2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. 3/22/2023, 1:24 PM Notes: 1) This is the FTIP lump sum “backup” list for HBP funded projects. Please see the Local Assistance web site for the most current listings: http://www.dot.ca.gov/hq/LocalPrograms/hbrr99/HBP_FSTIP.html 2) The purpose of this list is to show which projects being advanced by local agencies have met the eligibility requirements of the federal Highway Bridge Program and have been prioritized for funding by the Department in cooperation with local agencies for funding. 3) Contractual funding levels are determined at time of federal authorization/obligation for given phase of work. For details see Chapter 3 of the Local Assistance Procedures Manual. 4) For FTIP/FSTIP purposes, Federal Highway Bridge Program (HBP) funding constraint is managed by Caltrans. 5) Prop 1B bond funds for the Local Seismic Safety Retrofit Program (LSSRP) used for matching federal funds are also managed by Caltrans. 6) Financial constraint of LOCAL matching funds (including regional STIP funds) and LOCAL Advance Construction (AC) is the responsibility of the MPOs and their local agencies. 7) Some projects show that they are programmed using State STP funds. These funds are HBP funds transferred to the STP for bridge work that is not ordinarily eligible for HBP funds. See the HB Program Guidelines for details. Do not confuse these STP funds with Regional STP funds. 8) Corrections to this report should be addressed to the District Local Assistance Engineer: https://dot.ca.gov/programs/local-assistance/other-important-issues/local-assistance-contacts Note id: 24 Caltrans, Division of Local Assistance 3/22/2023, 1:24 PM Det2 FL4 SmlTxt brf Page 1 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 08 County: San Bernardino Responsible Agency HBP-ID Project Description Apple Valley 3971 BRIDGE NO. 54C0086, BEAR VALLEY RD OVER MOJAVE RIVER, 5 MI E RTE I-15. Bridge Rehabilitation, no added capacity. High Cost project agreement required. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 2,768,000 2,768,000 5453(018) R/W 680,000 1,585,000 2,265,000 CON 37,546,600 37,546,600 Total 3,448,000 1,585,000 37,546,600 42,579,600 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 3,052,514 1,403,201 33,240,005 37,695,720 Local Match 395,486 181,800 4,306,595 4,883,880 LSSRP Bond Local AC Total 3,448,000 1,585,000 37,546,600 42,579,600 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 2,450,510 2,450,510 Local Match 317,490 317,490 LSSRP Bond Local AC Total 2,768,000 2,768,000 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 602,004 1,403,201 2,005,205 Local Match 77,996 181,800 259,796 LSSRP Bond Local AC Total 680,000 1,585,000 2,265,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 33,240,005 33,240,005 Local Match 4,306,595 4,306,595 LSSRP Bond Local AC Total 37,546,600 37,546,600 Caltrans, Division of Local Assistance 3/22/2023, 1:24 PM Det2 FL4 SmlTxt brf Page 2 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 08 County: San Bernardino Responsible Agency HBP-ID Project Description Barstow 3834 BRIDGE NO. 54C0088, N 1ST AVENUE OVER BNSF RY UP RR AMTRAK, 0.2 MI N MAIN ST.. Replace existing 2 lane bridge with 2 lane bridge, existing bridge to be removed (Minor seismic retrofit funds). Other Federal Funds must be programmed in FTIP. SBCTA is project sponsor for construction. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 5,900,000 1,525,000 7,425,000 5298(030) R/W 4,965,340 4,524,547 2,000,000 11,489,887 CON Total 10,865,340 6,049,547 2,000,000 18,914,887 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 9,619,086 5,355,664 1,770,600 16,745,349 Local Match 1,246,254 693,883 229,400 2,169,538 LSSRP Bond Local AC Total 10,865,340 6,049,547 2,000,000 18,914,887 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 5,223,270 1,350,083 6,573,353 Local Match 676,730 174,918 851,648 LSSRP Bond Local AC Total 5,900,000 1,525,000 7,425,000 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 4,395,816 4,005,581 1,770,600 10,171,997 Local Match 569,524 518,966 229,400 1,317,890 LSSRP Bond Local AC Total 4,965,340 4,524,547 2,000,000 11,489,887 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ Local Match LSSRP Bond Local AC Total Caltrans, Division of Local Assistance 3/22/2023, 1:24 PM Det2 FL4 SmlTxt brf Page 3 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 08 County: San Bernardino Responsible Agency HBP-ID Project Description Barstow 4048 BRIDGE NO. 54C0089, N 1ST AVENUE OVER MOJAVE RIVER, 1.4 MI N/O RTE 15. Replace existing 2 lane bridge with 2 lane bridge, existing bridge to be removed. (minor seismic retrofit funds), Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 2,100,000 2,142,837 895,973 5,138,810 5298(031) R/W 800,000 160,000 960,000 CON 25,859,889 25,859,889 Total 2,100,000 2,942,837 1,055,973 25,859,889 31,958,699 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,859,130 2,605,294 934,853 22,893,760 28,293,036 Local Match 240,870 337,543 121,120 2,884,119 3,583,652 LSSRP Bond 82,011 82,011 Local AC Total 2,100,000 2,942,837 1,055,973 25,859,889 31,958,699 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,859,130 1,897,054 793,205 4,549,388 Local Match 240,870 245,783 102,768 589,422 LSSRP Bond Local AC Total 2,100,000 2,142,837 895,973 5,138,810 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 708,240 141,648 849,888 Local Match 91,760 18,352 110,112 LSSRP Bond Local AC Total 800,000 160,000 960,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 22,893,760 22,893,760 Local Match 2,884,119 2,884,119 LSSRP Bond 82,011 82,011 Local AC Total 25,859,889 25,859,889 Caltrans, Division of Local Assistance 3/22/2023, 1:24 PM Det2 FL4 SmlTxt brf Page 4 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 08 County: San Bernardino Responsible Agency HBP-ID Project Description Colton 2705 BRIDGE NO. 54C0100, MT VERNON AVE, OVER SANTA ANA RIVER, 0.6 MI S'LY OF RTE I-10. LSSRP Seismic Retrofit Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 60,000 125,100 408,900 594,000 5065(005) 5065(017)R/W CON 3,640,000 3,640,000 Total 60,000 125,100 3,640,000 408,900 4,234,000 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 53,118 110,751 3,222,492 361,999 3,748,360 Local Match 6,882 14,349 46,901 68,132 LSSRP Bond 417,508 417,508 Local AC Total 60,000 125,100 3,640,000 408,900 4,234,000 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 53,118 110,751 361,999 525,868 Local Match 6,882 14,349 46,901 68,132 LSSRP Bond Local AC Total 60,000 125,100 408,900 594,000 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ Local Match LSSRP Bond Local AC Total CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 3,222,492 3,222,492 Local Match LSSRP Bond 417,508 417,508 Local AC Total 3,640,000 3,640,000 Caltrans, Division of Local Assistance 3/22/2023, 1:24 PM Det2 FL4 SmlTxt brf Page 5 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 08 County: San Bernardino Responsible Agency HBP-ID Project Description Colton 1056 BRIDGE NO. 54C0379, BARTON RD, OVER UP RR, 0.25 MI W ROUTE 215. Replace 2 lane bridge with new 2 lane Asphalt roadway, Minor seismic contribution. The City of Colton will be the implementing agency for design and construction. FundSourceSummary: PER/WTotal462,887CONTotal2,076,3002,076,300331,700794,587600,000600,000931,7002,076,3003,470,887462,887PhaseSummary: Fed$ LocalACLocalMatchTotal53,111462,887LSSRPBondTotal51,61551,615824,8341,838,1483,072,758106,866186,537346,514931,7002,076,3003,470,887409,776Prior20/2121/2222/2323/2424/2525/26BeyondPrior20/2121/2222/2323/2424/2525/26Beyond5065(024) 5421(001) 5421(002) Project#: PESummary: Fed$ LocalACLocalMatchTotal53,111462,887LSSRPBondTotal293,654703,43038,04691,157331,700794,587409,776Prior20/2121/2222/2323/2424/2525/26Beyond R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 531,180 531,180 Local Match 68,820 68,820 LSSRP Bond Local AC Total 600,000 600,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,838,148 1,838,148 Local Match 186,537 186,537 LSSRP Bond 51,615 51,615 Local AC Total 2,076,300 2,076,300 Caltrans, Division of Local Assistance 3/22/2023, 1:24 PM Det2 FL4 SmlTxt brf Page 6 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 08 County: San Bernardino Responsible Agency HBP-ID Project Description Needles 4647 BRIDGE NO. 54C0349, K STREET OVER COLORADO RIVER, 0.25 MI N/O RIVER RD. Bridge Preventive Maintenance. Stand alone bridge PM to patch spalls or delaminations and overlay deck, and replace bearings. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 175,000 175,000 5220(007) R/W CON 625,000 790,131 1,415,131 Total 175,000 625,000 790,131 1,590,131 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 154,928 553,313 699,503 1,407,743 Local Match 20,073 71,688 90,628 182,388 LSSRP Bond Local AC 553,313 -553,313 Total 175,000 625,000 790,131 1,590,131 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 154,928 154,928 Local Match 20,073 20,073 LSSRP Bond Local AC Total 175,000 175,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 553,313 699,503 1,252,815 Local Match 71,688 90,628 162,316 LSSRP Bond Local AC 553,313 -553,313 Total 625,000 790,131 1,415,131 Caltrans, Division of Local Assistance 3/22/2023, 1:24 PM Det2 FL4 SmlTxt brf Page 7 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 08 County: San Bernardino Responsible Agency HBP-ID Project Description Redlands 4816 BRIDGE NO. PM00235, Bridge Preventive Maintenance Program (BPMP), various bridges in the City of Redlands. See Caltrans Local Assistance HBP website for backup list of projects. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total PE 521,000 521,000 R/W CON 2,038,000 2,038,000 Total 521,000 2,038,000 2,559,000 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 416,800 1,630,400 2,047,200 Local Match 104,200 407,600 511,800 LSSRP Bond Local AC Total 521,000 2,038,000 2,559,000 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 416,800 416,800 Local Match 104,200 104,200 LSSRP Bond Local AC Total 521,000 521,000 Project #: CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,630,400 1,630,400 Local Match 407,600 407,600 LSSRP Bond Local AC Total 2,038,000 2,038,000 Caltrans, Division of Local Assistance 3/22/2023, 1:24 PM Det2 FL4 SmlTxt brf Page 8 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 08 County: San Bernardino Responsible Agency HBP-ID Project Description San Bernardino 3733 BRIDGE NO. 54C0411, SECOND STREET OVER HISTORIC WARM CREEK, 0.1 MI E ARROWHEAD AVE. Replace existing four lane bridge with four lane bridge. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 488,360 488,360 5033(052) R/W 200,000 200,000 CON Total 688,360 688,360 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 609,405 609,405 Local Match 78,955 78,955 LSSRP Bond Local AC Total 688,360 688,360 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 432,345 432,345 Local Match 56,015 56,015 LSSRP Bond Local AC Total 488,360 488,360 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 177,060 177,060 Local Match 22,940 22,940 LSSRP Bond Local AC Total 200,000 200,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ Local Match LSSRP Bond Local AC Total Caltrans, Division of Local Assistance 3/22/2023, 1:24 PM Det2 FL4 SmlTxt brf Page 9 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 08 County: San Bernardino Responsible Agency HBP-ID Project Description San Bernardino County 4699 BRIDGE NO. 54C0239, NAT TRAILS HWY OVER AVON WASH, 9.5 MI E OF CRUCERO RD. Replace 2-lane timber bridge with 2-lane bridge. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total PE 1,000,000 1,000,000 R/W CON 4,844,000 4,844,000 Total 1,000,000 4,844,000 5,844,000 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 800,000 3,875,200 4,675,200 Local Match 200,000 968,800 1,168,800 LSSRP Bond Local AC Total 1,000,000 4,844,000 5,844,000 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 800,000 800,000 Local Match 200,000 200,000 LSSRP Bond Local AC Total 1,000,000 1,000,000 Project #: CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 3,875,200 3,875,200 Local Match 968,800 968,800 LSSRP Bond Local AC Total 4,844,000 4,844,000 Caltrans, Division of Local Assistance 3/22/2023, 1:24 PM Det2 FL4 SmlTxt brf Page 10 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 08 County: San Bernardino Responsible Agency HBP-ID Project Description San Bernardino County 4578 BRIDGE NO. 54C0242, NAT TRAILS HWY OVER KALMIA DITCH, 11.8 MI E OF CRUCERO RD. Replace 2-lane timber bridge with 2-lane bridge. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 630,000 630,000 5954(168) R/W CON 3,530,800 3,530,800 Total 630,000 3,530,800 4,160,800 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 504,000 2,824,640 3,328,640 Local Match 126,000 706,160 832,160 LSSRP Bond Local AC 504,000 -504,000 Total 630,000 3,530,800 4,160,800 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 504,000 504,000 Local Match 126,000 126,000 LSSRP Bond Local AC 504,000 -504,000 Total 630,000 630,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 2,824,640 2,824,640 Local Match 706,160 706,160 LSSRP Bond Local AC Total 3,530,800 3,530,800 Caltrans, Division of Local Assistance 3/22/2023, 1:24 PM Det2 FL4 SmlTxt brf Page 11 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 08 County: San Bernardino Responsible Agency HBP-ID Project Description San Bernardino County 4618 BRIDGE NO. 54C0269, NAT TRAILS HWY OVER BARODA DITCH, 24.8 MI E OF CRUCERO RD. Replace 2 lane timber bridge with 2 lane bridge. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 360,000 360,000 5954(169) R/W CON 1,345,400 1,345,400 Total 360,000 1,345,400 1,705,400 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 288,000 1,076,320 1,364,320 Local Match 72,000 269,080 341,080 LSSRP Bond Local AC 288,000 -288,000 Total 360,000 1,345,400 1,705,400 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 288,000 288,000 Local Match 72,000 72,000 LSSRP Bond Local AC 288,000 -288,000 Total 360,000 360,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,076,320 1,076,320 Local Match 269,080 269,080 LSSRP Bond Local AC Total 1,345,400 1,345,400 Caltrans, Division of Local Assistance 3/22/2023, 1:24 PM Det2 FL4 SmlTxt brf Page 12 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 08 County: San Bernardino Responsible Agency HBP-ID Project Description San Bernardino County 4345 BRIDGE NO. 54C0272, NAT TRAILS HWY OVER BRISTOL DITCH, 26.7 MI E CRUCERO RD. Replace existing 2-lane bridge with 2-lane bridge. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 338,000 68,000 406,000 5954(147) R/W CON 3,263,000 3,263,000 Total 338,000 68,000 3,263,000 3,669,000 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 299,231 60,200 2,888,734 3,248,166 Local Match 38,769 7,800 374,266 420,834 LSSRP Bond Local AC Total 338,000 68,000 3,263,000 3,669,000 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 299,231 60,200 359,432 Local Match 38,769 7,800 46,568 LSSRP Bond Local AC Total 338,000 68,000 406,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 2,888,734 2,888,734 Local Match 374,266 374,266 LSSRP Bond Local AC Total 3,263,000 3,263,000 Caltrans, Division of Local Assistance 3/22/2023, 1:24 PM Det2 FL4 SmlTxt brf Page 13 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 08 County: San Bernardino Responsible Agency HBP-ID Project Description San Bernardino County 4346 BRIDGE NO. 54C0275, NAT TRAILS HWY OVER CERRO DITCH, 1.3 MI E OF AMBOY RD. Replace existing 2-lane bridge with 2-lane bridge. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 338,000 68,000 406,000 5954(149) R/W CON 1,639,000 1,639,000 Total 338,000 68,000 1,639,000 2,045,000 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 299,231 60,200 1,451,007 1,810,439 Local Match 38,769 -0 7,800 187,993 234,562 LSSRP Bond Local AC Total 338,000 68,000 1,639,000 2,045,000 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 299,231 60,200 359,432 Local Match 38,769 7,800 46,568 LSSRP Bond Local AC Total 338,000 68,000 406,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,451,007 1,451,007 Local Match -0 187,993 187,993 LSSRP Bond Local AC Total 1,639,000 1,639,000 Caltrans, Division of Local Assistance 3/22/2023, 1:24 PM Det2 FL4 SmlTxt brf Page 14 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 08 County: San Bernardino Responsible Agency HBP-ID Project Description San Bernardino County 4347 BRIDGE NO. 54C0276, NAT TRAILS HWY OVER GORDO DITCH, 1.8 MI E OF AMBOY RD. Replace existing 2-lane bridge with 2-lane bridge. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 338,000 68,000 406,000 5954(150) R/W CON 1,667,000 1,667,000 Total 338,000 68,000 1,667,000 2,073,000 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 299,231 60,200 1,475,795 1,835,227 Local Match 38,769 -0 7,800 191,205 237,773 LSSRP Bond Local AC Total 338,000 68,000 1,667,000 2,073,000 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 299,231 60,200 359,432 Local Match 38,769 7,800 46,568 LSSRP Bond Local AC Total 338,000 68,000 406,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,475,795 1,475,795 Local Match -0 191,205 191,205 LSSRP Bond Local AC Total 1,667,000 1,667,000 Caltrans, Division of Local Assistance 3/22/2023, 1:24 PM Det2 FL4 SmlTxt brf Page 15 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 08 County: San Bernardino Responsible Agency HBP-ID Project Description San Bernardino County 4350 BRIDGE NO. 54C0277, NAT TRAILS HWY OVER CERULIA DITCH, 2.2 MI E OF AMBOY RD. Replace existing 2-lane bridge with new 2-lane bridge. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 338,000 68,000 406,000 5954(151) R/W CON 1,644,000 1,644,000 Total 338,000 68,000 1,644,000 2,050,000 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 299,231 60,200 1,455,433 1,814,865 Local Match 38,769 7,800 188,567 235,135 LSSRP Bond Local AC Total 338,000 68,000 1,644,000 2,050,000 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 299,231 60,200 359,432 Local Match 38,769 7,800 46,568 LSSRP Bond Local AC Total 338,000 68,000 406,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,455,433 1,455,433 Local Match 188,567 188,567 LSSRP Bond Local AC Total 1,644,000 1,644,000 Caltrans, Division of Local Assistance 3/22/2023, 1:24 PM Det2 FL4 SmlTxt brf Page 16 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 08 County: San Bernardino Responsible Agency HBP-ID Project Description San Bernardino County 4348 BRIDGE NO. 54C0279, NAT TRAILS HWY OVER LEITH DITCH, 3.1 MI E OF AMBOY RD. Replace the existing 2-lane bridge with new 2-lane bridge. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 338,000 68,000 406,000 5954(152) R/W CON 1,653,000 1,653,000 Total 338,000 68,000 1,653,000 2,059,000 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 299,231 60,200 1,463,401 1,822,833 Local Match 38,769 -0 7,800 189,599 236,167 LSSRP Bond Local AC Total 338,000 68,000 1,653,000 2,059,000 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 299,231 60,200 359,432 Local Match 38,769 7,800 46,568 LSSRP Bond Local AC Total 338,000 68,000 406,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,463,401 1,463,401 Local Match -0 189,599 189,599 LSSRP Bond Local AC Total 1,653,000 1,653,000 Caltrans, Division of Local Assistance 3/22/2023, 1:24 PM Det2 FL4 SmlTxt brf Page 17 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 08 County: San Bernardino Responsible Agency HBP-ID Project Description San Bernardino County 4349 BRIDGE NO. 54C0280, NAT TRAILS HWY OVER TERRA DITCH, 3.6 MI E OF AMBOY RD. Replace existing 2-lane bridge with new 2-lane bridge. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 338,000 68,000 406,000 5954(153) R/W CON 2,066,400 2,066,400 Total 338,000 68,000 2,066,400 2,472,400 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 299,231 60,200 1,829,384 2,188,816 Local Match 38,769 7,800 237,016 283,584 LSSRP Bond Local AC Total 338,000 68,000 2,066,400 2,472,400 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 299,231 60,200 359,432 Local Match 38,769 7,800 46,568 LSSRP Bond Local AC Total 338,000 68,000 406,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,829,384 1,829,384 Local Match 237,016 237,016 LSSRP Bond Local AC Total 2,066,400 2,066,400 Caltrans, Division of Local Assistance 3/22/2023, 1:24 PM Det2 FL4 SmlTxt brf Page 18 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 08 County: San Bernardino Responsible Agency HBP-ID Project Description San Bernardino County 4342 BRIDGE NO. 54C0281, NAT TRAILS HWY OVER SOMBRA DITCH, 4.1 MI E OF AMBOY RD. Replace existing 2-lane bridge with 2-lane bridge. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 370,000 74,000 444,000 5954(154) R/W CON 3,403,000 3,403,000 Total 370,000 74,000 3,403,000 3,847,000 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 327,561 65,512 3,012,676 3,405,749 Local Match 42,439 8,488 390,324 441,251 LSSRP Bond Local AC Total 370,000 74,000 3,403,000 3,847,000 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 327,561 65,512 393,073 Local Match 42,439 8,488 50,927 LSSRP Bond Local AC Total 370,000 74,000 444,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 3,012,676 3,012,676 Local Match 390,324 390,324 LSSRP Bond Local AC Total 3,403,000 3,403,000 Caltrans, Division of Local Assistance 3/22/2023, 1:24 PM Det2 FL4 SmlTxt brf Page 19 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 08 County: San Bernardino Responsible Agency HBP-ID Project Description San Bernardino County 4343 BRIDGE NO. 54C0282, NAT TRAILS HWY OVER BEACON DITCH, 6.2 MI E OF AMBOY RD. Replace existing 2-lane bridge with 2-lane bridge. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 338,000 68,000 406,000 5954(155) R/W CON 2,066,400 2,066,400 Total 338,000 68,000 2,066,400 2,472,400 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 299,231 60,200 1,829,384 2,188,816 Local Match 38,769 7,800 237,016 283,584 LSSRP Bond Local AC Total 338,000 68,000 2,066,400 2,472,400 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 299,231 60,200 359,432 Local Match 38,769 7,800 46,568 LSSRP Bond Local AC Total 338,000 68,000 406,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,829,384 1,829,384 Local Match 237,016 237,016 LSSRP Bond Local AC Total 2,066,400 2,066,400 Caltrans, Division of Local Assistance 3/22/2023, 1:24 PM Det2 FL4 SmlTxt brf Page 20 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 08 County: San Bernardino Responsible Agency HBP-ID Project Description San Bernardino County 4344 BRIDGE NO. 54C0284, NAT TRAILS HWY OVER LARISSA DITCH, 1.1 MI E KELBAKER RD. Replace existing 2-lane bridge with 2-lane bridge. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 338,000 68,000 406,000 5954(156) R/W CON 2,066,400 2,066,400 Total 338,000 68,000 2,066,400 2,472,400 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 299,231 60,200 1,829,384 2,188,816 Local Match 38,769 7,800 237,016 283,584 LSSRP Bond Local AC Total 338,000 68,000 2,066,400 2,472,400 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 299,231 60,200 359,432 Local Match 38,769 7,800 46,568 LSSRP Bond Local AC Total 338,000 68,000 406,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,829,384 1,829,384 Local Match 237,016 237,016 LSSRP Bond Local AC Total 2,066,400 2,066,400 Caltrans, Division of Local Assistance 3/22/2023, 1:24 PM Det2 FL4 SmlTxt brf Page 21 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 08 County: San Bernardino Responsible Agency HBP-ID Project Description San Bernardino County 4579 BRIDGE NO. 54C0296, NAT TRAILS HWY OVER TERZILLA DITCH, 10.2 MI E KELBAKER RD. Replace 2-lane timber bridge with 2-lane bridge. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 430,000 430,000 5954(170) R/W CON 1,675,800 1,675,800 Total 430,000 1,675,800 2,105,800 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 344,000 1,340,640 1,684,640 Local Match 86,000 335,160 421,160 LSSRP Bond Local AC 344,000 -344,000 Total 430,000 1,675,800 2,105,800 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 344,000 344,000 Local Match 86,000 86,000 LSSRP Bond Local AC 344,000 -344,000 Total 430,000 430,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,340,640 1,340,640 Local Match 335,160 335,160 LSSRP Bond Local AC Total 1,675,800 1,675,800 Caltrans, Division of Local Assistance 3/22/2023, 1:24 PM Det2 FL4 SmlTxt brf Page 22 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 08 County: San Bernardino Responsible Agency HBP-ID Project Description San Bernardino County 4623 BRIDGE NO. 54C0300, NAT TRAILS HWY OVER EDLOFT DITCH, 12.7 MI E KELBAKER RD. Replace 2 lane timber bridge with 2 lane bridge. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 370,000 370,000 5954(171) R/W CON 1,485,400 1,485,400 Total 370,000 1,485,400 1,855,400 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 296,000 1,188,320 1,484,320 Local Match 74,000 297,080 371,080 LSSRP Bond Local AC 296,000 -296,000 Total 370,000 1,485,400 1,855,400 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 296,000 296,000 Local Match 74,000 74,000 LSSRP Bond Local AC 296,000 -296,000 Total 370,000 370,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,188,320 1,188,320 Local Match 297,080 297,080 LSSRP Bond Local AC Total 1,485,400 1,485,400 Caltrans, Division of Local Assistance 3/22/2023, 1:24 PM Det2 FL4 SmlTxt brf Page 23 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 08 County: San Bernardino Responsible Agency HBP-ID Project Description San Bernardino County 4624 BRIDGE NO. 54C0303, NAT TRAILS HWY OVER ATAJO DITCH, 14.3 MI E KELBAKER RD. Replace 2 lane timber bridge with 2 lane bridge. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 360,000 360,000 5954(172) R/W CON 1,345,400 1,345,400 Total 360,000 1,345,400 1,705,400 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 288,000 1,076,320 1,364,320 Local Match 72,000 269,080 341,080 LSSRP Bond Local AC 288,000 -288,000 Total 360,000 1,345,400 1,705,400 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 288,000 288,000 Local Match 72,000 72,000 LSSRP Bond Local AC 288,000 -288,000 Total 360,000 360,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,076,320 1,076,320 Local Match 269,080 269,080 LSSRP Bond Local AC Total 1,345,400 1,345,400 Caltrans, Division of Local Assistance 3/22/2023, 1:24 PM Det2 FL4 SmlTxt brf Page 24 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 08 County: San Bernardino Responsible Agency HBP-ID Project Description San Bernardino County 4749 BRIDGE NO. 54C0304, NAT TRAILS HWY OVER ELLITA DITCH, 15.3 MI E KELBAKER RD. Replace two lane timber bridge with two lane bridge. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 360,000 360,000 5954(173) R/W CON 1,345,400 1,345,400 Total 360,000 1,345,400 1,705,400 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 288,000 1,076,320 1,364,320 Local Match 72,000 269,080 341,080 LSSRP Bond Local AC 288,000 -288,000 Total 360,000 1,345,400 1,705,400 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 288,000 288,000 Local Match 72,000 72,000 LSSRP Bond Local AC 288,000 -288,000 Total 360,000 360,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,076,320 1,076,320 Local Match 269,080 269,080 LSSRP Bond Local AC Total 1,345,400 1,345,400 Caltrans, Division of Local Assistance 3/22/2023, 1:24 PM Det2 FL4 SmlTxt brf Page 25 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 08 County: San Bernardino Responsible Agency HBP-ID Project Description San Bernardino County 4750 BRIDGE NO. 54C0305, NAT TRAILS HWY OVER TENINO DITCH, 16.0 MI E KELBAKER RD. Replace two lane timber bridge with two lane bridge. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 360,000 360,000 5954(174) R/W CON 1,345,400 1,345,400 Total 360,000 1,345,400 1,705,400 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 288,000 1,076,320 1,364,320 Local Match 72,000 269,080 341,080 LSSRP Bond Local AC 288,000 -288,000 Total 360,000 1,345,400 1,705,400 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 288,000 288,000 Local Match 72,000 72,000 LSSRP Bond Local AC 288,000 -288,000 Total 360,000 360,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,076,320 1,076,320 Local Match 269,080 269,080 LSSRP Bond Local AC Total 1,345,400 1,345,400 Caltrans, Division of Local Assistance 3/22/2023, 1:24 PM Det2 FL4 SmlTxt brf Page 26 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 08 County: San Bernardino Responsible Agency HBP-ID Project Description San Bernardino County 4751 BRIDGE NO. 54C0306, NAT TRAILS HWY OVER COTA DITCH, 16.7 MI E KELBAKER RD. Replace two lane timber bridge with two lane bridge. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 360,000 360,000 5954(175) R/W CON 1,345,400 1,345,400 Total 360,000 1,345,400 1,705,400 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 288,000 1,076,320 1,364,320 Local Match 72,000 269,080 341,080 LSSRP Bond Local AC 288,000 -288,000 Total 360,000 1,345,400 1,705,400 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 288,000 288,000 Local Match 72,000 72,000 LSSRP Bond Local AC 288,000 -288,000 Total 360,000 360,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,076,320 1,076,320 Local Match 269,080 269,080 LSSRP Bond Local AC Total 1,345,400 1,345,400 Caltrans, Division of Local Assistance 3/22/2023, 1:24 PM Det2 FL4 SmlTxt brf Page 27 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 08 County: San Bernardino Responsible Agency HBP-ID Project Description San Bernardino County 4752 BRIDGE NO. 54C0307, NAT TRAILS HWY OVER DANBY DITCH, 17.2 MI E KELBAKER RD. Replace two lane timber bridge with two lane bridge. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 360,000 360,000 5954(176) R/W CON 1,345,400 1,345,400 Total 360,000 1,345,400 1,705,400 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 288,000 1,076,320 1,364,320 Local Match 72,000 269,080 341,080 LSSRP Bond Local AC 288,000 -288,000 Total 360,000 1,345,400 1,705,400 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 288,000 288,000 Local Match 72,000 72,000 LSSRP Bond Local AC 288,000 -288,000 Total 360,000 360,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,076,320 1,076,320 Local Match 269,080 269,080 LSSRP Bond Local AC Total 1,345,400 1,345,400 Caltrans, Division of Local Assistance 3/22/2023, 1:24 PM Det2 FL4 SmlTxt brf Page 28 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 08 County: San Bernardino Responsible Agency HBP-ID Project Description San Bernardino County 4753 BRIDGE NO. 54C0308, NAT TRAILS HWY OVER DALMATIA DITCH, 17.8 MI E KELBAKER RD. Replace two lane timber bridge with two lane bridge. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 360,000 360,000 5954(177) R/W CON 1,345,400 1,345,400 Total 360,000 1,345,400 1,705,400 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 288,000 1,076,320 1,364,320 Local Match 72,000 269,080 341,080 LSSRP Bond Local AC 288,000 -288,000 Total 360,000 1,345,400 1,705,400 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 288,000 288,000 Local Match 72,000 72,000 LSSRP Bond Local AC 288,000 -288,000 Total 360,000 360,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,076,320 1,076,320 Local Match 269,080 269,080 LSSRP Bond Local AC Total 1,345,400 1,345,400 Caltrans, Division of Local Assistance 3/22/2023, 1:24 PM Det2 FL4 SmlTxt brf Page 29 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 08 County: San Bernardino Responsible Agency HBP-ID Project Description San Bernardino County 4577 BRIDGE NO. 54C0311, NAT TRAILS HWY OVER TARECO DITCH, 19.2 MI E KELBAKER RD. Replace 2-Lane timber bridge with 2-Lane bridge. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 360,000 360,000 5954(178) R/W CON 1,345,400 1,345,400 Total 360,000 1,345,400 1,705,400 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 288,000 1,076,320 1,364,320 Local Match 72,000 269,080 341,080 LSSRP Bond Local AC 288,000 -288,000 Total 360,000 1,345,400 1,705,400 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 288,000 288,000 Local Match 72,000 72,000 LSSRP Bond Local AC 288,000 -288,000 Total 360,000 360,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,076,320 1,076,320 Local Match 269,080 269,080 LSSRP Bond Local AC Total 1,345,400 1,345,400 Caltrans, Division of Local Assistance 3/22/2023, 1:24 PM Det2 FL4 SmlTxt brf Page 30 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 08 County: San Bernardino Responsible Agency HBP-ID Project Description San Bernardino County 4580 BRIDGE NO. 54C0312, NAT TRAILS HWY OVER AVA DITCH, 19.6 MI E KELBAKER RD. Replace 2-lane timber bridge with 2-lane bridge. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 410,000 410,000 5954(179) R/W CON 1,664,600 1,664,600 Total 410,000 1,664,600 2,074,600 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 328,000 1,331,680 1,659,680 Local Match 82,000 332,920 414,920 LSSRP Bond Local AC 328,000 -328,000 Total 410,000 1,664,600 2,074,600 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 328,000 328,000 Local Match 82,000 82,000 LSSRP Bond Local AC 328,000 -328,000 Total 410,000 410,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,331,680 1,331,680 Local Match 332,920 332,920 LSSRP Bond Local AC Total 1,664,600 1,664,600 Caltrans, Division of Local Assistance 3/22/2023, 1:24 PM Det2 FL4 SmlTxt brf Page 31 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 08 County: San Bernardino Responsible Agency HBP-ID Project Description San Bernardino County 4582 BRIDGE NO. 54C0313, NAT TRAILS HWY OVER NICOLA DITCH, 20.6 MI E KELBAKER RD. Replace 2-lane timber with 2-lane timber bridge. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 450,000 450,000 5954(180) R/W CON 1,835,400 1,835,400 Total 450,000 1,835,400 2,285,400 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 360,000 1,468,320 1,828,320 Local Match 90,000 367,080 457,080 LSSRP Bond Local AC 360,000 -360,000 Total 450,000 1,835,400 2,285,400 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 360,000 360,000 Local Match 90,000 90,000 LSSRP Bond Local AC 360,000 -360,000 Total 450,000 450,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,468,320 1,468,320 Local Match 367,080 367,080 LSSRP Bond Local AC Total 1,835,400 1,835,400 Caltrans, Division of Local Assistance 3/22/2023, 1:24 PM Det2 FL4 SmlTxt brf Page 32 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 08 County: San Bernardino Responsible Agency HBP-ID Project Description San Bernardino County 4583 BRIDGE NO. 54C0314, NAT TRAILS HWY OVER CALIFA DITCH, 21.2 MI E KELBAKER RD. Replace 2-lane timber with 2-Lane bridge. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 410,000 410,000 5954(181) R/W CON 1,664,600 1,664,600 Total 410,000 1,664,600 2,074,600 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 328,000 1,331,680 1,659,680 Local Match 82,000 332,920 414,920 LSSRP Bond Local AC 328,000 -328,000 Total 410,000 1,664,600 2,074,600 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 328,000 328,000 Local Match 82,000 82,000 LSSRP Bond Local AC 328,000 -328,000 Total 410,000 410,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,331,680 1,331,680 Local Match 332,920 332,920 LSSRP Bond Local AC Total 1,664,600 1,664,600 Caltrans, Division of Local Assistance 3/22/2023, 1:24 PM Det2 FL4 SmlTxt brf Page 33 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 08 County: San Bernardino Responsible Agency HBP-ID Project Description San Bernardino County 4293 BRIDGE NO. 54C0315, NAT TRAILS HWY OVER ADENA DITCH, 21.9 MI E KELBAKER RD. Replace existing 2 lane bridge with new 2 lane bridge. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 360,000 140,000 500,000 5954(142) R/W CON 2,268,000 2,268,000 Total 360,000 140,000 2,268,000 2,768,000 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 318,708 123,942 2,007,860 2,450,510 Local Match 41,292 16,058 260,140 317,490 LSSRP Bond Local AC Total 360,000 140,000 2,268,000 2,768,000 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 318,708 123,942 442,650 Local Match 41,292 16,058 57,350 LSSRP Bond Local AC Total 360,000 140,000 500,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 2,007,860 2,007,860 Local Match 260,140 260,140 LSSRP Bond Local AC Total 2,268,000 2,268,000 Caltrans, Division of Local Assistance 3/22/2023, 1:24 PM Det2 FL4 SmlTxt brf Page 34 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 08 County: San Bernardino Responsible Agency HBP-ID Project Description San Bernardino County 4584 BRIDGE NO. 54C0318, NAT TRAILS HWY OVER CLIPPER DITCH, 23.6 MI E KELBAKER RD. Replace 2-lane timber with 2-lane bridge. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 410,000 410,000 5954(182) R/W CON 1,664,600 1,664,600 Total 410,000 1,664,600 2,074,600 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 328,000 1,331,680 1,659,680 Local Match 82,000 332,920 414,920 LSSRP Bond Local AC 328,000 -328,000 Total 410,000 1,664,600 2,074,600 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 328,000 328,000 Local Match 82,000 82,000 LSSRP Bond Local AC 328,000 -328,000 Total 410,000 410,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,331,680 1,331,680 Local Match 332,920 332,920 LSSRP Bond Local AC Total 1,664,600 1,664,600 Caltrans, Division of Local Assistance 3/22/2023, 1:24 PM Det2 FL4 SmlTxt brf Page 35 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 08 County: San Bernardino Responsible Agency HBP-ID Project Description San Bernardino County 4586 BRIDGE NO. 54C0319, NAT TRAILS HWY OVER IZZY DITCH, 24.2 MI E KELBAKER RD. Replace 2-lane timber with 2-lane bridge. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 410,000 410,000 5954(183) R/W CON 1,664,600 1,664,600 Total 410,000 1,664,600 2,074,600 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 328,000 1,331,680 1,659,680 Local Match 82,000 332,920 414,920 LSSRP Bond Local AC 328,000 -328,000 Total 410,000 1,664,600 2,074,600 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 328,000 328,000 Local Match 82,000 82,000 LSSRP Bond Local AC 328,000 -328,000 Total 410,000 410,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,331,680 1,331,680 Local Match 332,920 332,920 LSSRP Bond Local AC Total 1,664,600 1,664,600 Caltrans, Division of Local Assistance 3/22/2023, 1:24 PM Det2 FL4 SmlTxt brf Page 36 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 08 County: San Bernardino Responsible Agency HBP-ID Project Description San Bernardino County 4585 BRIDGE NO. 54C0320, NAT TRAILS HWY OVER ELRITA DITCH, 24.6 MI E KELBAKER RD. Replace 2-lane timber with 2-lane bridge. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 410,000 410,000 5954(184) R/W CON 1,664,600 1,664,600 Total 410,000 1,664,600 2,074,600 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 328,000 1,331,680 1,659,680 Local Match 82,000 332,920 414,920 LSSRP Bond Local AC 328,000 -328,000 Total 410,000 1,664,600 2,074,600 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 328,000 328,000 Local Match 82,000 82,000 LSSRP Bond Local AC 328,000 -328,000 Total 410,000 410,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,331,680 1,331,680 Local Match 332,920 332,920 LSSRP Bond Local AC Total 1,664,600 1,664,600 Caltrans, Division of Local Assistance 3/22/2023, 1:24 PM Det2 FL4 SmlTxt brf Page 37 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 08 County: San Bernardino Responsible Agency HBP-ID Project Description San Bernardino County 4587 BRIDGE NO. 54C0322, NAT TRAILS HWY OVER AXTON DITCH, 26.0 MI E KELBAKER RD. Replace 2-lane timber with 2-lane bridge. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 410,000 410,000 5954(185) R/W CON 1,664,600 1,664,600 Total 410,000 1,664,600 2,074,600 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 328,000 1,331,680 1,659,680 Local Match 82,000 332,920 414,920 LSSRP Bond Local AC 328,000 -328,000 Total 410,000 1,664,600 2,074,600 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 328,000 328,000 Local Match 82,000 82,000 LSSRP Bond Local AC 328,000 -328,000 Total 410,000 410,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,331,680 1,331,680 Local Match 332,920 332,920 LSSRP Bond Local AC Total 1,664,600 1,664,600 Caltrans, Division of Local Assistance 3/22/2023, 1:24 PM Det2 FL4 SmlTxt brf Page 38 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 08 County: San Bernardino Responsible Agency HBP-ID Project Description San Bernardino County 4588 BRIDGE NO. 54C0323, NAT TRAILS HWY OVER BANDERA WASH, 26.1 MI E KELBAKER RD. Replace 2-lane timber with 2-lane bridge. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 560,000 560,000 5954(186) R/W CON 2,629,200 2,629,200 Total 560,000 2,629,200 3,189,200 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 448,000 2,103,360 2,551,360 Local Match 112,000 525,840 637,840 LSSRP Bond Local AC 448,000 -448,000 Total 560,000 2,629,200 3,189,200 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 448,000 448,000 Local Match 112,000 112,000 LSSRP Bond Local AC 448,000 -448,000 Total 560,000 560,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 2,103,360 2,103,360 Local Match 525,840 525,840 LSSRP Bond Local AC Total 2,629,200 2,629,200 Caltrans, Division of Local Assistance 3/22/2023, 1:24 PM Det2 FL4 SmlTxt brf Page 39 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 08 County: San Bernardino Responsible Agency HBP-ID Project Description San Bernardino County 4453 BRIDGE NO. 54C0670, ROCK SPRINGS ROAD OVER MOJAVE RIVER, .9 MI E ARROWHEAD LK RD. Replace 2 lane bridge with 2 lane bridge. This project has limited HBP eligiblity. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 5954(135) R/W 50,000 450,000 500,000 CON 15,126,000 15,126,000 Total 50,000 450,000 15,126,000 15,626,000 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 442,650 13,391,048 13,833,698 Local Match 5,735 51,615 1,734,952 1,792,302 LSSRP Bond Local AC 44,265 -44,265 Total 50,000 450,000 15,126,000 15,626,000 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ Local Match LSSRP Bond Local AC Total R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 442,650 442,650 Local Match 5,735 51,615 57,350 LSSRP Bond Local AC 44,265 -44,265 Total 50,000 450,000 500,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 13,391,048 13,391,048 Local Match 1,734,952 1,734,952 LSSRP Bond Local AC Total 15,126,000 15,126,000 Caltrans, Division of Local Assistance 3/22/2023, 1:24 PM Det2 FL4 SmlTxt brf Page 40 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 08 County: San Bernardino Responsible Agency HBP-ID Project Description San Bernardino County 4592 BRIDGE NO. PM00173, Bridge Preventive Maintenance Program (BPMP) various bridges in San Bernardino County. See Caltrans Local Assistance HBP website for backup list of projects. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total PE 1,695,000 1,695,000 R/W CON 5,650,000 5,650,000 Total 1,695,000 5,650,000 7,345,000 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,356,000 4,520,000 5,876,000 Local Match 339,000 1,130,000 1,469,000 LSSRP Bond Local AC Total 1,695,000 5,650,000 7,345,000 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,356,000 1,356,000 Local Match 339,000 339,000 LSSRP Bond Local AC Total 1,695,000 1,695,000 Project #: CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 4,520,000 4,520,000 Local Match 1,130,000 1,130,000 LSSRP Bond Local AC Total 5,650,000 5,650,000 Caltrans, Division of Local Assistance 3/22/2023, 1:24 PM Det2 FL4 SmlTxt brf Page 41 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 08 County: San Bernardino Responsible Agency HBP-ID Project Description San Bernardino County Transportation 4780 BRIDGE NO. 54C0088, N 1ST AVENUE OVER BNSF RY, UP RR, AMTRAK, 0.2 MI N MAIN ST. Replace existing 2 lane bridge with 2 lane Authority bridge, existing bridge to be removed (Minor seismic retrofit funds). Other Federal Funds must be programmed in FTIP. High Cost Project agreement required. SBCTA is project sponsor for construction phase only. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 6507(027) R/W CON 60,592,659 60,592,659 Total 60,592,659 60,592,659 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 5,900,000 20,000,000 20,000,000 7,742,681 53,642,681 Local Match 6,949,978 -305,102 6,644,876 LSSRP Bond 305,102 305,102 Local AC 53,642,681 -5,900,000 -20,000,000 -20,000,000 -7,742,681 Total 60,592,659 60,592,659 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 5,900,000 20,000,000 20,000,000 7,742,681 53,642,681 Local Match 6,949,978 -305,102 6,644,876 LSSRP Bond 305,102 305,102 Local AC 53,642,681 -5,900,000 -20,000,000 -20,000,000 -7,742,681 Total 60,592,659 60,592,659 Caltrans, Division of Local Assistance 3/22/2023, 1:24 PM Det2 FL4 SmlTxt brf Page 42 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 08 County: San Bernardino Responsible Agency HBP-ID Project Description Twentynine Palms 4059 BRIDGE NO. 00L0084, SPLIT ROCK AVENUE OVER TWENTYNINE PALMS FLOOD CONTROL CHANNEL. Replace two lane low water crossing with two lane bridge. (No added capacity) Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 478,775 66,225 545,000 NBIL(533) R/W 30,000 30,000 CON 2,725,000 2,725,000 Total 508,775 66,225 2,725,000 3,300,000 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 450,419 58,629 2,412,443 2,921,490 Local Match 58,356 7,596 312,558 378,510 LSSRP Bond Local AC Total 508,775 66,225 2,725,000 3,300,000 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 423,860 58,629 482,489 Local Match 54,915 7,596 62,512 LSSRP Bond Local AC Total 478,775 66,225 545,000 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 26,559 26,559 Local Match 3,441 3,441 LSSRP Bond Local AC Total 30,000 30,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 2,412,443 2,412,443 Local Match -0 312,558 312,558 LSSRP Bond Local AC Total 2,725,000 2,725,000 Caltrans, Division of Local Assistance 3/22/2023, 1:24 PM Det2 FL4 SmlTxt brf Page 43 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 08 County: San Bernardino Responsible Agency HBP-ID Project Description Yucaipa 3246 BRIDGE NO. 00L0034, PENDLETON AVENUE, OVER OAK GLEN CREEK, BETWEEN OAK GLEN ROAD AND HIGHLAND. Replace 2 lane low water crossing with 2 lane bridge. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 324,000 98,000 422,000 NBIL(506) R/W CON 5,441,250 5,441,250 Total 324,000 98,000 5,441,250 5,863,250 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 286,837 86,759 4,817,139 5,190,735 Local Match 37,163 11,241 624,111 672,515 LSSRP Bond Local AC Total 324,000 98,000 5,441,250 5,863,250 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 286,837 86,759 373,597 Local Match 37,163 11,241 48,403 LSSRP Bond Local AC Total 324,000 98,000 422,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 4,817,139 4,817,139 Local Match 624,111 624,111 LSSRP Bond Local AC Total 5,441,250 5,441,250 Caltrans, Division of Local Assistance 3/22/2023, 1:24 PM Det2 FL4 SmlTxt brf Page 44 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 08 County: San Bernardino Responsible Agency HBP-ID Project Description Yucaipa 3244 BRIDGE NO. 00L0035, FREMONT STREET, OVER WILSON CREEK, BETWEEN OAK GLEN ROAD AND VISTA DRIVE. Replace 2 lane low water crossing with 2 lane bridge. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 320,000 320,000 NBIL(508) NBIL(546)R/W CON 2,780,000 750,000 3,530,000 Total 3,100,000 750,000 3,850,000 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 2,744,430 663,975 3,408,405 Local Match 355,570 86,025 441,595 LSSRP Bond Local AC 663,975 -663,975 Total 3,100,000 750,000 3,850,000 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 283,296 283,296 Local Match 36,704 36,704 LSSRP Bond Local AC Total 320,000 320,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 2,461,134 663,975 3,125,109 Local Match 318,866 86,025 404,891 LSSRP Bond Local AC 663,975 -663,975 Total 2,780,000 750,000 3,530,000 Caltrans, Division of Local Assistance 3/22/2023, 1:24 PM Det2 FL4 SmlTxt brf Page 45 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 08 County: San Bernardino Responsible Agency HBP-ID Project Description Yucaipa 4025 BRIDGE NO. 00L0081, LIVE OAK CANYON ROAD OVER WILDWOOD CREEK. Replace 2-Lane Low-Water Crossing with 2-Lane Bridge. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 150,000 610,000 760,000 NBIL(534) R/W CON 8,250,000 8,250,000 Total 150,000 610,000 8,250,000 9,010,000 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 132,795 540,033 7,303,725 7,976,553 Local Match 17,205 69,967 946,275 1,033,447 LSSRP Bond Local AC Total 150,000 610,000 8,250,000 9,010,000 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 132,795 540,033 672,828 Local Match 17,205 69,967 87,172 LSSRP Bond Local AC Total 150,000 610,000 760,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 7,303,725 7,303,725 Local Match 946,275 946,275 LSSRP Bond Local AC Total 8,250,000 8,250,000 Caltrans, Division of Local Assistance 3/22/2023, 1:24 PM Det2 FL4 SmlTxt brf Page 46 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 08 County: San Bernardino Responsible Agency HBP-ID Project Description MPO Summary: San Bernardino Associated Governments Number of Projects: 45 Totals: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 22,412,557 7,960,958 3,235,594 10,054,003 28,279,503 29,877,779 9,992,537 134,035,558 245,848,490 Local Match 2,909,540 2,673,451 7,435,136 75,381 429,628 810,648 438,043 21,565,521 36,337,348 LSSRP Bond 305,102 469,123 82,011 856,236 Local AC 44,265 6,887,975 54,151,729 -7,117,288 -26,224,000 -20,000,000 -7,742,681 Total for all Phases 25,366,362 17,522,384 64,822,459 3,317,198 2,485,131 11,157,550 2,687,900 155,683,089 283,042,073 Caltrans, Division of Local Assistance 3/22/2023, 1:24 PM Det2 FL4 SmlTxt brf Page 47