2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. 3/22/2023, 1:22 PM Notes: 1) This is the FTIP lump sum “backup” list for HBP funded projects. Please see the Local Assistance web site for the most current listings: http://www.dot.ca.gov/hq/LocalPrograms/hbrr99/HBP_FSTIP.html 2) The purpose of this list is to show which projects being advanced by local agencies have met the eligibility requirements of the federal Highway Bridge Program and have been prioritized for funding by the Department in cooperation with local agencies for funding. 3) Contractual funding levels are determined at time of federal authorization/obligation for given phase of work. For details see Chapter 3 of the Local Assistance Procedures Manual. 4) For FTIP/FSTIP purposes, Federal Highway Bridge Program (HBP) funding constraint is managed by Caltrans. 5) Prop 1B bond funds for the Local Seismic Safety Retrofit Program (LSSRP) used for matching federal funds are also managed by Caltrans. 6) Financial constraint of LOCAL matching funds (including regional STIP funds) and LOCAL Advance Construction (AC) is the responsibility of the MPOs and their local agencies. 7) Some projects show that they are programmed using State STP funds. These funds are HBP funds transferred to the STP for bridge work that is not ordinarily eligible for HBP funds. See the HB Program Guidelines for details. Do not confuse these STP funds with Regional STP funds. 8) Corrections to this report should be addressed to the District Local Assistance Engineer: https://dot.ca.gov/programs/local-assistance/other-important-issues/local-assistance-contacts Note id: 24 Caltrans, Division of Local Assistance 3/22/2023, 1:22 PM Det2 FL4 SmlTxt brf Page 1 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 07 County: Ventura Responsible Agency HBP-ID Project Description Oxnard 3401 BRIDGE NO. 52C0095, CHANNEL ISLANDS BL, OVER EDISON CANAL, 0.2 MI E OF HARBOR BLVD. Bridge rehabilitation. No added lane capacity. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 186,101 186,101 5129(070) R/W CON 3,680,000 3,680,000 Total 186,101 3,680,000 3,866,101 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 164,755 3,257,904 3,422,659 Local Match 21,346 422,096 443,442 LSSRP Bond Local AC 3,257,904 -3,257,904 Total 186,101 3,680,000 3,866,101 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 164,755 164,755 Local Match 21,346 21,346 LSSRP Bond Local AC Total 186,101 186,101 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 3,257,904 3,257,904 Local Match 0 422,096 422,096 LSSRP Bond Local AC 3,257,904 -3,257,904 Total 3,680,000 3,680,000 Caltrans, Division of Local Assistance 3/22/2023, 1:22 PM Det2 FL4 SmlTxt brf Page 2 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 07 County: Ventura Responsible Agency HBP-ID Project Description Oxnard 3402 BRIDGE NO. 52C0108, CHANNEL ISLANDS BL, OVER MANDALAY BAY, 0.4 MI E OF HARBOR BLVD. Bridge rehabilitation. No adding lanes. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 76,856 76,856 5129(069) R/W CON 928,050 928,050 Total 76,856 928,050 1,004,906 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 68,041 821,603 889,643 Local Match 8,815 106,447 115,263 LSSRP Bond Local AC 821,603 -821,603 Total 76,856 928,050 1,004,906 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 68,041 68,041 Local Match 8,815 8,815 LSSRP Bond Local AC Total 76,856 76,856 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 821,603 821,603 Local Match 106,447 106,447 LSSRP Bond Local AC 821,603 -821,603 Total 928,050 928,050 Caltrans, Division of Local Assistance 3/22/2023, 1:22 PM Det2 FL4 SmlTxt brf Page 3 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 07 County: Ventura Responsible Agency HBP-ID Project Description San Buena Ventura 4681 BRIDGE NO. 52C0061, MAIN ST OVER VENTURA RIVER, 0.5 MI W OF VENTURA AVE. Replace 2-lane bridge with 2-lane bridge. Other Federal funds on project must be programmed in FTIP. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 2,959,321 2,959,321 5026(065) R/W 300,000 300,000 CON 34,919,000 34,919,000 Total 2,959,321 35,219,000 38,178,321 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 2,619,887 31,179,381 33,799,268 Local Match 339,434 4,039,619 4,379,053 LSSRP Bond Local AC Total 2,959,321 35,219,000 38,178,321 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 2,619,887 2,619,887 Local Match 339,434 339,434 LSSRP Bond Local AC Total 2,959,321 2,959,321 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 265,590 265,590 Local Match 34,410 34,410 LSSRP Bond Local AC Total 300,000 300,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 30,913,791 30,913,791 Local Match 4,005,209 4,005,209 LSSRP Bond Local AC Total 34,919,000 34,919,000 Caltrans, Division of Local Assistance 3/22/2023, 1:22 PM Det2 FL4 SmlTxt brf Page 4 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 07 County: Ventura Responsible Agency HBP-ID Project Description San Buena Ventura 4744 BRIDGE NO. 52C0064, VICTORIA AVE OVER UP RR & AMTRAK, 0.2 MI S OF ROUTE 101. Voluntary seismic retrofit. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total PE 351,000 351,000 R/W CON 2,160,200 2,160,200 Total 351,000 2,160,200 2,511,200 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 280,800 1,728,160 2,008,960 Local Match 70,200 432,040 502,240 LSSRP Bond Local AC Total 351,000 2,160,200 2,511,200 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 280,800 280,800 Local Match 70,200 70,200 LSSRP Bond Local AC Total 351,000 351,000 Project #: CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,728,160 1,728,160 Local Match 432,040 432,040 LSSRP Bond Local AC Total 2,160,200 2,160,200 Caltrans, Division of Local Assistance 3/22/2023, 1:22 PM Det2 FL4 SmlTxt brf Page 5 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 07 County: Ventura Responsible Agency HBP-ID Project Description San Buena Ventura 4745 BRIDGE NO. 52C0248, TELEPHONE RD, OVER UP RR & AMTRAK, 0.8 MI S OF MAIN ST. Voluntary seismic retrofit. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total PE 212,000 212,000 R/W CON 1,304,800 1,304,800 Total 212,000 1,304,800 1,516,800 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 169,600 1,043,840 1,213,440 Local Match 42,400 260,960 303,360 LSSRP Bond Local AC Total 212,000 1,304,800 1,516,800 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 169,600 169,600 Local Match 42,400 42,400 LSSRP Bond Local AC Total 212,000 212,000 Project #: CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,043,840 1,043,840 Local Match 260,960 260,960 LSSRP Bond Local AC Total 1,304,800 1,304,800 Caltrans, Division of Local Assistance 3/22/2023, 1:22 PM Det2 FL4 SmlTxt brf Page 6 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 07 County: Ventura Responsible Agency HBP-ID Project Description San Buena Ventura 4656 BRIDGE NO. PM00202, Bridge Preventive Maintenance Program (BPMP), various bridges in the City of Ventura. See Caltrans Local Assistance HBP website for backup list of projects. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total PE 534,750 534,750 R/W CON 1,604,250 1,604,250 Total 534,750 1,604,250 2,139,000 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 473,414 1,420,243 1,893,657 Local Match 61,336 184,007 245,343 LSSRP Bond Local AC Total 534,750 1,604,250 2,139,000 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 473,414 473,414 Local Match 61,336 61,336 LSSRP Bond Local AC Total 534,750 534,750 Project #: CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,420,243 1,420,243 Local Match 184,007 184,007 LSSRP Bond Local AC Total 1,604,250 1,604,250 Caltrans, Division of Local Assistance 3/22/2023, 1:22 PM Det2 FL4 SmlTxt brf Page 7 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 07 County: Ventura Responsible Agency HBP-ID Project Description Simi Valley 4075 BRIDGE NO. 52C0150, MADERA ROAD OVER UP RR AMTRAK METROLINK, 0.3 MI S OF STATE RTE 118. Repair deck spalls and overlay deck with PCC seal coat and construct MBGR on Northeast approach. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 66,000 45,000 45,000 156,000 5405(077) R/W CON 683,100 683,100 Total 66,000 45,000 45,000 683,100 839,100 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 58,430 39,839 39,839 604,748 742,855 Local Match 7,570 5,162 5,162 78,352 96,245 LSSRP Bond Local AC Total 66,000 45,000 45,000 683,100 839,100 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 58,430 39,839 39,839 138,107 Local Match 7,570 5,162 5,162 17,893 LSSRP Bond Local AC Total 66,000 45,000 45,000 156,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 604,748 604,748 Local Match 78,352 78,352 LSSRP Bond Local AC Total 683,100 683,100 Caltrans, Division of Local Assistance 3/22/2023, 1:22 PM Det2 FL4 SmlTxt brf Page 8 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 07 County: Ventura Responsible Agency HBP-ID Project Description Simi Valley 4074 BRIDGE NO. 52C0206, LOS ANGELES AVE, OVER ARROYO SIMI, 0.1 MI W OF FIRST STREET. Bridge Rehabilitation. Widen existing 6-lane bridge wide enough to accommodate sidewalks and bike lanes (no added capacity) Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 165,994 165,994 5405(076) R/W CON 9,510,000 9,510,000 Total 165,994 9,510,000 9,675,994 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 132,795 7,608,000 7,740,795 Local Match 33,199 1,902,000 1,935,199 LSSRP Bond Local AC Total 165,994 9,510,000 9,675,994 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 132,795 132,795 Local Match 33,199 33,199 LSSRP Bond Local AC Total 165,994 165,994 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 7,608,000 7,608,000 Local Match 1,902,000 1,902,000 LSSRP Bond Local AC Total 9,510,000 9,510,000 Caltrans, Division of Local Assistance 3/22/2023, 1:22 PM Det2 FL4 SmlTxt brf Page 9 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 07 County: Ventura Responsible Agency HBP-ID Project Description Simi Valley 4073 BRIDGE NO. 52C0231, BARNARD STREET OVER LAS LLAJAS CREEK, 0.5 MI W STEARNS ST. Widen existing 2-lane bridge with a 2-lane bridge wide enough to accommodate shoulders (no added capacity) Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 15,000 59,800 74,800 5405(075) R/W CON 254,000 254,000 Total 15,000 59,800 254,000 328,800 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 13,280 52,941 224,866 291,087 Local Match 1,721 6,859 29,134 37,713 LSSRP Bond Local AC Total 15,000 59,800 254,000 328,800 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 13,280 52,941 66,220 Local Match 1,721 6,859 8,580 LSSRP Bond Local AC Total 15,000 59,800 74,800 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 224,866 224,866 Local Match 29,134 29,134 LSSRP Bond Local AC Total 254,000 254,000 Caltrans, Division of Local Assistance 3/22/2023, 1:22 PM Det2 FL4 SmlTxt brf Page 10 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 07 County: Ventura Responsible Agency HBP-ID Project Description Ventura County 4454 BRIDGE NO. 52C0053, BRIDGE ROAD OVER SANTA PAULA CREEK, EAST OF SR 150. Rehabilitate historic bridge. No added lane capacity. 9/27/2016: Toll Credits programmed for PE & CON. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 600,000 600,000 5952(186) R/W CON 1,125,000 1,125,000 Total 600,000 1,125,000 1,725,000 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 600,000 1,125,000 1,725,000 Local Match LSSRP Bond Local AC Total 600,000 1,125,000 1,725,000 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 600,000 600,000 Local Match LSSRP Bond Local AC Total 600,000 600,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,125,000 1,125,000 Local Match LSSRP Bond Local AC Total 1,125,000 1,125,000 Caltrans, Division of Local Assistance 3/22/2023, 1:22 PM Det2 FL4 SmlTxt brf Page 11 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 07 County: Ventura Responsible Agency HBP-ID Project Description Ventura County 4611 BRIDGE NO. PM00186, Bridge Preventive Maintenance Program (BPMP) various bridges in Ventura County. See Caltrans Local Assistance HBP website for backup list of projects. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total PE 96,900 96,900 R/W CON 290,700 290,700 Total 96,900 290,700 387,600 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 77,520 232,560 310,080 Local Match 19,380 58,140 77,520 LSSRP Bond Local AC Total 96,900 290,700 387,600 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 77,520 77,520 Local Match 19,380 19,380 LSSRP Bond Local AC Total 96,900 96,900 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 232,560 232,560 Local Match 58,140 58,140 LSSRP Bond Local AC Total 290,700 290,700 Project #: Caltrans, Division of Local Assistance 3/22/2023, 1:22 PM Det2 FL4 SmlTxt brf Page 12 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 07 County: Ventura Responsible Agency HBP-ID Project Description MPO Summary: Ventura County Transportation Commission Number of Projects: 11 Totals: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 904,505 172,634 4,079,507 77,520 3,543,701 92,779 45,166,798 54,037,444 Local Match 39,452 38,360 528,543 19,380 513,370 12,021 6,984,252 8,135,378 LSSRP Bond Local AC 4,079,507 -4,079,507 Total for all Phases 943,957 210,994 4,608,050 96,900 4,057,071 104,800 52,151,050 62,172,822 Caltrans, Division of Local Assistance 3/22/2023, 1:22 PM Det2 FL4 SmlTxt brf Page 13