Dist-Co-Rte-KP-E.A.
Fact Sheet
EXCEPTION TO
PSR(PDS) REQUIREMENT
For STIP or SHOPP Projects with EIS or ND Environmental Documents
Project Description:
Briefly describe the project; what is the proposal? Note the type of project and/or major elements of work to be done, such as safety or operational improvement, roadway widening, rehabilitation, reconstruction, etc. Provide the geographic project limits and length; i.e. "…On Route 12 in Sonoma County between Napa St. (KP 60.7, PM 37.7) and Napa Rd. (KP 62.3, PM 38.7)".
Reason for Requesting Exception:
Be thorough, but brief; justification must be as complete and as convincing as possible in answering why a Project Study Report should be utilized as the project initiation document rather than a Project Study Report (Project Development Support).
Proposed Program Year:
List anticipated fiscal year that construction funding will be programmed.
Proposed Schedule:
Approve PSR:_______ PA&ED:________ PS&E:________ RTL:_______
List anticipated milestone dates
| Project Manager: .. | name |
.phone #: |
| Recommended for Approval: |
_________________signature___________________
|
_________
|
|
(Name) Chair, District Change Control Team |
date |
|
Approval By: |
_________________signature___________________
|
_________
|
|
(Name) Project Development Coordinator
|
date
|
*Note: If exception is approved, the following conditions apply to the PSR:
...........................................................