2020/21-2025/26 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides VERY detailed backup information to support the lump sum amounts programmed in the FTIP. 3/22/2023, 1 :08 PM Notes: 1) This list provides a very detailed history of how a project's programming has changed over time. 2) Summary, project level, grouped backup lists are available on the local assistance web site: http://www.dot.ca.gov/hq/Loca1Programs/hbrr99/HBP _FSTI P .html 3) Financial constraint of LOCAL matching funds (including regional STIP funds) and LOCAL Advance Construction (AC) is the responsibility of the MPOs and their local agencies. 4) Some projects show that they are programmed using State STP funds. These funds are HBP funds transferred to the STP for bridge work that is not ordinarily eligible for HBP funds. See the HB Program Guidelines for details. Do not confuse these STP funds with Regional STP funds. 5) Corrections to this report should be addressed to the District Local Assistance Engineer: http://www.dot.ca.gov/hq/LocalPrograms/dlae.htm Note id: 31 District: 03 County: Butte Responsible Agency I Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Butte County BRIDGE NO. 12C0009L, SKYWAY RD WB, OVER BUTTE CREEK, 0.5 Ml SE OF HUMBUG RD. Replace 2-lane bridge with 2-lane bridge, Fed Proj: Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total PE 1,100,000 1,100,000 R/W CON Total 1,100,000 20,000 5,588,000 5,608,000 20,000 5,588,000 6,708,000 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed$ 880,000 4,486,400 5,366,400 Local Match 220,000 1,121,600 1,341,600 LSSRP Bond Local AC Total 1,100,000 5,608,000 6,708,000 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed$ 880,000 880,000 Local Match 220,000 220,000 LSSRP Bond Local AC Total 1,100,000 1,100,000 Phase Funding Details: Proj id Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Funds Src Phase Total 4673 HBP PE 880,000 880,000 Local Match 220,000 220,000 Fed. Reimb. Rate: 80.00% 9/16/2022 Eileen Crawford: 2022 Prioritized Project, new eligible project Total: 1,100,000 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed$ 16,000 16,000 Local Match 4,000 4,000LSSRP Bond Local AC Total 20,000 20,000 Phase Funding Details: Proj id Funds Src Phase Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total I 4673 HBP R/W 16,000 16,000 Local Match 4,000 Fed. Reimb. Rate: 80.00% 12/16/2022 Linda Newton: 2022 Prioritized Project, new eligible project. Addition of RW funding that was requested in the application, but Total: -----4,000 ,20000 not programmed. New! CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed$ 4,470,400 4,470,400 Local Match 1,117,600 1,117,600 LSSRP Bond Local AC Total 5,588,000 5,588,000 Phase Funding Details: Proj id Funds Src Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Phase Total I 4673 HBP CON 4,470,400 4,470,400 Local Match 1,117,600 1,117,600 Fed. Reimb. Rate: 80.00% 9/16/2022 Eileen Crawford: 2022 Prioritized Project, new eligible project Total: 5,588,000 Butte County BRIDGE NO. 12C0022, OROVILLE GRIDLEY HOVER FEATHER RIVER, 1 Ml E OF LARKIN RD. Standalone Scour Countermeasure Project. Fed Proj: Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total PE 227,000 227,000 R/W CON Total 227,000 20,000 1,138,750 1,158,750 20,000 1,138,750 1,385,750 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed$ 181,600 927,000 1,108,600 Local Match 45,400 231,750 277,150 LSSRP Bond Local AC Total 227,000 1,158,750 1,385,750 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed$ 181,600 181,600 Local Match 45,400 45,400 LSSRP Bond Local AC Total 227,000 227,000 Phase Funding Details: Proj id Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Funds Src Phase Total 4801 HBP PE 181,600 181,600 Local Match 45,400 45,400 Fed. Reimb. Rate: 80.00% 9/26/2022 DLA-Admin: 2022 Prioritization Project, new eligible project. Total: 227,000 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed$ 16,000 16,000 Local Match 4,000 4,000 LSSRP Bond Local AC Total 20,000 20,000 4801 HBP R/W 16,000 16,000 Local Match 4,000 4,000 Fed. Reimb. Rate: 80.00% 9/26/2022 DLA-Admin: 2022 Prioritization Project, new eligible project. ----- Total: 20,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed$ 911,000 911,000 Local Match 227,750 227,750 LSSRP Bond Local AC Total 1,138,750 1,138,750 4801 HBP CON 911,000 911,000 Local Match 227,750 227,750 Fed. Reimb. Rate: 80.00% 9/26/2022 DLA-Admin: 2022 Prioritization Project, new eligible project. Total: 1,138,750 Butte County BRIDGE NO. 12C0052, MIDWAY ROAD, OVER BUTTE CREEK, 0.3 Ml S OF WHITE DR. and BRIDGE NO. 12C0053, MIDWAY ROAD OVER BUTTE CREEK OVERFLOW, 3.9 Ml N OF NELSON RD. Replace two existing structurally deficient 2 lane bridges with a new 2 lane bridge. High Cost Project Agreement needed. Fed Proj: BRLS-5912(085) Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total PE R/W CON Total 3,350,000 450,000 23,396,250 27,196,250 3,350,000 450,000 23,396,250 27,196,250 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed$ 16,264,112 5,000,000 2,812,728 24,076,840 Local Match 3,119,410 3,119,410 LSSRP Bond Local AC Total 7,812,728 27,196,250 -5,000,000 -2,812,728 27,196,250 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed$ 2,965,755 2,965,755 Local Match 384,245 384,245 LSSRP Bond Local AC Total 3,350,000 3,350,000 3470 HBP PE 132,795 132,795 Local Match 17,205 17,205 Fed. Reimb. Rate: 88.53% 9/16/2019 Vlad Popko: Ready to Advertise. As requested in September 2019 Survey and per Exhibit 6D dated 9.19.19. Cost increase Total: 150,000due to additional PE work 3470 HBP PE 239,562 239,562 Local Match 31,038 31,038 Fed. Reimb. Rate: 88.53% 6/29/2018 SP Mann: Request for additional PE funds approved per 6D dated 6/21/18. NEPA clear: Not ready to ad within 6 months. Total: 270,600 3470 HBP PE 822,798 822,798 Local Match 106,602 106,602 Fed. Reimb. Rate: 88.53% 9/13/2017 Darlene Wulff: Updated to reflect Sept 2017 Survey Total: 929,400 3470 HBP PE 1,770,600 1,770,600 Local Match 229,400 229,400 Fed. Reimb. Rate: 88.53% 9/22/2009 Michael McCollum: Program PE funds for new project per Ex. 6-A submitted by County. Total: 2,000,000 R/W Summary: Fed$ Prior 398,385 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total 398,385 Local Match 51,615 51,615 LSSRP Bond Local AC Total 450,000 450,000 3470 HBP R/W 354,120 354,120 Local Match 45,880 45,880 Fed. Reimb. Rate: 88.53% 9/16/2019 Vlad Popko: Ready to Advertise. As requested per September 2019 Survey and Exhibit 6D dated 9/19/19. Cost increase due Total: 400,000 3470 HBP R/W -22, 133 -22, 133 Local Match -2,868 -2,868 Fed. Reimb. Rate: 88.53% 3/22/2018 Darlene Wulff: Updated per RW RFA Total: -25,000 3470 HBP R/W 22,133 22,133 Local Match 2,868 2,868 Fed. Reimb. Rate: 88.53% 8/30/2017 Darlene Wulff: Not ready to ad within 6 months. RW funds moved from FFY 19/20 to 17/18. As requested in September 2017 Total: 25,000 3470 HBP R/W Local Match Fed. Reimb. Rate: 88.53% 10/10/2016 DLA-Admin: Not ready to ad within 6 months. RW funds moved from FFY 17/18 to 19/20. NEPA not yet clear. 7/27/2021 Total: DLA-Admin: Fundline zeroed out due to FTIP cycle migration: 2018/19-23/24 to 2020/21-25/26. This does not impact funds in the current FTIP cycle. 3470 HBP R/W Local Match Fed. Reimb. Rate: 88.53% 10/21/2015 DLA-Admin: Not ready to ad within 6 months. RW funds moved from FFY 15/16 to 17/18. NEPA not yet clear. 8/25/2019 Total: DLA-Admin: Fundline zeroed out due to FTIP cycle migration: 2016/17-21/22 to 2018/19-23/24. This does not impact funds in the current FTIP cycle. 3470 HBP R/W Local Match Fed. Reimb. Rate: 88.53% 9/18/2015 Michael McCollum: Move R/W funds to 15/16 fiscal year per fall survey. 8/25/2019 DLA-Ad min: Fundline zeroed out due to Total: FTIP cycle migration: 2016/17-21/22 to 2018/19-23/24. This does not impact funds in the current FTIP cycle. to additional R/W work Survey. 3470 HBP R/W Local Match Fed. Reimb. Rate: 88.53% 3/18/2015 DLA-Admin: Not ready to ad within 6 months. RW funds moved from FFY 15/16 to 17/18. NEPA not yet clear. 8/25/2019 Total: DLA-Admin: Fundline zeroed out due to FTIP cycle migration: 2016/17-21/22 to 2018/19-23/24. This does not impact funds in the current FTIP cycle. 3470 HBP R/W Local Match Fed. Reimb. Rate: 88.53% 3/25/2014 DLA-Admin: Not ready to ad within 6 months. RW funds moved from FFY 14/15 to 15/16. NEPA not yet clear. 8/17/2017 Total: DLA-Admin: Fundline zeroed out due to FTIP cycle migration: 2014/15-19/20 to 2016/17-21/22. This does not impact funds in the current FTIP cycle. 3470 HBP R/W 44,265 -44,265 Local Match 5,735 -5,735 Fed. Reimb. Rate: 88.53% 10/8/2013 Michael Mccollum: Move R/W from Beyond to the 14/15 fiscal year, per the fall survey. Total: 3470 HBP R/W 44,265 44,265 Local Match 5,735 5,735 Fed. Reimb. Rate: 88.53% 9/22/2009 Michael McCollum: Program R/W funds for new project per Ex. 6-A submitted by County. Total: 50,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed$ 12,899,972 5,000,000 2,812,728 20,712,700 Local Match 2,683,550 2,683,550 LSSRP Bond Local AC 7,812,728 -5,000,000 -2,812,728 Total 23,396,250 23,396,250 Phase Funding Details: 3470 HBP CON 2,812,728 -2,812,728 Local Match 364,419 -364,419 Fed. Reimb. Rate: 88.53% 10/25/2020 DLA-Admin: Pull Final AC conversion into FFY 21/22. Total: 3470 Local AC (HBP) CON -2,812,728 -2,812,728 -5,625,456 Local Match -364,419 -364,419 -728,838 Fed. Reimb. Rate: 88.53% 4/14/2020 Linda Newton: Fundline added to correct error. Total: -6,354,294 3470 Local AC (HBP) CON 2,812,728 2,812,728 5,625,456 Local Match 364,419 364,419 728,838 Fed. Reimb. Rate: 88.53% 3/30/2020 DLA-Admin: Move CON from FFY 21/22 to 22/23. Action taken to financially constrain the FTIP (PUSH). Total: 6,354,294 3470 HBP Local Match Fed. Reimb. Rate: 88.53% 3470 Local AC (HBP) Local Match Fed. Reimb. Rate: 88.53% 3470 HBP Local Match Fed. Reimb. Rate: 88.53% 3470 HBP Local Match Fed. Reimb. Rate: 88.53% 3470 HBP Local Match Fed. Reimb. Rate: 88.53% 3470 HBP Local Match Fed. Reimb. Rate: 88.53% 3470 HBP Local Match Fed. Reimb. Rate: 88.53% 3470 HBP Local Match Fed. Reimb. Rate: 88.53% 3470 HBP Local Match Fed. Reimb. Rate: 88.53% CON -2,812,728 2,812,728 -364,419 364,419 3/30/2020 DLA-Admin: Move CON from FFY 21/22 to 22/23.Action taken to financially constrain the FTIP (PUSH). Total: CON 7,812,728 -5,000,000 -2,812,728 1,012,222 -647,803 -364,419 10/15/2019 DLA-Admin: Revised funding to enter into High Cost Project Agreement Total: CON 12,899,972 5,000,000 2,812,728 -17,348,560 1,671,328 647,803 364,419 -2,247,690 10/14/2019 DLA-Admin: Revise funding to enter into High Cost Project Agreement. Total: CON -17,348,560 17,348,560 -2,247,690 2,247,690 10/25/2018 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 21/22 to Beyond. Action taken to financially Total: constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. CON 3,360,820 435,430 6/29/2018 SP Mann: Update CON funds as per approved 6D dated 6/21/18. Total: CON -13,987,740 13,987,740 -1,812,260 1,812,260 3/29/2018 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 20/21 to 21/22. Action taken to financially Total: constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. CON -13,987,740 13,987,740 -1,812,260 1,812,260 10/25/2017 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 19/20 to 20/21. Action taken to financially Total: constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. CON 10/25/2016 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 18/19 to 19/20. Action taken to financially Total: constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. 7/27/2021 DLA-Admin: Fundline zeroed out due to FTIP cycle migration: 2018/19-23/24 to 2020/21-25/26. This does not impact funds in the current FTIP cycle. CON 10/29/2015 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 17/18 to 18/19. Action taken to financially Total: constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. 7/27/2021 DLA-Admin: Fundline zeroed out due to FTIP cycle migration: 2018/19-23/24 to 2020/21-25/26. This does not impact funds in the current FTIP cycle. 3,364,140 435,860 3,800,000 3,360,820 435,430 3,796,250 3470 HBP CON Local Match Fed. Reimb. Rate: 88.53% 10/29/2015 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 16/17 to 17/18. Action taken to financially Total: constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. 8/25/2019 DLA-Admin: Fundline zeroed out due to FTIP cycle migration: 2016/17-21/22 to 2018/19-23/24. This does not impact funds in the current FTIP cycle. 3470 HBP CON 13,987,740 -13,987,740 Local Match 1,812,260 -1,812,260 Fed. Reimb. Rate: 88.53% 9/18/2015 Michael Mccollum: Move Construction to the 16/17 fiscal year per the fall survey. Total: 3470 HBP CON 13,987,740 13,987,740 Local Match 1,812,260 1,812,260 Fed. Reimb. Rate: 88.53% 9/22/2009 Michael McCollum: Program Construction funds for new project per Ex. 6-A submitted by County. Total: 15,800,000 Butte County BRIDGE NO. 12C0164, E RIO BONITO RD, OVER HAMILTON SLOUGH, 0.2 Ml E OF SH 99. Replace the existing functionally obsolete 2 lane bridge with a new 2 lane bridge. 11/2/2010: Toll Credits programmed for PE, R/W, & CON. Fed Proj: BRLO-5912(091) Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total PE 424,000 424,000 R/W 50,000 50,000 CON 1,074,000 1,074,000 Total 424,000 50,000 1,074,000 1,548,000 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed$ 424,000 50,000 1,074,000 1,548,000 Local Match LSSRP Bond Local AC Total 424,000 50,000 1,074,000 1,548,000 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed$ 424,000 424,000 Local Match LSSRP Bond Local AC Total 424,000 424,000 Phase Funding Details: Proj id Funds Src Phase Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total 3747 HBP PE 209,000 209,000 Local Match Fed. Reimb. Rate: 100.00% 3/6/2019 Tou Vang: Additional PE funds as requested in Exhibit 6-D dated 02/11/2019 Total: 209,000 3747 HBP PE 215,000 215,000 Local Match Fed. Reimb. Rate: 100.00% 11/2/2010 Michael Mccollum: Reimbursement changed to 100% (Toll Credits). Total: 215,000 11/2/2010 Michael Mccollum: New Project -Program funds for PE. R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed$ 50,000 50,000 Local Match LSSRP Bond Local AC Total 50,000 50,000 Phase Funding Details: Proj id Funds Src Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Phase Total I 3747 HBP R/W 50,000 -50,000 Local Match Fed. Reimb. Rate: 100.00% 5/10/2021 Linda Newton: Not ready to ad within 6 months. RW funds moved from FFY 21/22 to 20/21. Phase being advanced with Total: EPSP. 3747 HBP R/W -50,000 50,000 Local Match Fed. Reimb. Rate: 100.00% 3/19/2020 DLA-Admin: Not ready to ad within 6 months. RW funds moved from FFY 19/20 to 21/22. NEPA not yet clear. Total: 3747 HBP R/W 50,000 -50,000 Local Match Fed. Reimb. Rate: 100.00% 9/16/2019 Vlad Popko: Not ready to ad within 6 months. RW funds moved from FFY 21/22 to 19/20. As requested in September 2019 Total: Survey. 3747 HBP R/W -50,000 50,000 Local Match Fed. Reimb. Rate: 100.00% 10/16/2018 DLA-Admin: Not ready to ad within 6 months. RW funds moved from FFY 19/20 to 21/22. NEPA not yet clear. Total: 3747 HBP R/W Local Match Fed. Reimb. Rate: 100.00% 10/10/2017 DLA-Admin: Not ready to ad within 6 months. RW funds moved from FFY 17/18 to 19/20. NEPA not yet clear. 7/27/2021 Total: DLA-Admin: Fundline zeroed out due to FTIP cycle migration: 2018/19-23/24 to 2020/21-25/26. This does not impact funds in the current FTIP cycle. 3747 HBP R/W Local Match Fed. Reimb. Rate: 100.00% 8/30/2017 Darlene Wulff: Not ready to ad within 6 months. RW funds moved from FFY 19/20 to 17/18. As requested in September 2017 Total: Survey. 7/27/2021 DLA-Admin: Fundline zeroed out due to FTIP cycle migration: 2018/19-23/24 to 2020/21-25/26. This does not impact funds in the current FTIP cycle. 3747 HBP R/W Local Match Fed. Reimb. Rate: 100.00% 10/10/2016 DLA-Admin: Not ready to ad within 6 months. RW funds moved from FFY 17/18 to 19/20. NEPA not yet clear. 7/27/2021 Total: DLA-Admin: Fundline zeroed out due to FTIP cycle migration: 2018/19-23/24 to 2020/21-25/26. This does not impact funds in the current FTIP cycle. 3747 HBP R/W Local Match Fed. Reimb. Rate: 100.00% 3/18/2015 DLA-Admin: Not ready to ad within 6 months. RW funds moved from FFY 15/16 to 17/18. NEPA not yet clear. 8/25/2019 Total: DLA-Admin: Fundline zeroed out due to FTIP cycle migration: 2016/17-21/22 to 2018/19-23/24. This does not impact funds in the current FTIP cycle. 3747 HBP R/W Local Match Fed. Reimb. Rate: 100.00% 3/25/2014 DLA-Admin: Not ready to ad within 6 months. RW funds moved from FFY 14/15 to 15/16. NEPA not yet clear. 8/17/2017 Total: DLA-Admin: Fundline zeroed out due to FTIP cycle migration: 2014/15-19/20 to 2016/17-21/22. This does not impact funds in the current FTIP cycle. 3747 HBP R/W Local Match Fed. Reimb. Rate: 100.00% 10/8/2013 Michael Mccollum: Reimbursement changed to 100% (Toll Credits). Total: 10/8/2013 Michael McCollum: Move the R/W funds to the 14/15 fiscal year per the fall survey. 8/17/2017 DLA-Admin: Fundline zeroed out due to FTIP cycle migration: 2014/15-19/20 to 2016/17-21/22. This does not impact funds in the current FTIP cycle. 3747 HBP R/W 50,000 50,000 Local Match Fed. Reimb. Rate: 100.00% 11/2/2010 Michael Mccollum: Reimbursement changed to 100% (Toll Credits). Total: 50,000 11/2/2010 Michael McCollum: New Project -Program funds for R/W. CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed$ 1,074,000 1,074,000 Local Match LSSRP Bond Local AC Total 1,074,000 1,074,000 Phase Funding Details: Proj id Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Funds Src Phase Total I 3747 HBP CON 1,074,000 1,074,000 Local Match Fed. Reimb. Rate: 100.00% 11/2/2010 Michael Mccollum: Reimbursement changed to 100% (Toll Credits). Total: 1,074,000 11/2/2010 Michael McCollum: New Project -Program funds for Construction. Butte County BRIDGE NO. 12C0165, E RIO BONITO ROAD, OVER SUTTER-BUTTE CANAL, 0.8 Ml EAST OF SR 99. Replace the existing 2 lane structurally deficient bridge with a new 2 lane bridge. 11/2/2010: Toll Credits programmed for PE, R/W, & CON. Fed Proj: BRLO-5912(093) Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total PE 415,000 140,000 244,000 799,000 R/W 50,000 50,000 CON 2,000,000 2,000,000 Total 415,000 190,000 244,000 2,000,000 2,849,000 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed$ 415,000 190,000 244,000 2,000,000 2,849,000 Local Match LSSRP Bond Local AC Total 415,000 190,000 244,000 2,000,000 2,849,000 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed$ 415,000 140,000 244,000 799,000 Local Match LSSRP Bond Local AC Total 415,000 140,000 244,000 799,000 Phase Funding Details: Proj id Funds Src Phase Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total I 3746 HBP PE 140,000 -140,000 Local Match Fed. Reimb. Rate: 100.00% 8/27/2021 Linda Newton: Not ready to ad within 6 months. PE funds moved from FFY 21/22 to 20/21. Phase being advanced with Post Total: Programming. 3746 HBP PE -384,000 384,000 Local Match Fed. Reimb. Rate: 100.00% 10/16/2020 DLA-Admin: Not ready to ad within 6 months. PE funds moved from FFY 19/20 to 21/22. Delivery failure of phase in 19/20. Total: Push funding to FFY 21/22, per LAPG Ch. 6. 3746 HBP PE Local Match Fed. Reimb. Rate: 100.00% 10/14/2020 DLA-Admin: Fund line failed to deliver. Total: 10/21/2019 DLA-Admin: Not ready to ad within 6 months. PE funds moved from FFY 18/19 to 19/20. Funds not obligated, moved to next fiscal year. 7/27/2021 DLA-Admin: Fundline zeroed out due to FTIP cycle migration: 2018/19-23/24 to 2020/21-25/26. This does not impact funds in the current FTIP cycle. 3746 HBP PE 384,000 384,000 Local Match Fed. Reimb. Rate: 100.00% 4/10/2019 Vlad Popko: Increase PE costs per 6D attached Total: 384,000 3746 HBP PE 415,000 415,000 Local Match Fed. Reimb. Rate: 100.00% 11/2/2010 Michael Mccollum: Reimbursement changed to 100% (Toll Credits). Total: 415,000 11/2/2010 Michael McCollum: New Project -Program funds for PE. R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed$ 50,000 50,000 Local Match LSSRP Bond Local AC Total 50,000 50,000 Phase Funding Details: Proj id Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Funds Src Phase Total I 3746 HBP R/W 50,000 -50,000 Local Match Fed. Reimb. Rate: 100.00% 5/10/2021 Linda Newton: Not ready to ad within 6 months. RW funds moved from FFY 21/22 to 20/21. Phase being advanced with Total: EPSP. 3746 HBP R/W -50,000 50,000 Local Match Fed. Reimb. Rate: 100.00% 3/19/2020 DLA-Admin: Not ready to ad within 6 months. RW funds moved from FFY 19/20 to 21/22. NEPA not yet clear. Total: 3746 HBP R/W 50,000 -50,000 Local Match Fed. Reimb. Rate: 100.00% 9/16/2019 Vlad Popko: Not ready to ad within 6 months. RW funds moved from FFY 21/22 to 19/20. As requested in September 2019 Total: Survey. 3746 HBP R/W -50,000 50,000 Local Match Fed. Reimb. Rate: 100.00% 10/16/2018 DLA-Admin: Not ready to ad within 6 months. RW funds moved from FFY 19/20 to 21/22. NEPA not yet clear. Total: 3746 HBP R/W Local Match Fed. Reimb. Rate: 100.00% 10/10/2017 DLA-Admin: Not ready to ad within 6 months. RW funds moved from FFY 17/18 to 19/20. NEPA not yet clear. 7/27/2021 Total: DLA-Admin: Fundline zeroed out due to FTIP cycle migration: 2018/19-23/24 to 2020/21-25/26. This does not impact funds in the current FTIP cycle. 3746 HBP R/W Local Match Fed. Reimb. Rate: 100.00% 8/30/2017 Darlene Wulff: Not ready to ad within 6 months. RW funds moved from FFY 19/20 to 17/18. As requested in September 2017 Total: Survey. 7/27/2021 DLA-Admin: Fundline zeroed out due to FTIP cycle migration: 2018/19-23/24 to 2020/21-25/26. This does not impact funds in the current FTIP cycle. 3746 HBP R/W Local Match Fed. Reimb. Rate: 100.00% 10/10/2016 DLA-Admin: Not ready to ad within 6 months. RW funds moved from FFY 17/18 to 19/20. NEPA not yet clear. 7/27/2021 Total: DLA-Admin: Fundline zeroed out due to FTIP cycle migration: 2018/19-23/24 to 2020/21-25/26. This does not impact funds in the current FTIP cycle. 3746 HBP R/W Local Match Fed. Reimb. Rate: 100.00% 3/18/2015 DLA-Admin: Not ready to ad within 6 months. RW funds moved from FFY 15/16 to 17/18. NEPA not yet clear. 8/25/2019 Total: DLA-Admin: Fundline zeroed out due to FTIP cycle migration: 2016/17-21/22 to 2018/19-23/24. This does not impact funds in the current FTIP cycle. 3746 HBP R/W Local Match Fed. Reimb. Rate: 100.00% 3/25/2014 DLA-Admin: Not ready to ad within 6 months. RW funds moved from FFY 14/15 to 15/16. NEPA not yet clear. 8/17/2017 Total: DLA-Admin: Fundline zeroed out due to FTIP cycle migration: 2014/15-19/20 to 2016/17-21/22. This does not impact funds in the current FTIP cycle. 3746 HBP R/W Local Match Fed. Reimb. Rate: 100.00% 10/8/2013 Michael McCollum: Reimbursement changed to 100% (Toll Credits). Total: 10/8/2013 Michael McCollum: Move the R/W funds to the 14/15 fiscal year per the fall survey. 8/17/2017 DLA-Admin: Fundline zeroed out due to FTIP cycle migration: 2014/15-19/20 to 2016/17-21/22. This does not impact funds in the current FTIP cycle. 3746 HBP R/W 50,000 50,000 Local Match Fed. Reimb. Rate: 100.00% 11/2/2010 Michael McCollum: Reimbursement changed to 100% (Toll Credits). Total: 50,000 11/2/2010 Michael Mccollum: New Project -Program funds for R/W. CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed$ 2,000,000 2,000,000 Local Match LSSRP Bond Local AC Total 2,000,000 2,000,000 Phase Funding Details: Proj id Funds Src Phase Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total I 3746 HBP CON 2,000,000 2,000,000 Local Match Fed. Reimb. Rate: 100.00% 11/2/2010 Michael Mccollum: Reimbursement changed to 100% (Toll Credits). Total: 2,000,000 11/2/2010 Michael Mccollum: New Project -Program funds for Construction. Butte County BRIDGE NO. 12C0242, ORD FERRY ROAD, OVER LITTLE CHICO CREEK, 1 Ml EAST OF RIVER ROAD. Replace the existing 2 lane structurally deficient bridge with a new 2 lane bridge. Fed Proj: BRLS-5912(103) Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total PE 1,250,000 1,250,000 R/W 25,000 25,000 CON 12,213,750 12,213,750 Total 1,275,000 12,213,750 13,488,750 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed$ 1,128,758 10,812,833 11,941,590 Local Match 146,243 1,400,917 1,547,160 LSSRP Bond Local AC Total 1,275,000 12,213,750 13,488,750 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed$ 1,106,625 1,106,625 Local Match 143,375 143,375 LSSRP Bond Local AC Total 1,250,000 1,250,000 Phase Funding Details: Proj id Funds Src Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Phase Total I 4153 HBP PE 1,106,625 1,106,625 Local Match 143,375 143,375 Fed. Reimb. Rate: 88.53% 10/18/2013 Michael Mccollum: New Project. Programmed PE funds per Ex. 6-A submitted by the agency. Total: 1,250,000 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Fed$ 22,133 Local Match 2,868 LSSRP Bond Local AC Total 25,000 Phase Funding Details: Proj id Funds Src Phase Prior 20/21 21/22 22/23 23/24 24/25 25/26 4153 HBP R/W 22,133 -22,133 Local Match 2,868 -2,868 Fed. Reimb. Rate: 88.53% 9/16/2019 Vlad Popko: Not ready to ad within 6 months. RW funds moved from FFY 21/22 to 19/20. As requested in September 2019 Survey. 4153 HBP R/W -22,133 22,133 Local Match -2,868 2,868 Fed. Reimb. Rate: 88.53% 10/16/2018 DLA-Admin: Not ready to ad within 6 months. RW funds moved from FFY 19/20 to 21/22. NEPA not yet clear. 4153 HBP R/W Local Match Fed. Reimb. Rate: 88.53% 10/10/2016 DLA-Admin: Not ready to ad within 6 months. RW funds moved from FFY 17/18 to 19/20. NEPA not yet clear. 7/27/2021 DLA-Admin: Fundline zeroed out due to FTIP cycle migration: 2018/19-23/24 to 2020/21-25/26. This does not impact funds in the current FTIP cycle. 4153 HBP R/W Local Match Fed. Reimb. Rate: 88.53% 10/23/2014 DLA-Admin: Not ready to ad within 6 months. RW funds moved from FFY 16/17 to 17/18. NEPA not yet clear. 8/25/2019 DLA-Admin: Fundline zeroed out due to FTIP cycle migration: 2016/17-21/22 to 2018/19-23/24. This does not impact funds in the current FTIP cycle. 4153 HBP R/W Local Match Fed. Reimb. Rate: 88.53% 9/18/2014 Michael McCollum: Move R/W to 16/17 per agency survey. 8/25/2019 DLA-Admin: Fundline zeroed out due to FTIP cycle migration: 2016/17-21/22 to 2018/19-23/24. This does not impact funds in the current FTIP cycle. 4153 HBP R/W 22,133 Local Match 2,868 Fed. Reimb. Rate: 88.53% 10/18/2013 Michael McColl um: New Project. Programmed R/W funds per Ex. 6-A submitted by the agency. Beyond Beyond Total: Total: Total: Total: Total: Total: Total 22,133 2,868 25,000 Total I 22,133 2,868 25,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Fed$ 10,812,833 Local Match 1,400,917 LSSRP Bond Local AC Total 12,213,750 Phase Funding Details: Proj id Funds Src Phase Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond 4153 HBP CON 10,812,833 -10,812,833 Local Match 1,400,917 -1,400,917 Fed. Reimb. Rate: 88.53% 3/20/2023 DLA-Admin: Ready to Advertise. CON funds moved from FFY 25/26 to 22/23. Project ready to advertise. Total: 4153 HBP CON -10,812,833 10,812,833 Local Match -1,400,917 1,400,917 Fed. Reimb. Rate: 88.53% 10/24/2022 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 24/25 to 25/26. Action taken to financially Total: constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. 4153 HBP CON -10,812,833 10,812,833 Local Match -1,400,917 1,400,917 Fed. Reimb. Rate: 88.53% 10/24/2022 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 23/24 to 24/25. Action taken to financially Total: constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. 4153 HBP CON -10,812,833 10,812,833 Local Match -1,400,917 1,400,917 Fed. Reimb. Rate: 88.53% 10/24/2022 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 22/23 to 23/24. Action taken to financially Total: constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. 4153 HBP CON 10,812,833 -10,812,833 Local Match 1,400,917 -1,400,917 Fed. Reimb. Rate: 88.53% 10/20/2022 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY Beyond to 22/23. As requested in 2022 HBP Total: Annual Status. 4153 HBP CON 5,270,855 Local Match 682,895 Fed. Reimb. Rate: 88.53% 10/5/2022 DLA-Admin: Cost increase per 6D (09/07/2021). Total: 4153 HBP CON -5,541,978 5,541,978 Local Match -718,022 718,022 Fed. Reimb. Rate: 88.53% 11/5/2020 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 23/24 to Beyond. Action taken to financially Total: constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. Total 10,812,833 1,400,917 12,213,750 Total I New! 5,270,855 682,895 5,953,750 4153 HBP CON -5,541,978 5,541,978 Local Match -718,022 718,022 Fed. Reimb. Rate: 88.53% 11/4/2020 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 22/23 to 23/24. Action taken to financially constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. 4153 HBP CON -5,541,978 5,541,978 Local Match -718,022 718,022 Fed. Reimb. Rate: 88.53% 11/4/2020 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 21/22 to 22/23. Action taken to financially constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. 4153 HBP CON 5,541,978 Local Match 718,022 Fed. Reimb. Rate: 88.53% 9/9/2020 Robert Brown: Not ready to ad within 6 months. CON funds moved from FFY Beyond to 21/22. As requested in September 2020 Survey. 4153 HBP CON Local Match Fed. Reimb. Rate: 88.53% 10/18/2013 Michael McColl um: New Project. Programmed Construction funds per Ex. 6-A submitted by the agency. Total: Total: -5,541,978 -718,022 Total: 5,541,978 718,022 Total: 5,541,978 718,022 6,260,000 Butte County BRIDGE NO. 12C0301, CANA HWY OVER PINE CREEK, 4 Ml W/0 S R 99. Standalone Scour Countermeasure Project. Fed Proj: Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total PE 127,000 127,000 R/W 20,000 20,000 CON 612,500 612,500 Total 127,000 632,500 759,500 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed$ 112,433 559,952 672,385 Local Match 14,567 72,548 87,115 LSSRP Bond Local AC Total 127,000 632,500 759,500 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed$ 112,433 112,433 Local Match 14,567 14,567 LSSRP Bond Local AC Total 127,000 127,000 Phase Funding Details: Proj id Funds Src Phase Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total I 4701 HBP PE 112,433 -112,433 Local Match 14,567 -14,567 ----Fed. Reimb. Rate: 88.53% 9/6/2022 Bobby Zezoff: Not ready to ad within 6 months. PE funds moved from FFY Beyond to 24/25. 2022 Prioritized Project, new Total: eligible project 4701 HBP PE 112,433 112,433 Local Match 14,567 14,567 ---- Fed. Reimb. Rate: 88.53% 12/2/2019 Bobby Zezoff: Eligible stand-alone scour countermeasure project, added to prioritization list. Total: 127,000 R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 Fed$ Local Match LSSRP Bond Local AC Total Phase Funding Details: Proj id Funds Src Phase Prior 20/21 21/22 22/23 23/24 24/25 4701 HBP R/W Local Match Fed. Reimb. Rate: 88.53% 12/2/2019 Bobby Zezoff: Eligible stand-alone scour countermeasure project, added to prioritization list. CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 Fed$ Local Match LSSRP Bond Local AC Total Phase Funding Details: Proj id Funds Src Phase Prior 20/21 21/22 22/23 23/24 24/25 4701 HBP CON Local Match Fed. Reimb. Rate: 88.53% 12/2/2019 Bobby Zezoff: Eligible stand-alone scour countermeasure project, added to prioritization list. 25/26 25/26 25/26 25/26 Beyond Total 17,706 17,706 2,294 2,294 20,000 20,000 Beyond Total I 17,706 17,706 2,294 2,294 Total: 20,000 Beyond Total 542,246 542,246 70,254 70,254 612,500 612,500 Beyond Total I 542,246 542,246 70,254 70,254 Total: 612,500 Butte County BRIDGE NO. PM00155, Bridge Preventive Maintenance Program (BPMP) various bridges in the Butte County. See Caltrans Local Assistance HBP website for backup list of projects. Fed Proj: BPMP-5912(119) Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total PE 191,220 191,220 R/W CON 1,123,327 1,123,327 Total 191,220 1,123,327 1,314,547 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed$ 169,287 994,481 1,163,768 Local Match 21,933 128,846 150,779 LSSRP Bond Local AC Total 191,220 1,123,327 1,314,547 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed$ 169,287 169,287 Local Match 21,933 21,933 LSSRP Bond Local AC Total 191,220 191,220 Phase Funding Details: Proj id Funds Src Phase Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total 4483 HBP PE Local Match Fed. Reimb. Rate: 88.53% 10/6/2017 DLA-Admin: Not ready to ad within 6 months. PE funds moved from FFY 17/18 to 19/20. Project needs prioritization before Total: advancement. 7/27/2021 DLA-Admin: Fundline zeroed out due to FTIP cycle migration: 2018/19-23/24 to 2020/21-25/26. This does not impact funds in the current FTIP cycle. 4483 HBP PE -52,038 -52,038 Local Match -6,742 -6,742 Fed. Reimb. Rate: 88.53% 10/4/2017 Darlene Wulff: Update according to September submittal Total: -58,780 4483 HBP PE 22,133 22,133 Local Match 2,868 2,868 Fed. Reimb. Rate: 88.53% 2/22/2017 Linda Newton: Revised funding to match BPMP Plan list. Total: 25,000 4483 HBP PE Local Match Fed. Reimb. Rate: 88.53% 10/23/2016 DLA-Admin: Not ready to ad within 6 months. PE funds moved from FFY 17/18 to 19/20. New project must be amended into Total: the FTIP. NEPA not yet clear. 7/27/2021 DLA-Admin: Fundline zeroed out due to FTIP cycle migration: 2018/19-23/24 to 2020/21-25/26. This does not impact funds in the current FTIP cycle. 4483 HBP PE 199, 193 199,193 Local Match 25,808 25,808 Fed. Reimb. Rate: 88.53% 10/7/2016 Linda Newton: New eligible project. Total: 225,000 CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed$ 994,481 994,481 Local Match 128,846 128,846 LSSRP Bond Local AC Total 1,123,327 1,123,327 Phase Funding Details: Proj id Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Funds Src Phase Total I 4483 HBP CON -169,287 -169,287 Local Match -21,933 -21,933 Fed. Reimb. Rate: 88.53% 3/16/2020 Eileen Crawford: CON funding modified to match current posted BPMP plan Total: -191,220 4483 HBP CON -771,651 771,651 Local Match -99,976 99,976 Fed. Reimb. Rate: 88.53% 10/6/2017 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 17/18 to Beyond. Project needs prioritzation Total: before advancement. 4483 HBP CON 771,651 -550,325 221,326 Local Match 99,976 -71,301 28,675 Fed. Reimb. Rate: 88.53% 10/4/2017 Darlene Wulff: Update according to 2017 September submittal Total: 250,001 4483 HBP CON -565,579 942,443 376,863 Local Match -73,277 122,103 48,827 Fed. Reimb. Rate: 88.53% 2/22/2017 Linda Newton: Revised funding to match BPMP Plan list. Moved CON to beyond, NEPA not clear. Total: 425,690 4483 HBP CON 565,579 565,579 Local Match 73,277 73,277 Fed. Reimb. Rate: 88.53% 10/7/2016 Linda Newton: New eligible project. Total: 638,856 Chico BRIDGE NO. 12C0328, POMONA ROAD OVER LITTLE CHICO CREEK, 0.4 Ml SE/O MILLER AVE. Reolace the existing 2 lane bridge, without adding lane capacity. 11/2/2010: Toll Credits programmed for PE, R/W, & CON., Fed Proj: BRLO-5037(024) Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total PE 825,000 825,000 R/W 120,000 120,000 CON 3,295,000 3,295,000 Total 825,000 120,000 3,295,000 4,240,000 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed$ 825,000 120,000 3,295,000 4,240,000 Local Match LSSRP Bond Local AC Total 825,000 120,000 3,295,000 4,240,000 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed$ 825,000 825,000 Local Match LSSRP Bond Local AC Total 825,000 825,000 Phase Funding Details: Proj id Funds Src Phase Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total I 3766 HBP PE 569,000 569,000 Local Match Fed. Reimb. Rate: 100.00% 9/30/2016 Michael Mccollum: Adjust funds per fall survey and Ex. 6-D. Total: 569,000 3766 HBP PE 256,000 256,000 Local Match Fed. Reimb. Rate: 100.00% 11/2/2010 Harminder Basi: Reimbursement changed to 100% (Toll Credits). Total: 256,000 11/2/2010 Harminder Basi: Funds requested with Fall 2010 application: Not ready to ad within 6 months R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed$ 120,000 120,000 Local Match LSSRP Bond Local AC Total 120,000 120,000 Phase Funding Details: Proj id Funds Src Phase Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total I 3766 HBP R/W -120,000 120,000 Local Match Fed. Reimb. Rate: 100.00% 10/22/2019 DLA-Admin: Not ready to ad within 6 months. RW funds moved from FFY 20/21 to 21/22. NEPA not yet clear. Total: 3766 HBP R/W 120,000 -120,000 Local Match Fed. Reimb. Rate: 100.00% 9/10/2019 Vlad Popko: Not ready to ad within 6 months. RW funds moved from FFY 21/22 to 20/21. As requested in September 2019 Total: Survey. 3766 HBP R/W -120,000 120,000 Local Match Fed. Reimb. Rate: 100.00% 10/16/2018 DLA-Admin: Not ready to ad within 6 months. RW funds moved from FFY 19/20 to 21/22. NEPA not yet clear. Total: 3766 HBP R/W Local Match Fed. Reimb. Rate: 100.00% 10/10/2017 DLA-Admin: Not ready to ad within 6 months. RW funds moved from FFY 18/19 to 19/20. NEPA not yet clear. 7/27/2021 Total: DLA-Admin: Fundline zeroed out due to FTIP cycle migration: 2018/19-23/24 to 2020/21-25/26. This does not impact funds in the current FTIP cycle. 3766 HBP R/W Local Match Fed. Reimb. Rate: 100.00% 9/6/2017 Darlene Wulff: Not ready to ad within 6 months. RW funds moved from FFY 19/20 to 18/19. As requested in September 2017 Total: Survey. 7/27/2021 DLA-Admin: Fundline zeroed out due to FTIP cycle migration: 2018/19-23/24 to 2020/21-25/26. This does not impact funds in the current FTIP cycle. 3766 HBP R/W Local Match Fed. Reimb. Rate: 100.00% 10/10/2016 DLA-Admin: Not ready to ad within 6 months. RW funds moved from FFY 17/18 to 19/20. NEPA not yet clear. 7/27/2021 Total: DLA-Admin: Fundline zeroed out due to FTIP cycle migration: 2018/19-23/24 to 2020/21-25/26. This does not impact funds in the current FTIP cycle. 3766 HBP R/W 20,000 20,000 Local Match Fed. Reimb. Rate: 100.00% 9/30/2016 Michael Mccollum: Adjust funds per fall survey and Ex. 6-D. Total: 20,000 3766 HBP R/W Local Match Fed. Reimb. Rate: 100.00% 10/19/2015 DLA-Admin: Not ready to ad within 6 months. RW funds moved from FFY 15/16 to 17/18. NEPA not yet clear. 8/25/2019 Total: DLA-Admin: Fundline zeroed out due to FTIP cycle migration: 2016/17-21/22 to 2018/19-23/24. This does not impact funds in the current FTIP cycle. 3766 HBP R/W Local Match Fed. Reimb. Rate: 100.00% 9/22/2015 Michael Mccollum: Change R/W year per fall survey. 8/25/2019 DLA-Admin: Fundline zeroed out due to FTIP cycle migration: Total: 2016/17-21/22 to 2018/19-23/24. This does not impact funds in the current FTIP cycle. 3766 HBP R/W Local Match Fed. Reimb. Rate: 100.00% 3/18/2015 DLA-Admin: Not ready to ad within 6 months. RW funds moved from FFY 15/16 to 17/18. NEPA not yet clear. 8/25/2019 Total: DLA-Admin: Fundline zeroed out due to FTIP cycle migration: 2016/17-21/22 to 2018/19-23/24. This does not impact funds in the current FTIP cycle. 3766 HBP R/W Local Match Fed. Reimb. Rate: 100.00% 3/25/2014 DLA-Admin: Not ready to ad within 6 months. RW funds moved from FFY 13/14 to 15/16. NEPA not yet clear. 8/17/2017 Total: DLA-Admin: Fundline zeroed out due to FTIP cycle migration: 2014/15-19/20 to 2016/17-21/22. This does not impact funds in the current FTIP cycle. 3766 HBP R/W Local Match Fed. Reimb. Rate: 100.00% 10/8/2013 Michael Mccollum: Reimbursement changed to 100% (Toll Credits). Total: 10/8/2013 Michael McCollum: Move R/W funds the current fiscal year per fall survey. 8/21/2015 DLA-Admin: Fundline zeroed out due to FTIP cycle migration: 2012/13-17/18 to 2014/15-19/20. This does not impact funds in the current FTIP cycle. 3766 HBP R/W 100,000 100,000 Local Match Fed. Reimb. Rate: 100.00% 11/2/2010 Harminder Basi: Reimbursement changed to 100% (Toll Credits). Total: 100,000 11/2/2010 Harminder Basi: Funds requested with Fall 2010 application: Not ready to ad within 6 months CON Summary: Fed$ Local Match Prior 20/21 21/22 22/23 23/24 24/25 3,295,000 25/26 Beyond Total 3,295,000 LSSRP Bond Phase Funding Details: Proj id Funds Src 3766 HBP Local Match Fed. Reimb. Rate: 100.00% 3766 HBP Local Match Fed. Reimb. Rate: 100.00% 3766 HBP Local Match Fed. Reimb. Rate: 100.00% 3766 HBP Local Match Fed. Reimb. Rate: 100.00% 3766 HBP Local Match Fed. Reimb. Rate: 100.00% 3766 HBP Local Match Fed. Reimb. Rate: 100.00% 3766 HBP Local Match Fed. Reimb. Rate: 100.00% Local AC Total 3,295,000 3,295,000 Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Phase Total CON -3,295,000 3,295,000 10/24/2022 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 23/24 to 24/25. Action taken to financially Total: constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. CON -3,295,000 3,295,000 10/24/2022 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 22/23 to 23/24. Action taken to financially Total: constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. CON 3,295,000 -3,295,000 8/29/2022 Robert Brown: Not ready to ad within 6 months. CON funds moved from FFY Beyond to 22/23. As requested in August 2022 Total: Status. CON -3,295,000 3,295,000 11/2/2020 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 23/24 to Beyond. Action taken to financially Total: constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. CON -3,295,000 3,295,000 11/2/2020 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 22/23 to 23/24. Action taken to financially Total: constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. CON 3,295,000 -3,295,000 9/9/2020 Vlad Popko: Not ready to ad within 6 months. CON funds moved from FFY Beyond to 22/23. As requested in September 2020 Total: Survey. CON -3,295,000 3,295,000 10/25/2018 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 21/22 to Beyond. Action taken to financially Total: constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. 3766 HBP Local Match Fed. Reimb. Rate: 100.00% 3766 HBP Local Match Fed. Reimb. Rate: 100.00% 3766 HBP Local Match Fed. Reimb. Rate: 100.00% 3766 HBP Local Match Fed. Reimb. Rate: 100.00% 3766 HBP Local Match Fed. Reimb. Rate: 100.00% 3766 HBP Local Match Fed. Reimb. Rate: 100.00% 3766 HBP Local Match Fed. Reimb. Rate: 100.00% 3766 HBP Local Match Fed. Reimb. Rate: 100.00% 3766 HBP Local Match Fed. Reimb. Rate: 100.00% CON -3,295,000 3,295,000 10/24/2018 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 20/21 to 21/22. Action taken to financially constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. CON 3,295,000 9/28/2018 Tou Vang: Not ready to ad within 6 months. CON funds moved from FFY Beyond to 20/21. As requested in September 2018 Survey. CON -3,295,000 10/24/2017 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 21/22 to Beyond. Action taken to financially constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. CON -3,295,000 3,295,000 10/24/2017 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 20/21 to 21/22. Action taken to financially constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. CON -3,295,000 3,295,000 10/24/2017 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 19/20 to 20/21. Action taken to financially constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. CON 3,295,000 9/6/2017 Darlene Wulff: Not ready to ad within 6 months. CON funds moved from FFY Beyond to 19/20. As requested in September 2017 Survey. CON -3,295,000 10/25/2016 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 19/20 to Beyond. Action taken to financially constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. CON 1,860,000 9/30/2016 Michael McCollum: Adjust funds per fall survey and Ex. 6-D. CON 10/29/2015 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 18/19 to 19/20. Action taken to financially constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. 7/27/2021 DLA-Admin: Fundline zeroed out due to FTIP cycle migration: 2018/19-23/24 to 2020/21-25/26. This does not impact funds in the current FTIP cycle. Total: -3,295,000 Total: 3,295,000 Total: Total: Total: -3,295,000 Total: 3,295,000 Total: 1,860,000 Total: 1,860,000 Total: 3766 HBP Local Match Fed. Reimb. Rate: 100.00% 3766 HBP Local Match Fed. Reimb. Rate: 100.00% 3766 HBP Local Match Fed. Reimb. Rate: 100.00% 3766 HBP Local Match Fed. Reimb. Rate: 100.00% 3766 HBP Local Match Fed. Reimb. Rate: 100.00% 3766 HBP Local Match Fed. Reimb. Rate: 100.00% 3766 HBP Local Match Fed. Reimb. Rate: 100.00% 3766 HBP Local Match Fed. Reimb. Rate: 100.00% CON 10/29/2015 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 17/18 to 18/19. Action taken to financially constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. 7/27/2021 DLA-Admin: Fundline zeroed out due to FTIP cycle migration: 2018/19-23/24 to 2020/21-25/26. This does not impact funds in the current FTIP cycle. CON 1,435,000 9/22/2015 Michael Mccollum: Change Construction fund year per fall survey CON -1,435,000 10/28/2014 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 16/17 to Beyond. Action taken to financially constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. CON 1,435,000 10/13/2014 Wesley Zinke: Revised CON funding as requested in September 2014 Survey. CON -1,435,000 10/8/2013 Michael McCollum: Reimbursement changed to 100% (Toll Credits). 3/26/2013 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 15/16 to Beyond. Action taken to financially constrain the FTIP (PUSH). CON 10/8/2013 Michael Mccollum: Reimbursement changed to 100% (Toll Credits). 10/26/2012 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 14/15 to 15/16. Action taken to financially constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. 8/17/2017 DLA-Admin: Fundline zeroed out due to FTIP cycle migration: 2014/15-19/20 to 2016/17-21/22. This does not impact funds in the current FTIP cycle. CON 10/8/2013 Michael McCollum: Reimbursement changed to 100% (Toll Credits). 10/26/2012 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 13/14 to 14/15. Action taken to financially constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. 8/17/2017 DLA-Admin: Fundline zeroed out due to FTIP cycle migration: 2014/15-19/20 to 2016/17-21/22. This does not impact funds in the current FTIP cycle. CON 1,435,000 11/2/2010 Harminder Basi: Reimbursement changed to 100% (Toll Credits). 11/2/2010 Harminder Basi: Funds requested with Fall 2010 application: Not ready to ad within 6 months Total: -1,435,000 Total: 1,435,000 Total: -1,435,000 Total: 1,435,000 Total: Total: Total: 1,435,000 Total: 1,435,000 Chico BRIDGE NO. 12C0336, SALEM STREET OVER LITTLE CHICO CREEK, 0.1 Ml N OF 10TH ST. Replace 2-Lane bridge with 2-lane bridge. No Added Lane capacity: Toll Credits programmed for PE, R/W, & CON. Fed Proj: BRLO-5037(022) Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total PE 850,000 850,000 R/W 100,000 100,000 CON 3,584,000 3,584,000 Total 850,000 100,000 3,584,000 4,534,000 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed$ 850,000 100,000 3,584,000 4,534,000 Local Match LSSRP Bond Local AC Total 850,000 100,000 3,584,000 4,534,000 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed$ 850,000 850,000 Local Match LSSRP Bond Local AC Total 850,000 850,000 Phase Funding Details: Proj id Funds Src Phase Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total 3779 HBP PE Local Match Fed. Reimb. Rate: 100.00% 9/15/2017 Darlene Wulff: Not ready to ad within 6 months. PE funds moved from FFY 16/17 to 17/18. Ran out of FFY 16/17 OA. Move Total: to FFY 17/18. 8/25/2019 DLA-Admin: Fundline zeroed out due to FTIP cycle migration: 2016/17-21/22 to 2018/19-23/24. This does not impact funds in the current FTIP cycle. 3779 HBP PE 623,500 623,500 Local Match Fed. Reimb. Rate: 100.00% 9/30/2016 Michael McCollum: Adjusted funds per the fall survey and Ex. 6-D. Total: 623,500 3779 HBP PE 226,500 226,500 Local Match Fed. Reimb. Rate: 100.00% 11/2/2010 Harminder Basi: Reimbursement changed to 100% (Toll Credits). Total: 226,500 11/2/2010 Harminder Basi: Funds requested with Fall 2010 application: Not ready to ad within 6 months R/W Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Fed$ 100,000 Local Match LSSRP Bond Local AC Total 100,000 Phase Funding Details: Proj id Funds Src Phase Prior 20/21 21/22 22/23 23/24 24/25 25/26 3779 HBP R/W 100,000 -100,000 Local Match Fed. Reimb. Rate: 100.00% 3/8/2022 Andy Chou: Not ready to ad within 6 months. RW funds moved from FFY 23/24 to 21/22. Phase being advanced with EPSP. 3779 HBP R/W -100,000 100,000 Local Match Fed. Reimb. Rate: 100.00% 10/20/2021 DLA-Admin: Not ready to ad within 6 months. RW funds moved from FFY 21/22 to 23/24. Project has not received authorization to proceed. Move funding out. 3779 HBP R/W -100,000 100,000 Local Match Fed. Reimb. Rate: 100.00% 10/22/2019 DLA-Admin: Not ready to ad within 6 months. RW funds moved from FFY 20/21 to 21/22. NEPA not yet clear. 3779 HBP R/W 100,000 -100,000 Local Match Fed. Reimb. Rate: 100.00% 9/10/2019 Vlad Popko: Not ready to ad within 6 months. RW funds moved from FFY 21/22 to 20/21. As requested in September 2019 Survey. 3779 HBP R/W -100,000 100,000 Local Match Fed. Reimb. Rate: 100.00% 10/16/2018 DLA-Admin: Not ready to ad within 6 months. RW funds moved from FFY 19/20 to 21/22. NEPA not yet clear. 3779 HBP R/W Local Match Fed. Reimb. Rate: 100.00% 10/10/2017 DLA-Admin: Not ready to ad within 6 months. RW funds moved from FFY 18/19 to 19/20. NEPA not yet clear. 7/27/2021 DLA-Admin: Fundline zeroed out due to FTIP cycle migration: 2018/19-23/24 to 2020/21-25/26. This does not impact funds in the current FTIP cycle. 3779 HBP R/W Local Match Fed. Reimb. Rate: 100.00% 9/6/2017 Darlene Wulff: Not ready to ad within 6 months. RW funds moved from FFY 19/20 to 18/19. As requested in September 2017 Survey. 7/27/2021 DLA-Admin: Fundline zeroed out due to FTIP cycle migration: 2018/19-23/24 to 2020/21-25/26. This does not impact funds in the current FTIP cycle. Beyond Beyond Total: Total: Total: Total: Total: Total: Total: Total 100,000 100,000 Total I 3779 HBP Local Match Fed. Reimb. Rate: 100.00% 3779 HBP Local Match Fed. Reimb. Rate: 100.00% 3779 HBP Local Match Fed. Reimb. Rate: 100.00% 3779 HBP Local Match Fed. Reimb. Rate: 100.00% 3779 HBP Local Match Fed. Reimb. Rate: 100.00% 3779 HBP Local Match Fed. Reimb. Rate: 100.00% 3779 HBP Local Match Fed. Reimb. Rate: 100.00% 3779 HBP Local Match Fed. Reimb. Rate: 100.00% R/W 10/10/2016 DLA-Admin: Not ready to ad within 6 months. RW funds moved from FFY 18/19 to 19/20. NEPA not yet clear. 7/27/2021 Total: DLA-Admin: Fundline zeroed out due to FTIP cycle migration: 2018/19-23/24 to 2020/21-25/26. This does not impact funds in the current FTIP cycle. R/W 9/30/2016 Michael Mccollum: Adjusted funds per the fall survey and Ex. 6-D. 7/27/2021 DLA-Admin: Fundline zeroed out due to FTIP Total: cycle migration: 2018/19-23/24 to 2020/21-25/26. This does not impact funds in the current FTIP cycle. R/W 10/20/2015 DLA-Admin: Not ready to ad within 6 months. RW funds moved from FFY 15/16 to 17/18. NEPA not yet clear. 8/25/2019 Total: DLA-Admin: Fundline zeroed out due to FTIP cycle migration: 2016/17-21/22 to 2018/19-23/24. This does not impact funds in the current FTIP cycle. R/W 9/22/2015 Michael Mccollum: Move R/W funds to the 15/16 fiscal year per the fall survey. 8/25/2019 DLA-Admin: Fundline zeroed out Total: due to FTIP cycle migration: 2016/17-21/22 to 2018/19-23/24. This does not impact funds in the current FTIP cycle. R/W 3/18/2015 DLA-Admin: Not ready to ad within 6 months. RW funds moved from FFY 15/16 to 17/18. NEPA not yet clear. 8/25/2019 Total: DLA-Admin: Fundline zeroed out due to FTIP cycle migration: 2016/17-21/22 to 2018/19-23/24. This does not impact funds in the current FTIP cycle. R/W 3/25/2014 DLA-Admin: Not ready to ad within 6 months. RW funds moved from FFY 13/14 to 15/16. NEPA not yet clear. 8/17/2017 Total: DLA-Admin: Fundline zeroed out due to FTIP cycle migration: 2014/15-19/20 to 2016/17-21/22. This does not impact funds in the current FTIP cycle. R/W 10/8/2013 Michael Mccollum: Reimbursement changed to 100% (Toll Credits). Total: 10/8/2013 Michael McCollum: Move R/W funds to the current fiscal year per the fall survey. 8/21/2015 DLA-Admin: Fund line zeroed out due to FTIP cycle migration: 2012/13-17/18 to 2014/15-19/20. This does not impact funds in the current FTIP cycle. R/W 100,000 100,000 11/2/2010 Harminder Basi: Reimbursement changed to 100% (Toll Credits). Total: 100,00011/2/2010 Harminder Basi: Funds requested with Fall 2010 application: Not ready to ad within 6 months CON Summary: Fed$ Local Match Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond 3,584,000 Total 3,584,000 LSSRP Bond Phase Funding Details: Proj id Funds Src 3779 HBP Local Match Fed. Reimb. Rate: 100.00% 3779 HBP Local Match Fed. Reimb. Rate: 100.00% 3779 HBP Local Match Fed. Reimb. Rate: 100.00% 3779 HBP Local Match Fed. Reimb. Rate: 100.00% 3779 HBP Local Match Fed. Reimb. Rate: 100.00% 3779 HBP Local Match Fed. Reimb. Rate: 100.00% 3779 HBP Local Match Fed. Reimb. Rate: 100.00% Local AC Total 3,584,000 3,584,000 Phase CON Prior 20/21 21/22 22/23 23/24 24/25 25/26 -3,584,000 Beyond 3,584,000 Total I 10/24/2022 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 25/26 to Beyond. Action taken to financially constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. CON -3,584,000 3,584,000 Total: 10/24/2022 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 24/25 to 25/26. Action taken to financially constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. CON -3,584,000 3,584,000 Total: 10/24/2022 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 23/24 to 24/25. Action taken to financially constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. CON -3,584,000 3,584,000 Total: 10/24/2022 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 22/23 to 23/24. Action taken to financially constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. CON 3,584,000 Total: -3,584,000 8/29/2022 Robert Brown: Not ready to ad within 6 months. CON funds moved from FFY Beyond to 22/23. As requested in August 2022 Status. CON Total: 189,000 189,000 10/12/2021 DLA-Admin: Adjusting fund line to match LAPG-6A cost increase. CON -3,395,000 Total: 3,395,000 189,000 11/2/2020 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 23/24 to Beyond. Action taken to financially constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. Total: 3779 HBP Local Match Fed. Reimb. Rate: 100.00% 3779 HBP Local Match Fed. Reimb. Rate: 100.00% 3779 HBP Local Match Fed. Reimb. Rate: 100.00% 3779 HBP Local Match Fed. Reimb. Rate: 100.00% 3779 HBP Local Match Fed. Reimb. Rate: 100.00% 3779 HBP Local Match Fed. Reimb. Rate: 100.00% 3779 HBP Local Match Fed. Reimb. Rate: 100.00% 3779 HBP Local Match Fed. Reimb. Rate: 100.00% 3779 HBP Local Match Fed. Reimb. Rate: 100.00% CON -3,395,000 3,395,000 11/2/2020 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 22/23 to 23/24. Action taken to financially constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. CON 3,395,000 9/9/2020 Vlad Popko: Not ready to ad within 6 months. CON funds moved from FFY Beyond to 22/23. As requested in September 2020 Survey. CON -3,395,000 10/25/2018 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 21/22 to Beyond. Action taken to financially constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. CON -3,395,000 3,395,000 10/24/2018 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 20/21 to 21/22. Action taken to financially constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. CON 3,395,000 9/28/2018 Tou Vang: Not ready to ad within 6 months. CON funds moved from FFY Beyond to 20/21. As requested in September 2018 Survey. CON -3,395,000 10/24/2017 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 21/22 to Beyond. Action taken to financially constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. CON -3,395,000 3,395,000 10/24/2017 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 20/21 to 21/22. Action taken to financially constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. CON 3,395,000 9/6/2017 Darlene Wulff: Not ready to ad within 6 months. CON funds moved from FFY Beyond to 20/21. As requested in September 2017 Survey. CON 9/30/2016 Michael McCollum: Adjusted funds per the fall survey and Ex. 6-D. Total: -3,395,000 Total: 3,395,000 Total: Total: -3,395,000 Total: 3,395,000 Total: Total: -3,395,000 Total: 2,125,500 Total: 2,125,500 2,125,500 3779 HBP Local Match Fed. Reimb. Rate: 100.00% 3779 HBP Local Match Fed. Reimb. Rate: 100.00% 3779 HBP Local Match Fed. Reimb. Rate: 100.00% 3779 HBP Local Match Fed. Reimb. Rate: 100.00% 3779 HBP Local Match Fed. Reimb. Rate: 100.00% 3779 HBP Local Match Fed. Reimb. Rate: 100.00% 3779 HBP Local Match Fed. Reimb. Rate: 100.00% 3779 HBP Local Match Fed. Reimb. Rate: 100.00% CON -1,269,500 10/29/2015 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 19/20 to Beyond. Action taken to financially constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. CON 10/29/2015 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 18/19 to 19/20. Action taken to financially constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. 7/27/2021 DLA-Admin: Fundline zeroed out due to FTIP cycle migration: 2018/19-23/24 to 2020/21-25/26. This does not impact funds in the current FTIP cycle. CON 10/29/2015 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 17/18 to 18/19. Action taken to financially constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. 7/27/2021 DLA-Admin: Fundline zeroed out due to FTIP cycle migration: 2018/19-23/24 to 2020/21-25/26. This does not impact funds in the current FTIP cycle. CON 1,269,500 9/22/2015 Michael Mccollum: Move Construction funds to 17/18 fiscal year per the fall survey. CON -1,269,500 10/28/2014 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 16/17 to Beyond. Action taken to financially constrain the FTIP (PUSH). Attempt will be made to program this project in year shown. CON 1,269,500 10/13/2014 Wesley Zinke: Revised CON funding as requested in September 2014 Survey. CON -1,269,500 3/22/2011 Eric Bost: Reimbursement changed to 100% (Toll Credits). 12/27/2010 Eric Bost: Moved from Yolo County to City of Chico. 11/10/2010 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 13/14 to Beyond. Action taken to financially constrain the FTIP (PUSH). CON 1,269,500 11/2/2010 Harminder Basi: Reimbursement changed to 100% (Toll Credits). 11/2/2010 Harminder Basi: Funds requested with Fall 2010 application: Not ready to ad within 6 months 1,269,500 Total: Total: Total: -1,269,500 Total: 1,269,500 Total: -1,269,500 Total: 1,269,500 Total: 1,269,500 Total: 1,269,500 Chico BRIDGE NO. PM00175, Bridge Preventive Maintenance Program (BPMP) various bridges in the City of Chico. See Caltrans Local Assistance HBP website for backup list of projects. Fed Proj: Phase Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total PE 482,300 482,300 R/W CON 1,446,814 1,446,814 Total 482,300 1,446,814 1,929,114 Fund Source Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed$ 385,840 1,157,451 1,543,291 Local Match 96,460 289,363 385,823 LSSRP Bond Local AC Total 482,300 1,446,814 1,929,114 PE Summary: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed$ 385,840 385,840 Local Match 96,460 96,460 LSSRP Bond Local AC Total 482,300 482,300 Phase Funding Details: Proj id Funds Src Phase Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total 4599 HBP PE 385,840 385,840 Local Match 96,460 96,460 Fed. Reimb. Rate: 80.00% 8/14/2021 DLA-Admin: Revise reimbursement rate from 88.53% to 80% for on system project. Total: 482,300 4599 HBP PE -426,980 -426,980 Local Match -55,320 -55,320 Fed. Reimb. Rate: 88.53% 8/14/2021 DLA-Admin: Revise reimbursement rate from 88.53% to 80% for on system project. Total: -482,300 4599 HBP PE -426,980 426,980 Local Match -55,320 55,320 Fed. Reimb. Rate: 88.53% 10/28/2020 DLA-Admin: Not ready to ad within 6 months. PE funds moved from FFY 21/22 to 23/24. Action taken to financially constrain Total: the FTIP (PUSH). Attempt will be made to program this project in year shown. 4599 HBP PE 426,980 Local Match 55,320 Fed. Reimb. Rate: 88.53% 1/22/2018 Linda Newton: New eligible project. CON Summary: Prior 20/21 21/22 22/23 23/24 24/25 Fed$ Local Match LSSRP Bond Local AC Total Phase Funding Details: Proj id Funds Src Phase Prior 20/21 21/22 22/23 23/24 24/25 4599 HBP CON Local Match Fed. Reimb. Rate: 80.00% 8/14/2021 DLA-Admin: Revise reimbursement rate from 88.53% to 80% for on system project. 4599 HBP CON Local Match Fed. Reimb. Rate: 88.53% 8/14/2021 DLA-Admin: Revise reimbursement rate from 88.53% to 80% for on system project. 4599 HBP CON Local Match Fed. Reimb. Rate: 88.53% 1/22/2018 Linda Newton: New eligible project 25/26 Total: Beyond 1,157,451 289,363 25/26 1,446,814 Beyond 1,157,451 289,363 Total: -1,280,864 -165,950 Total: 1,280,864 165,950 Total: 426,980 55,320 482,300 Total 1,157,451 289,363 1,446,814 Total I 1,157,451 289,363 1,446,814 -1,280,864 -165,950 -1,446,814 1,280,864 165,950 1,446,814 MPO Summary: Butte County Association Of Governments Number of Projects: 11 Total Costs: Prior 20/21 21/22 22/23 23/24 24/25 25/26 Beyond Total Fed$ 20,076,156 5,240,000 3,276,728 10,812,833 385,840 4,287,433 181,600 14,783,285 59,043,876 Local Match 3,287,585 1,400,917 96,460 234,567 45,400 1,844,106 6,909,035 LSSRP Bond Local AC 7,812,728 -5,000,000 -2,812,728 Total for all Phases 31,176,470 240,000 464,000 12,213,750 482,300 4,522,000 227,000 16,627,391 65,952,911