2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. 3/22/2023, 1:16 PM Notes: 1) This is the FTIP lump sum “backup” list for HBP funded projects. Please see the Local Assistance web site for the most current listings: http://www.dot.ca.gov/hq/LocalPrograms/hbrr99/HBP_FSTIP.html 2) The purpose of this list is to show which projects being advanced by local agencies have met the eligibility requirements of the federal Highway Bridge Program and have been prioritized for funding by the Department in cooperation with local agencies for funding. 3) Contractual funding levels are determined at time of federal authorization/obligation for given phase of work. For details see Chapter 3 of the Local Assistance Procedures Manual. 4) For FTIP/FSTIP purposes, Federal Highway Bridge Program (HBP) funding constraint is managed by Caltrans. 5) Prop 1B bond funds for the Local Seismic Safety Retrofit Program (LSSRP) used for matching federal funds are also managed by Caltrans. 6) Financial constraint of LOCAL matching funds (including regional STIP funds) and LOCAL Advance Construction (AC) is the responsibility of the MPOs and their local agencies. 7) Some projects show that they are programmed using State STP funds. These funds are HBP funds transferred to the STP for bridge work that is not ordinarily eligible for HBP funds. See the HB Program Guidelines for details. Do not confuse these STP funds with Regional STP funds. 8) Corrections to this report should be addressed to the District Local Assistance Engineer: https://dot.ca.gov/programs/local-assistance/other-important-issues/local-assistance-contacts Note id: 24 Caltrans, Division of Local Assistance 3/22/2023, 1:16 PM Det2 FL4 SmlTxt brf Page 1 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 05 County: Monterey Responsible Agency HBP-ID Project Description Department of Parks and Recreation 4775 BRIDGE NO. 36P0015, APTOS CREEK ROAD OVER APTOS CREEK, Standalone Bridge Preventive Maintenance Project. 10/21/2022: Toll Credits programmed for PE & CON. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total PE 85,000 85,000 R/W CON 476,000 476,000 Total 85,000 476,000 561,000 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 85,000 476,000 561,000 Local Match LSSRP Bond Local AC Total 85,000 476,000 561,000 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 85,000 85,000 Local Match LSSRP Bond Local AC Total 85,000 85,000 Project #: CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 476,000 476,000 Local Match LSSRP Bond Local AC Total 476,000 476,000 Caltrans, Division of Local Assistance 3/22/2023, 1:16 PM Det2 FL4 SmlTxt brf Page 2 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 05 County: Monterey Responsible Agency HBP-ID Project Description Department of Parks and Recreation 4629 BRIDGE NO. PM00191, Bridge Preventive Maintenance Program (BPMP) for various State Parks bridges in District 5 -AMBAG Region. See Caltrans Local Assistance HBP website for backup list of projects. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total PE 75,000 75,000 R/W CON 580,000 580,000 Total 75,000 580,000 655,000 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 60,000 464,000 524,000 Local Match 15,000 116,000 131,000 LSSRP Bond Local AC Total 75,000 580,000 655,000 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 60,000 60,000 Local Match 15,000 15,000 LSSRP Bond Local AC Total 75,000 75,000 Project #: CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 464,000 464,000 Local Match 116,000 116,000 LSSRP Bond Local AC Total 580,000 580,000 Caltrans, Division of Local Assistance 3/22/2023, 1:16 PM Det2 FL4 SmlTxt brf Page 3 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 05 County: Monterey Responsible Agency HBP-ID Project Description Monterey County 3491 BRIDGE NO. 44C0017, ROBINSON CANYON RD, OVER CARMEL RIVER, 0.1 MI S CARMEL VALLEY RD. ; IMPLEMENT/INSTALL SCOUR COUNTERMEASURES 4/5/2010: Toll Credits programmed for PE, R/W & Con. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 812,169 50,000 862,169 5944(099) R/W 182,000 182,000 CON 1,485,333 1,485,333 Total 994,169 50,000 1,485,333 2,529,502 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 994,169 50,000 1,485,333 2,529,502 Local Match LSSRP Bond Local AC Total 994,169 50,000 1,485,333 2,529,502 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 812,169 50,000 862,169 Local Match LSSRP Bond Local AC Total 812,169 50,000 862,169 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 182,000 182,000 Local Match LSSRP Bond Local AC Total 182,000 182,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,485,333 1,485,333 Local Match LSSRP Bond Local AC Total 1,485,333 1,485,333 Caltrans, Division of Local Assistance 3/22/2023, 1:16 PM Det2 FL4 SmlTxt brf Page 4 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 05 County: Monterey Responsible Agency HBP-ID Project Description Monterey County 3407 BRIDGE NO. 44C0035 : GONZALES RIVER ROAD BRIDGE, OVER SALINAS RIVER : Rehabilitate Bridge -Replace Superstructure: not adding lane capacity. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 1,175,796 1,175,796 5944(098) R/W 229,000 229,000 CON 10,652,222 10,652,222 Total 1,175,796 229,000 10,652,222 12,057,018 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,040,932 202,734 9,430,412 10,674,078 Local Match 134,864 26,266 1,221,810 1,382,940 LSSRP Bond Local AC Total 1,175,796 229,000 10,652,222 12,057,018 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,040,932 1,040,932 Local Match 134,864 134,864 LSSRP Bond Local AC Total 1,175,796 1,175,796 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 202,734 202,734 Local Match 26,266 26,266 LSSRP Bond Local AC Total 229,000 229,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 9,430,412 9,430,412 Local Match 1,221,810 1,221,810 LSSRP Bond Local AC Total 10,652,222 10,652,222 Caltrans, Division of Local Assistance 3/22/2023, 1:16 PM Det2 FL4 SmlTxt brf Page 5 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 05 County: Monterey Responsible Agency HBP-ID Project Description Monterey County 3490 BR. NO. 44C0050 ; BRADLEY ROAD OVER THE SALINAS RIVER ; IMPLEMENT/INSTALL SCOUR COUNTERMEASURES 4/5/2010: Toll Credits programmed for PE, R/W, & Con. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 596,534 307,126 903,660 5944(100) R/W 39,100 110,900 150,000 CON 5,838,800 4,828,000 10,666,800 Total 635,634 110,900 6,145,926 4,828,000 11,720,460 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 635,634 110,900 6,145,926 4,828,000 11,720,460 Local Match LSSRP Bond Local AC Total 635,634 110,900 6,145,926 4,828,000 11,720,460 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 596,534 307,126 903,660 Local Match LSSRP Bond Local AC Total 596,534 307,126 903,660 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 39,100 110,900 150,000 Local Match LSSRP Bond Local AC Total 39,100 110,900 150,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 5,838,800 4,828,000 10,666,800 Local Match LSSRP Bond Local AC Total 5,838,800 4,828,000 10,666,800 Caltrans, Division of Local Assistance 3/22/2023, 1:16 PM Det2 FL4 SmlTxt brf Page 6 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 05 County: Monterey Responsible Agency HBP-ID Project Description Monterey County 3540 BRIDGE NO. 44C0110, HARTNELL ROAD OVER ALISAL CREEK, 0.15 MI S ALISAL ROAD. Replace 2-lane bridge with 2-lane bridge 4/29/2010: Toll Credits programmed for PE, R/W, & Con. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 660,575 76,925 737,500 5944(103) R/W 88,000 230,500 318,500 CON 2,773,750 230,008 3,003,758 Total 748,575 307,425 2,773,750 230,008 4,059,758 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 748,575 307,425 2,773,750 230,008 4,059,758 Local Match LSSRP Bond Local AC Total 748,575 307,425 2,773,750 230,008 4,059,758 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 660,575 76,925 737,500 Local Match LSSRP Bond Local AC Total 660,575 76,925 737,500 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 88,000 230,500 318,500 Local Match LSSRP Bond Local AC Total 88,000 230,500 318,500 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 2,773,750 230,008 3,003,758 Local Match LSSRP Bond Local AC Total 2,773,750 230,008 3,003,758 Caltrans, Division of Local Assistance 3/22/2023, 1:16 PM Det2 FL4 SmlTxt brf Page 7 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 05 County: Monterey Responsible Agency HBP-ID Project Description Monterey County 4327 BRIDGE NO. PM00136, Bridge Preventive Miantenance Program (BPMP) various bridges in the County of Monterey. See Caltrans Local Assistance HBP website for backup list of projects Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 316,740 316,740 5944(125) 5944(140)R/W CON 1,520,350 1,520,350 Total 316,740 1,520,350 1,837,090 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 253,392 1,216,280 1,469,672 Local Match 63,348 304,070 367,418 LSSRP Bond Local AC Total 316,740 1,520,350 1,837,090 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 253,392 253,392 Local Match 63,348 63,348 LSSRP Bond Local AC Total 316,740 316,740 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,216,280 1,216,280 Local Match 304,070 304,070 LSSRP Bond Local AC Total 1,520,350 1,520,350 Caltrans, Division of Local Assistance 3/22/2023, 1:16 PM Det2 FL4 SmlTxt brf Page 8 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 05 County: Monterey Responsible Agency HBP-ID Project Description Salinas 4559 BRIDGE NO. PM00168, Bridge Preventive Maintenance Program (BPMP) various bridges in the City of Salinas. See Caltrans Local Assistance HBP website for backup list of projects. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total PE 420,499 420,499 R/W CON 1,561,990 1,561,990 Total 420,499 1,561,990 1,982,489 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 336,399 1,249,592 1,585,991 Local Match 84,100 312,398 396,498 LSSRP Bond Local AC Total 420,499 1,561,990 1,982,489 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 336,399 336,399 Local Match 84,100 84,100 LSSRP Bond Local AC Total 420,499 420,499 Project #: CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,249,592 1,249,592 Local Match 312,398 312,398 LSSRP Bond Local AC Total 1,561,990 1,561,990 Caltrans, Division of Local Assistance 3/22/2023, 1:16 PM Det2 FL4 SmlTxt brf Page 9 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 05 County: San Benito Responsible Agency HBP-ID Project Description San Benito County 1860 BRIDGE NO. 00L0026, HOSPITAL ROAD, OVER SAN BENITO RIVER, BETWEEN SOUTHSIDE ROAD AND CIENEGA ROAD. Replace 2 lane low water crossing with 2 lane bridge. 5/3/2010: Toll credits used for R/W and CON. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 1,514,407 1,514,407 NBIL(501) R/W 805,000 805,000 CON 13,467,187 13,467,187 Total 15,786,594 15,786,594 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 11,016,526 4,467,187 15,483,713 Local Match 302,881 302,881 LSSRP Bond Local AC 4,467,187 -4,467,187 Total 15,786,594 15,786,594 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,211,526 1,211,526 Local Match 302,881 302,881 LSSRP Bond Local AC Total 1,514,407 1,514,407 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 805,000 805,000 Local Match LSSRP Bond Local AC Total 805,000 805,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 9,000,000 4,467,187 13,467,187 Local Match LSSRP Bond Local AC 4,467,187 -4,467,187 Total 13,467,187 13,467,187 Caltrans, Division of Local Assistance 3/22/2023, 1:16 PM Det2 FL4 SmlTxt brf Page 10 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 05 County: San Benito Responsible Agency HBP-ID Project Description San Benito County 3272 BRIDGE NO. 43C0002, UNION ROAD, OVER SAN BENITO RIVER, EAST CIENEGA RD. Replace bridge, no addded capacity. High Cost Project agreement required. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 4,015,426 247,480 4,262,906 5943(043) R/W 565,500 172,500 738,000 CON 42,647,500 42,647,500 Total 4,580,926 419,980 42,647,500 47,648,406 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 4,055,494 371,808 15,935,400 17,440,410 4,380,022 42,183,134 Local Match 525,432 48,172 4,891,668 5,465,272 LSSRP Bond Local AC 37,755,832 -15,935,400 -17,440,410 -4,380,022 Total 4,580,926 419,980 42,647,500 47,648,406 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 3,554,857 219,094 3,773,951 Local Match 460,569 28,386 488,955 LSSRP Bond Local AC Total 4,015,426 247,480 4,262,906 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 500,637 152,714 653,351 Local Match 64,863 19,786 84,649 LSSRP Bond Local AC Total 565,500 172,500 738,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 15,935,400 17,440,410 4,380,022 37,755,832 Local Match 4,891,668 4,891,668 LSSRP Bond Local AC 37,755,832 -15,935,400 -17,440,410 -4,380,022 Total 42,647,500 42,647,500 Caltrans, Division of Local Assistance 3/22/2023, 1:16 PM Det2 FL4 SmlTxt brf Page 11 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 05 County: San Benito Responsible Agency HBP-ID Project Description San Benito County 4194 BRIDGE NO. 43C0016, PANOCHE ROAD OVER TRES PINOS CREEK, 6 MI E OF SH 25. SCOUR COUNTERMEASURE Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 546,750 546,750 5943(075) R/W 50,000 50,000 CON 3,061,800 3,061,800 Total 546,750 50,000 3,061,800 3,658,550 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 484,038 44,265 2,710,612 3,238,914 Local Match 62,712 5,735 351,188 419,636 LSSRP Bond Local AC Total 546,750 50,000 3,061,800 3,658,550 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 484,038 484,038 Local Match 62,712 62,712 LSSRP Bond Local AC Total 546,750 546,750 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 44,265 44,265 Local Match 5,735 5,735 LSSRP Bond Local AC Total 50,000 50,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 2,710,612 2,710,612 Local Match 351,188 351,188 LSSRP Bond Local AC Total 3,061,800 3,061,800 Caltrans, Division of Local Assistance 3/22/2023, 1:16 PM Det2 FL4 SmlTxt brf Page 12 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 05 County: San Benito Responsible Agency HBP-ID Project Description San Benito County 2306 BRIDGE NO. 43C0027, PANOCHE ROAD, OVER TRES PINOS CREEK, 12 MI W LITTLE PANOCHE RD. Replace 1-lane Bridge with 2-lane Bridge (satisfies seismic requirement). Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 580,000 100,000 300,000 980,000 5943(056) R/W 100,000 100,000 CON 3,745,000 3,745,000 Total 580,000 100,000 400,000 3,745,000 4,825,000 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 513,474 88,530 354,120 3,315,449 4,271,573 Local Match 66,526 11,470 45,880 429,552 553,428 LSSRP Bond Local AC Total 580,000 100,000 400,000 3,745,000 4,825,000 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 513,474 88,530 265,590 867,594 Local Match 66,526 11,470 34,410 112,406 LSSRP Bond Local AC Total 580,000 100,000 300,000 980,000 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 88,530 88,530 Local Match 11,470 11,470 LSSRP Bond Local AC Total 100,000 100,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 3,315,449 3,315,449 Local Match 429,552 429,552 LSSRP Bond Local AC Total 3,745,000 3,745,000 Caltrans, Division of Local Assistance 3/22/2023, 1:16 PM Det2 FL4 SmlTxt brf Page 13 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 05 County: San Benito Responsible Agency HBP-ID Project Description San Benito County 3565 BRIDGE NO. 43C0039, ANZAR RD, OVER SAN JUAN CREEK, 0.35 MI W SAN JUAN HWY R. Replace 2-lane bridge with 2-lane bridge (no added capacity) Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 546,051 127,000 673,051 5943(062) R/W 50,000 50,000 CON 1,721,250 1,721,250 Total 596,051 127,000 1,721,250 2,444,301 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 527,684 112,433 1,523,823 2,163,940 Local Match 68,367 14,567 197,427 280,361 LSSRP Bond Local AC Total 596,051 127,000 1,721,250 2,444,301 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 483,419 112,433 595,852 Local Match 62,632 14,567 77,199 LSSRP Bond Local AC Total 546,051 127,000 673,051 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 44,265 44,265 Local Match 5,735 5,735 LSSRP Bond Local AC Total 50,000 50,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,523,823 1,523,823 Local Match 197,427 197,427 LSSRP Bond Local AC Total 1,721,250 1,721,250 Caltrans, Division of Local Assistance 3/22/2023, 1:16 PM Det2 FL4 SmlTxt brf Page 14 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 05 County: San Benito Responsible Agency HBP-ID Project Description San Benito County 3424 BRIDGE NO. 43C0041, ROSA MORADA RD, OVER ARROYO DOS PICACHOS, 0.6 MI E FAIRVIEW RD. Replace Bridge (No added lane capacity.) 4/1/2010: Toll Credits programmed for PE, R/W, & Con. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 914,897 914,897 5943(055) R/W 164,200 164,200 CON 1,794,000 1,794,000 Total 1,079,097 1,794,000 2,873,097 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,079,097 1,794,000 2,873,097 Local Match LSSRP Bond Local AC Total 1,079,097 1,794,000 2,873,097 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 914,897 914,897 Local Match LSSRP Bond Local AC Total 914,897 914,897 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 164,200 164,200 Local Match LSSRP Bond Local AC Total 164,200 164,200 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,794,000 1,794,000 Local Match LSSRP Bond Local AC Total 1,794,000 1,794,000 Caltrans, Division of Local Assistance 3/22/2023, 1:16 PM Det2 FL4 SmlTxt brf Page 15 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 05 County: San Benito Responsible Agency HBP-ID Project Description San Benito County 3425 BRIDGE NO. 43C0053, ROCKS ROAD, OVER PINACATE ROCK CREEK, EAST LITTLE MERRILL RD. Replace 1-Lane Bridge with 2-Lane Bridge 4/1/2010: Toll Credits programmed for PE, R/W, & Con. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 615,691 615,691 5943(054) R/W 60,000 60,000 CON 2,853,750 2,853,750 Total 675,691 2,853,750 3,529,441 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 675,691 2,853,750 3,529,441 Local Match LSSRP Bond Local AC Total 675,691 2,853,750 3,529,441 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 615,691 615,691 Local Match LSSRP Bond Local AC Total 615,691 615,691 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 60,000 60,000 Local Match LSSRP Bond Local AC Total 60,000 60,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 2,853,750 2,853,750 Local Match LSSRP Bond Local AC Total 2,853,750 2,853,750 Caltrans, Division of Local Assistance 3/22/2023, 1:16 PM Det2 FL4 SmlTxt brf Page 16 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 05 County: San Benito Responsible Agency HBP-ID Project Description San Benito County 3822 BRIDGE NO. 43C0054, LIMEKILN RD, OVER PESCADERO CREEK, 0.1 MI S CIENEGA RD. Replace 1-lane bridge with 2-lane bridge 10/17/2011: Toll Credits programmed for PE, R/W, & CON. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 603,672 280,000 883,672 5943(063) R/W 50,000 50,000 CON 1,625,000 1,625,000 Total 653,672 280,000 1,625,000 2,558,672 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 653,672 280,000 1,625,000 2,558,672 Local Match LSSRP Bond Local AC Total 653,672 280,000 1,625,000 2,558,672 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 603,672 280,000 883,672 Local Match LSSRP Bond Local AC Total 603,672 280,000 883,672 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 50,000 50,000 Local Match LSSRP Bond Local AC Total 50,000 50,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,625,000 1,625,000 Local Match LSSRP Bond Local AC Total 1,625,000 1,625,000 Caltrans, Division of Local Assistance 3/22/2023, 1:16 PM Det2 FL4 SmlTxt brf Page 17 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 05 County: Santa Cruz Responsible Agency HBP-ID Project Description Santa Cruz 1142 BRIDGE NO. 36C0108, MURRAY AVE, OVER WOODS LAGOON, W/O INT/O LAKE AVE. LSSRP seismic retrofit. Replace bridge rail and associated roadway improvements. (Mixed Funds.) Phase Summary: PE R/W CON Total Fund Source Summary: Fed $ Local Match LSSRP Bond Local AC Total PE Summary: Fed $ Local Match LSSRP Bond Local AC Total Prior 2,522,400 5,900,500 8,422,900 Prior 7,456,793 289,319 676,787 8,422,900 Prior 2,233,081 289,319 2,522,400 20/21 20/21 20/21 21/22 21/22 21/22 22/23 170,600 150,000 19,872,738 20,193,338 22/23 283,827 2,298,971 17,205 17,593,335 20,193,338 22/23 151,032 19,568 170,600 23/24 23/24 23/24 24/25 24/25 24/25 25/26 25/26 25/26 Beyond Beyond 17,593,335 -604,713 604,713 -17,593,335 Beyond Total Project #: 5025(048)2,693,000 5025(084)6,050,500 19,872,738 28,616,238 Total 25,333,956 1,983,577 1,298,705 28,616,238 Total 2,384,113 308,887 2,693,000 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 5,223,713 132,795 5,356,508 Local Match LSSRP Bond 676,787 17,205 693,992 Local AC Total 5,900,500 150,000 6,050,500 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 17,593,335 17,593,335 Local Match 2,279,403 -604,713 1,674,690 LSSRP Bond 604,713 604,713 Local AC 17,593,335 -17,593,335 Total 19,872,738 19,872,738 Caltrans, Division of Local Assistance 3/22/2023, 1:16 PM Det2 FL4 SmlTxt brf Page 18 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 05 County: Santa Cruz Responsible Agency HBP-ID Project Description Santa Cruz County 3959 BRIDGE NO. 36C0018, SWANTON RD, OVER BIG CREEK, 3 MI NW OF SR 1. Replace Bridge. Replace 2 lane bridge with 2 lane bridge. 7/9/2012: Toll Credits programmed for PE, R/W, & CON. Phase Summary: PE R/W CON Total Fund Source Summary: Fed $ Local Match LSSRP Bond Local AC Total PE Summary: Fed $ Local Match LSSRP Bond Local AC Total Prior 500,000 500,000 Prior 500,000 500,000 Prior 500,000 500,000 20/21 20/21 20/21 21/22 21/22 21/22 22/23 22/23 22/23 23/24 1,890,000 1,890,000 23/24 1,890,000 1,890,000 23/24 24/25 24/25 24/25 25/26 150,000 150,000 25/26 150,000 150,000 25/26 Beyond Beyond Beyond Total Project #: 5936(111)500,000 5936(132)150,000 1,890,000 2,540,000 Total 2,540,000 2,540,000 Total 500,000 500,000 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 150,000 150,000 Local Match LSSRP Bond Local AC Total 150,000 150,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,890,000 1,890,000 Local Match LSSRP Bond Local AC Total 1,890,000 1,890,000 Caltrans, Division of Local Assistance 3/22/2023, 1:16 PM Det2 FL4 SmlTxt brf Page 19 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 05 County: Santa Cruz Responsible Agency HBP-ID Project Description Santa Cruz County 1765 BRIDGE NO. 36C0035, QUAIL HOLLOW ROAD, OVER ZAYANTE CREEK, 0.01 MI W OF E ZAYANTE RD. Replace 2 lane bridge with new 2 lane bridge. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 420,000 420,000 5936(061) R/W 500,000 500,000 CON 2,352,000 2,352,000 Total 920,000 2,352,000 3,272,000 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 814,476 2,082,226 2,896,702 Local Match 105,524 269,774 375,298 LSSRP Bond Local AC Total 920,000 2,352,000 3,272,000 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 371,826 371,826 Local Match 48,174 48,174 LSSRP Bond Local AC Total 420,000 420,000 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 442,650 442,650 Local Match 57,350 57,350 LSSRP Bond Local AC Total 500,000 500,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 2,082,226 2,082,226 Local Match 269,774 269,774 LSSRP Bond Local AC Total 2,352,000 2,352,000 Caltrans, Division of Local Assistance 3/22/2023, 1:16 PM Det2 FL4 SmlTxt brf Page 20 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 05 County: Santa Cruz Responsible Agency HBP-ID Project Description Santa Cruz County 3820 BRIDGE NO. 36C0038, CONFERENCE DR, OVER EAST ZAYANTE ROAD. Scour Countermeasures 6/14/2011: Toll Credits programmed for PE, R/W, & CON. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 55,000 55,000 110,000 5936(092) R/W 20,000 20,000 CON 323,000 323,000 Total 55,000 55,000 20,000 323,000 453,000 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 55,000 55,000 20,000 323,000 453,000 Local Match LSSRP Bond Local AC Total 55,000 55,000 20,000 323,000 453,000 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 55,000 55,000 110,000 Local Match LSSRP Bond Local AC Total 55,000 55,000 110,000 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 20,000 20,000 Local Match LSSRP Bond Local AC Total 20,000 20,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 323,000 323,000 Local Match LSSRP Bond Local AC Total 323,000 323,000 Caltrans, Division of Local Assistance 3/22/2023, 1:16 PM Det2 FL4 SmlTxt brf Page 21 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 05 County: Santa Cruz Responsible Agency HBP-ID Project Description Santa Cruz County 4383 BRIDGE NO. 36C0063, TWO BAR RD, OVER TWO BAR CREEK, 2.7 MI E OF SR 9. Rehabilitate bridge. Widen 1-lane bridge to 2-lane bridge (non capacity increasing) 8/12/2016: Toll Credits programmed for PE, R/W, & CON. 10/19/2021: Toll credits for PE, R/W, and CON deleted. 7/21/2022: Toll Credits programmed for PE, R/W, & CON. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 336,000 336,000 5936(146) R/W 100,000 100,000 CON 1,260,000 1,260,000 Total 336,000 1,360,000 1,696,000 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 336,000 1,360,000 1,696,000 Local Match LSSRP Bond Local AC Total 336,000 1,360,000 1,696,000 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 336,000 336,000 Local Match LSSRP Bond Local AC Total 336,000 336,000 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 100,000 100,000 Local Match LSSRP Bond Local AC Total 100,000 100,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,260,000 1,260,000 Local Match LSSRP Bond Local AC Total 1,260,000 1,260,000 Caltrans, Division of Local Assistance 3/22/2023, 1:16 PM Det2 FL4 SmlTxt brf Page 22 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 05 County: Santa Cruz Responsible Agency HBP-ID Project Description Santa Cruz County 4001 BRIDGE NO. 36C0068 , LARKSPUR ST, OVER SAN LORENZO RIVER, 0.2 MI E HIGHWAY 9. Replace 1-lane bridge with 2-lane bridge 10/1/2012: Toll Credits programmed for PE, R/W, & CON. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 485,000 485,000 5936(112) R/W 600,000 600,000 CON 2,724,000 2,724,000 Total 485,000 2,724,000 600,000 3,809,000 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 485,000 2,724,000 600,000 3,809,000 Local Match LSSRP Bond Local AC Total 485,000 2,724,000 600,000 3,809,000 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 485,000 485,000 Local Match LSSRP Bond Local AC Total 485,000 485,000 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 600,000 600,000 Local Match LSSRP Bond Local AC Total 600,000 600,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 2,724,000 2,724,000 Local Match LSSRP Bond Local AC Total 2,724,000 2,724,000 Caltrans, Division of Local Assistance 3/22/2023, 1:16 PM Det2 FL4 SmlTxt brf Page 23 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 05 County: Santa Cruz Responsible Agency HBP-ID Project Description Santa Cruz County 4460 BRIDGE NO. 36C0070, PLEASANT WAY OVER SAN LORENZO RIVER, 0.1 MI W OF SR 9. Replace 1-lane bridge with 2-lane bridge (non-capacity increasing) 9/30/2016: Toll Credits programmed for PE, R/W, & CON. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 575,000 575,000 5936(134) R/W 1,000,000 1,000,000 CON 2,165,000 2,165,000 Total 575,000 1,000,000 2,165,000 3,740,000 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 575,000 1,000,000 2,165,000 3,740,000 Local Match LSSRP Bond Local AC Total 575,000 1,000,000 2,165,000 3,740,000 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 575,000 575,000 Local Match LSSRP Bond Local AC Total 575,000 575,000 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,000,000 1,000,000 Local Match LSSRP Bond Local AC Total 1,000,000 1,000,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 2,165,000 2,165,000 Local Match LSSRP Bond Local AC Total 2,165,000 2,165,000 Caltrans, Division of Local Assistance 3/22/2023, 1:16 PM Det2 FL4 SmlTxt brf Page 24 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 05 County: Santa Cruz Responsible Agency HBP-ID Project Description Santa Cruz County 3816 BRIDGE NO. 36C0071, FERN DR OVER SAN LORENZO RIVER, 0.05 MI W OF SR 9. Replace 1-lane bridge with 2-lane bridge. 6/8/2011: Toll Credits programmed for PE, R/W, & CON. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 450,000 450,000 5936(093) R/W 250,000 250,000 CON 1,848,000 1,848,000 Total 450,000 1,848,000 250,000 2,548,000 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 450,000 1,848,000 250,000 2,548,000 Local Match LSSRP Bond Local AC Total 450,000 1,848,000 250,000 2,548,000 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 450,000 450,000 Local Match LSSRP Bond Local AC Total 450,000 450,000 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 250,000 250,000 Local Match LSSRP Bond Local AC Total 250,000 250,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,848,000 1,848,000 Local Match LSSRP Bond Local AC Total 1,848,000 1,848,000 Caltrans, Division of Local Assistance 3/22/2023, 1:16 PM Det2 FL4 SmlTxt brf Page 25 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 05 County: Santa Cruz Responsible Agency HBP-ID Project Description Santa Cruz County 3821 BRIDGE NO. 36C0073, EITHER WAY LANE, OVER SAN LORENZO RIVER, 0.1 MI SW OF STATE RTE 9. Replace 1-lane bridge with 2-lane bridge 6/14/2011: Toll Credits programmed for PE, R/W, & CON. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 290,000 290,000 5936(094) R/W 200,000 200,000 CON 1,624,000 1,624,000 Total 290,000 1,624,000 200,000 2,114,000 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 290,000 1,624,000 200,000 2,114,000 Local Match LSSRP Bond Local AC Total 290,000 1,624,000 200,000 2,114,000 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 290,000 290,000 Local Match LSSRP Bond Local AC Total 290,000 290,000 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 200,000 200,000 Local Match LSSRP Bond Local AC Total 200,000 200,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,624,000 1,624,000 Local Match LSSRP Bond Local AC Total 1,624,000 1,624,000 Caltrans, Division of Local Assistance 3/22/2023, 1:16 PM Det2 FL4 SmlTxt brf Page 26 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 05 County: Santa Cruz Responsible Agency HBP-ID Project Description Santa Cruz County 3520 BRIDGE NO. 36C0085, SAN LORENZO WAY OVER SAN LORENZO RIVER, JUST N OF GRAHAM HILL RD. Replace 1-Lane Bridge with 2-Lane Bridge 4/1/2010: Toll Credits programmed for PE, R/W, & Con. 4/6/2010: Changed to grouped programmed project. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 650,000 400,000 1,050,000 5936(086) R/W 100,000 100,000 200,000 CON 5,345,000 5,345,000 Total 750,000 500,000 5,345,000 6,595,000 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 750,000 500,000 5,345,000 6,595,000 Local Match LSSRP Bond Local AC Total 750,000 500,000 5,345,000 6,595,000 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 650,000 400,000 1,050,000 Local Match LSSRP Bond Local AC Total 650,000 400,000 1,050,000 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 100,000 100,000 200,000 Local Match LSSRP Bond Local AC Total 100,000 100,000 200,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 5,345,000 5,345,000 Local Match LSSRP Bond Local AC Total 5,345,000 5,345,000 Caltrans, Division of Local Assistance 3/22/2023, 1:16 PM Det2 FL4 SmlTxt brf Page 27 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 05 County: Santa Cruz Responsible Agency HBP-ID Project Description Santa Cruz County 3786 BRIDGE NO. 36C0117, GREEN VALLEY RD OVER CASSERLY CREEK TRIB NO 1, 4.1 MI N FREEDOM BLVD. Replace two-lane bridge with two-lane bridge 2/15/2011: Toll Credits programmed for PE, R/W, & CON. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 295,000 295,000 5936(091) R/W 100,000 100,000 CON 1,652,000 1,652,000 Total 395,000 1,652,000 2,047,000 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 395,000 1,652,000 2,047,000 Local Match LSSRP Bond Local AC Total 395,000 1,652,000 2,047,000 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 295,000 295,000 Local Match LSSRP Bond Local AC Total 295,000 295,000 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 100,000 100,000 Local Match LSSRP Bond Local AC Total 100,000 100,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,652,000 1,652,000 Local Match LSSRP Bond Local AC Total 1,652,000 1,652,000 Caltrans, Division of Local Assistance 3/22/2023, 1:16 PM Det2 FL4 SmlTxt brf Page 28 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 05 County: Santa Cruz Responsible Agency HBP-ID Project Description Santa Cruz County 3817 BRIDGE NO. 36C0128, RANCHO RIO AVENUE OVER NEWELL CREEK, 0.1 MI E NEWELL CREEK RD. Replace 1-lane bridge with 2-lane bridge. 6/8/2011: Toll Credits programmed for PE, R/W, & CON. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 210,000 150,000 360,000 5936(096) R/W 250,000 250,000 CON 1,504,100 1,504,100 Total 210,000 1,904,100 2,114,100 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 210,000 1,904,100 2,114,100 Local Match LSSRP Bond Local AC Total 210,000 1,904,100 2,114,100 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 210,000 150,000 360,000 Local Match LSSRP Bond Local AC Total 210,000 150,000 360,000 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 250,000 250,000 Local Match LSSRP Bond Local AC Total 250,000 250,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,504,100 1,504,100 Local Match LSSRP Bond Local AC Total 1,504,100 1,504,100 Caltrans, Division of Local Assistance 3/22/2023, 1:16 PM Det2 FL4 SmlTxt brf Page 29 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 05 County: Santa Cruz Responsible Agency HBP-ID Project Description Santa Cruz County 4292 BRIDGE NO. 36C0131, LOMPICO ROAD BRIDGE AT LOMPICO CREEK REPLACE 2-LANE BRIDGE WITH 2-LANE BRIDGE : Toll Credits programmed for PE, R/W, & CON. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 384,000 384,000 5936(127) R/W 46,000 46,000 CON 1,430,400 1,430,400 Total 384,000 46,000 1,430,400 1,860,400 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 384,000 46,000 1,430,400 1,860,400 Local Match LSSRP Bond Local AC Total 384,000 46,000 1,430,400 1,860,400 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 384,000 384,000 Local Match LSSRP Bond Local AC Total 384,000 384,000 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 46,000 46,000 Local Match LSSRP Bond Local AC Total 46,000 46,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,430,400 1,430,400 Local Match LSSRP Bond Local AC Total 1,430,400 1,430,400 Caltrans, Division of Local Assistance 3/22/2023, 1:16 PM Det2 FL4 SmlTxt brf Page 30 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 05 County: Santa Cruz Responsible Agency HBP-ID Project Description Santa Cruz County 3818 BRIDGE NO. 36C0135, FOREST HILL DR OVER BEAR CREEK, 0.2 MI W BEAR CREEK RD. Replace 2-lane bridge with 2-lane bridge 6/8/2011: Toll Credits programmed for PE, R/W, & CON. Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Project #: PE 285,000 150,000 435,000 5936(095) R/W 100,000 100,000 CON 1,596,000 1,596,000 Total 285,000 250,000 1,596,000 2,131,000 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 285,000 250,000 1,596,000 2,131,000 Local Match LSSRP Bond Local AC Total 285,000 250,000 1,596,000 2,131,000 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 285,000 150,000 435,000 Local Match LSSRP Bond Local AC Total 285,000 150,000 435,000 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 100,000 100,000 Local Match LSSRP Bond Local AC Total 100,000 100,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 1,596,000 1,596,000 Local Match LSSRP Bond Local AC Total 1,596,000 1,596,000 Caltrans, Division of Local Assistance 3/22/2023, 1:16 PM Det2 FL4 SmlTxt brf Page 31 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 05 County: Santa Cruz Responsible Agency HBP-ID Project Description Santa Cruz County 3844 BRIDGE NO. PM00059, Bridge Preventive Maintenance Program (BPMP) various bridges in Santa Cruz County. See Local Assistance HBP website for backup list of projects. Phase Summary: PE R/W CON Total Fund Source Summary: Fed $ Local Match LSSRP Bond Local AC Total PE Summary: Fed $ Local Match LSSRP Bond Local AC Total CON Summary: Fed $ Local Match LSSRP Bond Local AC Total Prior 415,000 1,617,242 2,032,242 Prior 1,799,144 233,098 2,032,242 Prior 367,400 47,601 415,000 Prior 1,431,744 185,498 1,617,242 20/21 20/21 20/21 20/21 21/22 21/22 21/22 21/22 22/23 22/23 22/23 22/23 23/24 23/24 23/24 23/24 24/25 24/25 24/25 24/25 25/26 25/26 25/26 25/26 Beyond 550,000 550,000 Beyond 486,915 63,085 550,000 Beyond Beyond 486,915 63,085 550,000 Total Project #: 5936(070)415,000 5936(103) 5936(104) 2,167,242 5936(105) 2,582,242 5936(106) 5936(107)Total 5936(113)2,286,059 5936(117) 296,183 5936(118) 5936(119) 5936(126) 2,582,242 Total 367,400 47,601 415,000 Total 1,918,659 248,583 2,167,242 Caltrans, Division of Local Assistance 3/22/2023, 1:16 PM Det2 FL4 SmlTxt brf Page 32 2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 05 County: Santa Cruz Responsible Agency HBP-ID Project Description MPO Summary: Association of Monterey Bay Area Governments Number of Projects: 31 Totals: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed $ 36,874,399 6,142,320 9,120,639 23,655,422 30,534,201 7,104,022 4,464,365 53,695,792 171,591,160 Local Match 1,788,724 48,172 4,917,705 2,371,117 162,448 5,735 2,660,592 11,954,493 LSSRP Bond 676,787 17,205 604,713 1,298,705 Local AC 4,467,187 -4,467,187 37,755,832 1,657,935 -17,440,410 -4,380,022 -17,593,335 Total for all Phases 43,807,097 1,723,305 51,794,176 27,701,679 13,256,239 2,724,000 4,470,100 39,367,762 184,844,358 Caltrans, Division of Local Assistance 3/22/2023, 1:16 PM Det2 FL4 SmlTxt brf Page 33