Viewing inquiries for 08-0N5704

Submit new inquiry for this project


Inquiry #1: Will you please describe the construction of the existing bridge deck: Thickness of structural concrete and overlay;
size and spacing of rebar.

Inquiry submitted 06/19/2013

Response #1:Submitted for consideration.
Response posted 07/02/2013


Response #2:Refer to 2-1.06B “Supplemental Project Information” of the Contract Special Provisions, Standard Specifications and Revised Standard Specifications for where to find as-built information.
Response posted 07/23/2013




Inquiry #2: On bid item #7, core concrete 1" please confirm that the bid quantity is 2,304 lineal feet of drilling not 2,304 lineal inches of drilling. Multiplting the hole total(9)at each location (16) locations, x depth of each hole, 16". Total 2,304 inches.
Inquiry submitted 07/02/2013

Response #1:Submitted for consideration.
Response posted 07/02/2013


Response #2:Refer to Addendum No. 2 dated July 12, 2013. Bid item list has been modified. Sheet 8 of the contract plans has been modified.
Response posted 07/23/2013




Inquiry #3: Was the Bid Opening Date for this project postponed?
Inquiry submitted 07/10/2013

Response #1:Yes.
Addendum # 1 issued on 07/09/2013 postponed the Bid Opening Date indefinitely.
A new Addendum will be forthcoming to set the new Bid Opening Date.
Response posted 07/10/2013






The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.03, “Examination of Plans, Specifications, Contract, and Site of Work,” of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.