Inquiry #1: How can As-Builts be obtained for the W198-N99 Connector Plaza Overhead bridge?
Inquiry submitted 12/06/2012

Response #1:Submitted for consideration.
Response posted 12/07/2012


Response #2:Refer to the last row in the table in Section 5-1.09, "SUPPLEMENTAL PROJECT INFORMATION" (page 160) of the special provisions and to Section 2-1.03, "BID DOCUMENTS" paragraph 5 in subsection 2-1.03B "Supplemental Project Information" (page 13-291) of the "Amendments to the Standard Specifications" of the special provisions which states:

"If bridge as-built drawings are available:

1. For a project in District 1 through 6 or 10, you may request them from the Office of Structure Maintenance
and Investigations, fax (916) 227-8357
2. For a project in District 7, 8, 9, 11, or 12, you may request them from the Office of Structure Maintenance
and Investigations, fax (916) 227-8357, and they are available at the Office of Structure Maintenance and
Investigations, Los Angeles, CA, telephone (213) 897-0877"

Response posted 12/10/2012




Inquiry #2: The weight for Bid Item #53 is seem to be way under the engineers estimate. One 8" XX-strong pipe (8.625 OD x .875 wall) is 72.42 lbs/ft. Total 634x4 = 2,536 not including galvanizing and threaded rods. Please advise?
Inquiry submitted 12/10/2012

Response #1:Submitted for consideration.
Response posted 12/10/2012






The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.03, “Examination of Plans, Specifications, Contract, and Site of Work,” of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.