Manual Updates

This page last updated: April 10, 2014

You will need Adobe Acrobat Reader to view the files

Note: this page includes manual updates from 01/2010 thru 04/2013.





Memo to Designers

Section: Title: Date of
Memo:
Replaces
Memo Dated:
10-20 Attachment 1 Deck Slab Reinforcement Details 04/2013 New
11-1 Prestressed Concrete - Shop Drawing Review 04/2013 06/1993
11-1A Attachment A 04/2013 10/1996
20-12 Seismic Design Criteria for Bridge Widenings 04/2013 New
8-8 Deck Finishing and Quiet Decks 03/2013 New
11-28 Attachment 1 Prestress Clearances for Cast-In-Place Prestressed Box Girder Structures 01/2013 New
20-10 Fault Rupture 01/2013 01/2007
20-8 Analysis of Ordinary Bridges that Cross Faults 01/2013 New
3-7 Design Data Documentation and Evaluation of Anomalous Concrete Shafts 04/2012 06/2011
3-7 Attachment 1 04/2012 06/2011
3-7 Attachment 2 04/2012 06/2011
3-7 Attachment 3 04/2012 06/2011
3-7 Attachment 4 04/2012 06/2011
20-2 Site Seismicity for Temporary Bridge and Stage Construction 05/2011 12/2010
15-14 Loads for Temporary Highway Structures 12/2010 02/2004
15-14 Attachment 1 12/2010 02/2004
20-12 Bridges Widening Seismic Deisgn Criteria 12/2010 02/2003
11-3 Designer’s Checklist for Prestressing in Post-Tensioned Concrete Box Girders 11/2010 03/1994
11-28 Prestress Clearances for Cast-In-Place Prestressed Box Girder Structures 10/2010 11/1996
1-47 Attachment 1 08/2010 04/2010
20-4 Seismic Retrofit Guidlines for Bridges in California 07/2010 08/2004
20-4 Attachment A 07/2010 06/2008
20-1 Seismic Design Methodology 07/2010 01/1999
20-1 Attachment 1 07/2010 01/1999
10-5 Protection of Reinforcement Against Corrosion Due to Chlorides, Acids and Sulfates 06/2010 01/2002
10-6 Use of Prefabricated Epoxy Coated Reforcement in Marine Environments 06/2010 01/2002
9-3 Widening Existing Bridges 05/2010 04/1991
20-5 Identifying Seismic Design Criteria in the General Notes 05/2010 02/2003
1-47 General Notes 04/2010 04/2009
11-31 Curved Post-Tensioned Bridges 02/2010 03/1994
20-13 Tsunami Hazard Guidlines 01/2010 New
15-19 Implementation Memo 02/2014 New
15-19 Bridges With Skewed Supports 01/2014 New
11-8 Implementation Memo 03/2014 03/1994
11-8 Design Guidelines of Precast Prestressed Girders 03/2014 03/1994
5-5 Implementation Memo 04/2014 New
5-5 Design Criteria of Standard Earth Retaining Systems 04/2014 New
       
       

Bridge Design Specifications

Section: Title: Date of
Memo:
Replaces
Memo Dated:
Note: this page includes manual updates from 01/2010 thru 01/2013.
       
       
       

Bridge Design Details

Section: Title: Date of
Memo:
Replaces
Memo Dated:
9-10 9-10 Girder Layout Sheet Checklist 09/2010 New
9-20 9-20 Camber Diagrams for Cast-In-Place Concrete Girders 09/2010 New
9-21 9-21 Center of Gravity of Prestressing Force Diagram 09/2010 New
9-22 9-22 Concrete Strength and Type Limits 09/2010 New
10-30 9-30 Deck Joints: Cast-In-Place Concrete Girder 09/2010 New
10-50 9-50 Attachments 09/2010 New
10-30 Girder Reinforcement Sheet Check List 06/2010 New
10-20 Girder Reinforcement 06/2010 New
10-30A Attachments 06/2010 New
1-1 General Detailing 06/2010 New
1-3 Stationing and Curve Data 06/2010 New
1-4 Dimensioning and Notations 06/2010 New
1-5 Section Hatching 06/2010 New
1-7 Decimal Equivalents 06/2010 New
1-8 Useful Angles 06/2010 New
1-10 Project Plans Made From As-Built Plans Image 06/2010 New
1-11 Abbreviations 06/2010 New
1-12 Sheet Title Blocks and Signature Blocks 06/2010 New
1-14 Revision Dates 06/2010 New
1-15 Use of Standard Plans 06/2010 New
1-16 Use of Bridge Standard Detail Sheet (XS Sheets) 06/2010 New
1-17 Use of CADD Cells or Components 06/2010 New
1-18 Transmittal of Project Plan Sets to DES Office Engineer at Expedite 06/2010 New
1-19 Late Plan Changes 06/2010 New
1-20 Revisions to Contract Plans 06/2010 New
1-21 As-Built Plan Corrections 06/2010 New
1-22 Attachments 06/2010 New
12-1 General Plan (Railroad GP) 05/2010 New
12-2A Attachment A 05/2010 New
12-3 Railroad Advanced Planning Study 05/2010 New
12-4A Attachement 12-4A 05/2010 New
12-5A Attachement 12-5A 05/2010 New
12-6 General Plan Review (Railroad Submittal) 05/2010 New
12-7A Attachement 12-7A 05/2010 New
12-8 Railroad Overhead General Plan Transmittal 05/2010 New
12-9A Attachment 12-9A 05/2010 New
       
       
       

Bridge Design Aids

Section: Title: Date of
Memo:
Replaces
Memo Dated:
3-8 Mechanically Stablized Embankments 04/2013 New
3-8 Attachment 1 Attachment 1 04/2013 New
3-8 Attachment 2 Attachment 2 04/2013 New
3-8 Attachment 3 Attachment 3 04/2013 New
3-8 Attachment 4 Attachment 4 04/2013 New
3-8 Attachment 5 Attachment 5 04/2013 New
6-1 Precast-Prestressed Concreate Girders 07/2012 New
6-4 Prestressing Streel Design Properties 06/2012 New
14-2 Steel Column Casing Design and Details 11/2011 New
       
       
       

Seismic Design Criteria

Section: Title: Date of
Memo:
Replaces
Memo Dated:
1.7 Seismic Design Criteria (SDC 1.7 Full Version, OEE Release) 04/2013 11/2010
1.6 Seismic Design Criteria (SDC 1.6 Full Version, OEE Release) 11/2010 09/2009