aggregate Base and Sub Base, QC/QA for HMA, Tack Coat, MSE Walls, Temp Shoring, Minor Concrete Subcontractors, Sign Structure, Grated Line Drain, Jack and Bore, Misc. Iron and Steel, Fencing, Midwest Guardrail System, Concrete Barrier. Teichert Construction intends to work cooperatively with all qualified firms seeking work on this project, including but not limited to breaking out contract work items into economically feasible units to increase overall DBE participation. Plans and specifications are available from the Caltrans website listed above and the Teichert Woodland Estimating office. For assistance obtaining or regarding the plans and specifications, please contact the listed Estimator.
Requirements: 100% Payment and Performance Bonds for subcontractors are required. Teichert will pay bond premium up to 2%. Insurance Waiver of subrogation also required. However, certified DBE's are encouraged to contact Teichert and request assistance if they are unable to meet Teichert's standard bonding or insurance requirements. DBE's also are encouraged to contact Teichert for assistance in obtaining lines of credit, equipment, supplies, materials or related assistance or services. Subcontractor, Supplier and Trucker quotes must be valid, at minimum, for the award period stated in the contract documents. Please note that this is a prevailing wage project and Teichert Construction is Union signatory. Subcontractors will be subject to the terms and conditions of Teichert's subcontract and safety documents available at www.teichert.com/for-subcontractors.cfm. Submission of a bid to Teichert will confirm that you have reviewed and accepted Teichert's subcontract form. Conditions or exceptions in Subcontractor?s quote are expressly rejected unless accepted in writing prior to bid. Subcontractor scopes and supplier quotes are required 24 hours prior to bid. Equal Opportunity Employer.
Date posted: 03/26/2014
Contractor: Bay Cities Paving & Grading, Inc. Contact: Russ Olney
Address: 1450 Civic Ct. Concord, CA 94520
Phone: (925) 687-6666 Fax: (925) 687-2122 Email: rolney@baycities.us
Services needed: Sub-trades suppliers? needed for following work (but not limited to): Trucking, Lead Compliance Plan, Construction Area Signs, Traffic Control System, Type III Barricade, PCMS, Temp. Railing (Type K), Channelizers, Temp. & Alternative Crash Cushions, SWPPP, REAP, Storm Water Sampling, Storm Water Annual Report, Dewatering & Non-Storm Water Discharge System, Water Quality Sampling & Analysis, Asbestos Compliance Plan, ADL Burial Location Report, Noise Monitoring, Water Quality Monitoring Report, Temporary Erosion Control Measures, Street Sweeping, Adjust Utility Frames & Covers, Demolition, Develop Water Plan, Creek Diversion, Structural Backfill, Cellular Concrete, Soil-Cement, Landscaping & Irrigation Systems, Cast-In-Drilled-Hole Concrete Piling, Piling Systems (Class 90, 140), Cast-In-Steel Shell Concrete Piling, Prestressed Concrete Girder, Structural Concrete (Bridge, Retaining Wall, Barrier Slab, Approach Slab, Box Culvert), Fractured Rib Texture, Bar Reinforcing Steel, Roadside & Aluminum Signs, Sign Structures, Alternative Pipe Culvert, Plastic Pipe, Alternative Flared End Sections, PVC Pipe, HDPE Pipe, Water Line Pipe, Jacked Steel Casing, Reinforced Concrete Pipe, Rock Slope Protection, Minor Concrete (Utility Structure, Gutter, Textured / Brushed / Stamped Paving, Vegetation Control, Misc.), Chain Link Fence / Gate / Railing, Ornamental Railing, Concrete Barrier (Type 26 Modified, 26A Modified, 60P, 60, 60C, 60D, 60GE, 60R Modified, 736, 736A Modified, 736 Modified), Wildlife Passageway, Thermoplastic Pavement Marking & Traffic Stripe, Paint Marking & Traffic Stripe, Delineators, Object Markers, Concrete Painting, Signal & Lighting (Temporary & Permanent), Traffic Operation System.
Requirements: Plans and specifications for the Project are available for review at our office at 1450 Civic Ct., Concord, (925) 687-6666. 100% Performance, Payment Bonds by an admitted surety naming prime contractor as oblige, in the full amount of the subcontractors bid shall be required. Retention will be withheld if subcontractor fails to provide bonds. Bay Cities Paving & Grading, Inc. will pay bond premium up to 2%. Bay Cities Paving & Grading is signatory to the following Unions: Operators, Laborers, Teamsters & Cement Masons. Call Russ Olney for assistance with credit line, bonding, insurance, equipment, supplies and materials. Bay Cities Paving & Grading, Inc. is an equal opportunity employer.
Date posted: 03/28/2014
Contractor: DeSilva Gates/Flatiron, a Joint Venture Contact: Victor Le
Address: 11555 Dublin Blvd., Dublin, CA 94568
Phone: 925-829-9220 Fax: 925-803-4263 Email: dgcestimating@desilvagates.com
Services needed: DeSilva Gates Construction is requesting quotes from all qualified subcontractors and suppliers including certified UDBE/DBE/SBE/DVBE firms for the following types of work, including but not limited to: Clearing & Grubbing, Concrete Barrier, Lime Treatment, Lean Concrete Base, Minor Concrete, Minor Concrete Structures, PCC Paving, Striping and Pavement Markers, Slurry Seal, Underground Work, Vegetation Control Concrete, Trucking, Sweeping, Water Trucks, Imported Borrow Material, Imported Biofiltiration Soil, MSE Wall Suppliers, MSE Backfill Material, Aggregate Subbase Material, Aggregate Base Material, HMA Material, RHMA Material and Tack Coat Material.
Requirements: DeSilva Gates is signatory to Operating Engineers and Laborers unions. 100% performance and payment bonds may be required for the full amount of subcontract price. DeSilva Gates will pay for bond premium up to 2%. Subcontractors must possess current insurance and worker?s compensation coverage meeting DeSilva Gates Construction?s requirements. Subcontractor will be required to sign the standard DeSilva Gates Construction Subcontract Agreement. A copy of the agreement can be obtained from our estimator. Quotations must be valid for the same duration as specified by the Owner for Contract Award. Plans and specifications are available for viewing at our Dublin office. Please call if you need assistance in obtaining bonding, insurance, equipment, materials and/or supplies. DeSilva Gates intends to work cooperatively with all qualified firms seeking work on this project. DeSilva Gates is an equal opportunity employer.
Date posted: 03/28/2014
Contractor: Flatiron West Inc Contact: Lillian Simon
Address: 2100 Goodyear Road Benicia, CA 94510
Phone: 707-742-6000 Fax: 707-746-1603 Email: lisimon@flatironcorp.com
Services needed: Flatiron will be bidding this project as a JOINT VENTURE with DeSilva Gates. We are encouraging and seeking participation of local Disadvantaged Business Enterprises. This project has an 8% DBE Goal, and we are soliciting DBE subcontractors and material quotations for the following types of work including but not limited to: CONSTRUCTION AREA SIGNS/ROADWAY SIGNS, BRIDGE DEMO, EROSION CONTROL, LANDSCAPING/IRRIGATION, CIDH, JOINT SEAL ASSEMBLY, PRESTRESSING, REBAR, OVERHEAD SIGNS, PAINTING/CONCRETE STAIN, FENCING, METAL RAILING, MBGR, BRIDGE CONCRETE BARRIER, ELECTRICAL, CELLULAR CONCRETE, FURNISH/ERECT PRECAST GIRDERS, DSM WALLS SOIL CEMENT, STRUCTURE BACKFILL PERMEABLE MATERIAL, READY MIX, CONCRETE PUMPING, CONCRETE PILING, 24? STEEL PIPE PILE, WELDED STEEL PIPE, MISC. METALS, SWPPP PLAN (ENVIRONMENTAL COMPLIANCE), SWPPP MATERIALS, GEOTEXTILE MATERIALS, BRIDGE BEARINGS, FORMLINER, STREET SWEEPING, NOISE MONITORING. Non-DBE Subs/Suppliers: You will be expected to carry a proportionate percentage of 2nd-tier participation with your quote. 2nd-tier participation will be evaluated with your price.
Requirements: 100% performance and payment bonds will be required for the full amount of the subcontract price. By submitting a price quote to Flatiron, subcontractors and suppliers bidder affirms that they have carefully examined ALL the bidding/contract documents/Addenda and that from his/her own investigation, they have satisfied themselves as to the nature and location of the work. Please contact Flatiron West for any assistance to this solicitation, including obtaining bonding, insurance, equipment, materials and/or supplies. Please provide subcontractor and supplier quotes as early as possible to enable our estimators to perform a thorough evaluation of all quotes received. Flatiron's listing of a Subcontractor in its bid submittal to any agency is not to be construed as an acceptance of all of the Subcontractor?s conditions or exceptions included with Subcontractor?s price quotes. Quotations will be broken down into comparable packages as reasonably necessary. Quotations must be valid for the same duration as specified by the Owner for Contract Award. Flatiron is signatory to Operating Engineers, Laborers, Cement Masons, Carpenters and Pile Drivers Unions. Any non-signatory subcontractors will be required to sign an agreement for trades covered under our union agreements. Plans, specifications and project requirements may be reviewed at our office by appointment only or plans and specs may also be downloaded on the Caltrans Office Engineer website at no cost. Flatiron West will work cooperatively with Subcontractors and suppliers for all bid items you are licensed and qualified to perform. Bid items can be split to facilitate participation from all certified firms. Flatiron West will pay for bond premium up to 2%. Subcontractors must possess a current contractor?s license, insurance and worker?s compensation coverage meeting Flatiron's requirements and will be required to sign the standard Flatiron Subcontract Agreement. A copy of the insurance requirements and agreement can be obtained by contacting the Estimating Administrator. Flatiron West is an Equal Opportunity Employer. Plans and Specs for this project are available for review in our Benicia office by appointment. Please contact Lillian Simon by email at LiSimon@flatironcorp.com
Date posted: 03/31/2014
Contractor: O. C. Jones & Sons and Disney Construction, A Joint Venture Contact: Jean Sicard
Address: 1520 Fourth Street Berkeley, CA 94710
Phone: 510-526-3424 Fax: 510-526-0990 Email: jsicard@ocjones.com
Services needed: REQUEST FOR DBE SUBCONTRACTORS AND SUPPLIERS FOR O. C. Jones & Sons, Inc. is soliciting quotes (including but not limited to): Trucking, Lead Compliance Plan, Construction Area Signs, Portable Changeable Message Sign, SWPPP, Rain Event Action Plan, Storm Water Sampling & Analysis, Temporary Erosion Control, Sweeping, Dewatering and Non Storm Water Discharge System, Water Quality Sampling and Analysis, Temporary Fence, ADL Burial Location Report, Treated Wood Waste, Adjust Utilities, Cold Plane AC, Cap Inlet, Bridge Removal, Clearing & Grubbing, Develop Water Supply, Roadway Excavation (Type Z-3 ADL) (Type Y-1 ADL), (Type Y-2 ADL), Previous Backfill Material, Imported Borrow, Lightweight Embankment Material (Cellular Concrete), Subgrade Enhancement Geotextile Class B-2, Soil-Cement Ground Improvements, Weed Germination, Soil Amendment, Planting & Irrigation, Imported Topsoil, Hydroseed, Compost, Lime Stabilized Soil, Lean Concrete Base, Slurry Seal, Data Core, Tack Coat, Biofiltration Soil, Jointed Plain Concrete, Mechanically Stabilized Embankment, Temporary Shoring, Minor Concrete, Sign Structure, Roadside Signs, Prepare & Paint Concrete, Rock Slope Protection, Automatic Drainage Gate, Fencing, Delineator, Object Marker, Midwest Guardrail System, Wildlife Passage Way, Tubular Handrailing, Crash Cushion Type SCI-100GM, Striping & Marking, Electrical ? Signals & Lighting, Stone Veneer, Ornamental Railing, CA-ST-10 Bridge Rail, Metal Lettering, Metal Bands, Precast Concrete Letters, Prepaving Grinding, Inertial Profiler, Grated Line Drain, and Construction Materials Contact: Jean Sicard @ O.C. Jones 510-526-3424 Fax 510-526-0990 Disney Construction, Inc. is soliciting quotes for (including but not limited to): Asbestos Compliance Plan, Noise Monitoring, CIDH Concrete Piling, Prestressing Precast Girder, Precast Prestressed Concrete Girder, Joint Seal, Corbel Cap, Rebar, Bar Reinforcing Steel, Pipe Jacking, Misc. Iron and Steel, Concrete Barrier, Furnish Pile, Drive Pile, Cast-In-Steel Shell Concrete Pile Contact: Rick Disney @ Disney Construction 650-259-9545 Fax 650-259-9651
Requirements: Equal Opportunity Employers 100% Performance & Payment Bonds may be required. Worker?s Compensation Waiver of Subrogation required. Please call OCJ/Disney Construction for assistance with bonding, insurance, necessary equipment, material and/or supplies. OCJ/Disney Construction is willing to breakout any portion of work to encourage DBE Participation. Plans & Specs are available for viewing at both offices or through the Caltrans Website at www.dot.ca.gov/hq/esc/oe/weekly_ads/index.php
Date posted: 03/31/2014
Contractor: Granite Rock Company Contact: Paul Brizzolara
Address: 120 Granite Rock Way San Jose, CA 95136
Phone: (408) 574-1400 Fax: (408) 365-9548 Email: estimating@graniterock.com
Services needed: Certified DBE firms are encouraged to provide a quote to Graniterock for all items of work listed on the bid list, particularly these: Trucking, Underground, Construction Area Signs, Traffic Control, Erosion Control, Stripe, MBGR, Clear & Grub, Bridge Demo, Sign Structure, Landscape, Slurry Seal, Minor Concrete, Fence, Concrete Barrier, Electrical, Rebar, Joint Seal, Piles, Drilling, Masonry, Precast Girders, Post-Tensioning, Bridge Railings, Grinding & Grooving, PCMS, Crash Cushion, Cold Plane AC, Jack Welded Steel Pipe.
Requirements: Granite Rock Company 'Graniterock' is signatory to Operating Engineers, Laborers, Teamsters, Carpenters and Cement Masons unions. 100% performance and payment bonds will be required from a qualified surety company for the full amount of the subcontract price. Bonding assistance is available. Graniterock will pay bond premium up to 1.5%. In addition to bonding assistance, subcontractors are encouraged to contact Graniterock Estimating with questions regarding obtaining lines of credit, insurance, equipment, materials and/or supplies, or with any questions you may have. Subcontractors must possess a current contractor's license, insurance and worker's compensation coverage. Subcontractors will be required to enter into our standard contract. Graniterock intends to work cooperatively with all qualified firms seeking work on this project. Granite Rock Company is an equal opportunity employer.
Date posted: 03/31/2014
Contractor: Ghilotti Bros., Inc. Contact: Renee Powers, Bid Administrator
Address: 525 Jacoby Street, San Rafael CA 94901
Phone: (415) 454-7011 Fax: (415) 454-8376 Email: reneep@ghilottibros.com
Services needed: Ghilotti Bros., Inc. is requesting quotes from all qualified Subcontractors and Suppliers including certified DBE firms for the following items of work: Electrical, Signs, Erosion Control, Metal Beam Guard Rail, Cold Plane Asphalt, Landscape, Fencing & Railing, Type 60 Concrete Barrier, Striping, DBE Trucking, and Sign Structure. Rich Wilkerson (richw@ghilottibros.com p:415-454-7011 f:415-454-8376) is our Estimator for this project and is available to answer any questions and/or provide clarification regarding the scope of work; clarification of plans, specifications and requirements; bid preparation or any technical assistance. Non-DBE Subs/Suppliers: You are encouraged to carry a proportionate percentage of 2nd-tier DBE participation with your quote and this participation will be evaluated with your price. Plans and Specs for this project are available for review in our San Rafael office by appointment.
Requirements: NOTE: 100% Payment and Performance Bonds as well as Insurance Waiver of subrogation may be required of subcontractors. However, certified DBE's are encouraged to contact Ghilotti Bros. to request assistance if they are unable to meet the standard bonding or insurance requirements. Subcontractors must possess a current contractor's license, insurance and worker's compensation coverage. Ghilotti Bros. intends to work cooperatively with all qualified firms seeking work on this project. Please note that this is a prevailing wage project and Ghilotti Bros. is signatory to Operating Engineers, Laborers, Cement Masons, Carpenters and Teamsters Unions. Any non-signatory subcontractors will be required to sign an agreement for trades covered under our union agreements. Subcontractors will be subject to the terms and conditions of Ghilotti Bros.? subcontract and safety documents which are available upon request. Ghilotti Bros., Inc. is an Equal Opportunity Employer and actively hires U.S. Veterans.
Date posted: 04/02/2014