2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. 3/22/2023, 1:18 PM Notes: 1) This is the FTIP lump sum “backup” list for HBP funded projects. Please see the Local Assistance web site for the most current listings: http://www.dot.ca.gov/hq/LocalPrograms/hbrr99/HBP_FSTIP.html 2) The purpose of this list is to show which projects being advanced by local agencies have met the eligibility requirements of the federal Highway Bridge Program and have been prioritized for funding by the Department in cooperation with local agencies for funding. 3) Contractual funding levels are determined at time of federal authorization/obligation for given phase of work. For details see Chapter 3 of the Local Assistance Procedures Manual. 4) For FTIP/FSTIP purposes, Federal Highway Bridge Program (HBP) funding constraint is managed by Caltrans. 5) Prop 1B bond funds for the Local Seismic Safety Retrofit Program (LSSRP) used for matching federal funds are also managed by Caltrans. 6) Financial constraint of LOCAL matching funds (including regional STIP funds) and LOCAL Advance Construction (AC) is the responsibility of the MPOs and their local agencies. 7) Some projects show that they are programmed using State STP funds. These funds are HBP funds transferred to the STP for bridge work that is not ordinarily eligible for HBP funds. See the HB Program Guidelines for details. Do not confuse these STP funds with Regional STP funds. 8) Corrections to this report should be addressed to the District Local Assistance Engineer: https://dot.ca.gov/programs/local-assistance/other-important-issues/local-assistance-contacts Note id: 24 Caltrans, Division of Local Assistance 3/22/2023, 1:18 PM Det2 FL4 SmlTxt brf Page 1 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 06 County: Fresno Responsible Agency HBP-ID Project Description Fresno 4229 BRIDGE NO. PM00116, Bridge Preventive Maintenance Program (BPMP), various bridges in the City of Fresno. See Caltrans Local Assistance HBP web site for backup list of bridges Phase Summary: PE R/W CON Total Fund Source Summary: Fed $ Local Match LSSRP Bond Local AC Total PE Summary: Fed $ Local Match LSSRP Bond Local AC Total Prior 156,700 307,000 463,700 Prior 410,514 53,186 463,700 Prior 138,727 17,973 156,700 20/21 25,200 25,200 20/21 22,310 2,890 25,200 20/21 22,310 2,890 25,200 21/22 68,000 68,000 21/22 60,200 7,800 68,000 21/22 60,200 7,800 68,000 22/23 335,000 335,000 22/23 296,576 38,425 335,000 22/23 23/24 14,704 14,704 23/24 13,017 1,687 14,704 23/24 13,017 1,687 14,704 24/25 106,000 106,000 24/25 93,842 12,158 106,000 24/25 93,842 12,158 106,000 25/26 25/26 25/26 Beyond 473,303 473,303 Beyond 419,015 54,288 473,303 Beyond Total Project #: 5060(307)370,604 5060(308) 5060(328) 1,115,303 1,485,907 Total 1,315,473 170,434 1,485,907 Total 328,096 42,508 370,604 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 271,787 296,576 419,015 987,378 Local Match 35,213 38,425 54,288 127,925 LSSRP Bond Local AC Total 307,000 335,000 473,303 1,115,303 Caltrans, Division of Local Assistance 3/22/2023, 1:18 PM Det2 FL4 SmlTxt brf Page 2 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 06 County: Fresno Responsible Agency HBP-ID Project Description Fresno County 4250 BRIDGE NO. 42C0001, NORTH FORK ROAD, OVER SAN JOAQUIN RIVER, 0.1 MI W/O FRIANT RD. Replace 2 Lane Bridge with 2 Lane Bridge Phase Summary: PE R/W CON Total Fund Source Summary: Fed $ Local Match LSSRP Bond Local AC Total PE Summary: Fed $ Local Match LSSRP Bond Local AC Total Prior 991,000 991,000 Prior 877,332 113,668 991,000 Prior 877,332 113,668 991,000 20/21 20/21 20/21 21/22 21/22 21/22 22/23 22/23 22/23 23/24 23/24 23/24 24/25 24/25 24/25 25/26 574,500 300,000 874,500 25/26 774,195 100,305 874,500 25/26 508,605 65,895 574,500 Beyond 7,943,000 7,943,000 Beyond 7,031,938 911,062 7,943,000 Beyond Total Project #: 5942(262)1,565,500 5942(279)300,000 7,943,000 9,808,500 Total 8,683,465 1,125,035 9,808,500 Total 1,385,937 179,563 1,565,500 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 265,590 265,590 Local Match 34,410 34,410 LSSRP Bond Local AC Total 300,000 300,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 7,031,938 7,031,938 Local Match 911,062 911,062 LSSRP Bond Local AC Total 7,943,000 7,943,000 Caltrans, Division of Local Assistance 3/22/2023, 1:18 PM Det2 FL4 SmlTxt brf Page 3 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 06 County: Fresno Responsible Agency HBP-ID Project Description Fresno County 4254 BRIDGE NO. 42C0038, E MANNING AVE, OVER FOWLER SWITCH CANAL, 1.0 MI W OF MCCALL AVE. Scour Countermeasure Project Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 110,000 110,000 5942(263) R/W 6,000 6,000 CON 210,000 210,000 Total 110,000 6,000 210,000 326,000 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 97,383 5,312 185,913 288,608 Local Match 12,617 688 24,087 37,392 LSSRP Bond Local AC Total 110,000 6,000 210,000 326,000 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 97,383 97,383 Local Match 12,617 12,617 LSSRP Bond Local AC Total 110,000 110,000 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 5,312 5,312 Local Match 688 688 LSSRP Bond Local AC Total 6,000 6,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 185,913 185,913 Local Match 24,087 24,087 LSSRP Bond Local AC Total 210,000 210,000 Caltrans, Division of Local Assistance 3/22/2023, 1:18 PM Det2 FL4 SmlTxt brf Page 4 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 06 County: Fresno Responsible Agency HBP-ID Project Description Fresno County 4129 BRIDGE NO. 42C0066, W MANNING AVE, OVER JAMES BYPASS OVERFLOW, 3.8 MILES WEST OF SR 145. Replace 2 Lane Bridge with 2 Lane Bridge Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 705,000 705,000 5942(233) R/W 45,000 45,000 CON 4,015,138 4,015,138 Total 750,000 4,015,138 4,765,138 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 663,975 3,554,602 4,218,577 Local Match 86,025 460,536 546,561 LSSRP Bond Local AC 3,554,602 -3,554,602 Total 750,000 4,015,138 4,765,138 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 624,137 624,137 Local Match 80,864 80,864 LSSRP Bond Local AC Total 705,000 705,000 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 39,839 39,839 Local Match 5,162 5,162 LSSRP Bond Local AC Total 45,000 45,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 3,554,602 3,554,602 Local Match 460,536 460,536 LSSRP Bond Local AC 3,554,602 -3,554,602 Total 4,015,138 4,015,138 Caltrans, Division of Local Assistance 3/22/2023, 1:18 PM Det2 FL4 SmlTxt brf Page 5 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 06 County: Fresno Responsible Agency HBP-ID Project Description Fresno County 4131 BRIDGE NO. 42C0067, W MANNING AVE, OVER JAMES BYPASS OVERFLOW, 3.2 MI EAST OF COLORADO. Replace 2 Lane Bridge with 2 Lane Bridge Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 544,000 544,000 5942(233) R/W 45,000 45,000 CON 1,925,961 1,925,961 Total 589,000 1,925,961 2,514,961 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 521,442 1,705,053 2,226,495 Local Match 67,558 220,908 288,466 LSSRP Bond Local AC 1,705,053 -1,705,053 Total 589,000 1,925,961 2,514,961 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 481,603 481,603 Local Match 62,397 62,397 LSSRP Bond Local AC Total 544,000 544,000 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 39,839 39,839 Local Match 5,162 5,162 LSSRP Bond Local AC Total 45,000 45,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,705,053 1,705,053 Local Match 220,908 220,908 LSSRP Bond Local AC 1,705,053 -1,705,053 Total 1,925,961 1,925,961 Caltrans, Division of Local Assistance 3/22/2023, 1:18 PM Det2 FL4 SmlTxt brf Page 6 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 06 County: Fresno Responsible Agency HBP-ID Project Description Fresno County 3505 BRIDGE NO. 42C0074, W NEES AVE, OVER DELTA-MENDOTA CANAL, EAST OF DOUGLAS. Replace 2 Lane Bridge with 2 Lane Bridge. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 850,000 850,000 5942(213) R/W 120,000 120,000 CON 3,643,000 3,643,000 Total 970,000 3,643,000 4,613,000 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 858,741 3,225,148 4,083,889 Local Match 111,259 417,852 529,111 LSSRP Bond Local AC Total 970,000 3,643,000 4,613,000 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 752,505 752,505 Local Match 97,495 97,495 LSSRP Bond Local AC Total 850,000 850,000 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 106,236 106,236 Local Match 13,764 13,764 LSSRP Bond Local AC Total 120,000 120,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 3,225,148 3,225,148 Local Match 417,852 417,852 LSSRP Bond Local AC Total 3,643,000 3,643,000 Caltrans, Division of Local Assistance 3/22/2023, 1:18 PM Det2 FL4 SmlTxt brf Page 7 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 06 County: Fresno Responsible Agency HBP-ID Project Description Fresno County 4132 BRIDGE NO. 42C0078, LOST HILLS AVE, OVER JACALITOS CREEK, JACALITOS CREEK RD. Replace 2 Lane Bridge with 2 Lane Bridge 10/14/2013: Toll Credits programmed for PE, R/W, & CON. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 679,000 77,000 756,000 5942(234) R/W 60,000 60,000 CON 4,200,000 4,200,000 Total 739,000 77,000 4,200,000 5,016,000 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 739,000 77,000 4,200,000 5,016,000 Local Match LSSRP Bond Local AC Total 739,000 77,000 4,200,000 5,016,000 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 679,000 77,000 756,000 Local Match LSSRP Bond Local AC Total 679,000 77,000 756,000 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 60,000 60,000 Local Match LSSRP Bond Local AC Total 60,000 60,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 4,200,000 4,200,000 Local Match LSSRP Bond Local AC Total 4,200,000 4,200,000 Caltrans, Division of Local Assistance 3/22/2023, 1:18 PM Det2 FL4 SmlTxt brf Page 8 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 06 County: Fresno Responsible Agency HBP-ID Project Description Fresno County 4253 BRIDGE NO. 42C0090, S GOLDEN STATE BL, OVER FOWLER SWITCH CANAL, 0.2 MI N OF DINUBA AVE. Replace 4 Lane Bridge with 4 Lane Bridge. Phase Summary: PE R/W CON Total Fund Source Summary: Fed $ Local Match LSSRP Bond Local AC Total PE Summary: Fed $ Local Match LSSRP Bond Local AC Total Prior 464,000 464,000 Prior 410,779 53,221 464,000 Prior 410,779 53,221 464,000 20/21 20/21 20/21 21/22 21/22 21/22 22/23 22/23 22/23 23/24 23/24 23/24 24/25 24/25 24/25 25/26 70,000 70,000 25/26 61,971 8,029 70,000 25/26 Beyond 2,282,000 2,282,000 Beyond 2,020,255 261,745 2,282,000 Beyond Total Project #: 5942(265)464,000 5942(281)70,000 2,282,000 2,816,000 Total 2,493,005 322,995 2,816,000 Total 410,779 53,221 464,000 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 61,971 61,971 Local Match 8,029 8,029 LSSRP Bond Local AC Total 70,000 70,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 2,020,255 2,020,255 Local Match 261,745 261,745 LSSRP Bond Local AC Total 2,282,000 2,282,000 Caltrans, Division of Local Assistance 3/22/2023, 1:18 PM Det2 FL4 SmlTxt brf Page 9 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 06 County: Fresno Responsible Agency HBP-ID Project Description Fresno County 4298 BRIDGE NO. 42C0097, S EL DORADO AVE, OVER ARROYO PASAJERO, 2.0 MI NORTH OF JAYNE AVE. Replace 2 lane bridge with 2 lane bridge. 9/15/2015: Toll Credits programmed for PE, R/W, & CON. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 610,000 285,000 895,000 5942(271) R/W 88,000 88,000 CON 5,500,000 5,500,000 Total 610,000 373,000 5,500,000 6,483,000 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 610,000 373,000 5,500,000 6,483,000 Local Match LSSRP Bond Local AC Total 610,000 373,000 5,500,000 6,483,000 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 610,000 285,000 895,000 Local Match LSSRP Bond Local AC Total 610,000 285,000 895,000 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 88,000 88,000 Local Match LSSRP Bond Local AC Total 88,000 88,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 5,500,000 5,500,000 Local Match LSSRP Bond Local AC Total 5,500,000 5,500,000 Caltrans, Division of Local Assistance 3/22/2023, 1:18 PM Det2 FL4 SmlTxt brf Page 10 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 06 County: Fresno Responsible Agency HBP-ID Project Description Fresno County 4184 BRIDGE NO. 42C0099, ENNIS RD OVER SAND CREEK, 0.3 MI S GEORGE SMITH RD. Replace 2 Lane Bridge with 2 Lane Bridge 3/23/2014: Toll Credits programmed for PE, R/W, & CON. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 480,000 480,000 5942(238) R/W 100,000 100,000 CON 2,110,000 1,127,287 3,237,287 Total 2,690,000 1,127,287 3,817,287 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 2,010,342 1,806,945 3,817,287 Local Match LSSRP Bond Local AC 679,658 -679,658 Total 2,690,000 1,127,287 3,817,287 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 480,000 480,000 Local Match LSSRP Bond Local AC Total 480,000 480,000 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 100,000 100,000 Local Match LSSRP Bond Local AC Total 100,000 100,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,430,342 1,806,945 3,237,287 Local Match LSSRP Bond Local AC 679,658 -679,658 Total 2,110,000 1,127,287 3,237,287 Caltrans, Division of Local Assistance 3/22/2023, 1:18 PM Det2 FL4 SmlTxt brf Page 11 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 06 County: Fresno Responsible Agency HBP-ID Project Description Fresno County 4189 BRIDGE NO. 42C0134, BURROUGH VALLEY RD OVER DRY CREEK, JUST E/O TOLLHOUSE RD. Replace 2 Lane Bridge with 2 Lane Bridge Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 685,000 685,000 5942(245) R/W 60,000 60,000 CON 3,200,000 3,200,000 Total 745,000 3,200,000 3,945,000 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 659,549 2,832,960 3,492,509 Local Match 85,452 367,040 452,492 LSSRP Bond Local AC 2,832,960 -2,832,960 Total 745,000 3,200,000 3,945,000 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 606,431 606,431 Local Match 78,570 78,570 LSSRP Bond Local AC Total 685,000 685,000 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 53,118 53,118 Local Match 6,882 6,882 LSSRP Bond Local AC Total 60,000 60,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 2,832,960 2,832,960 Local Match 367,040 367,040 LSSRP Bond Local AC 2,832,960 -2,832,960 Total 3,200,000 3,200,000 Caltrans, Division of Local Assistance 3/22/2023, 1:18 PM Det2 FL4 SmlTxt brf Page 12 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 06 County: Fresno Responsible Agency HBP-ID Project Description Fresno County 4190 BRIDGE NO. 42C0264, JOSE BASIN RD, OVER BALD MILL CREEK, 2.3 MI NE/O AUBERRY RD. Replace 1 Lane Bridge with 2 Lane Bridge 3/23/2014: Toll Credits programmed for PE, R/W, & CON. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 465,000 465,000 5942(246) R/W 45,000 45,000 CON 2,268,000 2,268,000 Total 465,000 45,000 2,268,000 2,778,000 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 465,000 45,000 2,268,000 2,778,000 Local Match LSSRP Bond Local AC Total 465,000 45,000 2,268,000 2,778,000 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 465,000 465,000 Local Match LSSRP Bond Local AC Total 465,000 465,000 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 45,000 45,000 Local Match LSSRP Bond Local AC Total 45,000 45,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 2,268,000 2,268,000 Local Match LSSRP Bond Local AC Total 2,268,000 2,268,000 Caltrans, Division of Local Assistance 3/22/2023, 1:18 PM Det2 FL4 SmlTxt brf Page 13 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 06 County: Fresno Responsible Agency HBP-ID Project Description Fresno County 4111 BRIDGE NO. 42C0267, MILLERTON ROAD, OVER NORTH FORK LITTLE DRY CR, .81 MI E OF AUBERRY RD. Replace 1 Lane Bridge with 2 Lane Bridge 10/14/2013: Toll Credits programmed for PE, R/W, & CON. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 326,000 100,000 426,000 5942(210) R/W 75,000 75,000 CON 2,042,000 2,042,000 Total 326,000 2,217,000 2,543,000 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 326,000 2,217,000 2,543,000 Local Match LSSRP Bond Local AC Total 326,000 2,217,000 2,543,000 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 326,000 100,000 426,000 Local Match LSSRP Bond Local AC Total 326,000 100,000 426,000 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 75,000 75,000 Local Match LSSRP Bond Local AC Total 75,000 75,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 2,042,000 2,042,000 Local Match LSSRP Bond Local AC Total 2,042,000 2,042,000 Caltrans, Division of Local Assistance 3/22/2023, 1:18 PM Det2 FL4 SmlTxt brf Page 14 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 06 County: Fresno Responsible Agency HBP-ID Project Description Fresno County 4117 BRIDGE NO. 42C0268, MILLERTON ROAD, OVER LITTLE DRY CREEK, 1.8 MI E OF AUBERRY RD. Replace 1 Lane Bridge with 2 Lane Bridge 10/14/2013: Toll Credits programmed for PE, R/W, & CON. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 326,000 100,000 426,000 5942(210) R/W 75,000 75,000 CON 2,007,000 2,007,000 Total 326,000 175,000 2,007,000 2,508,000 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 326,000 175,000 2,007,000 2,508,000 Local Match LSSRP Bond Local AC Total 326,000 175,000 2,007,000 2,508,000 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 326,000 100,000 426,000 Local Match LSSRP Bond Local AC Total 326,000 100,000 426,000 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 75,000 75,000 Local Match LSSRP Bond Local AC Total 75,000 75,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 2,007,000 2,007,000 Local Match LSSRP Bond Local AC Total 2,007,000 2,007,000 Caltrans, Division of Local Assistance 3/22/2023, 1:18 PM Det2 FL4 SmlTxt brf Page 15 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 06 County: Fresno Responsible Agency HBP-ID Project Description Fresno County 4110 BRIDGE NO. 42C0269, MILLERTON ROAD OVER LITTLE DRY CREEK, 2.6 MI E OF AUBERRY RD. Replace 1 lane bridge with 2 lane bridge 10/14/2013: Toll Credits programmed for PE, R/W, & CON. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 326,000 100,000 426,000 5942(210) R/W 75,000 75,000 CON 2,946,000 2,946,000 Total 326,000 175,000 2,946,000 3,447,000 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 326,000 175,000 2,946,000 3,447,000 Local Match LSSRP Bond Local AC Total 326,000 175,000 2,946,000 3,447,000 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 326,000 100,000 426,000 Local Match LSSRP Bond Local AC Total 326,000 100,000 426,000 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 75,000 75,000 Local Match LSSRP Bond Local AC Total 75,000 75,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 2,946,000 2,946,000 Local Match LSSRP Bond Local AC Total 2,946,000 2,946,000 Caltrans, Division of Local Assistance 3/22/2023, 1:18 PM Det2 FL4 SmlTxt brf Page 16 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 06 County: Fresno Responsible Agency HBP-ID Project Description Fresno County 4109 BRIDGE NO. 42C0270, MILLERTON ROAD, OVER LITTLE DRY CREEK, 3.93 MI E OF AUBERRY RD. Replace 2 lane bridge with 2 lane bridge 10/14/2013: Toll Credits programmed for PE, R/W, & CON. Phase Summary: PE R/W CON Total Fund Source Summary: Fed $ Local Match LSSRP Bond Local AC Total PE Summary: Fed $ Local Match LSSRP Bond Local AC Total Prior 255,964 255,964 Prior 255,964 255,964 Prior 255,964 255,964 20/21 20/21 20/21 21/22 170,036 170,036 21/22 170,036 170,036 21/22 170,036 170,036 22/23 22/23 22/23 23/24 23/24 23/24 24/25 24/25 24/25 25/26 300,000 60,000 360,000 25/26 360,000 360,000 25/26 300,000 300,000 Beyond 2,317,000 2,317,000 Beyond 2,317,000 2,317,000 Beyond Total Project #: 5942(210)726,000 5942(287)60,000 2,317,000 3,103,000 Total 3,103,000 3,103,000 Total 726,000 726,000 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 60,000 60,000 Local Match LSSRP Bond Local AC Total 60,000 60,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 2,317,000 2,317,000 Local Match LSSRP Bond Local AC Total 2,317,000 2,317,000 Caltrans, Division of Local Assistance 3/22/2023, 1:18 PM Det2 FL4 SmlTxt brf Page 17 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 06 County: Fresno Responsible Agency HBP-ID Project Description Fresno County 4186 BRIDGE NO. 42C0276, S ENGLEHART AVE OVER REEDLEY MAIN CANAL, 0.3 MI N OF AMERICAN AVE. Replace 2 Lane Bridge with 2 Lane Bridge. 3/23/2014: Toll Credits programmed for PE, R/W, & CON. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 275,000 85,000 360,000 5942(239) R/W 50,000 50,000 CON 1,195,000 1,195,000 Total 325,000 85,000 1,195,000 1,605,000 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 325,000 85,000 1,195,000 1,605,000 Local Match LSSRP Bond Local AC Total 325,000 85,000 1,195,000 1,605,000 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 275,000 85,000 360,000 Local Match LSSRP Bond Local AC Total 275,000 85,000 360,000 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 50,000 50,000 Local Match LSSRP Bond Local AC Total 50,000 50,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,195,000 1,195,000 Local Match LSSRP Bond Local AC Total 1,195,000 1,195,000 Caltrans, Division of Local Assistance 3/22/2023, 1:18 PM Det2 FL4 SmlTxt brf Page 18 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 06 County: Fresno Responsible Agency HBP-ID Project Description Fresno County 4191 BRIDGE NO. 42C0289, N FRANKWOOD AVE OVER ALTA MAIN CANAL, 1.15 MI S OF PIEDRA RD. Replace 2 Lane Bridge with 2 Lane Bridge 3/23/2014: Toll Credits programmed for PE, R/W, & CON. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 620,000 620,000 5942(247) R/W 100,000 100,000 CON 2,789,000 2,789,000 Total 720,000 2,789,000 3,509,000 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 720,000 2,789,000 3,509,000 Local Match LSSRP Bond Local AC Total 720,000 2,789,000 3,509,000 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 620,000 620,000 Local Match LSSRP Bond Local AC Total 620,000 620,000 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 100,000 100,000 Local Match LSSRP Bond Local AC Total 100,000 100,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 2,789,000 2,789,000 Local Match LSSRP Bond Local AC Total 2,789,000 2,789,000 Caltrans, Division of Local Assistance 3/22/2023, 1:18 PM Det2 FL4 SmlTxt brf Page 19 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 06 County: Fresno Responsible Agency HBP-ID Project Description Fresno County 4192 BRIDGE NO. 42C0317, WATTS VALLEY RD OVER WATTS CREEK, 5.59 MI E/O PITTMAN HILL. Replace 2 Lane Bridge with 2 Lane Bridge 3/23/2014: Toll Credits programmed for PE, R/W, & CON. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 427,000 31,581 458,581 5942(248) R/W 60,000 60,000 CON 1,709,000 130,173 1,839,173 Total 2,196,000 161,754 2,357,754 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 2,196,000 161,754 2,357,754 Local Match LSSRP Bond Local AC Total 2,196,000 161,754 2,357,754 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 427,000 31,581 458,581 Local Match LSSRP Bond Local AC Total 427,000 31,581 458,581 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 60,000 60,000 Local Match LSSRP Bond Local AC Total 60,000 60,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,709,000 130,173 1,839,173 Local Match LSSRP Bond Local AC Total 1,709,000 130,173 1,839,173 Caltrans, Division of Local Assistance 3/22/2023, 1:18 PM Det2 FL4 SmlTxt brf Page 20 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 06 County: Fresno Responsible Agency HBP-ID Project Description Fresno County 3504 BRIDGE NO. 42C0343, E MCKINLEY AVE, OVER FRESNO CANAL, 0.8 MI EAST OF ACADEMY AV. Replace 2 lane bridge with 2 lane bridge. 4/1/2010: Toll Credits programmed for PE, R/W, & Con. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 350,000 82,829 432,829 5942(225) R/W 75,000 23,500 98,500 CON 1,769,362 1,769,362 Total 2,194,362 106,329 2,300,691 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 425,000 1,875,691 2,300,691 Local Match LSSRP Bond Local AC 1,769,362 -1,769,362 Total 2,194,362 106,329 2,300,691 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 350,000 82,829 432,829 Local Match LSSRP Bond Local AC Total 350,000 82,829 432,829 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 75,000 23,500 98,500 Local Match LSSRP Bond Local AC Total 75,000 23,500 98,500 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,769,362 1,769,362 Local Match LSSRP Bond Local AC 1,769,362 -1,769,362 Total 1,769,362 1,769,362 Caltrans, Division of Local Assistance 3/22/2023, 1:18 PM Det2 FL4 SmlTxt brf Page 21 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 06 County: Fresno Responsible Agency HBP-ID Project Description Fresno County 4242 BRIDGE NO. 42C0348, S QUALITY AVE OVER FOWLER SWITCH CANAL, 0.02 MI S OF SWITCH AVE. Scour Countermeasure project. 10/15/2014: Toll Credits programmed for PE, R/W, & CON. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 105,000 105,000 5942(266) R/W 60,000 60,000 CON 184,800 184,800 Total 105,000 60,000 184,800 349,800 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 105,000 60,000 184,800 349,800 Local Match LSSRP Bond Local AC Total 105,000 60,000 184,800 349,800 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 105,000 105,000 Local Match LSSRP Bond Local AC Total 105,000 105,000 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 60,000 60,000 Local Match LSSRP Bond Local AC Total 60,000 60,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 184,800 184,800 Local Match LSSRP Bond Local AC Total 184,800 184,800 Caltrans, Division of Local Assistance 3/22/2023, 1:18 PM Det2 FL4 SmlTxt brf Page 22 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 06 County: Fresno Responsible Agency HBP-ID Project Description Fresno County 3502 BRIDGE NO. 42C0413, E LINCOLN AVE, OVER TRAVERS CREEK, 0.5 MI EAST OF ALTA AVE. Replace 2 lane bridge with 2 lane bridge. Toll Credits programmed for PE, R/W, & Con. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 280,000 100,000 380,000 5942(226) R/W 80,000 100,000 180,000 CON 1,400,000 1,400,000 Total 360,000 200,000 1,400,000 1,960,000 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 360,000 200,000 1,400,000 1,960,000 Local Match LSSRP Bond Local AC Total 360,000 200,000 1,400,000 1,960,000 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 280,000 100,000 380,000 Local Match LSSRP Bond Local AC Total 280,000 100,000 380,000 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 80,000 100,000 180,000 Local Match LSSRP Bond Local AC Total 80,000 100,000 180,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,400,000 1,400,000 Local Match LSSRP Bond Local AC Total 1,400,000 1,400,000 Caltrans, Division of Local Assistance 3/22/2023, 1:18 PM Det2 FL4 SmlTxt brf Page 23 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 06 County: Fresno Responsible Agency HBP-ID Project Description Fresno County 3503 BRIDGE NO. 42C0417, E PARLIER AVE, OVER TRAVERS CREEK, 0.2 MI E ENGLEHART AVE. Replace 2 lane bridge with 2 lane bridge. 4/1/2010: Toll Credits programmed for PE, R/W, & Con. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 280,000 120,000 400,000 5942(227) R/W 80,000 80,000 CON 1,100,000 1,100,000 Total 360,000 120,000 1,100,000 1,580,000 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 360,000 120,000 1,100,000 1,580,000 Local Match LSSRP Bond Local AC Total 360,000 120,000 1,100,000 1,580,000 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 280,000 120,000 400,000 Local Match LSSRP Bond Local AC Total 280,000 120,000 400,000 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 80,000 80,000 Local Match LSSRP Bond Local AC Total 80,000 80,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,100,000 1,100,000 Local Match LSSRP Bond Local AC Total 1,100,000 1,100,000 Caltrans, Division of Local Assistance 3/22/2023, 1:18 PM Det2 FL4 SmlTxt brf Page 24 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 06 County: Fresno Responsible Agency HBP-ID Project Description Fresno County 4248 BRIDGE NO. 42C0445, E LINCOLN AVE, OVER FOWLER SWITCH CANAL, 0.5 MI E OF LEONARD AVE. Scour Countermeasure project. 10/16/2014: Toll Credits programmed for PE, R/W, & CON. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 105,000 105,000 5942(267) R/W 6,000 6,000 CON 184,800 184,800 Total 105,000 6,000 184,800 295,800 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 105,000 6,000 184,800 295,800 Local Match LSSRP Bond Local AC Total 105,000 6,000 184,800 295,800 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 105,000 105,000 Local Match LSSRP Bond Local AC Total 105,000 105,000 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 6,000 6,000 Local Match LSSRP Bond Local AC Total 6,000 6,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 184,800 184,800 Local Match LSSRP Bond Local AC Total 184,800 184,800 Caltrans, Division of Local Assistance 3/22/2023, 1:18 PM Det2 FL4 SmlTxt brf Page 25 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 06 County: Fresno Responsible Agency HBP-ID Project Description Fresno County 4249 BRIDGE NO. 42C0447, S LEONARD AVE, OVER FOWLER SWITCH CANAL, 0.7 MI S OF MANNING AVE. Scour Countermeasure project. 10/16/2014: Toll Credits programmed for PE, R/W, & CON. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 105,000 105,000 5942(268) R/W 6,000 6,000 CON 184,800 184,800 Total 105,000 6,000 184,800 295,800 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 105,000 6,000 184,800 295,800 Local Match LSSRP Bond Local AC Total 105,000 6,000 184,800 295,800 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 105,000 105,000 Local Match LSSRP Bond Local AC Total 105,000 105,000 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 6,000 6,000 Local Match LSSRP Bond Local AC Total 6,000 6,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 184,800 184,800 Local Match LSSRP Bond Local AC Total 184,800 184,800 Caltrans, Division of Local Assistance 3/22/2023, 1:18 PM Det2 FL4 SmlTxt brf Page 26 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 06 County: Fresno Responsible Agency HBP-ID Project Description Fresno County 4255 BRIDGE NO. 42C0448, S DE WOLF AVE, OVER FOWLER SWITCH CANAL, AT DINUBA AVE. Replace 2 Lane Bridge with 2 Lane Bridge. 08/19/2016: Toll Credits programmed for PE, R/W, & CON. Phase Summary: PE R/W CON Total Fund Source Summary: Fed $ Local Match LSSRP Bond Local AC Total PE Summary: Fed $ Local Match LSSRP Bond Local AC Total Prior 449,000 449,000 Prior 449,000 449,000 Prior 449,000 449,000 20/21 20/21 20/21 21/22 21/22 21/22 22/23 22/23 22/23 23/24 23/24 23/24 24/25 24/25 24/25 25/26 115,000 115,000 25/26 115,000 115,000 25/26 Beyond 2,070,000 2,070,000 Beyond 2,070,000 2,070,000 Beyond Total Project #: 5942(269)449,000 5942(280)115,000 2,070,000 2,634,000 Total 2,634,000 2,634,000 Total 449,000 449,000 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 115,000 115,000 Local Match LSSRP Bond Local AC Total 115,000 115,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 2,070,000 2,070,000 Local Match LSSRP Bond Local AC Total 2,070,000 2,070,000 Caltrans, Division of Local Assistance 3/22/2023, 1:18 PM Det2 FL4 SmlTxt brf Page 27 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 06 County: Fresno Responsible Agency HBP-ID Project Description Fresno County 4182 BRIDGE NO. 42C0486, N CHATEAU FRESNO OVER HOUGHTON CANAL, 0.5 MI SOUTH OF BELMONT. Replace 2 lane bridge with 2 lane bridge 3/4/2014: Toll Credits programmed for PE, R/W, & CON. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 371,000 371,000 5942(237) R/W 150,000 150,000 CON 1,952,000 1,952,000 Total 521,000 1,952,000 2,473,000 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 521,000 1,952,000 2,473,000 Local Match LSSRP Bond Local AC Total 521,000 1,952,000 2,473,000 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 371,000 371,000 Local Match LSSRP Bond Local AC Total 371,000 371,000 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 150,000 150,000 Local Match LSSRP Bond Local AC Total 150,000 150,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,952,000 1,952,000 Local Match LSSRP Bond Local AC Total 1,952,000 1,952,000 Caltrans, Division of Local Assistance 3/22/2023, 1:18 PM Det2 FL4 SmlTxt brf Page 28 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 06 County: Fresno Responsible Agency HBP-ID Project Description Fresno County 4193 BRIDGE NO. 42C0496, N DEL REY AVE, OVER FRESNO CANAL, 0.5 MI SOUTH OF MCKINLEY. Replace 2 Lane Bridge with 2 Lane Bridge 3/23/2014: Toll Credits programmed for PE, R/W, & CON. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 435,000 435,000 5942(249) R/W 80,000 80,000 CON 1,900,000 1,900,000 Total 515,000 1,900,000 2,415,000 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 515,000 1,900,000 2,415,000 Local Match LSSRP Bond Local AC Total 515,000 1,900,000 2,415,000 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 435,000 435,000 Local Match LSSRP Bond Local AC Total 435,000 435,000 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 80,000 80,000 Local Match LSSRP Bond Local AC Total 80,000 80,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,900,000 1,900,000 Local Match LSSRP Bond Local AC Total 1,900,000 1,900,000 Caltrans, Division of Local Assistance 3/22/2023, 1:18 PM Det2 FL4 SmlTxt brf Page 29 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 06 County: Fresno Responsible Agency HBP-ID Project Description Fresno County 4252 BRIDGE NO. 42C0557, ADAMS AVE, OVER FOWLER SWITCH CANAL, 0.33 MI W OF MCCALL AVE. Scour Countermeasure project. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 105,000 105,000 5942(270) R/W 6,000 6,000 CON 184,800 184,800 Total 105,000 6,000 184,800 295,800 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 92,957 5,312 163,603 261,872 Local Match 12,044 688 21,197 33,928 LSSRP Bond Local AC Total 105,000 6,000 184,800 295,800 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 92,957 92,957 Local Match 12,044 12,044 LSSRP Bond Local AC Total 105,000 105,000 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 5,312 5,312 Local Match 688 688 LSSRP Bond Local AC Total 6,000 6,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 163,603 163,603 Local Match 21,197 21,197 LSSRP Bond Local AC Total 184,800 184,800 Caltrans, Division of Local Assistance 3/22/2023, 1:18 PM Det2 FL4 SmlTxt brf Page 30 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 06 County: Fresno Responsible Agency HBP-ID Project Description Fresno County 3377 PM00009, Bridge Preventive Maintenance Program, various locations. See Caltrans Local Assistance HBP web site for backup list of bridges. Phase Summary: PE R/W CON Total Fund Source Summary: Fed $ Local Match LSSRP Bond Local AC Total PE Summary: Fed $ Local Match LSSRP Bond Local AC Total Prior 1,328,500 2,992,130 4,320,630 Prior 3,825,054 495,576 4,320,630 Prior 1,176,121 152,379 1,328,500 20/21 20/21 20/21 21/22 21/22 0 21/22 22/23 1,736,000 1,736,000 22/23 1,536,881 199,119 1,736,000 22/23 23/24 23/24 23/24 24/25 557,000 557,000 24/25 493,112 63,888 557,000 24/25 493,112 63,888 557,000 25/26 25/26 25/26 Beyond 245,000 5,391,870 5,636,870 Beyond 4,990,321 646,549 5,636,870 Beyond 216,899 28,102 245,000 Total Project #: 5942(200)2,130,500 5942(219) 5942(240) 10,120,000 5942(261) 12,250,500 Total 10,845,368 1,405,132 12,250,500 Total 1,886,132 244,368 2,130,500 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 2,648,933 1,536,881 4,773,423 8,959,236 Local Match 343,197 0 199,119 618,447 1,160,764 LSSRP Bond Local AC Total 2,992,130 1,736,000 5,391,870 10,120,000 Caltrans, Division of Local Assistance 3/22/2023, 1:18 PM Det2 FL4 SmlTxt brf Page 31 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 06 County: Fresno Responsible Agency HBP-ID Project Description Sanger 4304 BRIDGE NO. PM00127, Bridge Preventive Maintenance Program (BPMP), various bridges in the City of Sanger. See Caltrans Local Assistance HBP web site for backup list of bridges. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 292,500 292,500 5197(024) 5197(034)R/W CON 996,000 206,500 1,202,500 Total 1,288,500 206,500 1,495,000 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,140,709 182,814 1,323,524 Local Match 147,791 -0 23,686 171,477 LSSRP Bond Local AC Total 1,288,500 206,500 1,495,000 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 258,950 258,950 Local Match 33,550 33,550 LSSRP Bond Local AC Total 292,500 292,500 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 881,759 182,814 1,064,573 Local Match 114,241 -0 23,686 137,927 LSSRP Bond Local AC Total 996,000 206,500 1,202,500 Caltrans, Division of Local Assistance 3/22/2023, 1:18 PM Det2 FL4 SmlTxt brf Page 32 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 06 County: Fresno Responsible Agency HBP-ID Project Description MPO Summary: Council Of Fresno County Goverments Number of Projects: 31 Totals: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 20,802,740 4,348,700 230,236 12,426,071 3,160,017 586,954 4,378,789 44,770,407 90,703,915 Local Match 1,238,396 684,334 374,840 237,544 1,687 76,046 109,711 2,360,466 5,083,023 LSSRP Bond Local AC 2,449,020 2,810,635 2,832,960 -8,092,615 Total for all Phases 24,490,156 7,843,669 3,438,036 4,571,000 3,161,704 663,000 4,488,500 47,130,873 95,786,938 Caltrans, Division of Local Assistance 3/22/2023, 1:18 PM Det2 FL4 SmlTxt brf Page 33