California Department of Transportation
Main Page | Search | You are not logged in | Login | Register | Instructions
View Project Details
6
FRE
180
R71.8/74.5
STIP
34252_
NEAR CENTERVILLE FROM QUALITY AVENUE TO SMITH AVENUE
2C TO 4E ON EXISTING ALIGNMENT
10 – 20
300
February 2013
THE SCOPE OF THE POJECT INVOLVES WIDENING 2-LANE CONVENTIONAL HIGHWAY TO 4-LANE EXPRESSWAY, RE-ALIGNMENT OF COUNTY ROADS PREVIOUSLY CONNECTED TO HIGHWAY, NEW FRONTAGE ROADS, 2 STANDARD INTERSETIONS AND BRIDGE STRUCTURES OVER FOWLER SWITCH CANAL AND LONE TREE CANAL AT ROUTE 180 MAINLINE AND FRONTAGE ROAD CROSSINGS
Types of Work
  • Asphalt Concrete Surfacing
  • Bridge Railing
  • Bridge
  • Concrete Barrier
  • Culverts
  • Drainage
  • Earthwork
  • Electrical Facilities
  • Erosion Control
  • Expressway
  • Fence
  • Grading and Paving
  • Guard Railing
  • Highway Planting
  • Remove Irrigation System
  • Lighting
  • Overhead
  • Pavements Markers
  • Pavements Markings
  • Realignment
  • Roadway
  • Rock Slope Protection
  • Seal Coat
  • Signs
  • Slurry Seal Coat
  • Widening
  • Wing Wall
Quantity of Major Highway Items
17900
26300
28100
18300
91700
Major Structure Items
383721
2758