2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides VERY detailed backup information to support the lump sum amounts programmed in the FTIP. 3/22/2023, 1 : 19 PM Notes: 1) This list provides a very detailed history of how a project's programming has changed over time. 2) Summary, project level, grouped backup lists are available on the local assistance web site: http://www.dot.ca.gov/hq/Loca1Programs/hbrr99/HBP _FSTIP .html 3) Financial constraint of LOCAL matching funds (including regional STIP funds) and LOCAL Advance Construction (AC) is the responsibility of the MPOs and their local agencies. 4) Some projects show that they are programmed using State STP funds. These funds are HBP funds transferred to the STP for bridge work that is not ordinarily eligible for HBP funds. See the HB Program Guidelines for details. Do not confuse these STP funds with Regional STP funds. 5) Corrections to this report should be addressed to the District Local Assistance Engineer: http://www.dot.ca.gov/hq/LocalPrograms/dlae.htm Note id: 31 District: 06 County: Kings Responsible Agency Kings County BRIDGE NO. 45C0118, 16TH AVE, OVER TULARE LAKE CANAL, 0.3 Ml N NEVADA AVE. Replace 2 lane Bridge with 2 lane Bridge 8/13/2010: Toll Credits programmed for PE, R/W, & CON. Fed Proj: BRLO-5945(081) Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total PE 396,000 74,000 470,000 R/W 75,000 75,000 CON 1,910,000 933,000 2,843,000 Total 471,000 74,000 1,910,000 933,000 3,388,000 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed$ 471,000 74,000 1,910,000 933,000 3,388,000 Local Match LSSRP Bond Local AC Total 471,000 74,000 1,910,000 933,000 3,388,000 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed$ 396,000 74,000 470,000 Local Match LSSRP Bond Local AC Total 396,000 74,000 470,000 Phase Funding Details: Proj id Funds Src Phase Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total 3578 HBP PE 74,000 74,000 Local Match Fed. Reimb. Rate: 100.00% 2/18/2022 Kirk Anderson: Add PE to complete PE phase. Adjustment per 6-D received 02/18/2022. Total: 74,000 3578 HBP PE 50,000 50,000 Local Match Fed. Reimb. Rate: 100.00% 6/14/2019 Kirk Anderson: Add PE funds for CEQA/NEPA compliance costs (Permits) not anticipated and design costs associated with Total: 50,000 SLA's review comments. See the 6-D in Edocs. 3578 HBP PE Local Match Fed. Reimb. Rate: 100.00% 9/29/2012 Tom Glaski: Move PRE Funds to FFY 12/13 as requested by Agency in September 7, 2012 Survey. 8/21/2015 DLA-Admin: Total: Fundline zeroed out due to FTIP cycle migration: 2012/13-17/18 to 2014/15-19/20. This does not impact funds in the current FTIP cycle. 3578 Fed. ReiHBP Local Matcmb. Rate: PE h 100.00% 271,000 8/23/2012 Tom Glaski: Postprogammatic increase, Agency's August 14, 2012 6A package Total: 271,000 271,000 3578 Fed. ReiHBP Local Matcmb. Rate: PE h 100.00% 75,000 8/13/2010 Tom Glaski: Reimbursement changed to 100% (Toll Credits). 8/13/2010 Tom Glaski: Enter New Project Total: 75,000 75,000 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed$ 75,000 75,000 Local Match LSSRP Bond Local AC Total 75,000 75,000 Phase Funding Details: Proj id Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Funds Src Phase Total 3578 HBP R/W Local Match Fed. Reimb. Rate: 100.00% 4/16/2015 Kirk Anderson: Agency requests funds in 14/15. KA 8/17/2017 DLA-Admin: Fundline zeroed out due to FTIP cycle migration: 2014/15-19/20 to 2016/17-21/22. This does not impact funds in the current FTIP cycle. Total: 3578 HBP R/W Local Match Fed. Reimb. Rate: 100.00% 3/28/2014 DLA-Admin: Not ready to ad within 6 months. RW funds moved from FFY 13/14 to 15/16. NEPA not yet clear. 8/17/2017 DLA-Admin: Fundline zeroed out due to FTIP cycle migration: 2014/15-19/20 to 2016/17-21/22. This does not impact funds in the current FTIP cycle. Total: 3578 HBP R/W 65,000 65,000 Local Match Fed. Reimb. Rate: 100.00% 8/23/2012 Tom Glaski: Increase in RoW funding and push out program year to reflect Agency's August 14, 2012 6A package Total: 65,000 3578 HBP R/W 10,000 10,000 Local Match Fed. Reimb. Rate: 100.00% 8/13/2010 Tom Glaski: Reimbursement changed to 100% (Toll Credits). Total: 10,000 8/13/2010 Tom Glaski: Enter New Project CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed$ 1,910,000 933,000 2,843,000 Local Match LSSRP Bond Local AC Total 1,910,000 933,000 2,843,000 Phase Funding Details: Proj id Funds Src Phase Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total 3578 HBP CON 933,000 933,000 New! Local Match Fed. Reimb. Rate: 100.00% 1/6/2023 Andy Chou: Funds revised to reflect LAPG 6D dated 11/29/22. Total: 933,000 3578 HBP CON 1,910,000 -1,910,000 New! Local Match Fed. Reimb. Rate: 100.00% 12/28/2022 Kirk Anderson: Ready to Advertise. CON funds moved from FFY 23/24 to 22/23. As requested by agency. Total: 3578 HBP CON -1,910,000 1,910,000 Local Match Fed. Reimb. Rate: 100.00% 10/24/2022 DLA-Admin: NEARLY Ready to Advertise. CON funds moved from FFY 22/23 to 23/24. Action taken to financially constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. Total: 3578 HBP CON 1,910,000 -1,910,000 Local Match Fed. Reimb. Rate: 100.00% 7/5/2022 Kirk Anderson: Ready to ad within 6 months. CON funds moved from FFY Beyond to 22/23. As requested by agency. Total: 3578 HBP CON 1,000 1,000 Local Match Fed. Reimb. Rate: 100.00% 2/18/2022 Kirk Anderson: Adjustment per 6-D received 02/18/2022. Total: 1,000 3578 HBP CON -1,909,000 1,909,000 Local Match Fed. Reimb. Rate: 100.00% 3/29/2020 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 23/24 to Beyond. Action taken to financially constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. Total: 3578 HBP CON -1,909,000 1,909,000 Local Match Fed. Reimb. Rate: 100.00% 3/29/2020 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 22/23 to 23/24. Action taken to financially constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. Total: 3578 HBP CON -1,909,000 1,909,000 Local Match Fed. Reimb. Rate: 100.00% 3/28/2020 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 21/22 to 22/23. Action taken to financially constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. Total: 3578 HBP CON 1,909,000 -1,909,000 Local Match Fed. Reimb. Rate: 100.00% 2/25/2020 Kirk Anderson: Not ready to ad within 6 months. CON funds moved from FFY Beyond to 21/22. As requested by agency. Total: 3578 HBP CON -1,909,000 1,909,000 Local Match Fed. Reimb. Rate: 100.00% 10/30/2019 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 23/24 to Beyond. Action taken to financially constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. Total: 3578 HBP CON -1,909,000 1,909,000 Local Match Fed. Reimb. Rate: 100.00% 10/30/2019 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 22/23 to 23/24. Action taken to financially constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. Total: 3578 HBP CON -1,909,000 1,909,000 Local Match Fed. Reimb. Rate: 100.00% 10/30/2019 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 21/22 to 22/23. Action taken to financially constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. Total: 3578 HBP CON -1,909,000 1,909,000 Local Match Fed. Reimb. Rate: 100.00% 10/30/2019 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 20/21 to 21/22. Action taken to financially constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. Total: 3578 HBP CON -1,909,000 1,909,000 Local Match Fed. Reimb. Rate: 100.00% 10/24/2018 DLA-Admin: NEARLY Ready to Advertise. CON funds moved from FFY 19/20 to 20/21. Action taken to financially constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. Total: 3578 HBP CON 1,909,000 -1,909,000 Local Match Fed. Reimb. Rate: 100.00% 9/28/2018 Kirk Anderson: NEARLY Ready to Advertise. CON funds moved from FFY Beyond to 19/20. As requested in September 2018 Survey. Total: 3578 HBP CON -1,909,000 1,909,000 Local Match Fed. Reimb. Rate: 100.00% 10/24/2017 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 21/22 to Beyond. Action taken to financially constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. Total: 3578 HBP CON -1,909,000 1,909,000 Local Match Fed. Reimb. Rate: 100.00% 10/24/2017 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 20/21 to 21/22. Action taken to financially constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. Total: 3578 HBP CON -1,909,000 1,909,000 Local Match Fed. Reimb. Rate: 100.00% 10/24/2017 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 19/20 to 20/21. Action taken to financially constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. Total: 3578 HBP CON Local Match Fed. Reimb. Rate: 100.00% 10/23/2017 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 18/19 to 19/20. Action taken to financially constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. 7/27/2021 DLA-Admin: Fundline zeroed out due to FTIP cycle migration: 2018/19-23/24 to 2020/21-25/26. This does not impact funds in the current FTIP cycle. Total: 3578 HBP CON Local Match Fed. Reimb. Rate: 100.00% 10/23/2017 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 17/18 to 18/19. Action taken to financially constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. 7/27/2021 DLA-Admin: Fundline zeroed out due to FTIP cycle migration: 2018/19-23/24 to 2020/21-25/26. This does not impact funds in the current FTIP cycle. Total: 3578 HBP CON 1,909,000 -1,909,000 Local Match Fed. Reimb. Rate: 100.00% 9/15/2017 Kirk Anderson: NEARLY Ready to Advertise. CON funds moved from FFY Beyond to 17/18. As requested in September 2017 Survey. Total: 3578 HBP CON -1,909,000 1,909,000 Local Match Fed. Reimb. Rate: 100.00% 10/25/2016 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 19/20 to Beyond. Action taken to financially constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. Total: 3578 HBP CON Local Match Fed. Reimb. Rate: 100.00% 10/25/2016 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 18/19 to 19/20. Action taken to financially constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. 7/27/2021 DLA-Admin: Fundline zeroed out due to FTIP cycle migration: 2018/19-23/24 to 2020/21-25/26. This does not impact funds in the current FTIP cycle. Total: 3578 HBP CON Local Match Fed. Reimb. Rate: 100.00% 10/25/2016 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 17/18 to 18/19. Action taken to financially constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. 7/27/2021 DLA-Admin: Fundline zeroed out due to FTIP cycle migration: 2018/19-23/24 to 2020/21-25/26. This does not impact funds in the current FTIP cycle. Total: 3578 HBP CON Local Match Fed. Reimb. Rate: 100.00% 10/25/2016 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 16/17 to 17/18. Action taken to financially constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. 8/25/2019 DLA-Admin: Fundline zeroed out due to FTIP cycle migration: 2016/17-21/22 to 2018/19-23/24. This does not impact funds in the current FTIP cycle. Total: 3578 HBP CON Local Match Fed. Reimb. Rate: 100.00% 10/29/2015 DLA-Admin: Ready to Advertise. CON funds moved from FFY 15/16 to 16/17. Action taken to financially constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. 8/25/2019 DLA-Admin: Fundline zeroed out due to FTIP cycle migration: 2016/17-21/22 to 2018/19-23/24. This does not impact funds in the current FTIP cycle. Total: 3578 HBP CON Local Match Fed. Reimb. Rate: 100.00% 10/22/2015 DLA-Admin: NEARLY Ready to Advertise. CON funds moved from FFY 16/17 to 15/16. Project ready to advertise. 8/25/2019 DLA-Admin: Fundline zeroed out due to FTIP cycle migration: 2016/17-21/22 to 2018/19-23/24. This does not impact funds in the current FTIP cycle. Total: 3578 HBP CON 1,909,000 -1,909,000 Local Match Fed. Reimb. Rate: 100.00% 2/5/2015 Kirk Anderson: NEPA was cleared 08/13/14. The Type Selection and Hydraulic Report are approved. The construction funds are ready to be programmed. Estimated submittal of construction authorization request is 04/2015. An attempt will be made by the agency to meet their construction window in the Fall of 2015. Total: 3578 HBP CON 1,209,000 1,209,000 Local Match Fed. Reimb. Rate: 100.00% 8/23/2012 Tom Glaski: Increase in Construction/CE funding to reflect Agency's August 14, 2012 6A package Total: 1,209,000 3578 HBP CON 700,000 700,000 Local Match Fed. Reimb. Rate: 100.00% 8/13/2010 Tom Glaski: Reimbursement changed to 100% (Toll Credits). 8/13/2010 Tom Glaski: Enter New Project Total: 700,000 Kings County BRIDGE NO. PM00144. Bridge Preventive Maintenance Program (BPMP) various bridges in the County of Kings. See Caltrans Local Assistance HBP website for backup list of projects. Fed Proj: BPMP-5945(102) Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total PE 560,000 560,000 R/W CON 1,605,000 1,605,000 Total 560,000 1,605,000 2,165,000 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed$ 495,768 1,420,907 1,916,675 Local Match 64,232 184,094 248,326 LSSRP Bond Local AC Total 560,000 1,605,000 2,165,000 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed$ 495,768 495,768 Local Match 64,232 64,232 LSSRP Bond Local AC Total 560,000 560,000 Phase Funding Details: Proj id Funds Src Phase Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total 4340 HBP PE 495,768 495,768 Local Match 64,232 64,232 Fed. Reimb. Rate: 88.53% 3/7/2016 Linda Newton: New eligible BPMP Plan project. Total: 560,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed$ 1,420,907 1,420,907 Local Match 184,094 184,094 LSSRP Bond Local AC Total 1,605,000 1,605,000 Phase Funding Details: Proj id Funds Src Phase Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total 4340 HBP CON 1,420,907 -1,420,907 Local Match 184,094 -184,094 Fed. Reimb. Rate: 88.53% 9/14/2022 Kirk Anderson: Ready to Advertise. CON funds moved from FFY 25/26 to 22/23. As requested by agency. Total: 4340 HBP CON -1,420,907 1,420,907 Local Match -184,094 184,094 Fed. Reimb. Rate: 88.53% 3/17/2022 DLA-Admin: Ready to Advertise. CON funds moved from FFY 21/22 to 25/26. Programming priorities can't allow EPSP. Total: 4340 HBP CON 1,420,907 -1,420,907 Local Match 184,094 -184,094 Fed. Reimb. Rate: 88.53% 11/17/2021 Kirk Anderson: Ready to Advertise. CON funds moved from FFY 25/26 to 21/22. As requested by agency. Total: 4340 HBP CON -1,420,907 1,420,907 Local Match -184,094 184,094 Fed. Reimb. Rate: 88.53% 10/28/2021 DLA-Admin: Ready to Advertise. CON funds moved from FFY 24/25 to 25/26. Action taken to financially constrain the FTIP Total: (PUSH). Attempt will be made to program this project in year shown. 4340 HBP CON -1,420,907 1,420,907 Local Match -184,094 184,094 Fed. Reimb. Rate: 88.53% 10/28/2021 DLA-Admin: Ready to Advertise. CON funds moved from FFY 23/24 to 24/25. Action taken to financially constrain the FTIP Total: (PUSH). Attempt will be made to program this project in year shown. 4340 HBP CON -1,420,907 1,420,907 Local Match -184,094 184,094 Fed. Reimb. Rate: 88.53% 10/28/2021 DLA-Ad min: Ready to Advertise. CON funds moved from FFY 22/23 to 23/24. Action taken to financially constrain the FTIP Total: (PUSH). Attempt will be made to program this project in year shown. 4340 HBP CON -1,420,907 1,420,907 Local Match -184,094 184,094 Fed. Reimb. Rate: 88.53% 10/27/2021 DLA-Ad min: Ready to Advertise. CON funds moved from FFY 21/22 to 22/23. Action taken to financially constrain the FTIP Total: (PUSH). Attempt will be made to program this project in year shown. 4340 HBP CON 1,420,907 -1,420,907 Local Match 184,094 -184,094 Fed. Reimb. Rate: 88.53% 4/27/2021 Kirk Anderson: Ready to advertise. CON funds moved from FFY Beyond to 21/22. As requested by agency. Total: 4340 HBP CON -1,420,907 1,420,907 Local Match -184,094 184,094 Fed. Reimb. Rate: 88.53% 11/5/2020 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 23/24 to Beyond. Action taken to financially Total: constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. 4340 HBP CON -1,420,907 1,420,907 Local Match -184,094 184,094 Fed. Reimb. Rate: 88.53% 11/4/2020 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 22/23 to 23/24. Action taken to financially Total: constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. 4340 HBP CON -1,420,907 1,420,907 Local Match -184,094 184,094 Fed. Reimb. Rate: 88.53% 3/30/2020 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 21/22 to 22/23. Action taken to financially Total: constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. 4340 HBP CON -1,420,907 1,420,907 Local Match -184,094 184,094 Fed. Reimb. Rate: 88.53% 3/29/2020 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 20/21 to 21/22. Action taken to financially Total: constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. 4340 HBP CON -1,420,907 1,420,907 Local Match -184,094 184,094 Fed. Reimb. Rate: 88.53% 3/29/2018 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 19/20 to 20/21. Action taken to financially Total: constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. 4340 HBP CON Local Match Fed. Reimb. Rate: 88.53% 3/22/2017 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 18/19 to 19/20. NEPA not yet clear. 7/27/2021 Total: DLA-Admin: Fundline zeroed out due to FTIP cycle migration: 2018/19-23/24 to 2020/21-25/26. This does not impact funds in the current FTIP cycle. 4340 HBP CON 1,420,907 1,420,907 Local Match 184,094 184,094 Fed. Reimb. Rate: 88.53% 3/7/2016 Linda Newton: New eligible BPMP Plan project. Total: 1,605,000 Kings County BRIDGE NO. PM00182, Bridge Preventive Maintenance Program (BPMP) various bridges in Kings County. See Caltrans Local Assistance HBP website for backup list of projects. Fed Proj: Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total PE 540,000 540,000 R/W CON 1,539,000 1,539,000 Total 540,000 1,539,000 2,079,000 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed$ 432,000 1,231,200 1,663,200 Local Match 108,000 307,800 415,800 LSSRP Bond Local AC Total 540,000 1,539,000 2,079,000 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed$ 432,000 432,000 Local Match 108,000 108,000 LSSRP Bond Local AC Total 540,000 540,000 Phase Funding Details: Proj id Funds Src Phase Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total 4606 HBP PE -432,000 432,000 Local Match -108,000 108,000 Fed. Reimb. Rate: 80.00% 10/19/2021 DLA-Admin: Not ready to ad within 6 months. PE funds moved from FFY 21/22 to 23/24. NEPA not yet clear. Total: 4606 HBP PE 432,000 -432,000 Local Match 108,000 -108,000 Fed. Reimb. Rate: 80.00% 10/11/2021 Kirk Anderson: Not ready to ad within 6 months. PE funds moved from FFY 23/24 to 21/22. As requested by agency. Total: 4606 HBP PE 432,000 432,000 Local Match 108,000 108,000 Fed. Reimb. Rate: 80.00% 8/15/2021 DLA-Admin: Revise PE reimbursement rate from 88.53% to 80.00% for on system project, local agency wants to keep programmed for PE not yet authorized Total: 540,000 4606 HBP PE -478,062 -478,062 Local Match -61,938 -61,938 Fed. Reimb. Rate: 88.53% 8/15/2021 DLA-Admin:Revise PE reimbursement rate from 88.53% to 80.00% for on system project, local agency wants to keep programmed for PE not yet authorized Total: -540,000 4606 HBP PE -478,062 478,062 Local Match -61,938 61,938 Fed. Reimb. Rate: 88.53% 10/28/2020 DLA-Admin: Not ready to ad within 6 months. PE funds moved from FFY 21/22 to 23/24. Action taken to financially constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. Total: 4606 HBP PE 478,062 478,062 Local Match 61,938 61,938 Fed. Reimb. Rate: 88.53% 1/22/2018 Linda Newton: New eligible project. Total: 540,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed$ 1,231,200 1,231,200 Local Match 307,800 307,800 LSSRP Bond Local AC Total 1,539,000 1,539,000 Phase Funding Details: Proj id Funds Src Phase Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total I 4606 HBP CON 1,231,200 1,231,200 Local Match 307,800 307,800 Fed. Reimb. Rate: 80.00% 8/15/2021 DLA-Admin: Revise Con reimbursement rate from 88.53% to 80.00% for on system project, local agency wants to keep programmed for PE not yet authorized Total: 1,539,000 4606 HBP CON -1,362,477 -1,362,477 Local Match -176,523 -176,523 Fed. Reimb. Rate: 88.53% 8/15/2021 DLA-Admin: Revise Con reimbursement rate from 88.53% to 80.00% for on system project, local agency wants to keep programmed for PE not yet authorized Total: -1,539,000 4606 HBP CON 1,362,477 1,362,477 Local Match 176,523 176,523 Fed. Reimb. Rate: 88.53% 1/22/2018 Linda Newton: New eligible project. Total: 1,539,000 MPO Summary: Kings County Association of Governments Number of Projects: 3 Total Costs: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed$ 966,768 74,000 3,330,907 1,365,000 1,231,200 6,967,875 Local Match 64,232 184,094 108,000 307,800 664,126 LSSRP Bond Local AC Total for all Phases 1,031,000 74,000 3,515,000 1,473,000 1,539,000 7,632,000