6
KIN
5
9.0/16.5
SHOPP
0P180_
NEAR KETTLEMAN CITY FORM 3.3 MILES SOUTH OF UTICA AVE OC TO JCT 41.
OVERLAY 2R
10 – 20
130
August 2014
With this project, the existing top 0.35' layer of travel-way and 0.20' layer of shoulder AC pavement will be cold planed and replaced with 0.35' and 0.2' layer of Hot Mixed Asphalt, Superpave (Type A) respectively. The failed existing underlying PCC panels in the trave-way as listed in the attachment will be removed and replaced with full depth HMA Superpave (Type A). Then entire pavement will be capped with 0.20' Rubberized Hot Mix Asphalt, Superpave (Gap Graded).
Types of Work
  • Asphalt Concrete Surfacing
  • Modify Concrete Barrier
  • Electrical Facilities
  • Freeway and Structures
  • Grading and Paving
  • Replace Guard Railing
  • Pavements Markings
  • Repair Ramp
  • Rehabilitate Pavement
  • Repair Storm Damage
  • Replace PCC Pavement
  • Seal Cracks
Quantity of Major Highway Items
130900
4670
0
0
0
Major Structure Items
0
0